  1. A 2 wire dc distributor AB is 300m long. It is fed from point A. the various loads and their
     positions are given below:

  At point        Distance from point A in metres       Concentrated load in Amp.
  C               40                                    30
  D               100                                   40
  E               150                                   100
  F               250                                   50


  If the maximum permissible voltage drop is not to exceed 10V, find the cross-sectional area of the
  distributor. Take ρ = 1.78x10-8Ωm.                                      [ 1.164cm2 ]

  2. Two tram cars (A & B) 2 km and 6km away from a sub- station return 40A and 20 A respectively
     to the rails. The sub- station voltage is 600V dc. The resistance of trolley wire is 0.25Ω/km and
     that of track is 0.03Ω/km. calculate the voltage across each tram car.

                                                                         [Va = 566.4V, Vb = 544V].

  3. The load distribution on a 2 wire dc distributor is shown in the figure below:




      The cross-sectional area of each conductor is 0.27cm2. the end A is supplied at 250V. Resistivity
      of the wire is 1.78µΩcm. calculate (i) the current in each section of the conductor (ii) the 2 core
      resistance of each section (iii) the voltage at each tapping point.

                                       [20A,35A,47A; 0.099, 0.132,0.066Ω; 245.35, 240.73,239.41V]

  4. A 2 wire dc distributor AB is fed from both ends. At feeding point A, the voltage is maintained as
     at 230V and at B 235V. the total length of the distributor is 200m and loads are tapped of as
     under:
25A at 50m from A : 50A at 75m from A : 30A at 100m from A : 40A at 150m from A

    The resistance per km of one conductor is 0.3Ω. Calculate :

    (i) currents in various section of the distributor

    (ii) minimum voltage and the point at which it occurs

                                                [ 33.34A, 8.34A, 41.66A, 71.66A, 111.66A ; 228.875V]

5. A 2 wire dc distributor AB, 600m long is loaded as under:

    Distance from        150                    300                350                450
    A(m)

    Loads in Amp         100                    200                250                300

    The feeding point A is maintained at 440V and that at B at 430V. if each conductor has a
    resistance of 0.01 Ω per 100m, calculate:

    (1)The currents supplied from A to B, (2) the power dissipated in the distributor

                                                                         [437.5A, 412.5A,; 14.705KW]

6. An electric train runs between 2 sub-stations 6 km apart maintained at voltages 600V and 590V
   respectively and draws a constant current of 300A while in motion. The track resistance of go
   and return path is 0.04 Ω/km. calculate :

    (i)     The point along the track where minimum potential occurs

    (ii)    The current supplied by the two sub-stations when the train is at the point of minimum
            potential                                              [3.425km, 170.45A, 129.55A]

7. A 2 wire dc ring distributor is 300m long and is fed at 240V at point A. At point B, 150m from A,
   a load of 120A is taken and at C, 100m in the opposite direction, a load of 80A is taken. If the
   resistance per 100m of single conductor is 0.03 Ω, find

    (i)current in each section of distributor

    (ii)voltage at point B and C                         [86.67A, 33.33A, 113.33A; 232.2V, 233.2V]

8. A 2 wire dc distributor ABCDEA in the form of a ring main is fed at point A at 220 V and is loaded
   as under:

    10A at B ; 20A at C; 30A at D and 10A at E

    The resistances of various sections (go and return) are: AB = 0.1 Ω; BC = 0.05 Ω; CD = 0.01 Ω ; DE
    = 0.025 Ω ; EA = 0.075 Ω. Determine:
(i)the point of minimum potential

    (ii)current in each section of the distributor

                              [C is at minimum potential, ; 29.04A, 19.04A, 0.96A, 30.96A, 40.96A]

9. A dc ring main distributor ABCDEA is fed from point A from a 250V supply and the
   resistances(including both lead and return) of various sections are as follows: AB = 0.02 Ω; BC =
   0.018 Ω ; CD = 0.025 Ω ; DA = 0.02 Ω. The main supplies loads of 150A at B; 300A at C and 250A
   at D. determine the voltage at each load point.

