SlideShare una empresa de Scribd logo
1 de 19
Descargar para leer sin conexión
BUILDING A TIER 1 MINERAL
     SANDS COMPANY

      Africa Downunder Conference
               August 2012
         BRUCE GRIFFIN – CEO
Building a Tier 1 Mineral Sands Company                              2




                                        DISCLAIMER
This presentation has been prepared by World Titanium Resources Ltd (WTR). Certain information in
this document has been derived from third parties, and though WTR has no reason to believe that it is
not accurate, reliable or complete, it has not been independently audited or verified by WTR. Any
forward-looking statements included in this document involve subjective judgement and analysis and
are subject to uncertainties, risks and contingencies, many of which are outside the control of, and may
be unknown to, WTR. In particular, such statements are only as of the date of this document, assume
the success of WTR’s strategies, and are subject to significant political, regulatory, business,
competitive and economic uncertainties and risks. Actual future events may vary materially from the
forward-looking statements and the assumptions on which the forward-looking statements are based.
Recipients of this document ("Recipients") are cautioned to not place undue reliance on such forward-
looking statements.
WTR makes no representation or warranty as to the accuracy, reliability or completeness of information
in this document and does not take responsibility for updating any information or correcting any error
or omission which may become apparent after this document has been issued. To the extent permitted
by law, WTR and its officers, employees, related entities and agents ("Agents") disclaim all liability,
direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of
care of WTR and/or any of its Agents) for any loss or damage suffered by a Recipient or other persons
arising out of, or in connection with, any use or reliance on this presentation or information.
All amounts in A$ unless stated otherwise.
Ian Ransome, B.Sc. (Hons) Geology, Pr.Sci.Nat., a Director of the Company, who is a registered
geological scientist with the South African Council for Natural Scientific Professions (SACNASP), and has
sufficient experience which is relevant to the styles of mineralisation and types of deposits under
consideration, and is thus a Qualified Person in terms of the JORC Code, has reviewed and consented to
the inclusion of the scientific and technical information contained in this presentation.
Building a Tier 1 Mineral Sands Company   3




World Titanium Resources
ASX-listed mineral sands developer (WTR)

Toliara Sands Project in Madagascar

Definitive Engineering Study completed
 Large, scalable mineral sands asset
 Simple & low-risk development concept
 Low capital, high margin, robust NPV


Growth Options

First production – target 2014
Building a Tier 1 Mineral Sands Company                                                                                       4




           Large, high grade deposit




APG - Austpac; ARO – Astro; ATR - Astron; BSE - Base; DRX - Diatreme; GUN - Gunson; IMA - Image Resources; KMR – Kenmare Resources; MDL – Mineral Deposits; MZI - Matilda Zircon; PFP – Pathfinder; SFX - Sheffield
Source: Company websites, TZMI
Building a Tier 1 Mineral Sands Company                     5




Scalable                                                             Mineral Resource
                                                                   959 million tonnes @
                                                                        6.1% THM



Large Ore Reserve in ‘starter pit’
• 161 million tonnes at 8.2% THM
• 21 year LOM                                   Ore Reserve
                                            161 million tonnes @
                                                 8.2% THM



Just 17% of current Mineral Resource
• 959 million tonnes at 6.1% THM
• >100 years at initial production rate
Building a Tier 1 Mineral Sands Company                          6




Secured with Mining Licences
Mining licences granted April 2012                                        Ranobe Licences
                                                                          Mineral Resource
                                                                         959 Mt @ 6.1% THM

• 313 million tonnes at 7.6% THM
• 40 year licences, renewable                       Mining Licence (1)
                                                     Mineral Resource
                                                    176 Mt @ 8.1% THM
                                                        Ore Reserve
                                                    161 Mt @ 8.2% THM

Exploration licence renewed April 2012
• Covers rest of the Mineral Resource
• 959 million tonnes at 6.1% THM                         Mining Licence (2)
                                                          Mineral Resource
• 3 year licence                                            137 Mt @ 6.9



• Convertible into a mining licence
Building a Tier 1 Mineral Sands Company                               7




Maiden Ore Reserve                                                     WCP
                                                                       Location 3

Optimised mine plan developed
• Front End Loader dry mine
• 1 concentrator, moved twice
• 21 year initial mine life                                                         WCP
                                                                                    Location 2

