SlideShare una empresa de Scribd logo
1 de 13
Descargar para leer sin conexión
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 1
Institutional and Informal Framework:
Policies, Plans and Initiatives Background
FRAMEWORK FOR ANALYSIS
Prepared by: Urban Planning Institute
of the Republic of Slovenia
Central European Institute
of Technology ALANOVA
Reviewed by: STATUS Content Management Urbasofia
www.urbasofia.eu
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 2
Project number: SEE/D/0297/4.1/X
Project acronym: STATUS
Project title: Strategic Territorial Agendas for "Small and Middle-Sized Towns" Urban
Systems
Instrument: INTERREG IV B SEE
Call identifier: South East Europe Call D
Authorship
Barbara Music (UIRS), Bostjan Cotic (UIRS), Pietro Elisei (URBASOFIA), Sabina Dimitriu (URBASOFIA)
Review
Pietro Elisei (URBASOFIA), Sabina Dimitriu (URBASOFIA)
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 3
Table of Contents
Table of Contents......................................................................................................................... 3
Abbreviation List...................................................................................................................................... 4
1 Summary of WP3 .................................................................................................................. 5
2 Brief overview of activities .................................................................................................... 6
3 Introduction.......................................................................................................................... 7
4 Planning instruments and historical background .................................................................... 8
5 Methodology for the analysis of planning documents ............................................................ 8
6 Conclusions..........................................................................................................................11
7 References...........................................................................................................................12
Annexes......................................................................................................................................13
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 4
Abbreviation List
CKP - cities knowledge platform
ST/UA - Strategic Territorial/Urban Agendas
TP – Territorial Partner
SEE – South Eastern Europe
SWOT - Strengths, Weaknesses, Opportunities and Threats
UC – Urban Centers
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 5
1 Summary of WP3
The aim of WP 3 as an inception phase is characterized by different activities, analytical and cognitive
ones, to achieve the objectives of STATUS project like:
 tackling the problem of incoherent urban and regional development in SEE,
 developing place-based strategies by different participatory planning tools,
 reducing the widening development gap of SEE cities,
 guiding and supporting Territorial Partners to develop a sustainable and Strategic Territorial/
Urban Agendas (ST/UA), Urban Centers (UC) and the SEE cities knowledge platform (CKP).
Different methods of qualitative analyses (like stakeholder analyses in report 3.1.) and SWOT analysis
will be used not just in terms of networking but also as an opportunity for achieving a more in depth
knowledge of the state of the art of local urban issues. At the end all these activities they will provide
a clear framework of available data, current planning tools and pool of local actors characterizing the
partner cities planning areas.
WP 3 Inception consists of two main activities:
Activity 3.1.
Collecting data and identifying actors
Activity 3.2.
Analysis of current urban plans and policies in involved territories
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 6
2 Brief overview of activities
Figure 1: Overview of activity, own graphic
Activity 3.2. Analyses of current urban plans and policies in involved territories
Subactivity 3.2.1.
Preparing report on policies
and plans of involved
partner
Subactivity 3.2.2.
Preparing report on key
features of investigated
policies/ plans
Subactivity 3.2.3.
Atlas of plan and policies on
GIS DB (open source/ open
content)
Activity will focus on major
planning instruments
(plans and policies at
different institutional level-
from national planning acts
until local urban policies),
level of integration and
capability of making synergy
of these different tools is
going to be investigated and
even the link between
policy design and decision
makers are going to be
examined.
responsible PP: UIRS
other PP involved: CEIT, other
PP
from Sep.- Oct. 2013
• Preparing report on
policies and plans of
involved partners (1x)
• responsible PP: UIRS;
other PP: CEIT
from Sep. – Oct. 2013
Output 3.6.
responsible PP: UIRS
other PP involved: CEIT, other PP
from Nov.- Dec. 2013
responsible PP: CEIT
other PP involved: Fundazione
Graphitech
from Nov.- Dec. 2013
The report discuses the
incipient stage of policies
and plans used in the target
area for the Strategic
Territorial Agenda.
Once the policies and plans
have been identified, analysis
will be performed in order to
define the analogies,
differences, synergies and
dissonants.
An Atlas of plans and
policies, generated on GIS
DB, is going to be designed
and put online, using open
source software and
applying open content
principles in its design: 10
policy/plans atlas are going
to be generated at project
scale.
Output 3.7.
Output 3.5.
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 7
3 Introduction
This report is a state of the art inventarisation of institutional and informal framework of territorial
partners in STATUS project. It will be a base for analysis and comparison of territorial partner legal
framework that will be provided by UIRS and CEIT Alanova in an output 3.5. Report on policies and
plans of involved territorial partners.
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 8
4 Planning instruments and historical
background
For every territorial partner, major plans and policies operated in the selected area in the last 20
years, or currently operational, are reported.
Territorial partners:
1. Municipality of Kavala (GR)
