Response to City of Waterloo Planner Mr. Mounsey’s July 27, 2009

      correspondence re: Ira Needles Commercial Centre



             By Louisette Lanteigne
                 July 30 2009.
Background Information

• On July 15th 2009, I presented a list of questions to City
  of Waterloo Planner Ryan Mounsey regarding the
  proposed Ira Needles Commercial Centre.

• On July 27th a written reply was sent from Mr. Mounsey in
  regards to the list of questions.

• This presentation is to outline the remaining issues and
  concerns (not exhaustive) regarding the response and
  planning processes for the Ira Needles Commercial
  Centre.
Concern #1:
            City Planning Staff have the belief that:
“The City of Waterloo is not responsible for Water Resource Protection”
The July 27th reply from Planner Ryan Mounsey states:
To state that source water protection is not the city’s
       responsibility conflicts with the following:

• Information on the City of Waterloo Website

• The City of Waterloo’s Official Planning Policy

• The City of Waterloo’s Environmental Strategic
  Plan 2002
Example 1
      The City of Waterloo’s Website states:

• The City of Waterloo is responsible for
  water efficiency, water resource protection
  and sewer-use control programs, and has
  won several awards for this work.

  http://www.city.waterloo.on.ca/DesktopDefault.aspx?tabid=172
Example 2
 Official Plan of the City of Waterloo Planning Area 1990:



The Goal of the Plan
  1.7.3.9. To provide protection and enhancement of the fishery
  habitat through such means as maintaining the connective process
  between groundwater and baseflow to streams.
Example 2, Official Plan Cont.

2.3.3 It is the policy of this Plan to discourage development in
Environmental constraint Areas that would detract from the functions
performed by the natural environment such as groundwater
recharge, erosion control, wildlife habitat, or where environmental
constraints exist. Developments may be permitted where it can be
demonstrated to the satisfaction of Council, the Regional
Municipality of Waterloo, the Grand River Conservation Authority
and any other public agency having jurisdiction, that the proposal
will not adversely affect the Environmental Constraint Area. Such
appropriate statements as Environmental Impact Statement or an
Environmental Analysis Report as set out in the Regional Official
Policies Plan or an Environmental Study as set out in Section
2.3.1.4.3. of this Plan shall be required to support the development
proposal.
Example 2, Official Plan Cont.


4.1.11 Area Municipalities will in Consultation with the MNR or it’s
    delegate, establish policies in it’s’ Official Plans to:

a)   achieve no net loss of the productive capacity of the fish habitats
     by requiring that:

     i)   The applicant assess the impact of the new development on
          designated fish habitat;

     ii) The quality and quantity of water which sustains fish
          communities and fish habitats is not adversely affected.
Example 3
 The City of Waterloo’s Environment Strategic Plan 2002

• 3. Water Resources Monitoring
  In order to make appropriate management decisions with
  respect to land use and development, it is necessary to
  understand the current state of the watershed and to
  identify changes as they occur. The establishment of a
  monitoring program that measures appropriate water
  quality, quantity, and aquatic habitat parameters is an
  essential component of water resource protection.
Issue #2
The City of Waterloo approved the removal of the proposed Ira Needles
     Commercial Centre from the Laurel Creek Watershed Policy
OFFICIAL PLAN AMENDMENT 74 AND ZONE CHANGE for DS-09-34
            June 22, 2009 Waterloo City Council




As the Zone Change was approved for the Ira Needles Commercial
Centre, Waterloo City Council also agreed to remove this area from
the Laurel Creek Watershed Policy to be relocated into the Henry
Sturm Subwatershed area.
This correspondence inspired the change of Subwatershed
Issues regarding the change of subwatershed
• The City of Waterloo’s planners initiated the removal of the Ira
  Needles Commercial Centre area from one Subwatershed study
  to another in spite of the fact the lead planner wrote that water
  resource protection is not the City’s responsibility.