• Measured and Indicated Resource                                                         1000m


• Within granted mining licence


Maiden Ore Reserve
• 161 million tonnes at 8.2% THM
                                                                WCP
                                                                Location 1
                                                                                      Mining year
Building a Tier 1 Mineral Sands Company   8




Simple Deposit ~ Simple Development
Inherent advantages
 Unconsolidated sand
 Low slimes content (<5%)
 No strip
 Consistent assemblage
 Close to existing infrastructure


Simple mining, processing and logistics
 Single dry mine with 2 Front End Loaders
 Pump slurry to Primary Concentrator
 Mineral Separation Plant at mine site
 Sulphate and chloride ilmenite
 Zircon/rutile concentrate
 ~55km haul road to storage and jetty
 Direct load vessels in reef sheltered water
Building a Tier 1 Mineral Sands Company                                                      9




Proven, low-risk flowsheet
Simple Processing
• Gravity and magnetic separation
• Confirmed by pilot scale trials
  5,000t of ore processed, proved easy separation
• Off the shelf equipment
• Delivering three products
                                      Mining and Production Schedule
                        350                                                                                  9

                        300                                                                                  8
                                                                                                             7
      Production ktpa




                                                                                                                 Ore Mine mtpa
                        250
                                                                                                             6
                        200                                                                                                      Sulphate Ilmenite
                                                                                                             5
                                                                                                             4                   Chloride Ilmenite
                        150
                                                                                                             3                   Zircon Rich Concentrate
                        100
                                                                                                             2                   Ore mined
                         50                                                                                  1
                          0                                                                                  0
                                            2018




                                                                                        2030
                              2014


                                     2016




                                                   2020


                                                            2022


                                                                   2024


                                                                          2026


                                                                                 2028




                                                                                               2032


                                                                                                      2034
Building a Tier 1 Mineral Sands Company                  10




           Demand for products
                 Sulphate Ilmenite                                  Chloride Ilmenite




                      Underlying Demand       Existing Supply     Likely New Projects


                                          Zircon Concentrate




Source: TZMI
Building a Tier 1 Mineral Sands Company                                                    11




                               Prices and revenue assumptions
                                    Product Prices
                           3,000                                                      300
                                    Zircon Rich Concentrate
Zircon Concentrate US$/t




                           2,500                                                      250
                                    Ilmenite (80% sulphate, 20% chloride)




                                                                                            Ilmenite US$/t
                           2,000                                                      200

                           1,500                                                      150

                           1,000                                                      100

                            500                                                       50

                              0                                                       0
                                   2014
                                   2015
                                   2016
                                   2017
                                   2018
                                   2019
                                   2020
                                   2021
                                   2022
                                   2023
                                   2024
                                   2025
                                   2026
                                   2027
                                   2028
                                   2029
                                   2030
                                   2031
                                   2032
                                   2033
                                   2034
                                   2035
                                                                                                             Revenue Profile
                                        Calendar Year
                                                                                180
                                                                                                             Zircon Rich Concentrate
                                                                                160
                                                                                                             Ilmenite (80% sulphate, 20% chloride)
                                                                                140
                                                                                120
                                                                      US$m pa




                                                                                100
                                                                                80
                                                                                60
                                                                                40
                                                                                20
                                                                                 0



                                                                                                                      Calendar Year
Building a Tier 1 Mineral Sands Company              12




        Competitive cost structure
                                                                                         Annual Average Operating Cost
            Area
                                                                                                       Per Tonne Product
                                                                                         Total US$m
                                                                                                             $US/t
           Mining                                                                           16.2               36
           Concentrator                                                                      8.9               20
           Mineral Separation Plant                                                         10.4               23
           Product transport and Handling                                                    8.9               20
           Admin and Marketing                                                               5.0               11
           Royalties                                                                         2.3                5
           Total                                                                            51.7              116
                                                                                                                Revenue-to-cash cost ratio: 2015




Data in 2015 RC curve is based on TZMI’s long term zircon and titanium feedstock price
forecasts and production forecasts of existing and newly approved operations.
Source: TZMI
Building a Tier 1 Mineral Sands Company   13




