SlideShare una empresa de Scribd logo
1 de 17
CPSC PGA Message Set
& Certificate Registry Proposed
Alpha Pilot Overview
US Customs and Border Protection
(CBP)
COAC Webinar – March 26, 2015
This presentation was prepared by CPSC staff, has not been
reviewed or approved by, and may not reflect the views of, the
Commission.
 This is the second in a series of three public CBP
and CPSC Webinars
 The first webinar (March 12):
 Reviewed certificate requirements for regulated
products:
 CPC – children’s products
 GCC – other regulated products
 Introduced the CPSC Alpha Pilot
2
Welcome
 A two-pronged approach to electronic data
collection of importer certificate data
 Full Certificate PGA Message Set or
 Reference Certificate PGA Message Set
with CPSC Certificate Registry
3
Review: the e-Filing Alpha Pilot
 A way to test
implementation of e-filing
in proposed 1110 rule
 Electronic submission of
certificates at entry
 Using data elements from
proposed 1110.11.
 Key themes of these questions
include:
 When is a certificate required?
 Practical issues with filing
electronic certificates
 How will the certificate registry
work?
 Alpha Pilot timeline
4
March 12 Webinar Questions
The first webinar can be viewed here:
http://dhs.adobeconnect.com/p6kuisnvqqn/
 There were 76 questions asked during the March 12
webinar
 A way to file product certificates at time of entry
filing
 Full set of certificate data filed via the PGA
Message Set with each entry line
5
Full Certificate PGA Message Set
6
Full Certificate PGA Message Set
 A way to pre-file a product certificate in the
CPSC Certificate Registry in advance of entry
filing
 Limits (but does not eliminate) the amount of data
required to be filed via the PGA Message Set with
each entry line
7
Reference Certificate PGA Message
Set
8
Reference Certificate PGA Message
Set
Project
Preparation
Participant
Recruiting
&
Onboarding
Pilot Definition and Development
Projected Alpha Pilot Timeline
Alpha Pilot LIVE
Stakeholder Input
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2015 2016
Jun
Project
Preparation
Participant
Recruiting
&
Onboarding
Pilot Definition and Development
Projected Alpha Pilot Timeline
Alpha Pilot LIVE
Stakeholder Input
• Define Alpha Pilot concepts
• Review comments from 1110 rule
workshop
• Prepare initial project documentation
• Begin to define technical solution
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2015 2016
Jun
Project
Preparation
Participant
Recruiting
&
Onboarding
Pilot Definition and Development
Projected Alpha Pilot Timeline
Alpha Pilot LIVE
Stakeholder Input
• Federal Register Notice
• COAC meetings
• TSN presentation
• Select and onboard participants
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2015 2016
Jun
Project
Preparation
Participant
Recruiting
&
Onboarding
Pilot Definition and Development
Projected Alpha Pilot Timeline
Alpha Pilot LIVE
Stakeholder Input
• Alpha Pilot solution discussions with
participants
• Finalize Alpha Pilot details
• Develop technical solution (CPSC,
CBP and Alpha Pilot participants)
• Unit and Integration testing
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2015 2016
Jun
Project
Preparation
Participant
Recruiting
&
Onboarding
Pilot Definition and Development
Projected Alpha Pilot Timeline
Alpha Pilot LIVE
Stakeholder Input
Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May
2015 2016
• Go-live of Full
PGA Message Set
• Go-live of CPSC
Certificate Registry
• Approximately 3-6
months
• Alpha Pilot
Jun
 Identify issues or problems, as well as any proposed
solutions, that the trade foresees in implementing
the concept for the alpha pilot:
 How should we deal with multiple certificates for one product or
one line entry?
 How should we handle importing from an FTZ?
 How should we handle entries with HTS codes that may or may
not require a certificate?
 Should the registry assign certificate identifiers, or would firms
prefer to use their own, or should the system be flexible enough to
allow either approach?
 How far in advance do certificates need to be filed before filing an
entry in ACE?
14
COAC Working Group Feedback
 What else should CPSC be thinking about as we move
forward with the PGA and Registry concept for the pilot
as laid out for you?
 What kinds of issues will CPSC face in normalizing data
entry across multiple products?
 What expectations and requirements do importers that
will use a registry concept have for the application?
 With regard to the Trusted Trader program, staff is
interested in stakeholder ideas, but it is unlikely that we
can incorporate Trusted Trader ideas into an alpha pilot,
where we are testing the proposed rule. Such input
could be considered down the road, if we start planning
for a beta pilot. 15
COAC Working Group Feedback
16
Q & A
• Existing and proposed 16 C.F.R. part 1110
• Testing and certification resources
• Links to CPSC-accepted testing laboratories,
guidance on testing and certification
requirements (including certificates), and other
resources
• CPSC Business education page
• Guide to complying with CPSC regulations
• COAC Webinar May 12, 2015
• CPSC E-Filing Workshop September 18, 2014
17
Contact CBP
Traderelations@cbp.dhs.gov

