Web-COSI EU FP7 Project
Consortium Committee
Rome, 10 January 2014
Istat, Aula Magna, Via Cesare Balbo 14

Web-COSI
Web COmmunities for Statistics for Social Innovation:
management of Web-COSI - coordination of the
consortium
Maria Grazia Calza – Istat
Project Manager of Web-COSI
Web-COSI

Web-COSI is based on:

- Grant Agreement (GA) n. 610422
ANNEX 1 (Description of Work)
ANNEX 2 (General Conditions)
ANNEX 4 (Form A- Accession of beneficiaries to the Grant Agreement)

ANNEX 5 (Form B- Request for accession of a new beneficiary to the GA)
ANNEX 6 (Form C- Financial Statement to be filled in by each beneficiary)
ANNEX 7 (Form D-Terms of reference for the certificate of financial statements)
ANNEX 7 (Form E-Terms of reference for the certificate on methodology)

- Consortium Agreement (CA) – 19 September 2013

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Web-COSI main facts
Duration: 24 months, 1 January 2014 – 31 December 2015
Expected outputs:

– 23 Deliverables
– 2 Periodic Reports at the end of the following periods:
1st period (M1-M12) 1 January 2014 - 31 December 2014
2nd period (M13-M24) 1 January 2015 - 31 December 2015

– one Final Report
Financial Contribution

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Expected outputs: deliverables
23 Deliverables as foreseen in Annex I (DoW)
all deliverables must be submitted according to the timetable specified in the
DoW

the partner in charge of the deliverable will circulate a draft among the
partners in order to define a final version in accordance with the consortium
the coordinator will define a template for the final version that will be made
available to the partners
as to deliverables which are events/activities the partner in charge has to
write a brief report on the event/activity (following a specific template that
will be provided)
the final version of the deliverable will be submitted electronically by the
coordinator to the EC via the Participant Portal
Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Expected outputs: deliverables
Deliverable no. Deliverable name

WP no.
1

Nature Lead
Beneficiary
O
Istat

Delivery Month Delivery Date (by the
(DoW)
month)
1
30 January 2014

1

1.1

2

2.1

3

2.2

4

2.3

5

2.4

6

2.5

Webinar: well-being & societal progress initiatives in Europe good practice
Webinar to promote and disseminate the most incisive
contents and methods implemented by civil society for
societal innovation in the field of collecting statistics on wellbeing
Report: mapping initiatives best practice, the results of citizen
dialogue on well-being and societal progress
Set up of an interactive crowd-sourced map of initiatives in
Europe and in the World
Report on better practice models in a variety of areas related
to social entrepreneurship (e.g. health, education, community
cohesion) and on the mapping exercise

2

O

OECD

4

30 April 2014

2

O

LUNARIA

6

30 June 2014

2

R

OECD

8

30 August 2014

2

O

OECD

12

30 December 2014

2

R

i-genius

16

30 April 2015

7
8
9

2.6
3.1
3.2

Report on the NSIs experiences and best practices, focus on
EU level
Webinar on making data more accessible for society at large
European Wikiprogress University Programme

2
3
3

R
O
O

Istat
OECD
OECD

16
6
11

30 April 2015
30 June 2014
30 November 2014

O

OECD

8

30 August 2014

11 3.4

Wikipedia of progress statistics: redesign of Wikiprogress.stat 3
Workshop on the involvement of the communities for the
statistics engaging citizens in web 2.0 technology and data,
3
Report on

O

OECD

10

30 October 2014

12 3.5

citizens campaign and ‘youth section’ on the Wikiprogress
platform

R

OECD

12

30 December 2014

R

LUNARIA

20

30 August 2015

R

Istat

21

30 September 2015

O

i-genius

21

30 September 2015

10 3.3

13 3.6

14 3.7

15 3.8

Kick off M eeting

3

Report on the potential for social innovation in civil society
participation to the definition of statistics for societal progress
and human well-being beyond GDP, leading to suggestions to
civil society networks and to EU policy makers
3
Document to outline the European dimension, in a global
perspective, on the involvement of communities at large for
official and non official statistics on well-being and societal
progress
3
Four focus groups of social entrepreneurs in four locations of
the EU different to gain a sample perspective on how data can
be best utilised in their locality
3

Rome,10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Expected outputs: deliverables
Deliverable no. Deliverable name

WP no.

Nature Lead
Beneficiary

Delivery Month Delivery Date (by the
(DoW)
month)

16

4.1

Communication tools -Brochure and Web site of the project

4

O

i-genius

3

17

4.2

Policy Briefs

4

O

Istat

24

30 December 2015

18

4.3

Final Conference

4

O

i-genius

24

30 December 2015

19

4.4

Workshop: well-being and societal progress crowd sourcing
initiatives in Europe

4

O

OECD

9

30 September 2014

4

O

i-genius

14

28 February 2015

30 M arch 2014

20

4.5

21

4.6

Workshop to create new methods and develop existing
methods on creating critical mass on the usage of data for
driving social entrepreneurship initiatives
Workshop to promote and disseminate the contents and
methods implemented by civil society for societal innovation
in the field of collecting statistics on well-being

4

O

LUNARIA

16

30 April 2015

4.7

EU Seminar comprising social entrepreneurs and EU policy
makers to explore the findings of the data and consultations in
order to explore implications for policy
4

O

i-genius

20

30 August 2015

4.8

Produce a short film (4min.) for youtube and social media
distribution to showcase the better practice examples with
reference to the needs defined in the data gathering process

O

i-genius

22

30 October 2015

22

23

4

• 12 deliverables in the first reporting period (M1-M12)
• 11 deliverables in the second reporting period (M13-M24)

Rome,10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Expected outputs: periodic reports
The consortium has to submit a periodic report to the Commission within 60
days after the end of each reporting period.
Web-COSI reporting periods (art. 4 GA)
1st period: 1 January 2014 - 31 December 2014
2nd period: 1 January 2015 - 31 December 2015

2 periodic reports that contain both the technical and financial reporting, include:
•

an overview, including a publishable summary, of the progress of work towards the
objectives of the project, including achievements and attainments of any milestones
and deliverables identified in Annex I. This report should also include the differences
between the work planned in Annex I and the one actually carried out,

•

an explanation of the use of the resources, and

•

a financial statement (Form C – Annex 6) by each beneficiary together with a
summary financial report made by the coordinator based on the information provided
in Form C by each beneficiary.

