Monthly Status
Briefing
February 2013
Project Background

   The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely
    destroy 2,611 tons of mustard agent in mortar rounds and artillery
    projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).

   Neutralization followed by biotreatment is the technology selected by the
    Department of Defense to destroy the Pueblo chemical weapons stockpile.

   The Program Executive Officer, Assembled Chemical Weapons Alternatives
    (ACWA), headquartered at Aberdeen Proving Ground, Maryland, is
    responsible for managing all aspects of the safe and environmentally sound
    destruction of the chemical weapons stockpiles in Colorado and Kentucky.

   The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc.,
    URS, Parsons, and Battelle Memorial Institute. The BPT functions as the
    systems contractor selected to design, build, systemize, pilot test, operate,
    and close the PCAPP.



                                                                                    2
Bechtel Pueblo Team

                        Systems Contractor

 Project management                          Design/engineering
 Business services                           Procurement/subcontracting
 Safety and quality                          Construction



                       Teaming Subcontractors




   Systemization    Process design              Environmental permitting
   Pilot testing    Process equipment            and compliance
   Operations        fabrication                 Laboratory management
   Closure          Support to systemization    Pilot testing
                      and operations


                                                                              3
Construction

                       PCAPP
               Construction Completion
                 December 12, 2012




                                         4
Staffing


            Bechtel Pueblo Team
             non-manual: 585
                – Pueblo: 580
                     Pueblo County local
                      hires: 157
                     Colorado hires (outside
                      Pueblo County): 38
                – Other locations:   5


            Construction Workers: 63
                – Bechtel direct-hire craft
                  workers: 26
                – Subcontractor personnel: 37


                                                5
Employment Opportunities



        Hotline
     (719)549-4003


        Website
http://pueblo.bechtel.com




                            6
Safety


             As of January 30, 2013,
         PCAPP Project staff accomplished:

               280 Safe Work Days*

               1,472,764 Safe Work Hours




                               *Last Lost Time occurred on April 23, 2012
                                                                            7
Destruction Technology


  Step 1   Removal of Energetics                   Step 4    Biotreatment
           Robotic equipment removes energetics              Microbes treat the hydrolysate,
           (explosives) from the weapon. The                 breaking it down into brine. The brine
           energetics will be disposed of at a               is separated with water being recycled
           permitted facility offsite.                       back to the plant and salt cakes shipped
                                                             for disposal at a permitted facility.

 Step 2    Removal of                               Step 5   Thermal Treatment and
           Mustard Agent                                     Disposal of Metal Parts
           The inside of the weapon is remotely              Metal Parts are heated to 1,000 degrees
           accessed and mustard agent is washed              Fahrenheit for 15 minutes and can then
           out with high-pressure water.                     be recycled.


 Step 3    Neutralization of                       Neutralization followed by
           Mustard Agent                           biotreatment will be used to
           The mustard agent is neutralized with   destroy the Colorado chemical
           caustic solution and hot water. The
           byproduct is called hydrolysate.        weapons stockpile.




                                                                                                        8
Pueblo Chemical Agent-Destruction
Pilot Plant—Site Plan




                                    9
PCAPP Site Overview


            4                                              3
                                 5                                                       7
                                                 2

                            1




                                     6
                                                                    8




                          Northwestern Corner - Observation Point

       1   Enhanced Reconfiguration Building         5    Agent Filtration Area
       2   Automated Guided Vehicle Corridor         6    Munitions Service Magazine
       3   Agent Processing Building                 7    Control and Support Building
       4   Biotreatment Area                         8    Munitions Service Magazine corridor


                                                                                                10
Systemization

As the project transitions from construction to systemization, the
following systems have been turned over to the start-up group to begin
the systemization process:
                                                            Steam and Condensate—APB/Biotreatment Area
   Plant & Instrument Air
                                                             (BTA)/Brine Reduction System (BRS) Distribution
   Hot Process Water—Agent Processing Building
                                                            Bulk Chemical Storage and Distribution—
    (APB) Hot Process Water Tank and Heating Coil.
                                                             DAP, UREA and 25% caustic
   Agent Collection and Neutralization System—
                                                            Projectile Handling and Projectile
    Hydrolysate Collection and Storage—Yard
                                                             Disassembly—Projectile Mortar Disassembly
   HVAC Hot Water—Pumps and related tanks, Heat             systems and Related Equipment—Lines 1, 2,
    Exchangers and Outside Rack Piping                       and 3