Más contenido relacionado

La actualidad más candente

Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th January
UKTI2014
 
CE Presentation
CE Presentation CE Presentation
CE Presentation
Intertek CE
 

La actualidad más candente (20)

CPSC Toy Fair Presentation - Third Party Testing Rules for Children's Product...
CPSC Toy Fair Presentation - Third Party Testing Rules for Children's Product...CPSC Toy Fair Presentation - Third Party Testing Rules for Children's Product...
CPSC Toy Fair Presentation - Third Party Testing Rules for Children's Product...
 
2013 Compliance with Mandatory Reporting Requirements, Regulatory Violations,...
2013 Compliance with Mandatory Reporting Requirements, Regulatory Violations,...2013 Compliance with Mandatory Reporting Requirements, Regulatory Violations,...
2013 Compliance with Mandatory Reporting Requirements, Regulatory Violations,...
 
ICPHSO 2014 Advanced Compliance Course
ICPHSO 2014 Advanced Compliance CourseICPHSO 2014 Advanced Compliance Course
ICPHSO 2014 Advanced Compliance Course
 
ICPHSO CPSC PORT to PORT
ICPHSO CPSC PORT to PORTICPHSO CPSC PORT to PORT
ICPHSO CPSC PORT to PORT
 
Recalls in the US
Recalls in the USRecalls in the US
Recalls in the US
 
Laboratory Application Process (English)
Laboratory Application Process (English)Laboratory Application Process (English)
Laboratory Application Process (English)
 
2012 Safety Academy: Section 6(b) of the CPSA
2012 Safety Academy: Section 6(b) of the CPSA2012 Safety Academy: Section 6(b) of the CPSA
2012 Safety Academy: Section 6(b) of the CPSA
 
Colin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th JanuaryColin Bird. Doosan Babcock. 29th January
Colin Bird. Doosan Babcock. 29th January
 
Regulatory Enforcement: An Introduction & Refresher, with 2014 Updates
Regulatory Enforcement: An Introduction & Refresher, with 2014 UpdatesRegulatory Enforcement: An Introduction & Refresher, with 2014 Updates
Regulatory Enforcement: An Introduction & Refresher, with 2014 Updates
 
2012 Safety Academy: Compliance Overview
2012 Safety Academy: Compliance Overview2012 Safety Academy: Compliance Overview
2012 Safety Academy: Compliance Overview
 
Australia medical device registration and approval process - EMERGO
Australia medical device registration and approval process - EMERGOAustralia medical device registration and approval process - EMERGO
Australia medical device registration and approval process - EMERGO
 
Europe IVD medical registration and approval chart - EMERGO
Europe IVD medical registration and approval chart - EMERGOEurope IVD medical registration and approval chart - EMERGO
Europe IVD medical registration and approval chart - EMERGO
 
Colombia medical device approval chart - Emergo
Colombia  medical device approval chart - Emergo Colombia  medical device approval chart - Emergo
Colombia medical device approval chart - Emergo
 
ICPHSO 2013 consumer products, 6b, and the CPSC
ICPHSO 2013 consumer products, 6b, and the CPSCICPHSO 2013 consumer products, 6b, and the CPSC
ICPHSO 2013 consumer products, 6b, and the CPSC
 
Implementing a Global Unique Device Identification (UDI) Solution: Regional U...
Implementing a Global Unique Device Identification (UDI) Solution: Regional U...Implementing a Global Unique Device Identification (UDI) Solution: Regional U...
Implementing a Global Unique Device Identification (UDI) Solution: Regional U...
 