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Expected outputs: periodic reports
 The Financial Statement (Form C) has to be filled in by EACH beneficiary
and must be transmitted and electronically signed through the electronic
exchange system (Participant Portal) by the authorised person within the
beneficiary’s organisation
Recommendations:
Personnel costs: State the category of personnel (manager/researcher/..). State
the number of people and PMs per category: e.g. 2 researchers 1.5 PM; 1
technician 0.3 PM
Please be careful when specify, this contract does not envisage subcontracting
costs.
Travel costs: state the destination, date(s), number of attendees, purpose of the
meeting/travel and whether a presentation was made, for each travel.
e.g. Rome, 02/11/11, conference X, 1 person, 1 project presentation
made.

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Expected outputs: final report

One FINAL REPORT
It has to be delivered within 60 days after the end of the project
(in addition to the periodic report for the last reporting period).
It comprises:
• Final publishable summary report
• Report on wider societal implications (incl. ethics, gender,
awareness spreading) and
• Plan for the use and dissemination of foreground

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Expected outputs
 The Commission shall evaluate and approve project reports and
deliverables and disburse the corresponding payments within 90 days from
the day of receipt of project reports and deliverables
 After reception of the reports the Commission may:
– Approve the reports and deliverables
– Reject the reports and deliverables
– Suspend the time limit for approval
– Suspend the payment in whole or in part

 The consortium shall transmit the reports and other deliverables through the
coordinator to the Commission using the electronic exchange system
(Participant Portal) set up by the Commission.

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Technical audit or review
The Commission may initiate a technical audit or review at any time during
the implementation of the project
Two technical reviews are foreseen for Web-COSI project
The first review has been planned by the Commission at the end of 2014
The aim of a technical audit or review shall be to assess the work carried out
under the project over a certain period, inter alia by evaluating the project
reports and deliverables relevant to the period in question.
All the members of the consortium are required to participate in the
review

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Financial contribution
Total Budget Breakdown (art.5 GA-Annex1)

Each beneficiary has its own budget breakdown approved by the Commission and
accepted by each beneficiary signing the Grant Preparation Form during the negotiation
phase (GPFs - Form A2.5)

Beneficiaries are allowed to transfer budget between different activities and between
themselves in so far as the work is carried out as foreseen in the DoW.
Please consider that for this type of project, reimbursement of indirect eligible costs for
each beneficiary may reach a maximum of 7% of the direct eligible costs.

Rome, 10 January 2014
This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Financial contribution: pre-financing
In accordance with art.6 GA the following pre-financing has been paid:
EUR 353,400 – EUR 29,450 (guarantee fund) = EUR 323,950
distributed by the coordinator to the beneficiaries according to the total
budget breakdown
participant
number

participant
short name

requested EU pre-financing
contribution

1

ISTAT

116,316.00

63,973.80

2

OECD

250,000.00

137,500.00

3

LUNARIA

61,036.00

33,569.80

4

i-genius

161,648.00

88,906.40

589,000.00

323,950.00

TOTAL

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Financial contribution: interim and final payments
For projects with more than one reporting period, the Commission shall make
interim payments of the financial contribution corresponding to the amount
accepted for each reporting period.
The total amount of interim payments + pre-financing will be limited to 90% of
the maximum EU contribution. This may imply that in some cases payment
for the interim periods may be reduced in order to respect this limit.
The final payment will be transferred after the approval of the final report. It
consists of the difference between the calculated EU contribution (on the
basis of the eligible costs) minus the amounts already paid.
The Commission may, at any time during the implementation of the project
and up to five years after the end of the project, arrange for financial audits to
be carried out by external auditors or by the Commission services
themselves

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

EC reference documents
The following page includes all the H2020 & FP7 reference documents
http://ec.europa.eu/research/participants/portal/desktop/en/funding/ref
erence_docs.html#fp7

The network of National Contact Points (NCPs) is the main structure to
provide guidance, practical information and assistance on all aspects of
participation in EC projects.
http://ec.europa.eu/research/participants/portal/desktop/en/support/nat
ional_contact_points.html

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Consortium Agreement (CA)

The purpose of the Consortium Agreement is to specify with
respect to the Project the relationship among the Parties.

In particular, it concerns:
• the organisation of the work among the Parties
• the management of the Project
• rights and obligations of the Parties
• access rights and dispute resolution

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

CONSORTIUM AGREEMENT (CA)
ROLE OF PROJECT COORDINATOR
• to manage the project
• to act as a liaison between the Parties and the Commission
concerning the project
• to coordinate all decisions involving budgetary changes or changes in
the work to be undertaken by the Party after consultation with all the
other Parties
• to collect information from the Parties, to enable submission of all
management and progress reports and cost statements as specified in
the Grant Agreement, to be submitted to the Commission on time
• to administer project finances in accordance with the Grant Agreement
and with article 8 of this Consortium Agreement
• to ensure the scientific and/or technical quality of the work in line with
the provisions of Annex I of the Grant Agreement

Rome, 10 January 2014
Web-COSI

CONSORTIUM AGREEMENT (CA)
ROLE OF WP LEADERS
ISTAT (WP1 and WP4) – OECD (WP2 and WP3)
The Party which is a work package Leader shall manage and direct the
work, monitor the progress of the work and ensure the submission of
deliverables
The WP Leader shall also have the following responsibilities:
a) To call meetings, conference calls or exchange of e-mails as may be
required for the exchange of information about the work

b) To monitor the progress of the work and to promptly inform the
coordinator of any difficulties or delay
c) To ensure the successful completion of the work package within the
schedule identified in the Grant Agreement (Annex 1)

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Management Structure (CA)

Consortium Committee
Advisory Board
(AB)

(CC)

The scientific and technical coordination of the project will be managed by
Istat. Within the consortium Istat will be responsible for the overall
coordination of the project and thus will chair the envisaged governance
board (Consortium Committee) and coordinate the Advisory Board.