    If the points A and C are linked through an interconnector of resistance 0.02 Ω, determine the
    new voltage at each load point. [243.265V,239.904V, 242.735V; 245.93V, 244.97V, 245.1V]

10. A single phase distributor 2km long supplies a load of 120A at 0.8p.f. lagging at its far end and a
    load of 80A at 0.9p.f. lagging at its mid-point. Both power factors arereferred to the voltage at
    the far end. The resistance and reactance per km (go and return) are 0.05 Ω and 0.1 Ω
    respectively. If the voltage at the far end is maintained at 230V, calculate :

    (i)     Voltage at the sending end

    (ii)    Phase angle between voltages at the two ends.                      [261.67V ; 3.82°]

11. A single phase AC distributor 1 km long has resistance and reactance per conductor of 0.1 Ω and
    0.15 Ω respectively. At the far end, the voltage VB = 200V and the current is 100A at a p.f. of 0.8
    lagging. At the mid-point M of the distributor, a current of 100A is tapped at a pf of 0.6 lagging
    with reference to the voltage VM at the mid-point. Calculate:

    (i)Voltage at mid-point

    (ii)Sending end voltage VA

    (iii)Phase angle between VA and VB                                 [217.1V, 252.32V, 3.07°]

Más contenido relacionado

La actualidad más candente

Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design conceptKumar VEL
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear johny renoald
 
Generalised circuit constants
Generalised circuit constantsGeneralised circuit constants
Generalised circuit constantsKaustubh Nande
 
basics of busbar and lbb protection
basics of busbar and lbb protection basics of busbar and lbb protection
basics of busbar and lbb protection Salim Palayi
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysiskirkusawi
 
Conductors used in transmission line
Conductors used in transmission lineConductors used in transmission line
Conductors used in transmission lineSourabh sharma
 
Transformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsTransformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsPower System Operation
 
Chapter 2 transmission line parameters
Chapter 2  transmission line parametersChapter 2  transmission line parameters
Chapter 2 transmission line parametersfiraoltemesgen1
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introductionH. Kheir
 
Substation grounding
Substation groundingSubstation grounding
Substation groundingSyed Ubaid
 
transmission line
transmission line transmission line
transmission line singh1515
 

La actualidad más candente (20)

Transmisiion line design concept
Transmisiion line design conceptTransmisiion line design concept
Transmisiion line design concept
 
Protection & switchgear
Protection & switchgear   Protection & switchgear
Protection & switchgear
 
Generalised circuit constants
Generalised circuit constantsGeneralised circuit constants
Generalised circuit constants
 
Unsymmetrical Fault
Unsymmetrical FaultUnsymmetrical Fault
Unsymmetrical Fault
 
basics of busbar and lbb protection
basics of busbar and lbb protection basics of busbar and lbb protection
basics of busbar and lbb protection
 
Hvdc transmission system
Hvdc transmission systemHvdc transmission system
Hvdc transmission system
 
Auto recloser
Auto recloserAuto recloser
Auto recloser
 
File 1 power system fault analysis
File 1 power system fault analysisFile 1 power system fault analysis
File 1 power system fault analysis
 
Voltage Drop Calculation.pdf
Voltage Drop Calculation.pdfVoltage Drop Calculation.pdf
Voltage Drop Calculation.pdf
 
Current Transformer.pptx
Current Transformer.pptxCurrent Transformer.pptx
Current Transformer.pptx
 
Bus Bar Protection
Bus Bar ProtectionBus Bar Protection
Bus Bar Protection
 
Distribution transformer
Distribution transformerDistribution transformer
Distribution transformer
 
Conductors used in transmission line
Conductors used in transmission lineConductors used in transmission line
Conductors used in transmission line
 
Transformer Differential Protection Setting Calculations
Transformer Differential Protection Setting CalculationsTransformer Differential Protection Setting Calculations
Transformer Differential Protection Setting Calculations
 
Balanced faults
Balanced faultsBalanced faults
Balanced faults
 
Chapter 2 transmission line parameters
Chapter 2  transmission line parametersChapter 2  transmission line parameters
Chapter 2 transmission line parameters
 
What is Power factor?
What is Power factor?What is Power factor?
What is Power factor?
 
Transformers protection, an introduction
Transformers protection, an introductionTransformers protection, an introduction
Transformers protection, an introduction
 
Substation grounding
Substation groundingSubstation grounding
Substation grounding
 
transmission line
transmission line transmission line
transmission line
 

Similar a Dc Distribution

Similar a Dc Distribution (20)

Distribution System-2 in power system Engin
Distribution System-2 in power system EnginDistribution System-2 in power system Engin
Distribution System-2 in power system Engin
 
147110756 march-2005
147110756 march-2005147110756 march-2005
147110756 march-2005
 
Unit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothariUnit 2 Questions_Nagrath kothari
Unit 2 Questions_Nagrath kothari
 
Short And Medium Lines
Short And Medium LinesShort And Medium Lines
Short And Medium Lines
 