Medical device approval chart for Mexico - Emergo
Medical device approval chart for Mexico - Emergo Medical device approval chart for Mexico - Emergo
Medical device approval chart for Mexico - Emergo
 
Automated Requirements-Based Testing for Medical Device Software
Automated Requirements-Based Testing for Medical Device SoftwareAutomated Requirements-Based Testing for Medical Device Software
Automated Requirements-Based Testing for Medical Device Software
 
Automating Test Maintenance as Code and Requirements Change
Automating Test Maintenance as Code and Requirements ChangeAutomating Test Maintenance as Code and Requirements Change
Automating Test Maintenance as Code and Requirements Change
 
EPCS Overview
EPCS OverviewEPCS Overview
EPCS Overview
 
CE Presentation
CE Presentation CE Presentation
CE Presentation
 

Similar a COAC Presentation March 26 2015

Adapters and API Strategy at LeisureLink 2015-2016
Adapters and API Strategy at LeisureLink 2015-2016Adapters and API Strategy at LeisureLink 2015-2016
Adapters and API Strategy at LeisureLink 2015-2016
Keith Klundt
 

Similar a COAC Presentation March 26 2015 (20)

Free and Open Source Software - Challenges for the Automotive Supply Chain
Free and Open Source Software - Challenges for the Automotive Supply ChainFree and Open Source Software - Challenges for the Automotive Supply Chain
Free and Open Source Software - Challenges for the Automotive Supply Chain
 
Integrating SAP with codeBeamer ALM for Traceability and Data Consistency
Integrating SAP with codeBeamer ALM for Traceability and Data ConsistencyIntegrating SAP with codeBeamer ALM for Traceability and Data Consistency
Integrating SAP with codeBeamer ALM for Traceability and Data Consistency
 
How to Build & Execute Successful Roadmaps by Amazon Sr PM
How to Build & Execute Successful Roadmaps by Amazon Sr PMHow to Build & Execute Successful Roadmaps by Amazon Sr PM
How to Build & Execute Successful Roadmaps by Amazon Sr PM
 
Adapters and API Strategy at LeisureLink 2015-2016
Adapters and API Strategy at LeisureLink 2015-2016Adapters and API Strategy at LeisureLink 2015-2016
Adapters and API Strategy at LeisureLink 2015-2016
 
CTI Pilot-site Partner Orientation November 2015
CTI Pilot-site Partner Orientation November 2015CTI Pilot-site Partner Orientation November 2015
CTI Pilot-site Partner Orientation November 2015
 
IT NPI Process
IT NPI ProcessIT NPI Process
IT NPI Process
 
TL 9000 Measurements and Requirements Interactive Workshop
TL 9000 Measurements and Requirements Interactive WorkshopTL 9000 Measurements and Requirements Interactive Workshop
TL 9000 Measurements and Requirements Interactive Workshop
 
DC Buys 2018 - Information Technology (IT Pipeline) - Full Presentation (Apri...
DC Buys 2018 - Information Technology (IT Pipeline) - Full Presentation (Apri...DC Buys 2018 - Information Technology (IT Pipeline) - Full Presentation (Apri...
DC Buys 2018 - Information Technology (IT Pipeline) - Full Presentation (Apri...
 
Implementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project ManagementImplementation of ShipManagement Systems Project Management
Implementation of ShipManagement Systems Project Management
 
Shipmanagement System Selection Process
Shipmanagement System Selection ProcessShipmanagement System Selection Process
Shipmanagement System Selection Process
 
Capfy09 Presentation V12
Capfy09 Presentation V12Capfy09 Presentation V12
Capfy09 Presentation V12
 
Podcast movement 2018 - A look into the Podcast Measurement Guidelines
Podcast movement 2018 - A look into the Podcast Measurement GuidelinesPodcast movement 2018 - A look into the Podcast Measurement Guidelines
Podcast movement 2018 - A look into the Podcast Measurement Guidelines
 
Credential Transparency Initiative Overview Webinar - November 17, 2015
Credential Transparency Initiative Overview Webinar - November 17, 2015Credential Transparency Initiative Overview Webinar - November 17, 2015
Credential Transparency Initiative Overview Webinar - November 17, 2015
 
The Why, Where and How of Service Virtualization Adoption
The Why, Where and How of Service Virtualization AdoptionThe Why, Where and How of Service Virtualization Adoption
The Why, Where and How of Service Virtualization Adoption
 
Firehost Webinar: Validating your Cardholder Data Envirnment
Firehost Webinar: Validating your Cardholder Data EnvirnmentFirehost Webinar: Validating your Cardholder Data Envirnment
Firehost Webinar: Validating your Cardholder Data Envirnment
 
UK Conference 2018_Boost up your Oracle audit defence_Richard Spithoven & Cat...
UK Conference 2018_Boost up your Oracle audit defence_Richard Spithoven & Cat...UK Conference 2018_Boost up your Oracle audit defence_Richard Spithoven & Cat...
UK Conference 2018_Boost up your Oracle audit defence_Richard Spithoven & Cat...
 