Rome, 10 January 2014
This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
Web-COSI

Management Structure (CA)
Consortium Committee (CC)
chaired by the project coordinator, is formed by all partners. It is responsible
for the scientific and technical coordination of the project. It represents also
the general assembly of the project which takes decisions on administrative
and financial matters which transcend the individual work packages and
partners. It takes decisions on the opportunity of amending the work plan.
The Consortium Committee will regularly meet (physically and virtually via
video conference and emails) during the life-cycle of the project.
Advisory Board (AB)
is a counselling body providing advice and guidance for the development of
the project to ensure high quality and excellence and to enhance the
scientific relevance of the dissemination actions. It will be coordinated by
Istat. At least two meetings of the AB will take place during the duration of
the project, although the main exchanges of opinions will take place by mail
or by means of conference calls.

Rome, 10 January 2014

This project is funded by the European Union under the
7th Framework Programme (Theme ICT-2013-10) GA nr 610422
CONTACT DETAILS OF ISTAT
ISTAT Web-COSI Coordination Team
rd-projects@istat.it

Donatella Fazio
dofazio@istat.it
Maria Grazia Calza
calza@istat.it
Arianna Carciotto
arianna.carciotto@istat.it
Tamara Zangla
zangla@istat.it

Francesca D’Ambrogio
dambrogio@istat.it

Rome, 10 January 2014
Thank you for your attention

Rome, 10 January 2014

Más contenido relacionado

La actualidad más candente

Urban Inno - Informatica Trentina
Urban Inno - Informatica TrentinaUrban Inno - Informatica Trentina
Urban Inno - Informatica TrentinaSpeck&Tech
 
OpenCoesione Monithon at CTG Albany
OpenCoesione Monithon at CTG AlbanyOpenCoesione Monithon at CTG Albany
OpenCoesione Monithon at CTG AlbanyOpenCoesione
 
OpenCoesione - Inform network meeting 2016
OpenCoesione - Inform network meeting 2016OpenCoesione - Inform network meeting 2016
OpenCoesione - Inform network meeting 2016OpenCoesione
 
Getting Open Data Used
Getting Open Data UsedGetting Open Data Used
Getting Open Data UsedAndrew Stott
 
Presentation on WSIS Implementation beyond 2015
Presentation on WSIS Implementation beyond 2015Presentation on WSIS Implementation beyond 2015
Presentation on WSIS Implementation beyond 2015Jaroslaw Ponder
 
WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting
WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting
WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting Jaroslaw Ponder
 
GI2014 ppt faugnerova inspire_business&strategy_faugnerova
GI2014 ppt faugnerova inspire_business&strategy_faugnerovaGI2014 ppt faugnerova inspire_business&strategy_faugnerova
GI2014 ppt faugnerova inspire_business&strategy_faugnerovaIGN Vorstand
 
OpenCoesione & ASOC al Peer Exchange Meeting dei Balcani Occidentali
OpenCoesione & ASOC al Peer Exchange Meeting dei Balcani OccidentaliOpenCoesione & ASOC al Peer Exchange Meeting dei Balcani Occidentali
OpenCoesione & ASOC al Peer Exchange Meeting dei Balcani OccidentaliOpenCoesione
 
WSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS Fund
WSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS FundWSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS Fund
WSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS FundJaroslaw Ponder
 
Open Data Conference - Gesche Schmid - Introductin
Open Data Conference - Gesche Schmid - IntroductinOpen Data Conference - Gesche Schmid - Introductin
Open Data Conference - Gesche Schmid - IntroductinOpening-up.eu
 
URBACT presentation 16 may 2014
URBACT presentation 16 may 2014URBACT presentation 16 may 2014
URBACT presentation 16 may 2014URBACT
 
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)URBACT
 
OpenCoesione and OGP
OpenCoesione and OGPOpenCoesione and OGP
OpenCoesione and OGPOpenCoesione
 
Open Government Data - updates from around the world
Open Government Data - updates from around the worldOpen Government Data - updates from around the world
Open Government Data - updates from around the worldAndrew Stott
 
Value of official statistics: Recommendations on promoting, measuring and com...
Value of official statistics: Recommendations on promoting, measuring and com...Value of official statistics: Recommendations on promoting, measuring and com...
Value of official statistics: Recommendations on promoting, measuring and com...Светла Иванова
 
Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...
Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...
Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...Jaroslaw Ponder
 
Housing Intelligence for Dublin
Housing Intelligence for DublinHousing Intelligence for Dublin
Housing Intelligence for DublinDublinked .
 

La actualidad más candente (20)

Urban Inno - Informatica Trentina
Urban Inno - Informatica TrentinaUrban Inno - Informatica Trentina
Urban Inno - Informatica Trentina
 
OpenCoesione Monithon at CTG Albany
OpenCoesione Monithon at CTG AlbanyOpenCoesione Monithon at CTG Albany
OpenCoesione Monithon at CTG Albany
 
OpenLayers 3 - How to successfully run a crowdfunding campaign for an OSS pro...
OpenLayers 3 - How to successfully run a crowdfunding campaign for an OSS pro...OpenLayers 3 - How to successfully run a crowdfunding campaign for an OSS pro...
OpenLayers 3 - How to successfully run a crowdfunding campaign for an OSS pro...
 
