SlideShare una empresa de Scribd logo
1 de 7
AURIZON ANNOUNCES AN UPDATED MINERAL RESOURCE ESTIMATE FOR
                   NIOGOLD'S MARBAN DEPOSIT

Val-d’Or, Quebec - September 7, 2012 - NioGold Mining Corporation (TSX-V:NOX)
(OTCQX:NOXGF) (“NioGold”) is pleased to announce that Aurizon Mines Ltd. (“Aurizon”) has
announced an updated mineral resource estimate for the Marban deposit. The deposit is
located on NioGold's Marban Block property, in the Malartic gold camp, Abitibi region of
Quebec, which is currently under option to Aurizon. Pursuant to the option, the parties have
planned a three Phase drill program of which Phases 1 and 2 have been completed, and Phase
3 is in planning.

The updated mineral resource estimate, based on Phase 1 results, was prepared by SGS
Canada Inc. – Geostat (“SGS Geostat”) under guidelines set by Aurizon’s personnel. All
information of a scientific or technical nature in this release has been reproduced from Aurizon's
news release dated September 7, 2012. NioGold has not at this time independently verified any
of the scientific or technical information in Aurizon's news release and reproduced in this
release.

Resource Estimate from Phase 1 (August 2010 – August 2011)

The updated mineral resource estimate integrates the results of NioGold's drill programs on the
Marban deposit up to the mineral resource estimate prepared by Mine Development Associates
(“MDA”) on December 1, 2009, and the results of the Phase 1 drill program which was
completed last year on August 9, 2011. The updated mineral resource estimate does not:

         incorporate the results of the recently completed Phase 2 drill program, comprised of
         34,658 metres distributed in 90 new holes, that investigated the Marban deposit along
         strike, especially in the Western High Grade zone and the Eastern Down Dip zone

         incorporate the mineral resource estimates for the Norlartic and Kierens deposits,
         located north-west of the Marban deposit, which were previously reported on by MDA
         and which remain unchanged (see Table 4).

The Phase 1 drill program comprised a total of 41,270 metres distributed in 146 new holes,
drilled between August 30, 2010 and August 9, 2011.

Based on a cut-off grade of 0.35 grams of gold per tonne and a high value capping of 25 grams
of gold per tonne, the in-pit mineral resource is estimated at 20,700,000 tonnes at 1.58 grams of
gold per tonne or 1,053,000 ounces of gold in the measured and indicated category plus at
3,780,000 tonnes at 1.60 grams of gold per tonne or 194,000 ounces of gold in the inferred
category. The resource outside of the pit shell and using a cut-off grade of 2.0 grams of gold per
tonne is estimated at 980,000 tonnes at 2.82 grams of gold per tonne or 89,000 ounces of gold
in the measured and indicated category plus 800,000 tonnes at 2.68 grams of gold per tonne or

                                ON CANADA’S GOLDEN HIGHWAY

007359000-00103096; 6
69,000 ounces of gold in the inferred category.

Table 1: Marban Deposit 2012 Mineral Resource Estimate (uncapped results shown for comparison)

                                                                                                              Average
                       Cut-off                                             Grade             Gold
                                                                 1                 2                3        Metal Loss
                        Grade          Category        Tonnes            (capped)          (capped)
                                                                                                                 due
                       (Au g/t)                                           (g/t Au)         (Ounces)
                                                                                                             to Capping
                                          M+I          20 700 000           1.58            1 053 000           18.8%
      In-pit             0.35
                                       Inferred         3 780 000           1.60                194 000         65.9%
                                          M+I             980 000           2.82                 89 000         16.0%
Underground               2.0
                                       Inferred           800 000           2.68                 69 000         17.9%
                                          M+I          21 670 000           1.64            1 141 000           18.7%
      Total
                                       Inferred         4 580 000           1.79                263 000         59.7%
The mineral resource estimate has been calculated using the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definitions Standards for
mineral resources in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Mineral resources which are not mineral reserves do not have demonstrated economic viability.

Mineral resources update effective date: November 16, 2011.

1: Rounded to nearest 10 thousand.

2: High value capped at 25 g/t Au on assays.

3: Rounded to nearest 1 thousand.


“Following the resource estimate in 2010, our target was to increase the amount of ounces near
surface on the Marban deposit to assess if an open pit scenario was possible. The results of this
update of the resource estimate are showing that we achieved our goal” said Mike Iverson
Niogold’s President and CEO.

The in-pit and underground resources have been estimated based on the following parameters:

     Two distinct mining scenarios: open-pit and underground. The open pit mineral resources
     are reported within an initial Whittle pit shell;

    The base case scenario was performed with a minimum cut-off grade of 0.35 grams of gold
    per tonne;

     A total of 1,684 holes including 333 historical surface holes for a total of 136,789 metres of
     surface drilling and 1,205 historical underground holes for a total of 61,256 metres;

     A total of 858 underground channels and chips samples;

     A total of 107,904 assays which are available in the database;

     A capping of 25 grams of gold per tonne was applied to the assays.

     The mineral resources were modeled and estimated using SGS Proprietary software,
     Genesis 1.0.17;

     The mineral resource model was interpreted from 144 transverse sections at intervals of
     12.5 metres and from level plans at intervals of 5 metres;

     The interpolation was conducted on composite assays of 2 metres in length;


                                                  ON CANADA’S GOLDEN HIGHWAY

007359000-00103096; 6
The interpolation was done by Ordinary Kriging in two stages: One block model using
     mineralised envelopes for the high grade mineralisation (>0.5 grams of gold per tonne), and
     another block model for the lower grade mineralisation located outside the defined
     mineralised envelopes;

    The block model was defined by blocks of 5 metres long by 5 metres wide by 5 metres thick
    and covers a strike length of 1,400 metres to a maximum depth of 700 metres below surface;

    An average drill spacing of 25 metres x 25 metres was used for the measured and indicated
    resources;

    The average relative density used to calculate the tonnage of the Marban deposit was
    adjusted to 2.77 tonnes/cubic metre;

    The historical Marban production was removed from the mineral resources;

    The Whittle pit optimisation was performed by SGS Geostat using a gold price of US$1,350
    per ounce and an exchange rate of 1:1;The simulated pit is 1,400 metres long, 850 metres
    wide and 350 metres deep. The mineral resources located outside the Marban deposit
    optimised pit shell is evaluated using an underground (“U/G”) mining scenario. The base
    case cut-off grade for U/G mineral resources for the Marban deposit has been set at 2.0
    grams of gold per tonne.