Requirements Engineering: A Practicum
Requirements Engineering: A PracticumRequirements Engineering: A Practicum
Requirements Engineering: A Practicum
 
Value Stream Mapping – Stories From the Trenches
Value Stream Mapping – Stories From the TrenchesValue Stream Mapping – Stories From the Trenches
Value Stream Mapping – Stories From the Trenches
 
PolicyPLUS PCMH Series, Webinar 4 - Finishing Strong
PolicyPLUS PCMH Series, Webinar 4 - Finishing StrongPolicyPLUS PCMH Series, Webinar 4 - Finishing Strong
PolicyPLUS PCMH Series, Webinar 4 - Finishing Strong
 
Virtual Dreamin Salesforce DevOps Top 10
Virtual Dreamin Salesforce DevOps Top 10Virtual Dreamin Salesforce DevOps Top 10
Virtual Dreamin Salesforce DevOps Top 10
 

Más de U.S. Consumer Product Safety Commission

Más de U.S. Consumer Product Safety Commission (20)

Off-Highway Vehicle (OHV) Fire and Debris Penetration Hazard Voluntary Standards
Off-Highway Vehicle (OHV) Fire and Debris Penetration Hazard Voluntary StandardsOff-Highway Vehicle (OHV) Fire and Debris Penetration Hazard Voluntary Standards
Off-Highway Vehicle (OHV) Fire and Debris Penetration Hazard Voluntary Standards
 
Compliance Program Seminar - Panel 3 - Role of Trade Associations in Program ...
Compliance Program Seminar - Panel 3 - Role of Trade Associations in Program ...Compliance Program Seminar - Panel 3 - Role of Trade Associations in Program ...
Compliance Program Seminar - Panel 3 - Role of Trade Associations in Program ...
 
Compliance Program Seminar - Panel 2 - Compliance Program Development at Walmart
Compliance Program Seminar - Panel 2 - Compliance Program Development at WalmartCompliance Program Seminar - Panel 2 - Compliance Program Development at Walmart
Compliance Program Seminar - Panel 2 - Compliance Program Development at Walmart
 
Compliance Program Seminar - Panel 1 - Develop a Compliance Program
Compliance Program Seminar - Panel 1 - Develop a Compliance ProgramCompliance Program Seminar - Panel 1 - Develop a Compliance Program
Compliance Program Seminar - Panel 1 - Develop a Compliance Program
 
Panel 4 - Stakeholders' Perspectives (Spanish)
Panel 4 - Stakeholders' Perspectives (Spanish)Panel 4 - Stakeholders' Perspectives (Spanish)
Panel 4 - Stakeholders' Perspectives (Spanish)
 
Panel 4 - Stakeholders' Perspective - North America Consumer Product Safety S...
Panel 4 - Stakeholders' Perspective - North America Consumer Product Safety S...Panel 4 - Stakeholders' Perspective - North America Consumer Product Safety S...
Panel 4 - Stakeholders' Perspective - North America Consumer Product Safety S...
 
Panel 3 - Baterias de lones de Litio de Alta Energia
Panel 3 - Baterias de lones de Litio de Alta EnergiaPanel 3 - Baterias de lones de Litio de Alta Energia
Panel 3 - Baterias de lones de Litio de Alta Energia
 
Panel 3 - High Energy Lithium Ion Batteries - North America Consumer Product ...
Panel 3 - High Energy Lithium Ion Batteries - North America Consumer Product ...Panel 3 - High Energy Lithium Ion Batteries - North America Consumer Product ...
Panel 3 - High Energy Lithium Ion Batteries - North America Consumer Product ...
 
Panel 2 - E-Commerce (Spanish)
Panel 2 - E-Commerce (Spanish)Panel 2 - E-Commerce (Spanish)
Panel 2 - E-Commerce (Spanish)
 
Panel 2 - E-Commerce - North America Consumer Product Safety Summit
Panel 2 - E-Commerce - North America Consumer Product Safety SummitPanel 2 - E-Commerce - North America Consumer Product Safety Summit
Panel 2 - E-Commerce - North America Consumer Product Safety Summit
 
Panel 1 - Cooperacion en America del Norte CPSC, Health Canada y PROFECO Grup...
Panel 1 - Cooperacion en America del Norte CPSC, Health Canada y PROFECO Grup...Panel 1 - Cooperacion en America del Norte CPSC, Health Canada y PROFECO Grup...
Panel 1 - Cooperacion en America del Norte CPSC, Health Canada y PROFECO Grup...
 