OpenCoesione - Inform network meeting 2016
OpenCoesione - Inform network meeting 2016OpenCoesione - Inform network meeting 2016
OpenCoesione - Inform network meeting 2016
 
Getting Open Data Used
Getting Open Data UsedGetting Open Data Used
Getting Open Data Used
 
Presentation on WSIS Implementation beyond 2015
Presentation on WSIS Implementation beyond 2015Presentation on WSIS Implementation beyond 2015
Presentation on WSIS Implementation beyond 2015
 
WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting
WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting
WSIS Forum 2016: Open Consultation Process: Fist Physical Meeting
 
GI2014 ppt faugnerova inspire_business&strategy_faugnerova
GI2014 ppt faugnerova inspire_business&strategy_faugnerovaGI2014 ppt faugnerova inspire_business&strategy_faugnerova
GI2014 ppt faugnerova inspire_business&strategy_faugnerova
 
OpenCoesione & ASOC al Peer Exchange Meeting dei Balcani Occidentali
OpenCoesione & ASOC al Peer Exchange Meeting dei Balcani OccidentaliOpenCoesione & ASOC al Peer Exchange Meeting dei Balcani Occidentali
OpenCoesione & ASOC al Peer Exchange Meeting dei Balcani Occidentali
 
Bruno Monteiro, technology and experimentation, public service delivery, SIGM...
Bruno Monteiro, technology and experimentation, public service delivery, SIGM...Bruno Monteiro, technology and experimentation, public service delivery, SIGM...
Bruno Monteiro, technology and experimentation, public service delivery, SIGM...
 
WSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS Fund
WSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS FundWSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS Fund
WSIS Implementation: WSIS Forum, WSIS Stocktaking, WSIS Prizes, WSIS Fund
 
Open Data Conference - Gesche Schmid - Introductin
Open Data Conference - Gesche Schmid - IntroductinOpen Data Conference - Gesche Schmid - Introductin
Open Data Conference - Gesche Schmid - Introductin
 
URBACT presentation 16 may 2014
URBACT presentation 16 may 2014URBACT presentation 16 may 2014
URBACT presentation 16 may 2014
 
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)
Delivery Pilots Plenary - Objectives, Measuring Impact (29.01)
 
OpenCoesione and OGP
OpenCoesione and OGPOpenCoesione and OGP
OpenCoesione and OGP
 
Open Government Data - updates from around the world
Open Government Data - updates from around the worldOpen Government Data - updates from around the world
Open Government Data - updates from around the world
 
Value of official statistics: Recommendations on promoting, measuring and com...
Value of official statistics: Recommendations on promoting, measuring and com...Value of official statistics: Recommendations on promoting, measuring and com...
Value of official statistics: Recommendations on promoting, measuring and com...
 
Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...
Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...
Unlocking New Opportunities and Strengthening Impact of ICT for SDGs: Alignm...
 
Housing Intelligence for Dublin
Housing Intelligence for DublinHousing Intelligence for Dublin
Housing Intelligence for Dublin
 
Agenda, role of life events in end to end public service delivery, 3 COVID we...
Agenda, role of life events in end to end public service delivery, 3 COVID we...Agenda, role of life events in end to end public service delivery, 3 COVID we...
Agenda, role of life events in end to end public service delivery, 3 COVID we...
 

Similar a Web-COSI Deliverables Reporting and Management by Istat, MG.Calza

OpenCoesione at INFORM meeting
OpenCoesione at INFORM meetingOpenCoesione at INFORM meeting
OpenCoesione at INFORM meetingOpenCoesione
 
Towards WSIS beyond 2015: WSIS+10
Towards WSIS beyond 2015: WSIS+10 Towards WSIS beyond 2015: WSIS+10
Towards WSIS beyond 2015: WSIS+10 Jaroslaw Ponder
 
U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...
U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...
U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...European Green Vehicle Initiative
 
OpenAIRE factsheet: H2020 Open Data Pilot
OpenAIRE factsheet: H2020 Open Data PilotOpenAIRE factsheet: H2020 Open Data Pilot
OpenAIRE factsheet: H2020 Open Data PilotOpenAIRE
 
I4EU project presentation ing 2021 03
I4EU project presentation ing 2021 03I4EU project presentation ing 2021 03
I4EU project presentation ing 2021 03Manuel Castro
 
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...IanHallUK
 
Future internet-news jun-2014
Future internet-news jun-2014Future internet-news jun-2014
Future internet-news jun-2014schahzada
 
Citadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi Luotonen
Citadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi LuotonenCitadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi Luotonen
Citadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi LuotonenBen Cave
 
FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002
FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002
FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002Efthimios Tambouris
 
Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI...
 Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI... Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI...
Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI...European Network of Living Labs (ENoLL)
 
Mobile Age - Overall Project Presentation
Mobile Age - Overall Project PresentationMobile Age - Overall Project Presentation
Mobile Age - Overall Project PresentationPantelis Kanellopoulos
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFOSTEr in MED
 
Ict enabled public sector innovation in h2020
Ict enabled public sector innovation in h2020Ict enabled public sector innovation in h2020
Ict enabled public sector innovation in h2020SarahBuelens
 
Jean christophe charlier alps4_eu final conference
Jean christophe charlier alps4_eu final conferenceJean christophe charlier alps4_eu final conference
Jean christophe charlier alps4_eu final conferenceLeaKane
 

Similar a Web-COSI Deliverables Reporting and Management by Istat, MG.Calza (20)

OpenCoesione at INFORM meeting
OpenCoesione at INFORM meetingOpenCoesione at INFORM meeting
OpenCoesione at INFORM meeting
 
Towards WSIS beyond 2015: WSIS+10
Towards WSIS beyond 2015: WSIS+10 Towards WSIS beyond 2015: WSIS+10
Towards WSIS beyond 2015: WSIS+10
 
U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...
U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...
U-TURN - Rethinking Urban Transportation through advanced tools and supply ch...
 