Sensitivity Analysis of the Resources

The mineral resource sensitivity is presented in the next 2 tables with different cut-off grades
from 0.35 to 3.0 grams of gold per tonne.

Table 2: Marban Deposit - In-Pit Mineral Resource

                                                              Grade         Gold       Average Metal
   Cut-off Grade                                        1             2            3
                          Category             Tonnes       (capped)      (capped)       Loss due
     (Au g/t)
                                                             (g/t Au)     (Ounces)      to Capping

                          Measured             8 650 000       1.72         479 000        9.1%

       0.35               Indicated        12 050 000          1.48         574 000       25.5%
    (Base case)               M+I          20 700 000          1.58       1 053 000       18.8%
                           Inferred            3 780 000       1.60         194 000       65.9%
                          Measured             8 500 000       1.75         477 000        9.1%
                          Indicated        11 990 000          1.49         573 000       25.5%
         0.5
                              M+I          20 490 000          1.59       1 050 000       18.9%
                           Inferred            3 780 000       1.6          194 000       65.9%
                          Measured             6 940 000       1.96         437 000        9.9%
                          Indicated            9 360 000       1.67         502 000       28.1%
         1.0
                              M+I          16 300 000          1.79         938 000       20.7%
                           Inferred            3 090 000       1.77         176 000       67.5%
1: Rounded to nearest 10 thousand.

2: High value capped at 25 g/t Au on assays.

3: Rounded to nearest 1 thousand.



                                                  ON CANADA’S GOLDEN HIGHWAY

007359000-00103096; 6
Table 3: Marban Deposit - Underground Mineral Resource (Outside the pit shell)

                                                              Grade         Gold       Average Metal
   Cut-off Grade                                        1             2            3
                          Category             Tonnes       (capped)      (capped)       Loss due
     (Au g/t)
                                                             (g/t Au)     (Ounces)      to Capping

                          Measured             360 000         3.03        35 000         12.5%

        2.0               Indicated            620 000         2.70        53 000         18.5%
    (Base case)               M+I              980 000         2.82        89 000         16.0%
                           Inferred            800 000         2.68        69 000         17.9%
                          Measured             220 000         3.55        25 000         13.8%
                          Indicated            290 000         3.26        30 000         23.1%
         2.5
                              M+I              510 000         3.39        55 000         19.1%
                           Inferred            390 000         3.20        40 000         24.5%
                          Measured             130 000         4.09        17 000         15.0%
                          Indicated            160 000         3.71        19 000         26.9%
         3.0
                              M+I              290 000         3.88        36 000         27.8%
                           Inferred            190 000         3.73        22 000         24.1%

1: Rounded to nearest 10 thousand.

2: High value capped at 25 g/t Au on assays.

3: Rounded to nearest 1 thousand.


Geology

The Marban mineralized system has a funnel shape corresponding to a 400 to 700 metres wide
multi-folded structure in the upper part and a more steeply dipping root at depth, with
thicknesses in the range of 100 to 200 metres. Mineralized zones and structures are developed
in east-west oriented schistosed basalt altered to carbonate, chlorite and albite. Shear zones dip
45° to 70° to the north and are from 10 to over 70 meters wide. Gold grade typically correlates
with an increasing density of quartz veining associated with disseminated pyrite and pyrrhotite.
The hanging wall and footwall are composed mainly of ultramafic units.

The historical production from this mine is 1.98 million tonnes at 5.27 grams of gold per tonne
for 330,000 ounces produced.

Marban Property Mineral Resources

The Marban deposit currently represents the core of the mineral resources located on the
Marban property. The Norlartic and Kierens deposits represent two additional mineral
resources, reported on by Mine Development Associates (MDA) December 1, 2009. The project
comprises 3 mining lease and 42 claims covering 976 hectares.

The following table provides the details of the total mineral resources for the Marban Block
property, as updated by the SGS September 2012 mineral resource estimate on the Marban
deposit. Note that MDA's previous estimate on the Marban deposit used a cut-off grade of 2.5
g/t, compared to SGS's use of a cut-off grades of 0.35 g/t and 2.0 g/t.




                                                  ON CANADA’S GOLDEN HIGHWAY

007359000-00103096; 6
Table 4: Marban Block property - Mineral Resource Summary
                                                      September 6, 2012                                                      December 1, 2009

                   Cut-off                                                        2                                                                2
                                                      1       Grade         Gold            Cut-off Grade                1        Grade       Gold          Gain
 Deposit            Grade        Category    Tonnes                                                             Tonnes
                                                             (g/t Au)     (Ounces)            (Au g/t)                           (g/t Au)   (Ounces)      (Ounces)
                   (Au g/t)

                     0.35          M+I      20 700 000        1.58         1 053 000                                                                      1 053 000
                    In-pit       Inferred    3 780 000         1.6           194 000                                                                       194 000
 Marban
                     2.0           M+I         980 000        2.82            89 000                           1 240 000          4.55          181 000    (92 000)
                                                                                                  2.5
                 Underground     Inferred      800 000        2.68            69 000                                870 000       4.08          114 000    (45 000)

                                   M+I       5 420 000        1.82           316 000                           5 420 000          1.82          316 000
             4               3                                                                          3
 Norlartic        0.5 / 2.5                                                                    0.5 / 2.5
                                 Inferred    3 200 000        1.44           148 000                           3 200 000          1.44          148 000

                                   M+I       1 440 000        2.19           101 000                           1 440 000          2.19          101 000
 Kierens4         0.5 / 2.53                                                                   0.5 / 2.53
                                 Inferred    1 780 000        1.73            99 000                           1 780 000          1.73           99 000

                                   M+I      28 540 000         1.7         1 559 000                           8 100 000           2.3          599 000    960 000
   Total
                                 Inferred    9 560 000        1.66           510 000                           5 850 000          1.92          361 000    149 000

The mineral resource estimate has been calculated using the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definitions Standards for mineral
resources in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects.

Mineral resources which are not mineral reserves do not have demonstrated economic viability.

Mineral resources update for Marban gold deposit is effective date: November 16, 2011.

Mineral resources update for Norlartic and Kierens deposit is effective date: December 1, 2009.

1: Rounded to nearest 10 thousand.