2. Municipality of Alba Iulia (RO)
3. Baia Mare Metropolitan Area (RO)
4. Province of Foggia (I)
5. Municipality of Schwechat (AT)
6. Abruzzo Region (I)
7. Municipality of Satu Mare (RO)
8. Municipality of Drama (GR)
9. Municipality of Herceg Novi (MNE)
10. Municipality of Temerin (RS)
5 Methodology for the analysis of planning
documents
This section will be aimed at outlining a methodology for the critical analysis of plans and policies,
based on a set of criteria and methodological tools such as the SWOT analysis, PEST, etc.
The section will be developed by CEIT and UIRS.
Questionnaire for Territorial Partners
1. Short description of the whole administrative structure of the state
a. Check results of the Plurel project (attached, please note that Plurel report is dated in
2010, so it may be outdated for some countries with recent changes in legislation!)
b. max. 2 A4 pages
c. add graphic (maps, illustrations, check the attached sample made by Sabina.) and
insert them appropriate for word documents (no big files)
2. Short description of a planning system
a. Check the description of the Municipality of Schwechat
b. max. 2 A4 pages
c. add graphic (maps, illustrations please check the attached sample for Austria, made
by CEIT) and insert them appropriate for word documents (no big files)
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 9
3. History of planning instruments, polices and plans
a. before current legislation and plans
b. Check the description of the Municipality of Kavala
c. max. 2 A4 page
d. add graphic (maps, illustrations, etc.) and insert them appropriate for word
documents (no big files)
4. Current planning instruments, policies and plans on different administrative levels with
short description of each
National level
State level
Regional level
Province level
Municipal level
Add missing level if exist
Describe doc, scale and what they regulate
5. Detailed description of the impact of the most important planning plans, instruments and
policies on the area of intervention
Administrative level Name of the
document
Define:
formal or
informal
document
Positive
impact on
the area of
intervention
Negative
impact on
the area of
intervention
National level Regulator
dpdv
legislativ
sau directii
strategice
Preferinta
din punct de
vedere a
bugetului
Limitari
geografic sau
administrativ
State level
Regional level
Province level
Municipal level
Add missing level if
exist
6. Do you already know if you will need to change existing or prepare new formal documents,
if so, which ones – explain what docs are about and what relevance it has for the city.
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 10
7. Addition information you feel you need to add to clarify the current situation
Samples for the graphics for the chapter 1: Short description of the whole administrative structure
of the state
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 11
6 Conclusions
Assessing the coherence of the first proposal coming from TPs, with the instruments’ backgrounds.
Conclusions will provide suggestions for future planning attitudes to keep.
Structogram of the levels and instruments of the Austrian spatial planning system
functional Europe national state (province) (9) local (2356 municipalities)
Europe
national
state (province) (9)
regional
local (2356 municipalities)
Coordination by ÖROK, political guidelines (collective resolution of several partners on the national and province level)
Legally binding directives by laws, enactments and ordinances
zoning plan for built up and being
developed land (1:1.000, 500)
sectoral plans and concepts by federal
authorities (ministeries, e.g. flood
protection, transport infrastructure,
energy)
EUREK
guidelines
general spatial development concept
spatial development program
regional development program
regional development program on
specific themes ( flood protection,
technical or social infrastructure...)
local/spatial development plan for the
whole municipality (1:10.000)
administrative
ÖROK - Austrian Conference on Spatial Planning
maln publication: Österreichisches Raumentwicklungskonzept 2001
Austrian Spatial Development Concept 2001, next update 2011
land use plan for the whole
municipality (1:5.000)
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 12
7 References
Businessballs personal and organisational development website (2013) [Online], Available:
http://www.businessballs.com/swotanalysisfreetemplate.htm], 26.08.2013
European Commission (2011) Territorial Agenda of the European Union 2020, Towards an Inclusive,
Smart and Sustainable Europe of Diverse Regions [Online], Available: http://www.eu-territorial-
agenda.eu/Reference%20Documents/Final%20TA2020.pdf, 23.10.2013.
Gerhard Larsson (2006) Spatial planning systems in Western Europe: An overview, Amsterdam.
Joint research center of the European Commission (2013) online foresight guide, [Online], Available:
http://forlearn.jrc.ec.europa.eu/guide/4_methodology/meth_swot-analysis.htm, 26.08.2013
Strategic management insight (2013) [Online], Available:
http://www.strategicmanagementinsight.com/tools/pest-pestel-analysis.html, 15.08.2013
United Nations (2008) Spatial Planning, Key Instrument for Development and Effective Governance
with Special Reference to Countries in Transition, Geneva.
Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives
Background 13
Annexes
ANNEX 1 – Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Municipality of Kavala (GR)
ANNEX 2 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Municipality of Alba Iulia (RO)
ANNEX 3 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Baia Mare Metropolitan Area (RO)
ANNEX 4 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Province of Foggia (I)
ANNEX 5 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Municipality of Schwechat (AT)
ANNEX 6 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Abruzzo Region (I)
ANNEX 7 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Municipality of Satu Mare (RO)
ANNEX 8 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Municipality of Drama (GR)
ANNEX 9 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Municipality of Herceg Novi (MNE)
ANNEX 10 - Institutional and Informal Framework: Policies, Plans and
Initiatives Background of the Municipality of Temerin (RS)