6. EOSC Secretariat and Landscaping
6. EOSC Secretariat and Landscaping6. EOSC Secretariat and Landscaping
6. EOSC Secretariat and Landscaping
 
OpenAIRE factsheet: H2020 Open Data Pilot
OpenAIRE factsheet: H2020 Open Data PilotOpenAIRE factsheet: H2020 Open Data Pilot
OpenAIRE factsheet: H2020 Open Data Pilot
 
The Interreg V-A Romania-Bulgaria Programme: what's next?
The Interreg V-A Romania-Bulgaria Programme: what's next?The Interreg V-A Romania-Bulgaria Programme: what's next?
The Interreg V-A Romania-Bulgaria Programme: what's next?
 
I4EU project presentation ing 2021 03
I4EU project presentation ing 2021 03I4EU project presentation ing 2021 03
I4EU project presentation ing 2021 03
 
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...
'Smart Cities'/'Open Data' event in Westminster on 13/11/14: EC/Olavi Luotone...
 
EPA Horizon 2020 SC5 Roadshow presentation - NUIG 27.04.16
EPA Horizon 2020 SC5 Roadshow presentation - NUIG 27.04.16EPA Horizon 2020 SC5 Roadshow presentation - NUIG 27.04.16
EPA Horizon 2020 SC5 Roadshow presentation - NUIG 27.04.16
 
Future internet-news jun-2014
Future internet-news jun-2014Future internet-news jun-2014
Future internet-news jun-2014
 
Citadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi Luotonen
Citadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi LuotonenCitadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi Luotonen
Citadel Apps4Dummies London Workshop - 13th Nov 2014 - Olavi Luotonen
 
Agenda-ENG-SAI-Network-16032022
Agenda-ENG-SAI-Network-16032022Agenda-ENG-SAI-Network-16032022
Agenda-ENG-SAI-Network-16032022
 
FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002
FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002
FP5 IST eGov Project Presentation at the French Prime Minister Cabinet in 2002
 
Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI...
 Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI... Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI...
Smart Cities & Communities; actions at a European level - Axel Volkery @ EUI...
 
EPA Horizon 2020 SC5 Roadshow presentation - DCU 05.05.16
EPA Horizon 2020 SC5 Roadshow presentation - DCU 05.05.16EPA Horizon 2020 SC5 Roadshow presentation - DCU 05.05.16
EPA Horizon 2020 SC5 Roadshow presentation - DCU 05.05.16
 
Mobile Age - Overall Project Presentation
Mobile Age - Overall Project PresentationMobile Age - Overall Project Presentation
Mobile Age - Overall Project Presentation
 
Fostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication PlanFostering solar technology in the Mediterranean area - Communication Plan
Fostering solar technology in the Mediterranean area - Communication Plan
 
FASTEN Objectives
FASTEN ObjectivesFASTEN Objectives
FASTEN Objectives
 
Ict enabled public sector innovation in h2020
Ict enabled public sector innovation in h2020Ict enabled public sector innovation in h2020
Ict enabled public sector innovation in h2020
 
Jean christophe charlier alps4_eu final conference
Jean christophe charlier alps4_eu final conferenceJean christophe charlier alps4_eu final conference
Jean christophe charlier alps4_eu final conference
 

Más de Wikiprogress_slides

The R&D projects funded by the European Union. The recent experience of Web-...
The R&D projects funded by the European Union.  The recent experience of Web-...The R&D projects funded by the European Union.  The recent experience of Web-...
The R&D projects funded by the European Union. The recent experience of Web-...Wikiprogress_slides
 
Citizenship to monitor quality of life and evaluate progress in cities
Citizenship to monitor quality of life and evaluate progress in citiesCitizenship to monitor quality of life and evaluate progress in cities
Citizenship to monitor quality of life and evaluate progress in citiesWikiprogress_slides
 
Transferring knowledge into policy and the role of Wikiprogress
Transferring knowledge into policy and the role of WikiprogressTransferring knowledge into policy and the role of Wikiprogress
Transferring knowledge into policy and the role of WikiprogressWikiprogress_slides
 
German adolescent health behaviors
German adolescent health behaviorsGerman adolescent health behaviors
German adolescent health behaviorsWikiprogress_slides
 
The data needs to support the effectiveness of social entrepreneurship initia...
The data needs to support the effectiveness of social entrepreneurship initia...The data needs to support the effectiveness of social entrepreneurship initia...
The data needs to support the effectiveness of social entrepreneurship initia...Wikiprogress_slides
 
Information and data from civil society by Lunaria_G.Naletto
Information and data from civil society by Lunaria_G.NalettoInformation and data from civil society by Lunaria_G.Naletto
Information and data from civil society by Lunaria_G.NalettoWikiprogress_slides
 
Istat web cosi meeting-e.baldacci
Istat web cosi meeting-e.baldacciIstat web cosi meeting-e.baldacci
Istat web cosi meeting-e.baldacciWikiprogress_slides
 
Catalyst negotiation workshop may 15 v5
Catalyst negotiation workshop may 15 v5Catalyst negotiation workshop may 15 v5
Catalyst negotiation workshop may 15 v5Wikiprogress_slides
 
Cap2020 negotiation workshop_15may2013
Cap2020 negotiation workshop_15may2013Cap2020 negotiation workshop_15may2013
Cap2020 negotiation workshop_15may2013Wikiprogress_slides
 
Decarbo net negotiation-workshop
Decarbo net negotiation-workshopDecarbo net negotiation-workshop
Decarbo net negotiation-workshopWikiprogress_slides
 

Más de Wikiprogress_slides (20)

The R&D projects funded by the European Union. The recent experience of Web-...
The R&D projects funded by the European Union.  The recent experience of Web-...The R&D projects funded by the European Union.  The recent experience of Web-...
The R&D projects funded by the European Union. The recent experience of Web-...
 