2: Rounded to nearest 1 thousand.

3: 0.5 g/t Au cut-off on resources from surface to 200 metres vertically and 2.5 g/t Au cut-off below 200 metres.

4: Mineral resource estimate reported by MDA Dec 1, 2009.


Outlook from Phase 2 drilling program

The results of 90 holes and 9 extensions of previous holes of the Phase 2 of the drilling program
have successfully confirmed the extension of the different zones of the Marban mineralized
system (see the news releases dated March 1, April 26, June 12, and August 15 2012). The
objectives of this program on the Marban deposit were to improve the quality of the near surface
resources, developing a mineral inventory below a depth of 250 vertical metres and outside the
known lateral extension.

An updated mineral resource will be produced in order to integrate the results of the Phase 2
drilling program in the resource estimate.

The preliminary metallurgical testwork at Marban indicates a favourable recovery between
95.4% and 97.6% for the ore cyanidation test (see news release dated April 24, 2012). The
Bond ball mill testing indicated the ore fell in the medium soft to medium range of hardness
compared to the SGS database (10.1-10.9 kWh/t).

A baseline environmental study has been initiated and being prepared by Golder Associates
and should be completed by the end of the year.

A third phase of drilling will be initiated later this month. There is still $9M to be spent in the
earn-in option with Aurizon.




                                                          ON CANADA’S GOLDEN HIGHWAY

007359000-00103096; 6
Aurizon Option

Aurizon can earn up to a 65% interest the Marban Block property under the terms of an option
and joint venture agreement dated July 5, 2010, between NioGold and Aurizon. The initial 50%
interest can be earned by incurring expenditures of $20 million over three years, completing an
updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for
50% of the total gold ounces defined by the mineral resource estimate. NioGold remains the
project operator during the initial earn-in period (see news release dated July 6, 2010).

Scientific/Technical Info, Qualified Persons and QA/QC

Information of a scientific or technical nature in this news release has been reproduced from
Aurizon's news release, which information was prepared by or under the supervision of Ghislain
Fournier P.Eng., Technical Services General Manager of Aurizon and Martin Demers P.Geo,
Exploration Manager of Aurizon. The current mineral resource estimate on the Marban deposit
was completed by Yann Camus Eng., of SGS Canada Inc. – Geostat, an independent Qualified
Person under NI 43-101 guidelines, using the Canadian Institute of Mining, Metallurgy and
Petroleum (CIM) Standards on Mineral Resources and Reserves, Definitions and Guidelines
prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM
Council on December 11, 2005. The effective date of the estimate is November 16, 2011.
NioGold does not, at present, know if, how and to what extent any qualified persons at Aurizon
have verified the data underlying the scientific and technical information disclosed in Aurizon's
news release and reproduced in this news release. NioGold will attempt to verify the data once
Aurizon files its technical report in support of its news release.

Additional Information

A sketch is attached showing the plan and longitudinal view of the Marban Gold deposit with the
outline of the in-pit and underground resources. All other information previously released on
Marban is also available on NioGold's website at www.niogold.com

NioGold Mining Corporation – « On Canada’s Golden Highway »

NioGold Mining Corporation is a mineral exploration company focused on gold. The Company’s
flagship projects are located in the Cadillac - Malartic - Val-d’Or region of the prolific Abitibi gold
mining district Quebec. The Cadillac, Malartic and Val-d’Or mining camps have produced over
45 million ounces of gold since the 1930’s and presently encompasses six producing gold mines
including Osisko Mining’s new Canadian Malartic operations. NioGold’s land holdings within the
Abitibi presently cover 130km2 and encompass four former gold producers, namely the Norlartic,
Kierens (First Canadian), Marban and Malartic Hygrade mines that collectively produced
640,000 ounces of gold.

NioGold’s experienced and qualified technical team are overseeing the advancement of these
projects, with current drill programs underway targeting expansion of the resource base.

NioGold invites you to visit the company website at www.niogold.com. For information on
NioGold Mining Corporation contact:

Michael A. Iverson, Chairman & CEO                             Dale Paruk, Vice-President
miverson@niogold.com                                           dparuk@niogold.com
Tel: (604) 856-9887                                            Tel: (604) 662-4505
                                                               Toll-free: (877) 642-6200



                                  ON CANADA’S GOLDEN HIGHWAY

007359000-00103096; 6
Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined the policies of the
TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release.
FORWARD-LOOKING STATEMENTS
This news release includes "forward looking statements", as that term is defined in Section 27A of the Unites States
Securities Act of 1933, as amended, and Section 21E of the United States Exchange Act of 1934, as amended, that
are subject to assumptions, risks and uncertainties. Statements in this news release which are not purely historical
are forward looking statements, including without limitation any statements concerning the Company's intentions,
plans, estimates, expectations or beliefs regarding the future. Although the Company believes that any forward
looking statements in this news release are reasonable, there can be no assurance that any such forward looking
statements will prove to be accurate. The Company cautions readers that all forward looking statements, including
without limitation those relating to the Company's future operations and business prospects, are based on
assumptions none of which can be assured, and are subject to certain risks and uncertainties that could cause actual
events or results to differ materially from those indicated in the forward looking statements. Readers are advised to
rely on their own evaluation of such risks and uncertainties and should not place undue reliance on forward looking
statements.
Any forward looking statements are made as of the date of this news release, and the Company assumes no
obligation to update the forward looking statements, or to update the reasons why actual events or results could or do
differ from those projected in the forward looking statements. Except as required by law, the Company assumes no
obligation to update any forward looking statements, whether as a result of new information, future events or
otherwise.
CAUTIONARY NOTE TO U.S. INVESTORS
The United States Securities and Exchange Commission (the “SEC”) permits U.S. mining companies, in their filings
with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or
produce. We may use certain terms in this news release, such as „measured resources‟, „indicated resources‟ and
„inferred resources‟, which the SEC guidelines strictly prohibit U.S. registered companies from including in their filings
with the SEC. The news release may contain information about adjacent properties on which we have no right to
explore or mine. U.S. investors are cautioned that mineral deposits on adjacent properties may not be indicative of
mineral deposits on our properties.