• The stamp states the Stantec letter was received on May 4 2009
  and the vote was on June 22nd. The letter sent from Stantec does
  not state it was directed to either GRCA or Regional Staff, but
  there was adequate time for the city to consult with these
  agencies prior to the rezoning of the proposal. If the lead
  planner wrote that the Region has the responsibility of water
  source protection, then why didn’t the city contact the Region’s
  Water Resources Staff to get them involved with the planning of
  this proposal prior to the rezoning and the Official Plan
  amendment?
Change of watershed cont.

• The Henry Sturm subwatershed policy did not include
  this property into the area of study so the report lacks
  site specific data regarding various natural features.

• No data has been presented to indicate what
  ramifications this change would have upon the existing
  Watershed Studies.

• By removing the property from the Laurel Creek
  Subwatershed Study there are now less ecological
  constraints for this property.
For example: With the Laurel Creek Watershed Study this area had impervious
surface coverage limits but with the Henry Sturm criteria it does not have limits.
These dots are cars. .
Questions
• road salts issues in this area can have serious impacts to our
  municipal wells and aquifers.

• What happens with the leaking landfill when there is less water
  diluting the contamination issues?

• The landfill is already experiencing water issues. There are areas to
  wet to remove the methane. What about risks of explosion?
Issues #3:

Insufficient supporting documentation regarding hydrogeology of
         in regards to the Ira Needles Commercial Centre
In the July 27th letter from the City states:
The February 14, 2001 correspondence from Peto
      MacCallum Ltd. states the following:
The data used by Peto MacCallum
           (and referred to by Stantec)

• The PetoMacCallum Ltd. report titled: Preliminary
  Geotechnical Investigation Proposed industrial
  subdivision West Hill Drive and University Ave.
  Waterloo Ontario was produced in 1988.
The Peto MacCallum Ltd. states:
Examine the bore hole depth, the number of holes, the time of year for
                testing and the years they worked.
Issues and Concerns re: Geotechnical Data

• The bore hole data is too shallow to reasonably assess
  hydrogeological risks associated with a large scale
  commercial centre.

• There are not enough bore holes to accurately reflect the
  subsurface geology of the area.
• This report only relates to approximately one month
  worth of analysis in a study conducted over 20 years
  ago.

• There is no 12 month data to illustrate basic seasonal
  variants, ie: spring thaw water balances, flow rates etc.
re: Geotechnical Data cont.

• There is insufficient supporting documentation to
  ascertain that the clean water collection system will
  either result in a similar distribution (laterally or
  vertically) or similar volume of recharge water as
  presently occurs.

• There has been inadequate monitoring to accurately
  calculate existing runoff conditions, infiltration conditions
  and groundwater discharge.
re: Geotechnical Data cont.
•   Calculations and stream flow observations were not used to verify baseflow
    conditions. (Continuous streamflow measurements for a 12 month period
    would assist in the determination of volumes of runoff and volumes of
    groundwater discharge and groundwater recharge in/out of area creeks.)

•   Using bore hole data, outwash till formations can appear to reflect consistent
    clay coverage but this poses a serious risk to aquifer systems. GPR profiles
    can help mitigate the risks by illustrating the till areas in more detail and
    thereby providing a better view of the underlying sediment layout. This
    area’s topography indicates an outwash till system at this location.

•   Staff did not initiate a review of the hydrogeological data by Regional Water
    Services and do not feel it is their responsibility to do so as noted in the July
    27th correspondence.

•   Pre-development onsite monitoring for a minimum 2 year period in
    accordance to water resource protection policies of the GRCA should be
    implemented in order to circumvent risks to aquifer and well systems.
Further Information
Written on Jan. 20, 2013
Google Earth map showed a large vernal pond that was
     located by Ira Needles and University Ave.
Ira Needles pond habitat:

This large vernal pond was home to beavers, migratory
birds, raccoons, foxes, and turtles, etc.