Relatively low development capital
Pre-production capital expenditure


Area                                Capital
Mine + Primary Concentrator            19
Mineral Separation Plant               26
Road + Port                            71
Other Infrastructure                   13
Indirect + Other                        7
Process Plant and Infrastructure      136
EPCM (17%)                             23
Contingency (20%)                      32
Total                                 192
                             Low      188
~ Jetty piling cost
                             High     200
Cash Flow US$ M




                                                                            -120
                                                                                                    40
                                                                                                         80




                                                                                   -80
                                                                                          -40
                                                                                                0
                                                                                                              120
                                                                     2013
                                                                     2014
                                                                     2015
                                                                     2016
                                                                     2017
                                                                     2018
                                                                     2019
                                                                     2020
                                                                     2021
                                                                     2022
                                                                     2023
                                                                     2024
                                                                     2025
                                                                     2026
                                                                     2027
                                                                                                                    Project Cash Flows




                                                                     2028
                                                                     2029
                                                                     2030
                                                                     2031
                                                                     2032
                                                                     2033
                                                                     2034
              Cash Flow US$ M                                        2035




       -250
              0
                                    1000




                  250
                        500
                              750


2013
2014
2015
2016
2017
2018
2019
                                                                                                                                                                        Building a Tier 1 Mineral Sands Company




2020
2021
2022
2023
2024
2025
2026
2027
                                                                                                                                         Generating strong cash flows




2028
2029
                                           Cumulative Project Cash Flows




2030
2031
2032
                                                                                                                                                                        14




2033
2034
2035
Building a Tier 1 Mineral Sands Company                  15




Generating robust shareholder value
 ‘Starter Pit’
 Mine life                                         21 years
 Average annual production rate
  Ilmenite                                         407,000 tpa
   Zircon/rutile concentrate                       47,000 tps
 Ore mined                                         161 million tonnes
 Average grade                                     8.2%
 Ore mined per annum                               8 million tonnes
                                                   US$192 million development capital
 Capital Investment
                                                   US$24 million working capital
 Forecast project financial (August 2012)
 IRR (after tax)                                   27%
 NPV (after tax, 10% real)                         US$257 million
 Payback                                           3 years
 Average annual after tax cash flow                US$47 million
 Life of Mine Free Cash Flow (post-tax real)       US$1033 million
Building a Tier 1 Mineral Sands Company               16




Generating robust shareholder value
                                   NPV10 (US$ M)

 All Product Prices                 -10%              +10%

     Ilmenite Price                 -10%              +10%

   Non-Mag Price                    -10%              +10%

             Opex                   +10%              -10%

            Capex                   +20%              -10%

            Diesel                  +10%              -10%

                  177       217              257                  297   317
Building a Tier 1 Mineral Sands Company                                                                         17




         Growth options
         Expansion
         •       Latent expansion capacity in dedicated port and road

         •       Duplicate Mining, Concentrator and MSP facilities

         Value add
         •       Process non-magnetic concentrate into zircon and rutile products

         Life extension
         •       Starter pit utilises just 17% of the 959 Mt, 6.1% THM resource

         •       Starter pit utilises just 3% of the Projects’ potential mineralisation1


1TotalToliara Sands Project exploration target of 4.7 billion tonnes. Ranobe ~1,400Mt @ 6-7% THM, including 959Mt @ 6.1% Mineral Resource, Ankililoaka ~365 @ 5-6% THM, Basibasy
~445Mt @ 4.5-5.5% THM and Morombe 2500Mt @ 1-3% THM
These Exploration Targets are at an early stage of evaluation, and the potential quantity and grade remain conceptual in nature. At his stage there has been insufficient exploration to define
Mineral Resources and it is uncertain if further exploration will result in the determination of Mineral Resources greater than that already defined.
Building a Tier 1 Mineral Sands Company                                             18




          First production ~ 2014
               Sep 12                    Q3 12                           Q4 12                                1H 13                 2H 13                   2014


                                                                                                                              Geotechnical and marine studies for jetty
                                       Pre Development Engineering
                                                                                                                              EPCM Documentation


              Pre-paid off take and strategic partner funding

                                                                             Equity raise for balance

                                                                                     EPCM Tender

                                          Drilling at Ranobe and Morombe

                                      Pitting and bulk samples at Ranobe

                                               Surface rights

                           Environmental Approval (ESIA and EMP)