                                        ON CANADA’S GOLDEN HIGHWAY

007359000-00103096; 6

Más contenido relacionado

Destacado

Levon Resources Investor Presentation
Levon Resources Investor PresentationLevon Resources Investor Presentation
Levon Resources Investor PresentationViral Network Inc
 
Ludovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 kmLudovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 kmViral Network Inc
 
Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...
Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...
Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...Viral Network Inc
 
Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...
Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...
Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...Viral Network Inc
 
Golden Arrow Resources Corporation - Corporate Presentation
Golden Arrow Resources Corporation - Corporate PresentationGolden Arrow Resources Corporation - Corporate Presentation
Golden Arrow Resources Corporation - Corporate PresentationViral Network Inc
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationViral Network Inc
 
Petrichor Energy (TSX.V - PTP) Corporate Presentation
Petrichor Energy (TSX.V - PTP) Corporate PresentationPetrichor Energy (TSX.V - PTP) Corporate Presentation
Petrichor Energy (TSX.V - PTP) Corporate PresentationViral Network Inc
 
Catalogo musicales
Catalogo musicalesCatalogo musicales
Catalogo musicalesjjortizyanez
 
Slide 1
Slide 1Slide 1
Slide 1jokare
 
Unitate didaktikoa
Unitate didaktikoaUnitate didaktikoa
Unitate didaktikoaXingola
 
U N A J O R N A D A D E T R A B A J O E N L A E S C U E L A S E C U N ...
U N A  J O R N A D A  D E  T R A B A J O  E N  L A  E S C U E L A  S E C U N ...U N A  J O R N A D A  D E  T R A B A J O  E N  L A  E S C U E L A  S E C U N ...
U N A J O R N A D A D E T R A B A J O E N L A E S C U E L A S E C U N ...serarockcld
 
Pulso de Mercado de Activotrade - 3 de enero
Pulso de Mercado de Activotrade - 3 de eneroPulso de Mercado de Activotrade - 3 de enero
Pulso de Mercado de Activotrade - 3 de eneroSalainversion
 

Destacado (16)

Levon Resources Investor Presentation
Levon Resources Investor PresentationLevon Resources Investor Presentation
Levon Resources Investor Presentation
 
Ludovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 kmLudovick Zone Extended Over a Length of 1.3 km
Ludovick Zone Extended Over a Length of 1.3 km
 
Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...
Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...
Banks Island Gold Ltd. Reports NPV(8%) of $155M and IRR of 43% from Red Mount...
 
Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...
Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...
Canamex Resources Corp: CEO Greg Hahn Answers Questions About Its Aranka Nort...
 
Golden Arrow Resources Corporation - Corporate Presentation
Golden Arrow Resources Corporation - Corporate PresentationGolden Arrow Resources Corporation - Corporate Presentation
Golden Arrow Resources Corporation - Corporate Presentation
 
Highbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate PresentationHighbank Resources - August 2013 Corporate Presentation
Highbank Resources - August 2013 Corporate Presentation
 
Petrichor Energy (TSX.V - PTP) Corporate Presentation
Petrichor Energy (TSX.V - PTP) Corporate PresentationPetrichor Energy (TSX.V - PTP) Corporate Presentation
Petrichor Energy (TSX.V - PTP) Corporate Presentation
 
Catalogo musicales
Catalogo musicalesCatalogo musicales
Catalogo musicales
 
Operacion[1]..
Operacion[1]..Operacion[1]..
Operacion[1]..
 
Modulo ii
Modulo iiModulo ii
Modulo ii
 
iSarea 2010 escribir en blog
iSarea 2010 escribir en blogiSarea 2010 escribir en blog
iSarea 2010 escribir en blog
 
Slide 1
Slide 1Slide 1
Slide 1
 
Unitate didaktikoa
Unitate didaktikoaUnitate didaktikoa
Unitate didaktikoa
 
U N A J O R N A D A D E T R A B A J O E N L A E S C U E L A S E C U N ...
U N A  J O R N A D A  D E  T R A B A J O  E N  L A  E S C U E L A  S E C U N ...U N A  J O R N A D A  D E  T R A B A J O  E N  L A  E S C U E L A  S E C U N ...
U N A J O R N A D A D E T R A B A J O E N L A E S C U E L A S E C U N ...
 
Sin título 1
Sin título 1Sin título 1
Sin título 1
 
Pulso de Mercado de Activotrade - 3 de enero
Pulso de Mercado de Activotrade - 3 de eneroPulso de Mercado de Activotrade - 3 de enero
Pulso de Mercado de Activotrade - 3 de enero
 

Similar a Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban Deposit

NioGold - BullPen Notes Sept 10th
NioGold - BullPen Notes Sept 10thNioGold - BullPen Notes Sept 10th
NioGold - BullPen Notes Sept 10thViral Network Inc
 
NWM Mining Corporation Fall Presentation
NWM Mining Corporation Fall PresentationNWM Mining Corporation Fall Presentation
NWM Mining Corporation Fall Presentationjmckean2
 
QMI Corporate Presentation
QMI Corporate PresentationQMI Corporate Presentation
QMI Corporate Presentationjmckean2
 
TriMetals Mining Inc. news release
TriMetals Mining Inc. news releaseTriMetals Mining Inc. news release
TriMetals Mining Inc. news releaseChris Helweg
 
20110711 minera agm
20110711 minera agm20110711 minera agm
20110711 minera agmMineraandres
 
News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...
News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...
News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...Commerce Resources Corp. (TSXv:CCE)
 
F R X Presentation May 19 2010
F R X  Presentation  May 19 2010F R X  Presentation  May 19 2010
F R X Presentation May 19 2010ManexGroup
 
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Conferences
 
Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020MomentumPR
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Symposium
 
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...Symposium
 
Agm presentation mar 17 2011
Agm presentation mar 17 2011Agm presentation mar 17 2011
Agm presentation mar 17 2011aldridgeminerals
 
News Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals ProjectNews Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals ProjectCommerce Resources Corp. (TSXv:CCE)
 
Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Metals
 

Similar a Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban Deposit (20)

NioGold - BullPen Notes Sept 10th
NioGold - BullPen Notes Sept 10thNioGold - BullPen Notes Sept 10th
NioGold - BullPen Notes Sept 10th
 
NWM Mining Corporation Fall Presentation
NWM Mining Corporation Fall PresentationNWM Mining Corporation Fall Presentation
NWM Mining Corporation Fall Presentation
 
QMI Corporate Presentation
QMI Corporate PresentationQMI Corporate Presentation
QMI Corporate Presentation
 
TriMetals Mining Inc. news release
TriMetals Mining Inc. news releaseTriMetals Mining Inc. news release
TriMetals Mining Inc. news release
 
20110711 minera agm
20110711 minera agm20110711 minera agm
20110711 minera agm
 
News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...
News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...
News Release: Commerce Resources Corp. (TSXv: CCE) Announces Indicated Resour...
 