Más contenido relacionado

La actualidad más candente (7)

Analysing District Plans
Analysing District PlansAnalysing District Plans
Analysing District Plans
 
Kyiv School of Economics
Kyiv School of EconomicsKyiv School of Economics
Kyiv School of Economics
 
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
NDGISUC2017 - Introduction to the Boundary and Annexation Survey (BAS)
 
"NAtional Bureau os Statistics Core Role for National Statistical System"
"NAtional Bureau os Statistics Core Role for National Statistical System""NAtional Bureau os Statistics Core Role for National Statistical System"
"NAtional Bureau os Statistics Core Role for National Statistical System"
 
Victor Podorozhnyi
Victor PodorozhnyiVictor Podorozhnyi
Victor Podorozhnyi
 
Sectoral Working Ggoup
Sectoral Working GgoupSectoral Working Ggoup
Sectoral Working Ggoup
 
Helping Entrepreneurs: Getting the Most out of Government Information
Helping Entrepreneurs: Getting the Most out of Government InformationHelping Entrepreneurs: Getting the Most out of Government Information
Helping Entrepreneurs: Getting the Most out of Government Information
 

Similar a STATUS Plan and policy analysis framework

Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
KSI Koniag
 
Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
Koniag
 
D2.3 Inspire Requirements Analysis
D2.3 Inspire Requirements AnalysisD2.3 Inspire Requirements Analysis
D2.3 Inspire Requirements Analysis
plan4all
 
Cesar working document 7 urban strategy experiment 5
Cesar working document 7 urban strategy experiment 5Cesar working document 7 urban strategy experiment 5
Cesar working document 7 urban strategy experiment 5
Marco
 
George Chabrzyk
George ChabrzykGeorge Chabrzyk
George Chabrzyk
PPF5Serbia
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
Bayar Tsend
 
2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp
Alberto Mico
 

Similar a STATUS Plan and policy analysis framework (20)

Municipal periodic plan in nepalese context [compatibility mode]
Municipal periodic plan in nepalese context [compatibility mode]Municipal periodic plan in nepalese context [compatibility mode]
Municipal periodic plan in nepalese context [compatibility mode]
 
DPS and CPT eXplorer: connecting data & policy
DPS and CPT eXplorer: connecting data & policyDPS and CPT eXplorer: connecting data & policy
DPS and CPT eXplorer: connecting data & policy
 
Urban Planning Studio Project Orientation.pptx
Urban Planning Studio Project Orientation.pptxUrban Planning Studio Project Orientation.pptx
Urban Planning Studio Project Orientation.pptx
 
Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
 
Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010Lewis tftn fgdccg_08102010
Lewis tftn fgdccg_08102010
 
Enhancing budget literacy in Russia: Approaches, latest developments and firs...
Enhancing budget literacy in Russia: Approaches, latest developments and firs...Enhancing budget literacy in Russia: Approaches, latest developments and firs...
Enhancing budget literacy in Russia: Approaches, latest developments and firs...
 