                                                                                                        LGIM

                                                                                                                      FEED and Fabrication

                                                                                                                                                 Construction
EPCM – Engineering, Procurement Construction Management; ESIA - Environmental and Social Impact Assessment;
EMP - Environmental Management Plan; LGIM – Large Investment In Mining; FEED - Front-End Engineering and Design
Building a Tier 1 Mineral Sands Company   19




World Titanium Resources
ASX-listed mineral sands developer (WTR)

Toliara Sands Project in Madagascar

Secured with 40 year Mining Licences
Significantly de-risking the Project

Definitive Engineering Study demonstrates:
Large, scalable mineral sands asset
Simple & low-risk development concept
Low capital, high margin, robust NPV

Growth Options

First production – target 2014

Más contenido relacionado

La actualidad más candente

YTC Resources- Resources & Energy Symposium 2012
YTC Resources- Resources & Energy Symposium 2012YTC Resources- Resources & Energy Symposium 2012
YTC Resources- Resources & Energy Symposium 2012
Symposium
 
Reservoir minerals inc july 19 2012 v001 g90s48
Reservoir minerals inc  july 19 2012 v001 g90s48Reservoir minerals inc  july 19 2012 v001 g90s48
Reservoir minerals inc july 19 2012 v001 g90s48
reservoirminerals
 
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Symposium
 
Gold Investment Symposium 2012 - Company Presentation - Atlantic Gold NL
Gold Investment Symposium 2012 - Company Presentation - Atlantic Gold NLGold Investment Symposium 2012 - Company Presentation - Atlantic Gold NL
Gold Investment Symposium 2012 - Company Presentation - Atlantic Gold NL
Symposium
 
RMC November 2013 Corporate Presentation
RMC November 2013 Corporate PresentationRMC November 2013 Corporate Presentation
RMC November 2013 Corporate Presentation
reservoirminerals
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)
QMX Gold Corporation
 

La actualidad más candente (18)

YTC Resources- Resources & Energy Symposium 2012
YTC Resources- Resources & Energy Symposium 2012YTC Resources- Resources & Energy Symposium 2012
YTC Resources- Resources & Energy Symposium 2012
 
Reservoir minerals inc july 19 2012 v001 g90s48
Reservoir minerals inc  july 19 2012 v001 g90s48Reservoir minerals inc  july 19 2012 v001 g90s48
Reservoir minerals inc july 19 2012 v001 g90s48
 
Reservoir Minerals Presentation - March 2016
Reservoir Minerals Presentation - March 2016Reservoir Minerals Presentation - March 2016
Reservoir Minerals Presentation - March 2016
 
160530 corporate presentation
160530 corporate presentation160530 corporate presentation
160530 corporate presentation
 
160603 corporate presentation
160603 corporate presentation160603 corporate presentation
160603 corporate presentation
 
RMC Corporate November 2014
RMC Corporate November 2014RMC Corporate November 2014
RMC Corporate November 2014
 
Reservoir Corporate PDAC
Reservoir Corporate PDACReservoir Corporate PDAC
Reservoir Corporate PDAC
 
Augusta Resource Investor Presentation
Augusta Resource Investor PresentationAugusta Resource Investor Presentation
Augusta Resource Investor Presentation
 
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
Gold Investment Symposium 2012 - Company Presentation - Octagonal Resources L...
 
November Investor Presentation
November Investor PresentationNovember Investor Presentation
November Investor Presentation
 
Lion One Presenation September 2016
Lion One Presenation September 2016Lion One Presenation September 2016
Lion One Presenation September 2016
 
Reservoir Minerals Presentation - October 2012
Reservoir Minerals Presentation - October 2012Reservoir Minerals Presentation - October 2012
Reservoir Minerals Presentation - October 2012
 
Gold Investment Symposium 2012 - Company Presentation - Atlantic Gold NL
Gold Investment Symposium 2012 - Company Presentation - Atlantic Gold NLGold Investment Symposium 2012 - Company Presentation - Atlantic Gold NL
Gold Investment Symposium 2012 - Company Presentation - Atlantic Gold NL
 
RMC November 2013 Corporate Presentation
RMC November 2013 Corporate PresentationRMC November 2013 Corporate Presentation
RMC November 2013 Corporate Presentation
 