Panel 1 - North American Cooperation US Consumer Product Safety Commission, H...
Panel 1 - North American Cooperation US Consumer Product Safety Commission, H...Panel 1 - North American Cooperation US Consumer Product Safety Commission, H...
Panel 1 - North American Cooperation US Consumer Product Safety Commission, H...
 
Import Surveillance Overview - 2017
Import Surveillance Overview - 2017Import Surveillance Overview - 2017
Import Surveillance Overview - 2017
 
The Import Cargo Examination Process - 2017
The Import Cargo Examination Process - 2017The Import Cargo Examination Process - 2017
The Import Cargo Examination Process - 2017
 
CPSC Recall Effectiveness Workshop: Goals for CPSC Recall Press Releases
CPSC Recall Effectiveness Workshop: Goals for CPSC Recall Press ReleasesCPSC Recall Effectiveness Workshop: Goals for CPSC Recall Press Releases
CPSC Recall Effectiveness Workshop: Goals for CPSC Recall Press Releases
 
CPSC Recall Effectiveness Workshop Agenda
CPSC Recall Effectiveness Workshop AgendaCPSC Recall Effectiveness Workshop Agenda
CPSC Recall Effectiveness Workshop Agenda
 
CPSC Recall Effectiveness Workshop: Recall Data
CPSC Recall Effectiveness Workshop: Recall DataCPSC Recall Effectiveness Workshop: Recall Data
CPSC Recall Effectiveness Workshop: Recall Data
 
CPSC Recall Effectiveness Workshop: Recall Process
CPSC Recall Effectiveness Workshop: Recall ProcessCPSC Recall Effectiveness Workshop: Recall Process
CPSC Recall Effectiveness Workshop: Recall Process
 
Children's Sleepwear Seminar - 12/2/2016
Children's Sleepwear Seminar - 12/2/2016Children's Sleepwear Seminar - 12/2/2016
Children's Sleepwear Seminar - 12/2/2016
 
PPPA Workshop Certification - 2016
PPPA Workshop Certification - 2016PPPA Workshop Certification - 2016
PPPA Workshop Certification - 2016
 

Último

Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
ScottMeyers35
 

Último (20)

Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
NGO working for orphan children’s education
NGO working for orphan children’s educationNGO working for orphan children’s education
NGO working for orphan children’s education
 
World Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - PosterWorld Press Freedom Day 2024; May 3rd - Poster
World Press Freedom Day 2024; May 3rd - Poster
 
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...Just Call VIP Call Girls In  Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
Just Call VIP Call Girls In Bangalore Kr Puram ☎️ 6378878445 Independent Fem...
 
Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
31st World Press Freedom Day - A Press for the Planet: Journalism in the face...
 
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Haldia [ 7014168258 ] Call Me For Genuine Models We...
 
2024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 312024: The FAR, Federal Acquisition Regulations, Part 31
2024: The FAR, Federal Acquisition Regulations, Part 31
 
Competitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptxCompetitive Advantage slide deck___.pptx
Competitive Advantage slide deck___.pptx
 
A Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental CrisisA Press for the Planet: Journalism in the face of the Environmental Crisis
A Press for the Planet: Journalism in the face of the Environmental Crisis
 
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition PlansSustainability by Design: Assessment Tool for Just Energy Transition Plans
Sustainability by Design: Assessment Tool for Just Energy Transition Plans
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.2024 UN Civil Society Conference in Support of the Summit of the Future.
2024 UN Civil Society Conference in Support of the Summit of the Future.
 
tOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTRtOld settlement register shouldnotaffect BTR
tOld settlement register shouldnotaffect BTR
 
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
 
2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize2024 UNESCO/Guillermo Cano World Press Freedom Prize
2024 UNESCO/Guillermo Cano World Press Freedom Prize
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
 