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLANPREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
PREPARETION AND IMPLEMENTATION OF STRUCTURAL PLAN
 
D2.3 Inspire Requirements Analysis
D2.3 Inspire Requirements AnalysisD2.3 Inspire Requirements Analysis
D2.3 Inspire Requirements Analysis
 
3 J.Swoboda How To Build A Strategy
3 J.Swoboda How To Build A Strategy3 J.Swoboda How To Build A Strategy
3 J.Swoboda How To Build A Strategy
 
Kickoff presentation.040109cel
Kickoff presentation.040109celKickoff presentation.040109cel
Kickoff presentation.040109cel
 
Cesar working document 7 urban strategy experiment 5
Cesar working document 7 urban strategy experiment 5Cesar working document 7 urban strategy experiment 5
Cesar working document 7 urban strategy experiment 5
 
BDVe Webinar Series - Big Data for Public Policy, the state of play - Roadmap...
BDVe Webinar Series - Big Data for Public Policy, the state of play - Roadmap...BDVe Webinar Series - Big Data for Public Policy, the state of play - Roadmap...
BDVe Webinar Series - Big Data for Public Policy, the state of play - Roadmap...
 
CG contact point meeting in Bonn - Introduction
CG contact point meeting in Bonn - IntroductionCG contact point meeting in Bonn - Introduction
CG contact point meeting in Bonn - Introduction
 
George Chabrzyk
George ChabrzykGeorge Chabrzyk
George Chabrzyk
 
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
УЛААНБААТАР ХОТ ТӨЛӨВЛӨЛТТЭЙ ХОЛБООТОЙ ХИЙСЭН СУРГАЛТУУД
 
2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp2.1 ap lm pwd typical structure content ppp
2.1 ap lm pwd typical structure content ppp
 
978285452340_06.pptx
978285452340_06.pptx978285452340_06.pptx
978285452340_06.pptx
 
NEGOTIATING THE ANALOG MAINSTREAM WITH DIGITAL METHODS IN HAND VISIONS FROM T...
NEGOTIATING THE ANALOG MAINSTREAM WITH DIGITAL METHODS IN HAND VISIONS FROM T...NEGOTIATING THE ANALOG MAINSTREAM WITH DIGITAL METHODS IN HAND VISIONS FROM T...
NEGOTIATING THE ANALOG MAINSTREAM WITH DIGITAL METHODS IN HAND VISIONS FROM T...
 
Negotiating the analog mainstream with digital methods in hand, by Pertti Aho...
Negotiating the analog mainstream with digital methods in hand, by Pertti Aho...Negotiating the analog mainstream with digital methods in hand, by Pertti Aho...
Negotiating the analog mainstream with digital methods in hand, by Pertti Aho...
 
Out Line of the Presentation.pptx
Out Line of the Presentation.pptxOut Line of the Presentation.pptx
Out Line of the Presentation.pptx
 

Más de URBASOFIA

Más de URBASOFIA (11)

Kavala Strategic Agenda 2030
Kavala Strategic Agenda 2030Kavala Strategic Agenda 2030
Kavala Strategic Agenda 2030
 
STATUS BOOK
STATUS BOOKSTATUS BOOK
STATUS BOOK
 
Framework for reporting STATUS workshop 2
Framework for reporting STATUS workshop 2Framework for reporting STATUS workshop 2
Framework for reporting STATUS workshop 2
 
Framework for reporting STATUS workshop 1
Framework for reporting STATUS workshop 1Framework for reporting STATUS workshop 1
Framework for reporting STATUS workshop 1
 
Urbasofia company presentation
Urbasofia company presentationUrbasofia company presentation
Urbasofia company presentation
 
SUNSHINE Project Presentation
SUNSHINE Project PresentationSUNSHINE Project Presentation
SUNSHINE Project Presentation
 
STATUS Project presentation
STATUS Project presentationSTATUS Project presentation
STATUS Project presentation
 
ALBA IULIA 2030 Investment Folder
ALBA IULIA 2030 Investment FolderALBA IULIA 2030 Investment Folder
ALBA IULIA 2030 Investment Folder
 