A Blandings was found in Westvale during the pond
removal phase. The MNR stated the turtle found was a pet
Blandings because it was “tame.” Angela Schoen from
Turtle Haven rescue centre, stated the turtle came from the
wetlands “beside the dump”. She also stated that Blandings
were found in previous years to the north in close proximity
to this area.
The pond was drained.
They drained the creek dry.
Videos of Ira Needles Pond being drained

    This is a video of the wetland soon after they drained it:
       http://www.youtube.com/watch?v=Z-J3WNysFu8



This is a video of the pump used to drain the wetland, visit here:
http://www.youtube.com/watch?v=QaIwvZxQ0kI&feature=related
GRCA forms states there was no
wetland or habitats at all. Pg 1 top
Page 1 bottom
Page 2 top
Page 2 bottom
The Boardwalk Mall is in the red area with
       within 500m of the landfill.
Figure 33: Region of Waterloo Landfill schematic showing the relationship of garbage, the respective
                  liners and protection areas and the leachate gathering system.
                  Source: http://www.geoscapegrandriver.ca/waste_and_recycling.html
Quote from Geoscape website:

• In the region of Waterloo all waste is directed from satellite
  substations to the main landfill on Erb Street west of Waterloo. As
  seen in Figs. 33 and 36, this facility sits on top of the main drinking
  water aquifer and so care must be taken to protect the water supply
  from leachate contamination.
Regarding Landfills & Aquifers: Examine Waterloo Region!


• The Waterloo Landfill is located in the extreme southwest corner of
  the City of Waterloo. The area is underlain by a major sand and
  gravel aquifer which supplies about 45 million gallons per day
  (mgpd) of groundwater to Kitchener Waterloo area. In fact, this is
  one of the most significant groundwater resources in Canada.

• This passage is taken from page 231 of the following report:
  Hazardous waste risk assessment By D. Kofi Asante-Duah

       (A search of the title and author will lead you to the complete online report.)
Topography isn't enough to delineate
 watersheds or prevent water risks.
      (cross section of the Waterloo Moriane)
What goes in the ground will head to wells with draw down
  effects regardless of topography. Professor Mike Stone:
chloride loadings to Waterloo Regional wells reveals this fact.
Example: The Arkell Research Station in Guelph

                        •   Using standard bore hole testing, this area
                            appears to be covered in a consistent clay
                            layer.

                        •   GPR profiles identifies this area as a
                            shallow outwash aquifer. The clay is
                            discontinuous. They are like shingles with
                            many spaces of infiltration in between.

                        •   This area gathers up to 7% of Guelph’s
                            potable water supply and it recharges cold
                            water trout streams.

                        •   The GPR profiles for the Arkell Research
                            Station were provided by Hazen Russell,
                            Sedimentologist with the Canadian
                            Geological Survey of Canada. For more
                            information he can be reached by email at
                            hrussell@nrcan.gc.ca or by phone at 613-
                            992-4374

Más contenido relacionado

La actualidad más candente

Rccas presentation gm 11_14_13sm
Rccas presentation gm 11_14_13smRccas presentation gm 11_14_13sm
Rccas presentation gm 11_14_13smgreenbelt82
 
Pinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure WorkshopPinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure WorkshopNew Jersey Future
 
Water Conservation In Citrus County Florida
Water Conservation In Citrus County FloridaWater Conservation In Citrus County Florida
Water Conservation In Citrus County Floridabrentmwhite
 
Balancing Wetland Preservation and Stormwater Management: a case study
Balancing Wetland Preservation and Stormwater Management: a case studyBalancing Wetland Preservation and Stormwater Management: a case study
Balancing Wetland Preservation and Stormwater Management: a case studyAndrew T. Der & Associates, LLC
 
T4 fatma rezk groundwater management and water governance (summary)
T4 fatma rezk groundwater management and water governance (summary)T4 fatma rezk groundwater management and water governance (summary)
T4 fatma rezk groundwater management and water governance (summary)NENAwaterscarcity
 
Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...
Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...
Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...Mcrpc Staff
 
Stream buffer 20131108
Stream buffer 20131108Stream buffer 20131108
Stream buffer 20131108Mcrpc Staff
 
Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...
Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...
Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...Ezekiel Adelere Adeniran
 