F R X Presentation May 19 2010
F R X  Presentation  May 19 2010F R X  Presentation  May 19 2010
F R X Presentation May 19 2010
 
Cxb corp-profile-may-2015
Cxb corp-profile-may-2015Cxb corp-profile-may-2015
Cxb corp-profile-may-2015
 
Minaurum Presentation
Minaurum PresentationMinaurum Presentation
Minaurum Presentation
 
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
 
Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020Enduro Metals Corp. - Corporate Presentation - July 2020
Enduro Metals Corp. - Corporate Presentation - July 2020
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
 
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
 
Agm presentation mar 17 2011
Agm presentation mar 17 2011Agm presentation mar 17 2011
Agm presentation mar 17 2011
 
Corporate Profile September 2015
Corporate Profile September 2015Corporate Profile September 2015
Corporate Profile September 2015
 
News Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals ProjectNews Release: Resource Update for Blue River Rare Metals Project
News Release: Resource Update for Blue River Rare Metals Project
 
Coreinthe corner presentation
Coreinthe corner presentationCoreinthe corner presentation
Coreinthe corner presentation
 
Mineral Industry Statistics
Mineral Industry StatisticsMineral Industry Statistics
Mineral Industry Statistics
 
Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Presenation September 2016
Lion One Presenation September 2016
 
power point presentation in Abuja
power point presentation in Abujapower point presentation in Abuja
power point presentation in Abuja
 

Más de Viral Network Inc

IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate PresentationViral Network Inc
 
Calyx News Release April 9/14
Calyx News Release April 9/14Calyx News Release April 9/14
Calyx News Release April 9/14Viral Network Inc
 
Theralase Corporate Presentation
Theralase Corporate PresentationTheralase Corporate Presentation
Theralase Corporate PresentationViral Network Inc
 
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...Viral Network Inc
 
Highbank Resources August Corporate Presentation
Highbank Resources August Corporate PresentationHighbank Resources August Corporate Presentation
Highbank Resources August Corporate PresentationViral Network Inc
 
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...Viral Network Inc
 
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...Viral Network Inc
 
TNR Gold Investor Presentation
TNR Gold Investor PresentationTNR Gold Investor Presentation
TNR Gold Investor PresentationViral Network Inc
 
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...Viral Network Inc
 
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...Viral Network Inc
 
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver ProjectGolden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver ProjectViral Network Inc
 
IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate PresentationViral Network Inc
 
Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...Viral Network Inc
 
Sierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor PresentationSierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor PresentationViral Network Inc
 

Más de Viral Network Inc (20)

IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate Presentation
 
Calyx News Release April 9/14
Calyx News Release April 9/14Calyx News Release April 9/14
Calyx News Release April 9/14
 
Theralase Corporate Presentation
Theralase Corporate PresentationTheralase Corporate Presentation
Theralase Corporate Presentation
 
PTP Feb. 2014 Factsheet
PTP Feb. 2014 FactsheetPTP Feb. 2014 Factsheet
PTP Feb. 2014 Factsheet
 
SponsorsOne Investor Deck
SponsorsOne Investor DeckSponsorsOne Investor Deck
SponsorsOne Investor Deck
 
Altima Resources - 2 Pager
Altima Resources - 2 PagerAltima Resources - 2 Pager
Altima Resources - 2 Pager
 
PTP News - Nov. 14
PTP News - Nov. 14PTP News - Nov. 14
PTP News - Nov. 14
 
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
Petrichor Energy - Petrichor Closes First Tranche Convertible Debenture Finan...
 
Highbank Resources August Corporate Presentation
Highbank Resources August Corporate PresentationHighbank Resources August Corporate Presentation
Highbank Resources August Corporate Presentation
 
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
Highbank Resources - Highbank Receives Comments on Notice of Work (NoW) Permi...
 
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel  Specifica...
Scientific Study Reveals ReadiDiesel® Meets Petroleum-Based Diesel Specifica...
 
TNR Gold Investor Presentation
TNR Gold Investor PresentationTNR Gold Investor Presentation
TNR Gold Investor Presentation
 
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
Calyx Announces Commercial Launch of Higher Yielding Variety of Resonance(R) ...
 
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
Red Eagle Mining - Salman Partners "Accelerating Development at San Ramon-Pot...
 
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver ProjectGolden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
Golden Arrow Resources: Golden Arrow Triples Size of Chinchillas Silver Project
 
Sierra Metals Fact Sheet
Sierra Metals Fact SheetSierra Metals Fact Sheet
Sierra Metals Fact Sheet
 
IntelGenx Corporate Presentation
IntelGenx Corporate PresentationIntelGenx Corporate Presentation
IntelGenx Corporate Presentation
 
Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...Sierra Metals announces first proven and probable ore reserves at the Bolivar...
Sierra Metals announces first proven and probable ore reserves at the Bolivar...
 
Sierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor PresentationSierra Metals (TSX.V: SMT) Investor Presentation
Sierra Metals (TSX.V: SMT) Investor Presentation
 
Sierra Metals Fact Sheet
Sierra Metals Fact SheetSierra Metals Fact Sheet
Sierra Metals Fact Sheet
 

Último

NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataExhibitors Data
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfJamesConcepcion7
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationAnamaria Contreras
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Americas Got Grants
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in PhilippinesDavidSamuel525586
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxran17april2001
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxappkodes
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingrajputmeenakshi733
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsKnowledgeSeed
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024Adnet Communications
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfShashank Mehta
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 

Último (20)

NAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors DataNAB Show Exhibitor List 2024 - Exhibitors Data
NAB Show Exhibitor List 2024 - Exhibitors Data
 
WSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdfWSMM Technology February.March Newsletter_vF.pdf
WSMM Technology February.March Newsletter_vF.pdf
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
PSCC - Capability Statement Presentation
PSCC - Capability Statement PresentationPSCC - Capability Statement Presentation
PSCC - Capability Statement Presentation
 
Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...Church Building Grants To Assist With New Construction, Additions, And Restor...
Church Building Grants To Assist With New Construction, Additions, And Restor...
 