STATUS: Urban Task Forces and Urban Centers
STATUS: Urban Task Forces and Urban CentersSTATUS: Urban Task Forces and Urban Centers
STATUS: Urban Task Forces and Urban Centers
 
STATUS: Workshop Methodology
STATUS: Workshop MethodologySTATUS: Workshop Methodology
STATUS: Workshop Methodology
 
KAVALA 2030 Strategic Agenda presentation
KAVALA 2030 Strategic Agenda presentationKAVALA 2030 Strategic Agenda presentation
KAVALA 2030 Strategic Agenda presentation
 

Último

Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
gajnagarg
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
ScottMeyers35
 

Último (20)

Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218Panchayath circular KLC -Panchayath raj act s 169, 218
Panchayath circular KLC -Panchayath raj act s 169, 218
 
An Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCCAn Atoll Futures Research Institute? Presentation for CANCC
An Atoll Futures Research Institute? Presentation for CANCC
 
The NAP process & South-South peer learning
The NAP process & South-South peer learningThe NAP process & South-South peer learning
The NAP process & South-South peer learning
 
1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS1935 CONSTITUTION REPORT IN RIPH FINALLS
1935 CONSTITUTION REPORT IN RIPH FINALLS
 
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
Top profile Call Girls In Morena [ 7014168258 ] Call Me For Genuine Models We...
 
Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'Coastal Protection Measures in Hulhumale'
Coastal Protection Measures in Hulhumale'
 
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and NumberCall Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
Call Girls Mehsana / 8250092165 Genuine Call girls with real Photos and Number
 
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
Call Girls in Moti Bagh (delhi) call me [8448380779] escort service 24X7
 
Finance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCCFinance strategies for adaptation. Presentation for CANCC
Finance strategies for adaptation. Presentation for CANCC
 
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budgetCall Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
Call Girls Basheerbagh ( 8250092165 ) Cheap rates call girls | Get low budget
 
2024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 302024: The FAR, Federal Acquisition Regulations, Part 30
2024: The FAR, Federal Acquisition Regulations, Part 30
 
74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx74th Amendment of India PPT by Piyush(IC).pptx
74th Amendment of India PPT by Piyush(IC).pptx
 
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...Dating Call Girls inBaloda Bazar Bhatapara  9332606886Call Girls Advance Cash...
Dating Call Girls inBaloda Bazar Bhatapara 9332606886Call Girls Advance Cash...
 
Honasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdfHonasa Consumer Limited Impact Report 2024.pdf
Honasa Consumer Limited Impact Report 2024.pdf
 
31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.31st World Press Freedom Day Conference.
31st World Press Freedom Day Conference.
 
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'IsraëlAntisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
Antisemitism Awareness Act: pénaliser la critique de l'Etat d'Israël
 
Financing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCCFinancing strategies for adaptation. Presentation for CANCC
Financing strategies for adaptation. Presentation for CANCC
 
Unique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdfUnique Value Prop slide deck________.pdf
Unique Value Prop slide deck________.pdf
 
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girlsPakistani Call girls in Sharjah 0505086370 Sharjah Call girls
Pakistani Call girls in Sharjah 0505086370 Sharjah Call girls
 
Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!Make a difference in a girl's life by donating to her education!
Make a difference in a girl's life by donating to her education!
 