East Luther Grand Valley Posters
East Luther Grand Valley PostersEast Luther Grand Valley Posters
East Luther Grand Valley PostersDavid Arsenault
 
Watershed charecteristics
Watershed charecteristicsWatershed charecteristics
Watershed charecteristicsVipin Mishra
 
Adaptive methods to restore Lake Erie hydrology_Kroll
Adaptive methods to restore Lake Erie hydrology_KrollAdaptive methods to restore Lake Erie hydrology_Kroll
Adaptive methods to restore Lake Erie hydrology_KrollHealthy Lakes, Healthy Lives
 
Cu stormwater proposal
Cu stormwater proposalCu stormwater proposal
Cu stormwater proposalcbwalke
 

La actualidad más candente (20)

Low impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigationLow impact development_coupled_with_floodplain_mitigation
Low impact development_coupled_with_floodplain_mitigation
 
Rccas presentation gm 11_14_13sm
Rccas presentation gm 11_14_13smRccas presentation gm 11_14_13sm
Rccas presentation gm 11_14_13sm
 
EPA Water Conference 2021 Posters
EPA Water Conference 2021 PostersEPA Water Conference 2021 Posters
EPA Water Conference 2021 Posters
 
Pinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure WorkshopPinelands Regional Municipal Leaders Green Infrastructure Workshop
Pinelands Regional Municipal Leaders Green Infrastructure Workshop
 
Water Conservation In Citrus County Florida
Water Conservation In Citrus County FloridaWater Conservation In Citrus County Florida
Water Conservation In Citrus County Florida
 
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
Re-optimization and reoperation study of the Akosombo and Kpong dams (Ghana) ...
 
Balancing Wetland Preservation and Stormwater Management: a case study
Balancing Wetland Preservation and Stormwater Management: a case studyBalancing Wetland Preservation and Stormwater Management: a case study
Balancing Wetland Preservation and Stormwater Management: a case study
 
T4 fatma rezk groundwater management and water governance (summary)
T4 fatma rezk groundwater management and water governance (summary)T4 fatma rezk groundwater management and water governance (summary)
T4 fatma rezk groundwater management and water governance (summary)
 
Presentation 4: Mitigation Strategies
Presentation 4: Mitigation StrategiesPresentation 4: Mitigation Strategies
Presentation 4: Mitigation Strategies
 
Mk2 quantifying water user trade offs at yali reservoir vietnam
Mk2 quantifying water user trade offs at yali reservoir vietnamMk2 quantifying water user trade offs at yali reservoir vietnam
Mk2 quantifying water user trade offs at yali reservoir vietnam
 
Wmm 3rd 2001
Wmm 3rd 2001Wmm 3rd 2001
Wmm 3rd 2001
 
Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...
Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...
Gray vs. Green: The Role of Watershed-scale Green Infrastructure Systems for ...
 
Stream buffer 20131108
Stream buffer 20131108Stream buffer 20131108
Stream buffer 20131108
 
Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...
Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...
Prevention and Mitigating the Occurence and Impact of Flood in the City of Ib...
 
East Luther Grand Valley Posters
East Luther Grand Valley PostersEast Luther Grand Valley Posters
East Luther Grand Valley Posters
 
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment Nam Ngiep Hydropower Dam -- Climate Risk Assessment
Nam Ngiep Hydropower Dam -- Climate Risk Assessment
 
#13 - Comp Plan - Trends & Implications -continued
#13 - Comp Plan - Trends & Implications -continued#13 - Comp Plan - Trends & Implications -continued
#13 - Comp Plan - Trends & Implications -continued
 
Watershed charecteristics
Watershed charecteristicsWatershed charecteristics
Watershed charecteristics
 
Adaptive methods to restore Lake Erie hydrology_Kroll
Adaptive methods to restore Lake Erie hydrology_KrollAdaptive methods to restore Lake Erie hydrology_Kroll
Adaptive methods to restore Lake Erie hydrology_Kroll
 
Cu stormwater proposal
Cu stormwater proposalCu stormwater proposal
Cu stormwater proposal
 