Electrical and Electronics Engineering
Electrical and Electronics EngineeringElectrical and Electronics Engineering
Electrical and Electronics Engineering
 
Long Transmission Lines
Long Transmission LinesLong Transmission Lines
Long Transmission Lines
 
Eet3082 binod kumar sahu lecturer_10
Eet3082 binod kumar sahu lecturer_10Eet3082 binod kumar sahu lecturer_10
Eet3082 binod kumar sahu lecturer_10
 
Pre engineering model question papers
Pre engineering model question papersPre engineering model question papers
Pre engineering model question papers
 
Transmission network
Transmission  networkTransmission  network
Transmission network
 
Unit 1, Power system Analysis
Unit 1, Power system AnalysisUnit 1, Power system Analysis
Unit 1, Power system Analysis
 
Chapter20 powerpoint 090223020055-phpapp01
Chapter20 powerpoint 090223020055-phpapp01Chapter20 powerpoint 090223020055-phpapp01
Chapter20 powerpoint 090223020055-phpapp01
 
Tranp.pptx
Tranp.pptxTranp.pptx
Tranp.pptx
 
Electrical Engineering
Electrical EngineeringElectrical Engineering
Electrical Engineering
 
Ohmslawweb
OhmslawwebOhmslawweb
Ohmslawweb
 
Dc Circuits Exam
Dc Circuits ExamDc Circuits Exam
Dc Circuits Exam
 
PE UNIT IV.pptx
PE UNIT IV.pptxPE UNIT IV.pptx
PE UNIT IV.pptx
 
questions on diode analysis: Assignment6
questions on diode analysis: Assignment6questions on diode analysis: Assignment6
questions on diode analysis: Assignment6
 
Chapter02
Chapter02Chapter02
Chapter02
 
Tutorial no. 7
Tutorial no. 7Tutorial no. 7
Tutorial no. 7
 
Unit 103 power_point_4_resistors
Unit 103 power_point_4_resistorsUnit 103 power_point_4_resistors
Unit 103 power_point_4_resistors
 

Más de Abha Tripathi

Practice questions for unit ii
Practice questions for unit iiPractice questions for unit ii
Practice questions for unit iiAbha Tripathi
 
Questions practice unit iv
Questions practice unit ivQuestions practice unit iv
Questions practice unit ivAbha Tripathi
 
Power system Stability, Equal area criteria
Power system Stability, Equal area criteriaPower system Stability, Equal area criteria
Power system Stability, Equal area criteriaAbha Tripathi
 
Unit 2 samplesolutions
Unit 2 samplesolutionsUnit 2 samplesolutions
Unit 2 samplesolutionsAbha Tripathi
 
Unit1 and 2 sample solutions
Unit1 and 2 sample solutionsUnit1 and 2 sample solutions
Unit1 and 2 sample solutionsAbha Tripathi
 
Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01Abha Tripathi
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Abha Tripathi
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical componentsAbha Tripathi
 
Representation of power system components
Representation of power system componentsRepresentation of power system components
Representation of power system componentsAbha Tripathi
 
Gas and diesel Plant
Gas and diesel PlantGas and diesel Plant
Gas and diesel PlantAbha Tripathi
 
NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant, NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant, Abha Tripathi
 

Más de Abha Tripathi (20)

Practice questions for unit ii
Practice questions for unit iiPractice questions for unit ii
Practice questions for unit ii
 
Practice questions
Practice questionsPractice questions
Practice questions
 
Questions practice unit iv
Questions practice unit ivQuestions practice unit iv
Questions practice unit iv
 
Power system Stability, Equal area criteria
Power system Stability, Equal area criteriaPower system Stability, Equal area criteria
Power system Stability, Equal area criteria
 
Questions unit4
Questions unit4Questions unit4
Questions unit4
 
Questions unit3
Questions unit3Questions unit3
Questions unit3
 
Unit 2 samplesolutions
Unit 2 samplesolutionsUnit 2 samplesolutions
Unit 2 samplesolutions
 
Unit1 and 2 sample solutions
Unit1 and 2 sample solutionsUnit1 and 2 sample solutions
Unit1 and 2 sample solutions
 
Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01Non Conventional (Renewable) Energy Sources 01
Non Conventional (Renewable) Energy Sources 01
 
Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01Conventional sources of energy (power generation) 01
Conventional sources of energy (power generation) 01
 
Symmetrical components
Symmetrical componentsSymmetrical components
Symmetrical components
 