STATUS Plan and policy analysis framework

  • 1. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 1 Institutional and Informal Framework: Policies, Plans and Initiatives Background FRAMEWORK FOR ANALYSIS Prepared by: Urban Planning Institute of the Republic of Slovenia Central European Institute of Technology ALANOVA Reviewed by: STATUS Content Management Urbasofia www.urbasofia.eu
  • 2. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 2 Project number: SEE/D/0297/4.1/X Project acronym: STATUS Project title: Strategic Territorial Agendas for "Small and Middle-Sized Towns" Urban Systems Instrument: INTERREG IV B SEE Call identifier: South East Europe Call D Authorship Barbara Music (UIRS), Bostjan Cotic (UIRS), Pietro Elisei (URBASOFIA), Sabina Dimitriu (URBASOFIA) Review Pietro Elisei (URBASOFIA), Sabina Dimitriu (URBASOFIA)
  • 3. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 3 Table of Contents Table of Contents......................................................................................................................... 3 Abbreviation List...................................................................................................................................... 4 1 Summary of WP3 .................................................................................................................. 5 2 Brief overview of activities .................................................................................................... 6 3 Introduction.......................................................................................................................... 7 4 Planning instruments and historical background .................................................................... 8 5 Methodology for the analysis of planning documents ............................................................ 8 6 Conclusions..........................................................................................................................11 7 References...........................................................................................................................12 Annexes......................................................................................................................................13
  • 4. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 4 Abbreviation List CKP - cities knowledge platform ST/UA - Strategic Territorial/Urban Agendas TP – Territorial Partner SEE – South Eastern Europe SWOT - Strengths, Weaknesses, Opportunities and Threats UC – Urban Centers
  • 5. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 5 1 Summary of WP3 The aim of WP 3 as an inception phase is characterized by different activities, analytical and cognitive ones, to achieve the objectives of STATUS project like:  tackling the problem of incoherent urban and regional development in SEE,  developing place-based strategies by different participatory planning tools,  reducing the widening development gap of SEE cities,  guiding and supporting Territorial Partners to develop a sustainable and Strategic Territorial/ Urban Agendas (ST/UA), Urban Centers (UC) and the SEE cities knowledge platform (CKP). Different methods of qualitative analyses (like stakeholder analyses in report 3.1.) and SWOT analysis will be used not just in terms of networking but also as an opportunity for achieving a more in depth knowledge of the state of the art of local urban issues. At the end all these activities they will provide a clear framework of available data, current planning tools and pool of local actors characterizing the partner cities planning areas. WP 3 Inception consists of two main activities: Activity 3.1. Collecting data and identifying actors Activity 3.2. Analysis of current urban plans and policies in involved territories
  • 6. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 6 2 Brief overview of activities Figure 1: Overview of activity, own graphic Activity 3.2. Analyses of current urban plans and policies in involved territories Subactivity 3.2.1. Preparing report on policies and plans of involved partner Subactivity 3.2.2. Preparing report on key features of investigated policies/ plans Subactivity 3.2.3. Atlas of plan and policies on GIS DB (open source/ open content) Activity will focus on major planning instruments (plans and policies at different institutional level- from national planning acts until local urban policies), level of integration and capability of making synergy of these different tools is going to be investigated and even the link between policy design and decision makers are going to be examined. responsible PP: UIRS other PP involved: CEIT, other PP from Sep.- Oct. 2013 • Preparing report on policies and plans of involved partners (1x) • responsible PP: UIRS; other PP: CEIT from Sep. – Oct. 2013 Output 3.6. responsible PP: UIRS other PP involved: CEIT, other PP from Nov.- Dec. 2013 responsible PP: CEIT other PP involved: Fundazione Graphitech from Nov.- Dec. 2013 The report discuses the incipient stage of policies and plans used in the target area for the Strategic Territorial Agenda. Once the policies and plans have been identified, analysis will be performed in order to define the analogies, differences, synergies and dissonants. An Atlas of plans and policies, generated on GIS DB, is going to be designed and put online, using open source software and applying open content principles in its design: 10 policy/plans atlas are going to be generated at project scale. Output 3.7. Output 3.5.
  • 7. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 7 3 Introduction This report is a state of the art inventarisation of institutional and informal framework of territorial partners in STATUS project. It will be a base for analysis and comparison of territorial partner legal framework that will be provided by UIRS and CEIT Alanova in an output 3.5. Report on policies and plans of involved territorial partners.