Similar a Attachment a

Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Toronto Public Consultation Unit
 
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IA
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IAASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IA
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IADavid Koser
 
Disaster Management Flooding and Landslide
Disaster Management Flooding and LandslideDisaster Management Flooding and Landslide
Disaster Management Flooding and Landslidesonika patel
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerationsAMIE(I) Study Circle
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Fairfax County
 
The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Star Newspaper
 
Welland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationWelland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationMichael Reles
 
Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018VictoriaColangelo
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Louisette Lanteigne
 
Analysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well EfficiencyAnalysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well EfficiencyIRJET Journal
 
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”IRJET Journal
 
Download-manuals-surface water-software-investigation&selectionofhydrologica...
 Download-manuals-surface water-software-investigation&selectionofhydrologica... Download-manuals-surface water-software-investigation&selectionofhydrologica...
Download-manuals-surface water-software-investigation&selectionofhydrologica...hydrologyproject0
 
Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...
Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...
Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...Texas Living Waters Project
 
Storm Water manual
Storm Water manualStorm Water manual
Storm Water manualgscplanning
 

Similar a Attachment a (20)

John Nemeth, Richmond Hill - Water & Cities
John Nemeth, Richmond Hill - Water & CitiesJohn Nemeth, Richmond Hill - Water & Cities
John Nemeth, Richmond Hill - Water & Cities
 
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
Basement Flooding Remediation and Water Quality Improvement Master Plan Class...
 
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IA
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IAASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IA
ASSESSMENT OF FLOOD MITIGATION STRATEGIES FOR THE CITY OF KALONA, IA
 
Pitts_MRDAC2014
Pitts_MRDAC2014Pitts_MRDAC2014
Pitts_MRDAC2014
 
Disaster Management Flooding and Landslide
Disaster Management Flooding and LandslideDisaster Management Flooding and Landslide
Disaster Management Flooding and Landslide
 
Water resources planning & environmental considerations
Water resources planning & environmental considerationsWater resources planning & environmental considerations
Water resources planning & environmental considerations
 
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
Nottoway Park Stormwater and Water Quality Improvements Phases 1, 2, & 3
 
The Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project ReportThe Northern Collector Water Tunnel Project Report
The Northern Collector Water Tunnel Project Report
 
Welland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information PresentationWelland River Floodplain Mapping - Round 2 Public Information Presentation
Welland River Floodplain Mapping - Round 2 Public Information Presentation
 
Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018Consent 303 Gee Creek Flood Study 2018
Consent 303 Gee Creek Flood Study 2018
 
Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02Aggregateact 120611192330-phpapp02
Aggregateact 120611192330-phpapp02
 
Analysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well EfficiencyAnalysis Of Water Balance and Its Effect on Tube well Efficiency
Analysis Of Water Balance and Its Effect on Tube well Efficiency
 
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
“Analysis Of Water Balance and Its Effect on Tube well Efficiency”
 
Download-manuals-surface water-software-investigation&selectionofhydrologica...
 Download-manuals-surface water-software-investigation&selectionofhydrologica... Download-manuals-surface water-software-investigation&selectionofhydrologica...
Download-manuals-surface water-software-investigation&selectionofhydrologica...
 
Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...
Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...
Water + Planning: The Value of Land Use Planning in Achieving Improved Water ...
 
Storm Water manual
Storm Water manualStorm Water manual
Storm Water manual
 
Reason to rescind OMB decision
Reason to rescind OMB decisionReason to rescind OMB decision
Reason to rescind OMB decision
 
Environmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources ProjectsEnvironmental Impact Assessment in Water Resources Projects
Environmental Impact Assessment in Water Resources Projects
 
Raceway
RacewayRaceway
Raceway
 
Dam guide for communities
Dam guide for communitiesDam guide for communities
Dam guide for communities
 

Más de louisette lanteigne

Más de louisette lanteigne (17)

DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015DarlingtonNuclearLanteigne2015
DarlingtonNuclearLanteigne2015
 