COAC Presentation March 26 2015

  • 1. CPSC PGA Message Set & Certificate Registry Proposed Alpha Pilot Overview US Customs and Border Protection (CBP) COAC Webinar – March 26, 2015 This presentation was prepared by CPSC staff, has not been reviewed or approved by, and may not reflect the views of, the Commission.
  • 2.  This is the second in a series of three public CBP and CPSC Webinars  The first webinar (March 12):  Reviewed certificate requirements for regulated products:  CPC – children’s products  GCC – other regulated products  Introduced the CPSC Alpha Pilot 2 Welcome
  • 3.  A two-pronged approach to electronic data collection of importer certificate data  Full Certificate PGA Message Set or  Reference Certificate PGA Message Set with CPSC Certificate Registry 3 Review: the e-Filing Alpha Pilot  A way to test implementation of e-filing in proposed 1110 rule  Electronic submission of certificates at entry  Using data elements from proposed 1110.11.
  • 4.  Key themes of these questions include:  When is a certificate required?  Practical issues with filing electronic certificates  How will the certificate registry work?  Alpha Pilot timeline 4 March 12 Webinar Questions The first webinar can be viewed here: http://dhs.adobeconnect.com/p6kuisnvqqn/  There were 76 questions asked during the March 12 webinar
  • 5.  A way to file product certificates at time of entry filing  Full set of certificate data filed via the PGA Message Set with each entry line 5 Full Certificate PGA Message Set
  • 7.  A way to pre-file a product certificate in the CPSC Certificate Registry in advance of entry filing  Limits (but does not eliminate) the amount of data required to be filed via the PGA Message Set with each entry line 7 Reference Certificate PGA Message Set
  • 9. Project Preparation Participant Recruiting & Onboarding Pilot Definition and Development Projected Alpha Pilot Timeline Alpha Pilot LIVE Stakeholder Input Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2015 2016 Jun
  • 10. Project Preparation Participant Recruiting & Onboarding Pilot Definition and Development Projected Alpha Pilot Timeline Alpha Pilot LIVE Stakeholder Input • Define Alpha Pilot concepts • Review comments from 1110 rule workshop • Prepare initial project documentation • Begin to define technical solution Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2015 2016 Jun
  • 11. Project Preparation Participant Recruiting & Onboarding Pilot Definition and Development Projected Alpha Pilot Timeline Alpha Pilot LIVE Stakeholder Input • Federal Register Notice • COAC meetings • TSN presentation • Select and onboard participants Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2015 2016 Jun
  • 12. Project Preparation Participant Recruiting & Onboarding Pilot Definition and Development Projected Alpha Pilot Timeline Alpha Pilot LIVE Stakeholder Input • Alpha Pilot solution discussions with participants • Finalize Alpha Pilot details • Develop technical solution (CPSC, CBP and Alpha Pilot participants) • Unit and Integration testing Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2015 2016 Jun
  • 13. Project Preparation Participant Recruiting & Onboarding Pilot Definition and Development Projected Alpha Pilot Timeline Alpha Pilot LIVE Stakeholder Input Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr May 2015 2016 • Go-live of Full PGA Message Set • Go-live of CPSC Certificate Registry • Approximately 3-6 months • Alpha Pilot Jun
  • 14.  Identify issues or problems, as well as any proposed solutions, that the trade foresees in implementing the concept for the alpha pilot:  How should we deal with multiple certificates for one product or one line entry?  How should we handle importing from an FTZ?  How should we handle entries with HTS codes that may or may not require a certificate?  Should the registry assign certificate identifiers, or would firms prefer to use their own, or should the system be flexible enough to allow either approach?  How far in advance do certificates need to be filed before filing an entry in ACE? 14 COAC Working Group Feedback
  • 15.  What else should CPSC be thinking about as we move forward with the PGA and Registry concept for the pilot as laid out for you?  What kinds of issues will CPSC face in normalizing data entry across multiple products?  What expectations and requirements do importers that will use a registry concept have for the application?  With regard to the Trusted Trader program, staff is interested in stakeholder ideas, but it is unlikely that we can incorporate Trusted Trader ideas into an alpha pilot, where we are testing the proposed rule. Such input could be considered down the road, if we start planning for a beta pilot. 15 COAC Working Group Feedback
  • 16. 16 Q & A • Existing and proposed 16 C.F.R. part 1110 • Testing and certification resources • Links to CPSC-accepted testing laboratories, guidance on testing and certification requirements (including certificates), and other resources • CPSC Business education page • Guide to complying with CPSC regulations • COAC Webinar May 12, 2015 • CPSC E-Filing Workshop September 18, 2014

Notas del editor

  1. …and now we will use examples to help provide clarity to some of the questions that we received.