Stockport Exploration Presentation
Stockport Exploration PresentationStockport Exploration Presentation
Stockport Exploration Presentation
 
2012 Presentation
2012 Presentation2012 Presentation
2012 Presentation
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)
 
WEX Investor Presentation 11 Dec
WEX Investor Presentation 11 DecWEX Investor Presentation 11 Dec
WEX Investor Presentation 11 Dec
 

Similar a Presentation Africa Downunder - August 2012

1210 cambell baird
1210 cambell baird1210 cambell baird
1210 cambell baird
Symposium
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)
Andean American Gold
 
Canadian zincfeb13presentation
Canadian zincfeb13presentationCanadian zincfeb13presentation
Canadian zincfeb13presentation
Company Spotlight
 
Asx annoucement agm presentation 21.11.11
Asx annoucement agm presentation 21.11.11Asx annoucement agm presentation 21.11.11
Asx annoucement agm presentation 21.11.11
QRL
 
Pdac presentation march2011
Pdac presentation march2011Pdac presentation march2011
Pdac presentation march2011
Foyson Resources
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
libertymines
 

Similar a Presentation Africa Downunder - August 2012 (20)

WTR - TZMI Conference Nov 2012
WTR - TZMI Conference Nov 2012WTR - TZMI Conference Nov 2012
WTR - TZMI Conference Nov 2012
 
Reservoir Minerals Presentation - October 2012
Reservoir Minerals Presentation - October 2012Reservoir Minerals Presentation - October 2012
Reservoir Minerals Presentation - October 2012
 
Alphamin Resources Corporate Update (Jan 2014)
Alphamin Resources Corporate Update (Jan 2014)Alphamin Resources Corporate Update (Jan 2014)
Alphamin Resources Corporate Update (Jan 2014)
 
Corporate Presentation December 2012
Corporate Presentation December 2012Corporate Presentation December 2012
Corporate Presentation December 2012
 
1210 cambell baird
1210 cambell baird1210 cambell baird
1210 cambell baird
 
Aa ggold presentation 01 01-11
Aa ggold presentation 01 01-11Aa ggold presentation 01 01-11
Aa ggold presentation 01 01-11
 
Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)Andean American - Corporate Presentation (Sept. 2010)
Andean American - Corporate Presentation (Sept. 2010)
 
Canadian zincfeb13presentation
Canadian zincfeb13presentationCanadian zincfeb13presentation
Canadian zincfeb13presentation
 
Rmc jan2012 v2
Rmc jan2012 v2Rmc jan2012 v2
Rmc jan2012 v2
 
Aa ggold presentation 01 10-11
Aa ggold presentation 01 10-11Aa ggold presentation 01 10-11
Aa ggold presentation 01 10-11
 
NEW
NEWNEW
NEW
 
Reservoir Minerals Presentation - November 2012
Reservoir Minerals Presentation - November 2012Reservoir Minerals Presentation - November 2012
Reservoir Minerals Presentation - November 2012
 
Asx annoucement agm presentation 21.11.11
Asx annoucement agm presentation 21.11.11Asx annoucement agm presentation 21.11.11
Asx annoucement agm presentation 21.11.11
 
May 2012 - Roadshow Presentation
May 2012 - Roadshow PresentationMay 2012 - Roadshow Presentation
May 2012 - Roadshow Presentation
 
Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015Pilbara Minerals investor presentation July 2015
Pilbara Minerals investor presentation July 2015
 
Aa ggold 10 20-10
Aa ggold 10 20-10Aa ggold 10 20-10
Aa ggold 10 20-10
 
Pdac presentation march2011
Pdac presentation march2011Pdac presentation march2011
Pdac presentation march2011
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Praire creek
Praire creekPraire creek
Praire creek
 
Rmc fev13
Rmc fev13Rmc fev13
Rmc fev13
 

Último

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
lizamodels9
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Anamikakaur10
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
amitlee9823
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
dlhescort
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
dollysharma2066
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
amitlee9823
 

Último (20)

Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
Call Girls From Pari Chowk Greater Noida ❤️8448577510 ⊹Best Escorts Service I...
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
Call Girls Service In Old Town Dubai ((0551707352)) Old Town Dubai Call Girl ...
 