Entrepreneurship lessons in Philippines
Entrepreneurship lessons in  PhilippinesEntrepreneurship lessons in  Philippines
Entrepreneurship lessons in Philippines
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
BAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptxBAILMENT & PLEDGE business law notes.pptx
BAILMENT & PLEDGE business law notes.pptx
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Appkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptxAppkodes Tinder Clone Script with Customisable Solutions.pptx
Appkodes Tinder Clone Script with Customisable Solutions.pptx
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
digital marketing , introduction of digital marketing
digital marketing , introduction of digital marketingdigital marketing , introduction of digital marketing
digital marketing , introduction of digital marketing
 
Introducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applicationsIntroducing the Analogic framework for business planning applications
Introducing the Analogic framework for business planning applications
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024TriStar Gold Corporate Presentation - April 2024
TriStar Gold Corporate Presentation - April 2024
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Darshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdfDarshan Hiranandani [News About Next CEO].pdf
Darshan Hiranandani [News About Next CEO].pdf
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 

Aurizon Announces An Updated Mineral Resource Estimate For Niogold's Marban Deposit

  • 1. AURIZON ANNOUNCES AN UPDATED MINERAL RESOURCE ESTIMATE FOR NIOGOLD'S MARBAN DEPOSIT Val-d’Or, Quebec - September 7, 2012 - NioGold Mining Corporation (TSX-V:NOX) (OTCQX:NOXGF) (“NioGold”) is pleased to announce that Aurizon Mines Ltd. (“Aurizon”) has announced an updated mineral resource estimate for the Marban deposit. The deposit is located on NioGold's Marban Block property, in the Malartic gold camp, Abitibi region of Quebec, which is currently under option to Aurizon. Pursuant to the option, the parties have planned a three Phase drill program of which Phases 1 and 2 have been completed, and Phase 3 is in planning. The updated mineral resource estimate, based on Phase 1 results, was prepared by SGS Canada Inc. – Geostat (“SGS Geostat”) under guidelines set by Aurizon’s personnel. All information of a scientific or technical nature in this release has been reproduced from Aurizon's news release dated September 7, 2012. NioGold has not at this time independently verified any of the scientific or technical information in Aurizon's news release and reproduced in this release. Resource Estimate from Phase 1 (August 2010 – August 2011) The updated mineral resource estimate integrates the results of NioGold's drill programs on the Marban deposit up to the mineral resource estimate prepared by Mine Development Associates (“MDA”) on December 1, 2009, and the results of the Phase 1 drill program which was completed last year on August 9, 2011. The updated mineral resource estimate does not: incorporate the results of the recently completed Phase 2 drill program, comprised of 34,658 metres distributed in 90 new holes, that investigated the Marban deposit along strike, especially in the Western High Grade zone and the Eastern Down Dip zone incorporate the mineral resource estimates for the Norlartic and Kierens deposits, located north-west of the Marban deposit, which were previously reported on by MDA and which remain unchanged (see Table 4). The Phase 1 drill program comprised a total of 41,270 metres distributed in 146 new holes, drilled between August 30, 2010 and August 9, 2011. Based on a cut-off grade of 0.35 grams of gold per tonne and a high value capping of 25 grams of gold per tonne, the in-pit mineral resource is estimated at 20,700,000 tonnes at 1.58 grams of gold per tonne or 1,053,000 ounces of gold in the measured and indicated category plus at 3,780,000 tonnes at 1.60 grams of gold per tonne or 194,000 ounces of gold in the inferred category. The resource outside of the pit shell and using a cut-off grade of 2.0 grams of gold per tonne is estimated at 980,000 tonnes at 2.82 grams of gold per tonne or 89,000 ounces of gold in the measured and indicated category plus 800,000 tonnes at 2.68 grams of gold per tonne or ON CANADA’S GOLDEN HIGHWAY 007359000-00103096; 6
  • 2. 69,000 ounces of gold in the inferred category. Table 1: Marban Deposit 2012 Mineral Resource Estimate (uncapped results shown for comparison) Average Cut-off Grade Gold 1 2 3 Metal Loss Grade Category Tonnes (capped) (capped) due (Au g/t) (g/t Au) (Ounces) to Capping M+I 20 700 000 1.58 1 053 000 18.8% In-pit 0.35 Inferred 3 780 000 1.60 194 000 65.9% M+I 980 000 2.82 89 000 16.0% Underground 2.0 Inferred 800 000 2.68 69 000 17.9% M+I 21 670 000 1.64 1 141 000 18.7% Total Inferred 4 580 000 1.79 263 000 59.7% The mineral resource estimate has been calculated using the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definitions Standards for mineral resources in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mineral resources which are not mineral reserves do not have demonstrated economic viability. Mineral resources update effective date: November 16, 2011. 1: Rounded to nearest 10 thousand. 2: High value capped at 25 g/t Au on assays. 3: Rounded to nearest 1 thousand. “Following the resource estimate in 2010, our target was to increase the amount of ounces near surface on the Marban deposit to assess if an open pit scenario was possible. The results of this update of the resource estimate are showing that we achieved our goal” said Mike Iverson Niogold’s President and CEO. The in-pit and underground resources have been estimated based on the following parameters: Two distinct mining scenarios: open-pit and underground. The open pit mineral resources are reported within an initial Whittle pit shell; The base case scenario was performed with a minimum cut-off grade of 0.35 grams of gold per tonne; A total of 1,684 holes including 333 historical surface holes for a total of 136,789 metres of surface drilling and 1,205 historical underground holes for a total of 61,256 metres; A total of 858 underground channels and chips samples; A total of 107,904 assays which are available in the database; A capping of 25 grams of gold per tonne was applied to the assays. The mineral resources were modeled and estimated using SGS Proprietary software, Genesis 1.0.17; The mineral resource model was interpreted from 144 transverse sections at intervals of 12.5 metres and from level plans at intervals of 5 metres; The interpolation was conducted on composite assays of 2 metres in length; ON CANADA’S GOLDEN HIGHWAY 007359000-00103096; 6