Citizenship to monitor quality of life and evaluate progress in cities
Citizenship to monitor quality of life and evaluate progress in citiesCitizenship to monitor quality of life and evaluate progress in cities
Citizenship to monitor quality of life and evaluate progress in cities
 
qolexity_fazio_26 septembr_2014
qolexity_fazio_26 septembr_2014qolexity_fazio_26 septembr_2014
qolexity_fazio_26 septembr_2014
 
Transferring knowledge into policy and the role of Wikiprogress
Transferring knowledge into policy and the role of WikiprogressTransferring knowledge into policy and the role of Wikiprogress
Transferring knowledge into policy and the role of Wikiprogress
 
German adolescent health behaviors
German adolescent health behaviorsGerman adolescent health behaviors
German adolescent health behaviors
 
The data needs to support the effectiveness of social entrepreneurship initia...
The data needs to support the effectiveness of social entrepreneurship initia...The data needs to support the effectiveness of social entrepreneurship initia...
The data needs to support the effectiveness of social entrepreneurship initia...
 
Information and data from civil society by Lunaria_G.Naletto
Information and data from civil society by Lunaria_G.NalettoInformation and data from civil society by Lunaria_G.Naletto
Information and data from civil society by Lunaria_G.Naletto
 
Istat web cosi meeting-e.baldacci
Istat web cosi meeting-e.baldacciIstat web cosi meeting-e.baldacci
Istat web cosi meeting-e.baldacci
 
Usemp negotiation workshop mh
Usemp  negotiation workshop mhUsemp  negotiation workshop mh
Usemp negotiation workshop mh
 
Sci cafe 2.0 overview
Sci cafe 2.0 overviewSci cafe 2.0 overview
Sci cafe 2.0 overview
 
Ia4 si networing event_passani
Ia4 si networing event_passaniIa4 si networing event_passani
Ia4 si networing event_passani
 
Dcent slides
Dcent slidesDcent slides
Dcent slides
 
Chest presentation 2.1
Chest presentation 2.1Chest presentation 2.1
Chest presentation 2.1
 
Catalyst negotiation workshop may 15 v5
Catalyst negotiation workshop may 15 v5Catalyst negotiation workshop may 15 v5
Catalyst negotiation workshop may 15 v5
 
Cap2020 negotiation workshop_15may2013
Cap2020 negotiation workshop_15may2013Cap2020 negotiation workshop_15may2013
Cap2020 negotiation workshop_15may2013
 
Cap4 access networking
Cap4 access networkingCap4 access networking
Cap4 access networking
 
P2 p value nego summary
P2 p value nego summaryP2 p value nego summary
P2 p value nego summary
 
Sci cafe 2.0 overview
Sci cafe 2.0 overviewSci cafe 2.0 overview
Sci cafe 2.0 overview
 
P2 p value nego summary
P2 p value nego summaryP2 p value nego summary
P2 p value nego summary
 
Decarbo net negotiation-workshop
Decarbo net negotiation-workshopDecarbo net negotiation-workshop
Decarbo net negotiation-workshop
 

Último

Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...Hector Del Castillo, CPM, CPMM
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024Chandresh Chudasama
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...PRnews2
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIBGregory DeShields
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerAggregage
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdfMintel Group
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansNugget Global
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextP&CO
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfShashank Mehta
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersPeter Horsten
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOne Monitar
 

Último (20)

Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
How Generative AI Is Transforming Your Business | Byond Growth Insights | Apr...
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 
MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024MEP Plans in Construction of Building and Industrial Projects 2024
MEP Plans in Construction of Building and Industrial Projects 2024
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
Introducing the AI ShillText Generator A New Era for Cryptocurrency Marketing...
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIB
 
Driving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon HarmerDriving Business Impact for PMs with Jon Harmer
Driving Business Impact for PMs with Jon Harmer
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdftrending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
trending-flavors-and-ingredients-in-salty-snacks-us-2024_Redacted-V2.pdf
 
Simplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business LoansSimplify Your Funding: Quick and Easy Business Loans
Simplify Your Funding: Quick and Easy Business Loans
 
Entrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider contextEntrepreneurial ecosystem- Wider context
Entrepreneurial ecosystem- Wider context
 
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdfDarshan Hiranandani (Son of Niranjan Hiranandani).pdf
Darshan Hiranandani (Son of Niranjan Hiranandani).pdf
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
EUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exportersEUDR Info Meeting Ethiopian coffee exporters
EUDR Info Meeting Ethiopian coffee exporters
 
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring CapabilitiesOnemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
Onemonitar Android Spy App Features: Explore Advanced Monitoring Capabilities
 