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
Lundin Gold - Q1 2024 Conference Call Presentation (Revised)
 
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
Cheap Rate Call Girls In Noida Sector 62 Metro 959961乂3876
 
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRLBAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
BAGALUR CALL GIRL IN 98274*61493 ❤CALL GIRLS IN ESCORT SERVICE❤CALL GIRL
 
Value Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and painsValue Proposition canvas- Customer needs and pains
Value Proposition canvas- Customer needs and pains
 
Business Model Canvas (BMC)- A new venture concept
Business Model Canvas (BMC)-  A new venture conceptBusiness Model Canvas (BMC)-  A new venture concept
Business Model Canvas (BMC)- A new venture concept
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
Call Now ☎️🔝 9332606886🔝 Call Girls ❤ Service In Bhilwara Female Escorts Serv...
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
Falcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to ProsperityFalcon's Invoice Discounting: Your Path to Prosperity
Falcon's Invoice Discounting: Your Path to Prosperity
 
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
Call Girls Kengeri Satellite Town Just Call 👗 7737669865 👗 Top Class Call Gir...
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort ServiceEluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
Eluru Call Girls Service ☎ ️93326-06886 ❤️‍🔥 Enjoy 24/7 Escort Service
 
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service NoidaCall Girls In Noida 959961⊹3876 Independent Escort Service Noida
Call Girls In Noida 959961⊹3876 Independent Escort Service Noida
 
Falcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investorsFalcon Invoice Discounting: The best investment platform in india for investors
Falcon Invoice Discounting: The best investment platform in india for investors
 
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
FULL ENJOY Call Girls In Mahipalpur Delhi Contact Us 8377877756
 
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
Nelamangala Call Girls: 🍓 7737669865 🍓 High Profile Model Escorts | Bangalore...
 
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
The Path to Product Excellence: Avoiding Common Pitfalls and Enhancing Commun...
 