Aggregatecreation
AggregatecreationAggregatecreation
Aggregatecreation
 
Keystone XL Feedback
Keystone XL FeedbackKeystone XL Feedback
Keystone XL Feedback
 
Farmsat risk
Farmsat riskFarmsat risk
Farmsat risk
 
Pipelinespillsprevention
PipelinespillspreventionPipelinespillsprevention
Pipelinespillsprevention
 
EnbridgeResponse
EnbridgeResponseEnbridgeResponse
EnbridgeResponse
 
Enbridge line 9 earthquake risks
Enbridge line 9 earthquake risksEnbridge line 9 earthquake risks
Enbridge line 9 earthquake risks
 
National energystrategypetition
National energystrategypetitionNational energystrategypetition
National energystrategypetition
 
Lanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear PlantLanteigne on Darlington Nuclear Plant
Lanteigne on Darlington Nuclear Plant
 
Nelson quarry lanteigne
Nelson quarry lanteigneNelson quarry lanteigne
Nelson quarry lanteigne
 
Brant's Water Risks
Brant's Water RisksBrant's Water Risks
Brant's Water Risks
 
Brant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risksBrant's water supply, aggregate & development risks
Brant's water supply, aggregate & development risks
 
Waterloo Region’s drained ponds
Waterloo Region’s drained pondsWaterloo Region’s drained ponds
Waterloo Region’s drained ponds
 
Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron Lanteigne re: nuclear waste dump planned by Lake Huron
Lanteigne re: nuclear waste dump planned by Lake Huron
 
Ara submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impactsAra submission lanteigne: aggregate risks & gdp impacts
Ara submission lanteigne: aggregate risks & gdp impacts
 
Aggregateact
AggregateactAggregateact
Aggregateact
 
Lanteigne line9hearing
Lanteigne line9hearingLanteigne line9hearing
Lanteigne line9hearing
 