  • 8. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 8 4 Planning instruments and historical background For every territorial partner, major plans and policies operated in the selected area in the last 20 years, or currently operational, are reported. Territorial partners: 1. Municipality of Kavala (GR) 2. Municipality of Alba Iulia (RO) 3. Baia Mare Metropolitan Area (RO) 4. Province of Foggia (I) 5. Municipality of Schwechat (AT) 6. Abruzzo Region (I) 7. Municipality of Satu Mare (RO) 8. Municipality of Drama (GR) 9. Municipality of Herceg Novi (MNE) 10. Municipality of Temerin (RS) 5 Methodology for the analysis of planning documents This section will be aimed at outlining a methodology for the critical analysis of plans and policies, based on a set of criteria and methodological tools such as the SWOT analysis, PEST, etc. The section will be developed by CEIT and UIRS. Questionnaire for Territorial Partners 1. Short description of the whole administrative structure of the state a. Check results of the Plurel project (attached, please note that Plurel report is dated in 2010, so it may be outdated for some countries with recent changes in legislation!) b. max. 2 A4 pages c. add graphic (maps, illustrations, check the attached sample made by Sabina.) and insert them appropriate for word documents (no big files) 2. Short description of a planning system a. Check the description of the Municipality of Schwechat b. max. 2 A4 pages c. add graphic (maps, illustrations please check the attached sample for Austria, made by CEIT) and insert them appropriate for word documents (no big files)
  • 9. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 9 3. History of planning instruments, polices and plans a. before current legislation and plans b. Check the description of the Municipality of Kavala c. max. 2 A4 page d. add graphic (maps, illustrations, etc.) and insert them appropriate for word documents (no big files) 4. Current planning instruments, policies and plans on different administrative levels with short description of each National level State level Regional level Province level Municipal level Add missing level if exist Describe doc, scale and what they regulate 5. Detailed description of the impact of the most important planning plans, instruments and policies on the area of intervention Administrative level Name of the document Define: formal or informal document Positive impact on the area of intervention Negative impact on the area of intervention National level Regulator dpdv legislativ sau directii strategice Preferinta din punct de vedere a bugetului Limitari geografic sau administrativ State level Regional level Province level Municipal level Add missing level if exist 6. Do you already know if you will need to change existing or prepare new formal documents, if so, which ones – explain what docs are about and what relevance it has for the city.
  • 10. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 10 7. Addition information you feel you need to add to clarify the current situation Samples for the graphics for the chapter 1: Short description of the whole administrative structure of the state
  • 11. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 11 6 Conclusions Assessing the coherence of the first proposal coming from TPs, with the instruments’ backgrounds. Conclusions will provide suggestions for future planning attitudes to keep. Structogram of the levels and instruments of the Austrian spatial planning system functional Europe national state (province) (9) local (2356 municipalities) Europe national state (province) (9) regional local (2356 municipalities) Coordination by ÖROK, political guidelines (collective resolution of several partners on the national and province level) Legally binding directives by laws, enactments and ordinances zoning plan for built up and being developed land (1:1.000, 500) sectoral plans and concepts by federal authorities (ministeries, e.g. flood protection, transport infrastructure, energy) EUREK guidelines general spatial development concept spatial development program regional development program regional development program on specific themes ( flood protection, technical or social infrastructure...) local/spatial development plan for the whole municipality (1:10.000) administrative ÖROK - Austrian Conference on Spatial Planning maln publication: Österreichisches Raumentwicklungskonzept 2001 Austrian Spatial Development Concept 2001, next update 2011 land use plan for the whole municipality (1:5.000)
  • 12. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 12 7 References Businessballs personal and organisational development website (2013) [Online], Available: http://www.businessballs.com/swotanalysisfreetemplate.htm], 26.08.2013 European Commission (2011) Territorial Agenda of the European Union 2020, Towards an Inclusive, Smart and Sustainable Europe of Diverse Regions [Online], Available: http://www.eu-territorial- agenda.eu/Reference%20Documents/Final%20TA2020.pdf, 23.10.2013. Gerhard Larsson (2006) Spatial planning systems in Western Europe: An overview, Amsterdam. Joint research center of the European Commission (2013) online foresight guide, [Online], Available: http://forlearn.jrc.ec.europa.eu/guide/4_methodology/meth_swot-analysis.htm, 26.08.2013 Strategic management insight (2013) [Online], Available: http://www.strategicmanagementinsight.com/tools/pest-pestel-analysis.html, 15.08.2013 United Nations (2008) Spatial Planning, Key Instrument for Development and Effective Governance with Special Reference to Countries in Transition, Geneva.
  • 13. Output 3.5 Institutional and Informal Framework: Policies, Plans and Initiatives Background 13 Annexes ANNEX 1 – Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Municipality of Kavala (GR) ANNEX 2 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Municipality of Alba Iulia (RO) ANNEX 3 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Baia Mare Metropolitan Area (RO) ANNEX 4 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Province of Foggia (I) ANNEX 5 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Municipality of Schwechat (AT) ANNEX 6 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Abruzzo Region (I) ANNEX 7 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Municipality of Satu Mare (RO) ANNEX 8 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Municipality of Drama (GR) ANNEX 9 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Municipality of Herceg Novi (MNE) ANNEX 10 - Institutional and Informal Framework: Policies, Plans and Initiatives Background of the Municipality of Temerin (RS)