Presentation Africa Downunder - August 2012

  • 1. BUILDING A TIER 1 MINERAL SANDS COMPANY Africa Downunder Conference August 2012 BRUCE GRIFFIN – CEO
  • 2. Building a Tier 1 Mineral Sands Company 2 DISCLAIMER This presentation has been prepared by World Titanium Resources Ltd (WTR). Certain information in this document has been derived from third parties, and though WTR has no reason to believe that it is not accurate, reliable or complete, it has not been independently audited or verified by WTR. Any forward-looking statements included in this document involve subjective judgement and analysis and are subject to uncertainties, risks and contingencies, many of which are outside the control of, and may be unknown to, WTR. In particular, such statements are only as of the date of this document, assume the success of WTR’s strategies, and are subject to significant political, regulatory, business, competitive and economic uncertainties and risks. Actual future events may vary materially from the forward-looking statements and the assumptions on which the forward-looking statements are based. Recipients of this document ("Recipients") are cautioned to not place undue reliance on such forward- looking statements. WTR makes no representation or warranty as to the accuracy, reliability or completeness of information in this document and does not take responsibility for updating any information or correcting any error or omission which may become apparent after this document has been issued. To the extent permitted by law, WTR and its officers, employees, related entities and agents ("Agents") disclaim all liability, direct, indirect or consequential (and whether or not arising out of the negligence, default or lack of care of WTR and/or any of its Agents) for any loss or damage suffered by a Recipient or other persons arising out of, or in connection with, any use or reliance on this presentation or information. All amounts in A$ unless stated otherwise. Ian Ransome, B.Sc. (Hons) Geology, Pr.Sci.Nat., a Director of the Company, who is a registered geological scientist with the South African Council for Natural Scientific Professions (SACNASP), and has sufficient experience which is relevant to the styles of mineralisation and types of deposits under consideration, and is thus a Qualified Person in terms of the JORC Code, has reviewed and consented to the inclusion of the scientific and technical information contained in this presentation.
  • 3. Building a Tier 1 Mineral Sands Company 3 World Titanium Resources ASX-listed mineral sands developer (WTR) Toliara Sands Project in Madagascar Definitive Engineering Study completed  Large, scalable mineral sands asset  Simple & low-risk development concept  Low capital, high margin, robust NPV Growth Options First production – target 2014
  • 4. Building a Tier 1 Mineral Sands Company 4 Large, high grade deposit APG - Austpac; ARO – Astro; ATR - Astron; BSE - Base; DRX - Diatreme; GUN - Gunson; IMA - Image Resources; KMR – Kenmare Resources; MDL – Mineral Deposits; MZI - Matilda Zircon; PFP – Pathfinder; SFX - Sheffield Source: Company websites, TZMI
  • 5. Building a Tier 1 Mineral Sands Company 5 Scalable Mineral Resource 959 million tonnes @ 6.1% THM Large Ore Reserve in ‘starter pit’ • 161 million tonnes at 8.2% THM • 21 year LOM Ore Reserve 161 million tonnes @ 8.2% THM Just 17% of current Mineral Resource • 959 million tonnes at 6.1% THM • >100 years at initial production rate
  • 6. Building a Tier 1 Mineral Sands Company 6 Secured with Mining Licences Mining licences granted April 2012 Ranobe Licences Mineral Resource 959 Mt @ 6.1% THM • 313 million tonnes at 7.6% THM • 40 year licences, renewable Mining Licence (1) Mineral Resource 176 Mt @ 8.1% THM Ore Reserve 161 Mt @ 8.2% THM Exploration licence renewed April 2012 • Covers rest of the Mineral Resource • 959 million tonnes at 6.1% THM Mining Licence (2) Mineral Resource • 3 year licence 137 Mt @ 6.9 • Convertible into a mining licence
  • 7. Building a Tier 1 Mineral Sands Company 7 Maiden Ore Reserve WCP Location 3 Optimised mine plan developed • Front End Loader dry mine • 1 concentrator, moved twice • 21 year initial mine life WCP Location 2 • Measured and Indicated Resource 1000m • Within granted mining licence Maiden Ore Reserve • 161 million tonnes at 8.2% THM WCP Location 1 Mining year
  • 8. Building a Tier 1 Mineral Sands Company 8 Simple Deposit ~ Simple Development Inherent advantages  Unconsolidated sand  Low slimes content (<5%)  No strip  Consistent assemblage  Close to existing infrastructure Simple mining, processing and logistics  Single dry mine with 2 Front End Loaders  Pump slurry to Primary Concentrator  Mineral Separation Plant at mine site  Sulphate and chloride ilmenite  Zircon/rutile concentrate  ~55km haul road to storage and jetty  Direct load vessels in reef sheltered water
  • 9. Building a Tier 1 Mineral Sands Company 9 Proven, low-risk flowsheet Simple Processing • Gravity and magnetic separation • Confirmed by pilot scale trials 5,000t of ore processed, proved easy separation • Off the shelf equipment • Delivering three products Mining and Production Schedule 350 9 300 8 7 Production ktpa Ore Mine mtpa 250 6 200 Sulphate Ilmenite 5 4 Chloride Ilmenite 150 3 Zircon Rich Concentrate 100 2 Ore mined 50 1 0 0 2018 2030 2014 2016 2020 2022 2024 2026 2028 2032 2034