Attachment a

  • 1. Response to City of Waterloo Planner Mr. Mounsey’s July 27, 2009 correspondence re: Ira Needles Commercial Centre By Louisette Lanteigne July 30 2009.
  • 2. Background Information • On July 15th 2009, I presented a list of questions to City of Waterloo Planner Ryan Mounsey regarding the proposed Ira Needles Commercial Centre. • On July 27th a written reply was sent from Mr. Mounsey in regards to the list of questions. • This presentation is to outline the remaining issues and concerns (not exhaustive) regarding the response and planning processes for the Ira Needles Commercial Centre.
  • 3. Concern #1: City Planning Staff have the belief that: “The City of Waterloo is not responsible for Water Resource Protection”
  • 4. The July 27th reply from Planner Ryan Mounsey states:
  • 5. To state that source water protection is not the city’s responsibility conflicts with the following: • Information on the City of Waterloo Website • The City of Waterloo’s Official Planning Policy • The City of Waterloo’s Environmental Strategic Plan 2002
  • 6. Example 1 The City of Waterloo’s Website states: • The City of Waterloo is responsible for water efficiency, water resource protection and sewer-use control programs, and has won several awards for this work. http://www.city.waterloo.on.ca/DesktopDefault.aspx?tabid=172
  • 7. Example 2 Official Plan of the City of Waterloo Planning Area 1990: The Goal of the Plan 1.7.3.9. To provide protection and enhancement of the fishery habitat through such means as maintaining the connective process between groundwater and baseflow to streams.
  • 8. Example 2, Official Plan Cont. 2.3.3 It is the policy of this Plan to discourage development in Environmental constraint Areas that would detract from the functions performed by the natural environment such as groundwater recharge, erosion control, wildlife habitat, or where environmental constraints exist. Developments may be permitted where it can be demonstrated to the satisfaction of Council, the Regional Municipality of Waterloo, the Grand River Conservation Authority and any other public agency having jurisdiction, that the proposal will not adversely affect the Environmental Constraint Area. Such appropriate statements as Environmental Impact Statement or an Environmental Analysis Report as set out in the Regional Official Policies Plan or an Environmental Study as set out in Section 2.3.1.4.3. of this Plan shall be required to support the development proposal.
  • 9. Example 2, Official Plan Cont. 4.1.11 Area Municipalities will in Consultation with the MNR or it’s delegate, establish policies in it’s’ Official Plans to: a) achieve no net loss of the productive capacity of the fish habitats by requiring that: i) The applicant assess the impact of the new development on designated fish habitat; ii) The quality and quantity of water which sustains fish communities and fish habitats is not adversely affected.
  • 10. Example 3 The City of Waterloo’s Environment Strategic Plan 2002 • 3. Water Resources Monitoring In order to make appropriate management decisions with respect to land use and development, it is necessary to understand the current state of the watershed and to identify changes as they occur. The establishment of a monitoring program that measures appropriate water quality, quantity, and aquatic habitat parameters is an essential component of water resource protection.
  • 11. Issue #2 The City of Waterloo approved the removal of the proposed Ira Needles Commercial Centre from the Laurel Creek Watershed Policy
  • 12. OFFICIAL PLAN AMENDMENT 74 AND ZONE CHANGE for DS-09-34 June 22, 2009 Waterloo City Council As the Zone Change was approved for the Ira Needles Commercial Centre, Waterloo City Council also agreed to remove this area from the Laurel Creek Watershed Policy to be relocated into the Henry Sturm Subwatershed area.
  • 13. This correspondence inspired the change of Subwatershed
  • 14. Issues regarding the change of subwatershed • The City of Waterloo’s planners initiated the removal of the Ira Needles Commercial Centre area from one Subwatershed study to another in spite of the fact the lead planner wrote that water resource protection is not the City’s responsibility. • The stamp states the Stantec letter was received on May 4 2009 and the vote was on June 22nd. The letter sent from Stantec does not state it was directed to either GRCA or Regional Staff, but there was adequate time for the city to consult with these agencies prior to the rezoning of the proposal. If the lead planner wrote that the Region has the responsibility of water source protection, then why didn’t the city contact the Region’s Water Resources Staff to get them involved with the planning of this proposal prior to the rezoning and the Official Plan amendment?
  • 15. Change of watershed cont. • The Henry Sturm subwatershed policy did not include this property into the area of study so the report lacks site specific data regarding various natural features. • No data has been presented to indicate what ramifications this change would have upon the existing Watershed Studies. • By removing the property from the Laurel Creek Subwatershed Study there are now less ecological constraints for this property.
  • 16. For example: With the Laurel Creek Watershed Study this area had impervious surface coverage limits but with the Henry Sturm criteria it does not have limits.
  • 17. These dots are cars. .
  • 18. Questions • road salts issues in this area can have serious impacts to our municipal wells and aquifers. • What happens with the leaking landfill when there is less water diluting the contamination issues? • The landfill is already experiencing water issues. There are areas to wet to remove the methane. What about risks of explosion?