  • 3. The interpolation was done by Ordinary Kriging in two stages: One block model using mineralised envelopes for the high grade mineralisation (>0.5 grams of gold per tonne), and another block model for the lower grade mineralisation located outside the defined mineralised envelopes; The block model was defined by blocks of 5 metres long by 5 metres wide by 5 metres thick and covers a strike length of 1,400 metres to a maximum depth of 700 metres below surface; An average drill spacing of 25 metres x 25 metres was used for the measured and indicated resources; The average relative density used to calculate the tonnage of the Marban deposit was adjusted to 2.77 tonnes/cubic metre; The historical Marban production was removed from the mineral resources; The Whittle pit optimisation was performed by SGS Geostat using a gold price of US$1,350 per ounce and an exchange rate of 1:1;The simulated pit is 1,400 metres long, 850 metres wide and 350 metres deep. The mineral resources located outside the Marban deposit optimised pit shell is evaluated using an underground (“U/G”) mining scenario. The base case cut-off grade for U/G mineral resources for the Marban deposit has been set at 2.0 grams of gold per tonne. Sensitivity Analysis of the Resources The mineral resource sensitivity is presented in the next 2 tables with different cut-off grades from 0.35 to 3.0 grams of gold per tonne. Table 2: Marban Deposit - In-Pit Mineral Resource Grade Gold Average Metal Cut-off Grade 1 2 3 Category Tonnes (capped) (capped) Loss due (Au g/t) (g/t Au) (Ounces) to Capping Measured 8 650 000 1.72 479 000 9.1% 0.35 Indicated 12 050 000 1.48 574 000 25.5% (Base case) M+I 20 700 000 1.58 1 053 000 18.8% Inferred 3 780 000 1.60 194 000 65.9% Measured 8 500 000 1.75 477 000 9.1% Indicated 11 990 000 1.49 573 000 25.5% 0.5 M+I 20 490 000 1.59 1 050 000 18.9% Inferred 3 780 000 1.6 194 000 65.9% Measured 6 940 000 1.96 437 000 9.9% Indicated 9 360 000 1.67 502 000 28.1% 1.0 M+I 16 300 000 1.79 938 000 20.7% Inferred 3 090 000 1.77 176 000 67.5% 1: Rounded to nearest 10 thousand. 2: High value capped at 25 g/t Au on assays. 3: Rounded to nearest 1 thousand. ON CANADA’S GOLDEN HIGHWAY 007359000-00103096; 6
  • 4. Table 3: Marban Deposit - Underground Mineral Resource (Outside the pit shell) Grade Gold Average Metal Cut-off Grade 1 2 3 Category Tonnes (capped) (capped) Loss due (Au g/t) (g/t Au) (Ounces) to Capping Measured 360 000 3.03 35 000 12.5% 2.0 Indicated 620 000 2.70 53 000 18.5% (Base case) M+I 980 000 2.82 89 000 16.0% Inferred 800 000 2.68 69 000 17.9% Measured 220 000 3.55 25 000 13.8% Indicated 290 000 3.26 30 000 23.1% 2.5 M+I 510 000 3.39 55 000 19.1% Inferred 390 000 3.20 40 000 24.5% Measured 130 000 4.09 17 000 15.0% Indicated 160 000 3.71 19 000 26.9% 3.0 M+I 290 000 3.88 36 000 27.8% Inferred 190 000 3.73 22 000 24.1% 1: Rounded to nearest 10 thousand. 2: High value capped at 25 g/t Au on assays. 3: Rounded to nearest 1 thousand. Geology The Marban mineralized system has a funnel shape corresponding to a 400 to 700 metres wide multi-folded structure in the upper part and a more steeply dipping root at depth, with thicknesses in the range of 100 to 200 metres. Mineralized zones and structures are developed in east-west oriented schistosed basalt altered to carbonate, chlorite and albite. Shear zones dip 45° to 70° to the north and are from 10 to over 70 meters wide. Gold grade typically correlates with an increasing density of quartz veining associated with disseminated pyrite and pyrrhotite. The hanging wall and footwall are composed mainly of ultramafic units. The historical production from this mine is 1.98 million tonnes at 5.27 grams of gold per tonne for 330,000 ounces produced. Marban Property Mineral Resources The Marban deposit currently represents the core of the mineral resources located on the Marban property. The Norlartic and Kierens deposits represent two additional mineral resources, reported on by Mine Development Associates (MDA) December 1, 2009. The project comprises 3 mining lease and 42 claims covering 976 hectares. The following table provides the details of the total mineral resources for the Marban Block property, as updated by the SGS September 2012 mineral resource estimate on the Marban deposit. Note that MDA's previous estimate on the Marban deposit used a cut-off grade of 2.5 g/t, compared to SGS's use of a cut-off grades of 0.35 g/t and 2.0 g/t. ON CANADA’S GOLDEN HIGHWAY 007359000-00103096; 6
  • 5. Table 4: Marban Block property - Mineral Resource Summary September 6, 2012 December 1, 2009 Cut-off 2 2 1 Grade Gold Cut-off Grade 1 Grade Gold Gain Deposit Grade Category Tonnes Tonnes (g/t Au) (Ounces) (Au g/t) (g/t Au) (Ounces) (Ounces) (Au g/t) 0.35 M+I 20 700 000 1.58 1 053 000 1 053 000 In-pit Inferred 3 780 000 1.6 194 000 194 000 Marban 2.0 M+I 980 000 2.82 89 000 1 240 000 4.55 181 000 (92 000) 2.5 Underground Inferred 800 000 2.68 69 000 870 000 4.08 114 000 (45 000) M+I 5 420 000 1.82 316 000 5 420 000 1.82 316 000 4 3 3 Norlartic 0.5 / 2.5 0.5 / 2.5 Inferred 3 200 000 1.44 148 000 3 200 000 1.44 148 000 M+I 1 440 000 2.19 101 000 1 440 000 2.19 101 000 Kierens4 0.5 / 2.53 0.5 / 2.53 Inferred 1 780 000 1.73 99 000 1 780 000 1.73 99 000 M+I 28 540 000 1.7 1 559 000 8 100 000 2.3 599 000 960 000 Total Inferred 9 560 000 1.66 510 000 5 850 000 1.92 361 000 149 000 The mineral resource estimate has been calculated using the Canadian Institute of Mining, Metallurgy and Petroleum ("CIM") Definitions Standards for mineral resources in accordance with National Instrument 43-101 - Standards of Disclosure for Mineral Projects. Mineral resources which are not mineral reserves do not have demonstrated economic viability. Mineral resources update for Marban gold deposit is effective date: November 16, 2011. Mineral resources update for Norlartic and Kierens deposit is effective date: December 1, 2009. 1: Rounded to nearest 10 thousand. 2: Rounded to nearest 1 thousand. 3: 0.5 g/t Au cut-off on resources from surface to 200 metres vertically and 2.5 g/t Au cut-off below 200 metres. 4: Mineral resource estimate reported by MDA Dec 1, 2009. Outlook from Phase 2 drilling program The results of 90 holes and 9 extensions of previous holes of the Phase 2 of the drilling program have successfully confirmed the extension of the different zones of the Marban mineralized system (see the news releases dated March 1, April 26, June 12, and August 15 2012). The objectives of this program on the Marban deposit were to improve the quality of the near surface resources, developing a mineral inventory below a depth of 250 vertical metres and outside the known lateral extension. An updated mineral resource will be produced in order to integrate the results of the Phase 2 drilling program in the resource estimate. The preliminary metallurgical testwork at Marban indicates a favourable recovery between 95.4% and 97.6% for the ore cyanidation test (see news release dated April 24, 2012). The Bond ball mill testing indicated the ore fell in the medium soft to medium range of hardness compared to the SGS database (10.1-10.9 kWh/t). A baseline environmental study has been initiated and being prepared by Golder Associates and should be completed by the end of the year. A third phase of drilling will be initiated later this month. There is still $9M to be spent in the earn-in option with Aurizon. ON CANADA’S GOLDEN HIGHWAY 007359000-00103096; 6