Representation of power system components
Representation of power system componentsRepresentation of power system components
Representation of power system components
 
Questions unit2 ch3
Questions unit2 ch3Questions unit2 ch3
Questions unit2 ch3
 
Unit1questions
Unit1questionsUnit1questions
Unit1questions
 
Renewable Sor
Renewable SorRenewable Sor
Renewable Sor
 
Gas and diesel Plant
Gas and diesel PlantGas and diesel Plant
Gas and diesel Plant
 
NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant, NPP, Nuclear Power Plant,
NPP, Nuclear Power Plant,
 
Hydro E
Hydro EHydro E
Hydro E
 
Thermal power plant
Thermal power plantThermal power plant
Thermal power plant
 
Soln unit5
Soln unit5Soln unit5
Soln unit5
 

Último

joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...NadhimTaha
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Availablepr788182
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecZurliaSoop
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptxRoofing Contractor
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...pujan9679
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAITim Wilson
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfwill854175
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwaitdaisycvs
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentationuneakwhite
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfAdmir Softic
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...pujan9679
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...meghakumariji156
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGpr788182
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon investment
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1kcpayne
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165meghakumariji156
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxDitasDelaCruz
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 MonthsIndeedSEO
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityEric T. Tung
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingNauman Safdar
 

Último (20)

joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...joint cost.pptx  COST ACCOUNTING  Sixteenth Edition                          ...
joint cost.pptx COST ACCOUNTING Sixteenth Edition ...
 
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service AvailableNashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
Nashik Call Girl Just Call 7091819311 Top Class Call Girl Service Available
 
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan CytotecJual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
Jual Obat Aborsi ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan Cytotec
 
Pre Engineered Building Manufacturers Hyderabad.pptx
Pre Engineered  Building Manufacturers Hyderabad.pptxPre Engineered  Building Manufacturers Hyderabad.pptx
Pre Engineered Building Manufacturers Hyderabad.pptx
 
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
Chennai Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Av...
 
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAIGetting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
Getting Real with AI - Columbus DAW - May 2024 - Nick Woo from AlignAI
 
Arti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdfArti Languages Pre Seed Teaser Deck 2024.pdf
Arti Languages Pre Seed Teaser Deck 2024.pdf
 
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai KuwaitThe Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
The Abortion pills for sale in Qatar@Doha [+27737758557] []Deira Dubai Kuwait
 
Uneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration PresentationUneak White's Personal Brand Exploration Presentation
Uneak White's Personal Brand Exploration Presentation
 
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdfDr. Admir Softic_ presentation_Green Club_ENG.pdf
Dr. Admir Softic_ presentation_Green Club_ENG.pdf
 
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
Ooty Call Gril 80022//12248 Only For Sex And High Profile Best Gril Sex Avail...
 
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
Escorts in Nungambakkam Phone 8250092165 Enjoy 24/7 Escort Service Enjoy Your...
 
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDINGBerhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
Berhampur 70918*19311 CALL GIRLS IN ESCORT SERVICE WE ARE PROVIDING
 
Falcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business GrowthFalcon Invoice Discounting: Empowering Your Business Growth
Falcon Invoice Discounting: Empowering Your Business Growth
 
Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1Katrina Personal Brand Project and portfolio 1
Katrina Personal Brand Project and portfolio 1
 
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165Lucknow Housewife Escorts  by Sexy Bhabhi Service 8250092165
Lucknow Housewife Escorts by Sexy Bhabhi Service 8250092165
 
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptxQSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
QSM Chap 10 Service Culture in Tourism and Hospitality Industry.pptx
 
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 MonthsSEO Case Study: How I Increased SEO Traffic & Ranking by 50-60%  in 6 Months
SEO Case Study: How I Increased SEO Traffic & Ranking by 50-60% in 6 Months
 
How to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League CityHow to Get Started in Social Media for Art League City
How to Get Started in Social Media for Art League City
 
Mckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for ViewingMckinsey foundation level Handbook for Viewing
Mckinsey foundation level Handbook for Viewing
 