  • 19. Issues #3: Insufficient supporting documentation regarding hydrogeology of in regards to the Ira Needles Commercial Centre
  • 20. In the July 27th letter from the City states:
  • 21. The February 14, 2001 correspondence from Peto MacCallum Ltd. states the following:
  • 22. The data used by Peto MacCallum (and referred to by Stantec) • The PetoMacCallum Ltd. report titled: Preliminary Geotechnical Investigation Proposed industrial subdivision West Hill Drive and University Ave. Waterloo Ontario was produced in 1988.
  • 23. The Peto MacCallum Ltd. states:
  • 24. Examine the bore hole depth, the number of holes, the time of year for testing and the years they worked.
  • 25. Issues and Concerns re: Geotechnical Data • The bore hole data is too shallow to reasonably assess hydrogeological risks associated with a large scale commercial centre. • There are not enough bore holes to accurately reflect the subsurface geology of the area. • This report only relates to approximately one month worth of analysis in a study conducted over 20 years ago. • There is no 12 month data to illustrate basic seasonal variants, ie: spring thaw water balances, flow rates etc.
  • 26. re: Geotechnical Data cont. • There is insufficient supporting documentation to ascertain that the clean water collection system will either result in a similar distribution (laterally or vertically) or similar volume of recharge water as presently occurs. • There has been inadequate monitoring to accurately calculate existing runoff conditions, infiltration conditions and groundwater discharge.
  • 27. re: Geotechnical Data cont. • Calculations and stream flow observations were not used to verify baseflow conditions. (Continuous streamflow measurements for a 12 month period would assist in the determination of volumes of runoff and volumes of groundwater discharge and groundwater recharge in/out of area creeks.) • Using bore hole data, outwash till formations can appear to reflect consistent clay coverage but this poses a serious risk to aquifer systems. GPR profiles can help mitigate the risks by illustrating the till areas in more detail and thereby providing a better view of the underlying sediment layout. This area’s topography indicates an outwash till system at this location. • Staff did not initiate a review of the hydrogeological data by Regional Water Services and do not feel it is their responsibility to do so as noted in the July 27th correspondence. • Pre-development onsite monitoring for a minimum 2 year period in accordance to water resource protection policies of the GRCA should be implemented in order to circumvent risks to aquifer and well systems.
  • 29. Google Earth map showed a large vernal pond that was located by Ira Needles and University Ave.
  • 30. Ira Needles pond habitat: This large vernal pond was home to beavers, migratory birds, raccoons, foxes, and turtles, etc. A Blandings was found in Westvale during the pond removal phase. The MNR stated the turtle found was a pet Blandings because it was “tame.” Angela Schoen from Turtle Haven rescue centre, stated the turtle came from the wetlands “beside the dump”. She also stated that Blandings were found in previous years to the north in close proximity to this area.
  • 31. The pond was drained.
  • 32. They drained the creek dry.
  • 33. Videos of Ira Needles Pond being drained This is a video of the wetland soon after they drained it: http://www.youtube.com/watch?v=Z-J3WNysFu8 This is a video of the pump used to drain the wetland, visit here: http://www.youtube.com/watch?v=QaIwvZxQ0kI&feature=related
  • 34. GRCA forms states there was no wetland or habitats at all. Pg 1 top
  • 38. The Boardwalk Mall is in the red area with within 500m of the landfill.
  • 39.
  • 40. Figure 33: Region of Waterloo Landfill schematic showing the relationship of garbage, the respective liners and protection areas and the leachate gathering system. Source: http://www.geoscapegrandriver.ca/waste_and_recycling.html
  • 41. Quote from Geoscape website: • In the region of Waterloo all waste is directed from satellite substations to the main landfill on Erb Street west of Waterloo. As seen in Figs. 33 and 36, this facility sits on top of the main drinking water aquifer and so care must be taken to protect the water supply from leachate contamination.
  • 42. Regarding Landfills & Aquifers: Examine Waterloo Region! • The Waterloo Landfill is located in the extreme southwest corner of the City of Waterloo. The area is underlain by a major sand and gravel aquifer which supplies about 45 million gallons per day (mgpd) of groundwater to Kitchener Waterloo area. In fact, this is one of the most significant groundwater resources in Canada. • This passage is taken from page 231 of the following report: Hazardous waste risk assessment By D. Kofi Asante-Duah (A search of the title and author will lead you to the complete online report.)
  • 43. Topography isn't enough to delineate watersheds or prevent water risks. (cross section of the Waterloo Moriane)
  • 44. What goes in the ground will head to wells with draw down effects regardless of topography. Professor Mike Stone: chloride loadings to Waterloo Regional wells reveals this fact.
  • 45. Example: The Arkell Research Station in Guelph • Using standard bore hole testing, this area appears to be covered in a consistent clay layer. • GPR profiles identifies this area as a shallow outwash aquifer. The clay is discontinuous. They are like shingles with many spaces of infiltration in between. • This area gathers up to 7% of Guelph’s potable water supply and it recharges cold water trout streams. • The GPR profiles for the Arkell Research Station were provided by Hazen Russell, Sedimentologist with the Canadian Geological Survey of Canada. For more information he can be reached by email at hrussell@nrcan.gc.ca or by phone at 613- 992-4374