Web-COSI Deliverables Reporting and Management by Istat, MG.Calza

  • 1. Web-COSI EU FP7 Project Consortium Committee Rome, 10 January 2014 Istat, Aula Magna, Via Cesare Balbo 14 Web-COSI Web COmmunities for Statistics for Social Innovation: management of Web-COSI - coordination of the consortium Maria Grazia Calza – Istat Project Manager of Web-COSI
  • 2. Web-COSI Web-COSI is based on: - Grant Agreement (GA) n. 610422 ANNEX 1 (Description of Work) ANNEX 2 (General Conditions) ANNEX 4 (Form A- Accession of beneficiaries to the Grant Agreement) ANNEX 5 (Form B- Request for accession of a new beneficiary to the GA) ANNEX 6 (Form C- Financial Statement to be filled in by each beneficiary) ANNEX 7 (Form D-Terms of reference for the certificate of financial statements) ANNEX 7 (Form E-Terms of reference for the certificate on methodology) - Consortium Agreement (CA) – 19 September 2013 Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 3. Web-COSI Web-COSI main facts Duration: 24 months, 1 January 2014 – 31 December 2015 Expected outputs: – 23 Deliverables – 2 Periodic Reports at the end of the following periods: 1st period (M1-M12) 1 January 2014 - 31 December 2014 2nd period (M13-M24) 1 January 2015 - 31 December 2015 – one Final Report Financial Contribution Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 4. Web-COSI Expected outputs: deliverables 23 Deliverables as foreseen in Annex I (DoW) all deliverables must be submitted according to the timetable specified in the DoW the partner in charge of the deliverable will circulate a draft among the partners in order to define a final version in accordance with the consortium the coordinator will define a template for the final version that will be made available to the partners as to deliverables which are events/activities the partner in charge has to write a brief report on the event/activity (following a specific template that will be provided) the final version of the deliverable will be submitted electronically by the coordinator to the EC via the Participant Portal Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 5. Web-COSI Expected outputs: deliverables Deliverable no. Deliverable name WP no. 1 Nature Lead Beneficiary O Istat Delivery Month Delivery Date (by the (DoW) month) 1 30 January 2014 1 1.1 2 2.1 3 2.2 4 2.3 5 2.4 6 2.5 Webinar: well-being & societal progress initiatives in Europe good practice Webinar to promote and disseminate the most incisive contents and methods implemented by civil society for societal innovation in the field of collecting statistics on wellbeing Report: mapping initiatives best practice, the results of citizen dialogue on well-being and societal progress Set up of an interactive crowd-sourced map of initiatives in Europe and in the World Report on better practice models in a variety of areas related to social entrepreneurship (e.g. health, education, community cohesion) and on the mapping exercise 2 O OECD 4 30 April 2014 2 O LUNARIA 6 30 June 2014 2 R OECD 8 30 August 2014 2 O OECD 12 30 December 2014 2 R i-genius 16 30 April 2015 7 8 9 2.6 3.1 3.2 Report on the NSIs experiences and best practices, focus on EU level Webinar on making data more accessible for society at large European Wikiprogress University Programme 2 3 3 R O O Istat OECD OECD 16 6 11 30 April 2015 30 June 2014 30 November 2014 O OECD 8 30 August 2014 11 3.4 Wikipedia of progress statistics: redesign of Wikiprogress.stat 3 Workshop on the involvement of the communities for the statistics engaging citizens in web 2.0 technology and data, 3 Report on O OECD 10 30 October 2014 12 3.5 citizens campaign and ‘youth section’ on the Wikiprogress platform R OECD 12 30 December 2014 R LUNARIA 20 30 August 2015 R Istat 21 30 September 2015 O i-genius 21 30 September 2015 10 3.3 13 3.6 14 3.7 15 3.8 Kick off M eeting 3 Report on the potential for social innovation in civil society participation to the definition of statistics for societal progress and human well-being beyond GDP, leading to suggestions to civil society networks and to EU policy makers 3 Document to outline the European dimension, in a global perspective, on the involvement of communities at large for official and non official statistics on well-being and societal progress 3 Four focus groups of social entrepreneurs in four locations of the EU different to gain a sample perspective on how data can be best utilised in their locality 3 Rome,10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 6. Web-COSI Expected outputs: deliverables Deliverable no. Deliverable name WP no. Nature Lead Beneficiary Delivery Month Delivery Date (by the (DoW) month) 16 4.1 Communication tools -Brochure and Web site of the project 4 O i-genius 3 17 4.2 Policy Briefs 4 O Istat 24 30 December 2015 18 4.3 Final Conference 4 O i-genius 24 30 December 2015 19 4.4 Workshop: well-being and societal progress crowd sourcing initiatives in Europe 4 O OECD 9 30 September 2014 4 O i-genius 14 28 February 2015 30 M arch 2014 20 4.5 21 4.6 Workshop to create new methods and develop existing methods on creating critical mass on the usage of data for driving social entrepreneurship initiatives Workshop to promote and disseminate the contents and methods implemented by civil society for societal innovation in the field of collecting statistics on well-being 4 O LUNARIA 16 30 April 2015 4.7 EU Seminar comprising social entrepreneurs and EU policy makers to explore the findings of the data and consultations in order to explore implications for policy 4 O i-genius 20 30 August 2015 4.8 Produce a short film (4min.) for youtube and social media distribution to showcase the better practice examples with reference to the needs defined in the data gathering process O i-genius 22 30 October 2015 22 23 4 • 12 deliverables in the first reporting period (M1-M12) • 11 deliverables in the second reporting period (M13-M24) Rome,10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 7. Web-COSI Expected outputs: periodic reports The consortium has to submit a periodic report to the Commission within 60 days after the end of each reporting period. Web-COSI reporting periods (art. 4 GA) 1st period: 1 January 2014 - 31 December 2014 2nd period: 1 January 2015 - 31 December 2015 2 periodic reports that contain both the technical and financial reporting, include: • an overview, including a publishable summary, of the progress of work towards the objectives of the project, including achievements and attainments of any milestones and deliverables identified in Annex I. This report should also include the differences between the work planned in Annex I and the one actually carried out, • an explanation of the use of the resources, and • a financial statement (Form C – Annex 6) by each beneficiary together with a summary financial report made by the coordinator based on the information provided in Form C by each beneficiary. Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 8. Web-COSI Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 9. Web-COSI Expected outputs: periodic reports  The Financial Statement (Form C) has to be filled in by EACH beneficiary and must be transmitted and electronically signed through the electronic exchange system (Participant Portal) by the authorised person within the beneficiary’s organisation Recommendations: Personnel costs: State the category of personnel (manager/researcher/..). State the number of people and PMs per category: e.g. 2 researchers 1.5 PM; 1 technician 0.3 PM Please be careful when specify, this contract does not envisage subcontracting costs. Travel costs: state the destination, date(s), number of attendees, purpose of the meeting/travel and whether a presentation was made, for each travel. e.g. Rome, 02/11/11, conference X, 1 person, 1 project presentation made. Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 10. Web-COSI Expected outputs: final report One FINAL REPORT It has to be delivered within 60 days after the end of the project (in addition to the periodic report for the last reporting period). It comprises: • Final publishable summary report • Report on wider societal implications (incl. ethics, gender, awareness spreading) and • Plan for the use and dissemination of foreground Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 11. Web-COSI Expected outputs  The Commission shall evaluate and approve project reports and deliverables and disburse the corresponding payments within 90 days from the day of receipt of project reports and deliverables  After reception of the reports the Commission may: – Approve the reports and deliverables – Reject the reports and deliverables – Suspend the time limit for approval – Suspend the payment in whole or in part  The consortium shall transmit the reports and other deliverables through the coordinator to the Commission using the electronic exchange system (Participant Portal) set up by the Commission. Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 12. Web-COSI Technical audit or review The Commission may initiate a technical audit or review at any time during the implementation of the project Two technical reviews are foreseen for Web-COSI project The first review has been planned by the Commission at the end of 2014 The aim of a technical audit or review shall be to assess the work carried out under the project over a certain period, inter alia by evaluating the project reports and deliverables relevant to the period in question. All the members of the consortium are required to participate in the review Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 13. Web-COSI Financial contribution Total Budget Breakdown (art.5 GA-Annex1) Each beneficiary has its own budget breakdown approved by the Commission and accepted by each beneficiary signing the Grant Preparation Form during the negotiation phase (GPFs - Form A2.5) Beneficiaries are allowed to transfer budget between different activities and between themselves in so far as the work is carried out as foreseen in the DoW. Please consider that for this type of project, reimbursement of indirect eligible costs for each beneficiary may reach a maximum of 7% of the direct eligible costs. Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 14. Web-COSI Financial contribution: pre-financing In accordance with art.6 GA the following pre-financing has been paid: EUR 353,400 – EUR 29,450 (guarantee fund) = EUR 323,950 distributed by the coordinator to the beneficiaries according to the total budget breakdown participant number participant short name requested EU pre-financing contribution 1 ISTAT 116,316.00 63,973.80 2 OECD 250,000.00 137,500.00 3 LUNARIA 61,036.00 33,569.80 4 i-genius 161,648.00 88,906.40 589,000.00 323,950.00 TOTAL Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 15. Web-COSI Financial contribution: interim and final payments For projects with more than one reporting period, the Commission shall make interim payments of the financial contribution corresponding to the amount accepted for each reporting period. The total amount of interim payments + pre-financing will be limited to 90% of the maximum EU contribution. This may imply that in some cases payment for the interim periods may be reduced in order to respect this limit. The final payment will be transferred after the approval of the final report. It consists of the difference between the calculated EU contribution (on the basis of the eligible costs) minus the amounts already paid. The Commission may, at any time during the implementation of the project and up to five years after the end of the project, arrange for financial audits to be carried out by external auditors or by the Commission services themselves Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 16. Web-COSI EC reference documents The following page includes all the H2020 & FP7 reference documents http://ec.europa.eu/research/participants/portal/desktop/en/funding/ref erence_docs.html#fp7 The network of National Contact Points (NCPs) is the main structure to provide guidance, practical information and assistance on all aspects of participation in EC projects. http://ec.europa.eu/research/participants/portal/desktop/en/support/nat ional_contact_points.html Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 17. Web-COSI Consortium Agreement (CA) The purpose of the Consortium Agreement is to specify with respect to the Project the relationship among the Parties. In particular, it concerns: • the organisation of the work among the Parties • the management of the Project • rights and obligations of the Parties • access rights and dispute resolution Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 18. Web-COSI CONSORTIUM AGREEMENT (CA) ROLE OF PROJECT COORDINATOR • to manage the project • to act as a liaison between the Parties and the Commission concerning the project • to coordinate all decisions involving budgetary changes or changes in the work to be undertaken by the Party after consultation with all the other Parties • to collect information from the Parties, to enable submission of all management and progress reports and cost statements as specified in the Grant Agreement, to be submitted to the Commission on time • to administer project finances in accordance with the Grant Agreement and with article 8 of this Consortium Agreement • to ensure the scientific and/or technical quality of the work in line with the provisions of Annex I of the Grant Agreement Rome, 10 January 2014
  • 19. Web-COSI CONSORTIUM AGREEMENT (CA) ROLE OF WP LEADERS ISTAT (WP1 and WP4) – OECD (WP2 and WP3) The Party which is a work package Leader shall manage and direct the work, monitor the progress of the work and ensure the submission of deliverables The WP Leader shall also have the following responsibilities: a) To call meetings, conference calls or exchange of e-mails as may be required for the exchange of information about the work b) To monitor the progress of the work and to promptly inform the coordinator of any difficulties or delay c) To ensure the successful completion of the work package within the schedule identified in the Grant Agreement (Annex 1) Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 20. Web-COSI Management Structure (CA) Consortium Committee Advisory Board (AB) (CC) The scientific and technical coordination of the project will be managed by Istat. Within the consortium Istat will be responsible for the overall coordination of the project and thus will chair the envisaged governance board (Consortium Committee) and coordinate the Advisory Board. Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 21. Web-COSI Management Structure (CA) Consortium Committee (CC) chaired by the project coordinator, is formed by all partners. It is responsible for the scientific and technical coordination of the project. It represents also the general assembly of the project which takes decisions on administrative and financial matters which transcend the individual work packages and partners. It takes decisions on the opportunity of amending the work plan. The Consortium Committee will regularly meet (physically and virtually via video conference and emails) during the life-cycle of the project. Advisory Board (AB) is a counselling body providing advice and guidance for the development of the project to ensure high quality and excellence and to enhance the scientific relevance of the dissemination actions. It will be coordinated by Istat. At least two meetings of the AB will take place during the duration of the project, although the main exchanges of opinions will take place by mail or by means of conference calls. Rome, 10 January 2014 This project is funded by the European Union under the 7th Framework Programme (Theme ICT-2013-10) GA nr 610422
  • 22. CONTACT DETAILS OF ISTAT ISTAT Web-COSI Coordination Team rd-projects@istat.it Donatella Fazio dofazio@istat.it Maria Grazia Calza calza@istat.it Arianna Carciotto arianna.carciotto@istat.it Tamara Zangla zangla@istat.it Francesca D’Ambrogio dambrogio@istat.it Rome, 10 January 2014
  • 23. Thank you for your attention Rome, 10 January 2014