  • 10. Building a Tier 1 Mineral Sands Company 10 Demand for products Sulphate Ilmenite Chloride Ilmenite Underlying Demand Existing Supply Likely New Projects Zircon Concentrate Source: TZMI
  • 11. Building a Tier 1 Mineral Sands Company 11 Prices and revenue assumptions Product Prices 3,000 300 Zircon Rich Concentrate Zircon Concentrate US$/t 2,500 250 Ilmenite (80% sulphate, 20% chloride) Ilmenite US$/t 2,000 200 1,500 150 1,000 100 500 50 0 0 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 2028 2029 2030 2031 2032 2033 2034 2035 Revenue Profile Calendar Year 180 Zircon Rich Concentrate 160 Ilmenite (80% sulphate, 20% chloride) 140 120 US$m pa 100 80 60 40 20 0 Calendar Year
  • 12. Building a Tier 1 Mineral Sands Company 12 Competitive cost structure Annual Average Operating Cost Area Per Tonne Product Total US$m $US/t Mining 16.2 36 Concentrator 8.9 20 Mineral Separation Plant 10.4 23 Product transport and Handling 8.9 20 Admin and Marketing 5.0 11 Royalties 2.3 5 Total 51.7 116 Revenue-to-cash cost ratio: 2015 Data in 2015 RC curve is based on TZMI’s long term zircon and titanium feedstock price forecasts and production forecasts of existing and newly approved operations. Source: TZMI
  • 13. Building a Tier 1 Mineral Sands Company 13 Relatively low development capital Pre-production capital expenditure Area Capital Mine + Primary Concentrator 19 Mineral Separation Plant 26 Road + Port 71 Other Infrastructure 13 Indirect + Other 7 Process Plant and Infrastructure 136 EPCM (17%) 23 Contingency (20%) 32 Total 192 Low 188 ~ Jetty piling cost High 200
  • 14. Cash Flow US$ M -120 40 80 -80 -40 0 120 2013 2014 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2026 2027 Project Cash Flows 2028 2029 2030 2031 2032 2033 2034 Cash Flow US$ M 2035 -250 0 1000 250 500 750 2013 2014 2015 2016 2017 2018 2019 Building a Tier 1 Mineral Sands Company 2020 2021 2022 2023 2024 2025 2026 2027 Generating strong cash flows 2028 2029 Cumulative Project Cash Flows 2030 2031 2032 14 2033 2034 2035
  • 15. Building a Tier 1 Mineral Sands Company 15 Generating robust shareholder value ‘Starter Pit’ Mine life 21 years Average annual production rate Ilmenite 407,000 tpa Zircon/rutile concentrate 47,000 tps Ore mined 161 million tonnes Average grade 8.2% Ore mined per annum 8 million tonnes US$192 million development capital Capital Investment US$24 million working capital Forecast project financial (August 2012) IRR (after tax) 27% NPV (after tax, 10% real) US$257 million Payback 3 years Average annual after tax cash flow US$47 million Life of Mine Free Cash Flow (post-tax real) US$1033 million
  • 16. Building a Tier 1 Mineral Sands Company 16 Generating robust shareholder value NPV10 (US$ M) All Product Prices -10% +10% Ilmenite Price -10% +10% Non-Mag Price -10% +10% Opex +10% -10% Capex +20% -10% Diesel +10% -10% 177 217 257 297 317
  • 17. Building a Tier 1 Mineral Sands Company 17 Growth options Expansion • Latent expansion capacity in dedicated port and road • Duplicate Mining, Concentrator and MSP facilities Value add • Process non-magnetic concentrate into zircon and rutile products Life extension • Starter pit utilises just 17% of the 959 Mt, 6.1% THM resource • Starter pit utilises just 3% of the Projects’ potential mineralisation1 1TotalToliara Sands Project exploration target of 4.7 billion tonnes. Ranobe ~1,400Mt @ 6-7% THM, including 959Mt @ 6.1% Mineral Resource, Ankililoaka ~365 @ 5-6% THM, Basibasy ~445Mt @ 4.5-5.5% THM and Morombe 2500Mt @ 1-3% THM These Exploration Targets are at an early stage of evaluation, and the potential quantity and grade remain conceptual in nature. At his stage there has been insufficient exploration to define Mineral Resources and it is uncertain if further exploration will result in the determination of Mineral Resources greater than that already defined.
  • 18. Building a Tier 1 Mineral Sands Company 18 First production ~ 2014 Sep 12 Q3 12 Q4 12 1H 13 2H 13 2014 Geotechnical and marine studies for jetty Pre Development Engineering EPCM Documentation Pre-paid off take and strategic partner funding Equity raise for balance EPCM Tender Drilling at Ranobe and Morombe Pitting and bulk samples at Ranobe Surface rights Environmental Approval (ESIA and EMP) LGIM FEED and Fabrication Construction EPCM – Engineering, Procurement Construction Management; ESIA - Environmental and Social Impact Assessment; EMP - Environmental Management Plan; LGIM – Large Investment In Mining; FEED - Front-End Engineering and Design
  • 19. Building a Tier 1 Mineral Sands Company 19 World Titanium Resources ASX-listed mineral sands developer (WTR) Toliara Sands Project in Madagascar Secured with 40 year Mining Licences Significantly de-risking the Project Definitive Engineering Study demonstrates: Large, scalable mineral sands asset Simple & low-risk development concept Low capital, high margin, robust NPV Growth Options First production – target 2014