  • 6. Aurizon Option Aurizon can earn up to a 65% interest the Marban Block property under the terms of an option and joint venture agreement dated July 5, 2010, between NioGold and Aurizon. The initial 50% interest can be earned by incurring expenditures of $20 million over three years, completing an updated NI 43-101 compliant mineral resource estimate, and by making a resource payment for 50% of the total gold ounces defined by the mineral resource estimate. NioGold remains the project operator during the initial earn-in period (see news release dated July 6, 2010). Scientific/Technical Info, Qualified Persons and QA/QC Information of a scientific or technical nature in this news release has been reproduced from Aurizon's news release, which information was prepared by or under the supervision of Ghislain Fournier P.Eng., Technical Services General Manager of Aurizon and Martin Demers P.Geo, Exploration Manager of Aurizon. The current mineral resource estimate on the Marban deposit was completed by Yann Camus Eng., of SGS Canada Inc. – Geostat, an independent Qualified Person under NI 43-101 guidelines, using the Canadian Institute of Mining, Metallurgy and Petroleum (CIM) Standards on Mineral Resources and Reserves, Definitions and Guidelines prepared by the CIM Standing Committee on Reserve Definitions and adopted by the CIM Council on December 11, 2005. The effective date of the estimate is November 16, 2011. NioGold does not, at present, know if, how and to what extent any qualified persons at Aurizon have verified the data underlying the scientific and technical information disclosed in Aurizon's news release and reproduced in this news release. NioGold will attempt to verify the data once Aurizon files its technical report in support of its news release. Additional Information A sketch is attached showing the plan and longitudinal view of the Marban Gold deposit with the outline of the in-pit and underground resources. All other information previously released on Marban is also available on NioGold's website at www.niogold.com NioGold Mining Corporation – « On Canada’s Golden Highway » NioGold Mining Corporation is a mineral exploration company focused on gold. The Company’s flagship projects are located in the Cadillac - Malartic - Val-d’Or region of the prolific Abitibi gold mining district Quebec. The Cadillac, Malartic and Val-d’Or mining camps have produced over 45 million ounces of gold since the 1930’s and presently encompasses six producing gold mines including Osisko Mining’s new Canadian Malartic operations. NioGold’s land holdings within the Abitibi presently cover 130km2 and encompass four former gold producers, namely the Norlartic, Kierens (First Canadian), Marban and Malartic Hygrade mines that collectively produced 640,000 ounces of gold. NioGold’s experienced and qualified technical team are overseeing the advancement of these projects, with current drill programs underway targeting expansion of the resource base. NioGold invites you to visit the company website at www.niogold.com. For information on NioGold Mining Corporation contact: Michael A. Iverson, Chairman & CEO Dale Paruk, Vice-President miverson@niogold.com dparuk@niogold.com Tel: (604) 856-9887 Tel: (604) 662-4505 Toll-free: (877) 642-6200 ON CANADA’S GOLDEN HIGHWAY 007359000-00103096; 6
  • 7. Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined the policies of the TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. FORWARD-LOOKING STATEMENTS This news release includes "forward looking statements", as that term is defined in Section 27A of the Unites States Securities Act of 1933, as amended, and Section 21E of the United States Exchange Act of 1934, as amended, that are subject to assumptions, risks and uncertainties. Statements in this news release which are not purely historical are forward looking statements, including without limitation any statements concerning the Company's intentions, plans, estimates, expectations or beliefs regarding the future. Although the Company believes that any forward looking statements in this news release are reasonable, there can be no assurance that any such forward looking statements will prove to be accurate. The Company cautions readers that all forward looking statements, including without limitation those relating to the Company's future operations and business prospects, are based on assumptions none of which can be assured, and are subject to certain risks and uncertainties that could cause actual events or results to differ materially from those indicated in the forward looking statements. Readers are advised to rely on their own evaluation of such risks and uncertainties and should not place undue reliance on forward looking statements. Any forward looking statements are made as of the date of this news release, and the Company assumes no obligation to update the forward looking statements, or to update the reasons why actual events or results could or do differ from those projected in the forward looking statements. Except as required by law, the Company assumes no obligation to update any forward looking statements, whether as a result of new information, future events or otherwise. CAUTIONARY NOTE TO U.S. INVESTORS The United States Securities and Exchange Commission (the “SEC”) permits U.S. mining companies, in their filings with the SEC, to disclose only those mineral deposits that a company can economically and legally extract or produce. We may use certain terms in this news release, such as „measured resources‟, „indicated resources‟ and „inferred resources‟, which the SEC guidelines strictly prohibit U.S. registered companies from including in their filings with the SEC. The news release may contain information about adjacent properties on which we have no right to explore or mine. U.S. investors are cautioned that mineral deposits on adjacent properties may not be indicative of mineral deposits on our properties. ON CANADA’S GOLDEN HIGHWAY 007359000-00103096; 6