Dc Distribution

  • 1. DC and AC Distribution 1. A 2 wire dc distributor AB is 300m long. It is fed from point A. the various loads and their positions are given below: At point Distance from point A in metres Concentrated load in Amp. C 40 30 D 100 40 E 150 100 F 250 50 If the maximum permissible voltage drop is not to exceed 10V, find the cross-sectional area of the distributor. Take ρ = 1.78x10-8Ωm. [ 1.164cm2 ] 2. Two tram cars (A & B) 2 km and 6km away from a sub- station return 40A and 20 A respectively to the rails. The sub- station voltage is 600V dc. The resistance of trolley wire is 0.25Ω/km and that of track is 0.03Ω/km. calculate the voltage across each tram car. [Va = 566.4V, Vb = 544V]. 3. The load distribution on a 2 wire dc distributor is shown in the figure below: The cross-sectional area of each conductor is 0.27cm2. the end A is supplied at 250V. Resistivity of the wire is 1.78µΩcm. calculate (i) the current in each section of the conductor (ii) the 2 core resistance of each section (iii) the voltage at each tapping point. [20A,35A,47A; 0.099, 0.132,0.066Ω; 245.35, 240.73,239.41V] 4. A 2 wire dc distributor AB is fed from both ends. At feeding point A, the voltage is maintained as at 230V and at B 235V. the total length of the distributor is 200m and loads are tapped of as under:
  • 2. 25A at 50m from A : 50A at 75m from A : 30A at 100m from A : 40A at 150m from A The resistance per km of one conductor is 0.3Ω. Calculate : (i) currents in various section of the distributor (ii) minimum voltage and the point at which it occurs [ 33.34A, 8.34A, 41.66A, 71.66A, 111.66A ; 228.875V] 5. A 2 wire dc distributor AB, 600m long is loaded as under: Distance from 150 300 350 450 A(m) Loads in Amp 100 200 250 300 The feeding point A is maintained at 440V and that at B at 430V. if each conductor has a resistance of 0.01 Ω per 100m, calculate: (1)The currents supplied from A to B, (2) the power dissipated in the distributor [437.5A, 412.5A,; 14.705KW] 6. An electric train runs between 2 sub-stations 6 km apart maintained at voltages 600V and 590V respectively and draws a constant current of 300A while in motion. The track resistance of go and return path is 0.04 Ω/km. calculate : (i) The point along the track where minimum potential occurs (ii) The current supplied by the two sub-stations when the train is at the point of minimum potential [3.425km, 170.45A, 129.55A] 7. A 2 wire dc ring distributor is 300m long and is fed at 240V at point A. At point B, 150m from A, a load of 120A is taken and at C, 100m in the opposite direction, a load of 80A is taken. If the resistance per 100m of single conductor is 0.03 Ω, find (i)current in each section of distributor (ii)voltage at point B and C [86.67A, 33.33A, 113.33A; 232.2V, 233.2V] 8. A 2 wire dc distributor ABCDEA in the form of a ring main is fed at point A at 220 V and is loaded as under: 10A at B ; 20A at C; 30A at D and 10A at E The resistances of various sections (go and return) are: AB = 0.1 Ω; BC = 0.05 Ω; CD = 0.01 Ω ; DE = 0.025 Ω ; EA = 0.075 Ω. Determine:
  • 3. (i)the point of minimum potential (ii)current in each section of the distributor [C is at minimum potential, ; 29.04A, 19.04A, 0.96A, 30.96A, 40.96A] 9. A dc ring main distributor ABCDEA is fed from point A from a 250V supply and the resistances(including both lead and return) of various sections are as follows: AB = 0.02 Ω; BC = 0.018 Ω ; CD = 0.025 Ω ; DA = 0.02 Ω. The main supplies loads of 150A at B; 300A at C and 250A at D. determine the voltage at each load point. If the points A and C are linked through an interconnector of resistance 0.02 Ω, determine the new voltage at each load point. [243.265V,239.904V, 242.735V; 245.93V, 244.97V, 245.1V] 10. A single phase distributor 2km long supplies a load of 120A at 0.8p.f. lagging at its far end and a load of 80A at 0.9p.f. lagging at its mid-point. Both power factors arereferred to the voltage at the far end. The resistance and reactance per km (go and return) are 0.05 Ω and 0.1 Ω respectively. If the voltage at the far end is maintained at 230V, calculate : (i) Voltage at the sending end (ii) Phase angle between voltages at the two ends. [261.67V ; 3.82°] 11. A single phase AC distributor 1 km long has resistance and reactance per conductor of 0.1 Ω and 0.15 Ω respectively. At the far end, the voltage VB = 200V and the current is 100A at a p.f. of 0.8 lagging. At the mid-point M of the distributor, a current of 100A is tapped at a pf of 0.6 lagging with reference to the voltage VM at the mid-point. Calculate: (i)Voltage at mid-point (ii)Sending end voltage VA (iii)Phase angle between VA and VB [217.1V, 252.32V, 3.07°]