   Breathing Air—A & B Compressor/Purifier                 Brine Reduction Belt Feed System
    Packages, Receiver and Chiller, Bottle Filling
                                                            Chilled Water—Chillers, Distribution to
    Station
                                                             various HVAC units, recirculation units,
   Enhanced Reconfiguration Building (ERB) HVAC:            autoclave and Off-Gas Treatment scrubber
    Supply Air Handling Units/Control Room and
                                                            Decon Solution Storage and Distribution—
    Support Areas Ventilation System
                                                             APB
   Steam Supply—Fuel Oil Piping, Natural Gas
    Piping, Amine Feed Skid, Boilers A & B and
    Outside Rack Steam

   ERB 480V Substation

                                  To learn more about Systemization, watch the video at
                             http://www.peoacwa.army.mil/info/video/systemization_yt.html

                                                                                                               11
Systemization (cont.)
    Immobilized Cell Bioreactor (ICB) Feed,
                                                     Essential Power Panel—ECF
     Biotreatment, ICB Blower and Off Gas
     Treatment—Modules 1/2/3/4                       Water Recovery—Brine Concentrator Feed Tanks
                                                      “A“, “B”, and “C” and BC Feed Tanks Off-Gas Treatment
    Plant Air–BTA, APB and ERB Distribution
                                                     APB—Decon Solution and Distribution; Munitions Washout
    Process Cooling Water—BRS Distribution
                                                      System (MWS) Instrument Air Distribution, Process Water
    Potable Water—ERB, APB and BRS                   Distribution, Hydraulic Power Line 1 & 2; MWS High
                                                      Pressure Wash Water Supply and Distribution; MWS Drain,
    ERB Electrical Room Ventilation System           Wash and Collection Line 1 & 2; Off-Gas Treatment System;
                                                      Spent Decon Storage (SDS) Holding Tanks and Feed
    Munitions/Parts Monitoring-ERB                   Pumps; SDS APB “A” Sumps; SDS APB “B” pumps
    Process Cooling Water—PCW pumps, tanks,         Munitions Treatment Units #1 and #1; Munition Body
     chemical feed skids, cooling towers, BRS         Storage Building-Gravity Conveyors
     Distribution
                                                     APB HVAC: Supply Air Handling Units, Battery Room
    Main Sanitary Waste—Lift Stations, Waste         Ventilation System; Cascade Ventilation System, Operator
     Tank and Pumps                                   Work Station Ventilation System, APB Recirculation Units,
    Non-Essential Power Panel-Entry Control          Unit Heaters and Ventilators; APB Electrical Room
     Facility (ECF)                                   Ventilation System; APB Entry Support Area Ventilation
                                                      System
    Critical Power Panels—ERB
                                                     Agent Monitoring: Agent Filtration Area; Laboratory, APB

                                                     Control Support Building; Medical Building; Laboratory;
                                                      Utility Building




                                  To learn more about Systemization, watch the video at            *Newly added
                             http://www.peoacwa.army.mil/info/video/systemization_yt.html

                                                                                                                  12
Training Facility




                        The PCAPP
                    Training Facility is
                      now located at
                        4 Jetway Ct.
                       in the Pueblo
                     Memorial Airport
                      Industrial Park

                                           13
Boiler Steam Testing




      Systemization workers test the steam for the boilers during testing of the
      Steam and Condensate System last month.

                                                                                   14
Control Room




      Monitors are now installed in the Control Room, this is a necessary step in
      the process of bringing communications on line.

                                                                                    15
Hazard School Board Training




       How many unsafe conditions can you find? PCAPP workers evaluate a simulated
       hazardous scene as part of ongoing safety training. The new Hazard School Board
       comes up with quarterly simulations to train employees about working safely.

                                                                                         16
Contact Information


    Pueblo Chemical                  U.S. Army
Stockpile Outreach Office      Pueblo Chemical Depot
     104 West B Street           45825 Highway 96 East
       719-546-0400                  719-549-4135

       Tom Schultz                 Chuck Sprague
            PCAPP                  Public Affairs Officer
   Public Affairs Specialist
                                      Ken Roque
     Renee Martinez            Deputy Public Affairs Officer
 Community Outreach Office

     Sandy Romero
    Bechtel Pueblo Team
  Communications Manager



                                                               17

Más contenido relacionado

La actualidad más candente

Homeowner's Guide to Testing Water Wells Near Oil & Gas Drilling
Homeowner's Guide to Testing Water Wells Near Oil & Gas DrillingHomeowner's Guide to Testing Water Wells Near Oil & Gas Drilling
Homeowner's Guide to Testing Water Wells Near Oil & Gas DrillingMarcellus Drilling News
 
Bio Storage Labs & Repository Overview
Bio Storage  Labs & Repository OverviewBio Storage  Labs & Repository Overview
Bio Storage Labs & Repository Overviewtanyaray
 
D Projects Process Systems
D Projects Process SystemsD Projects Process Systems
D Projects Process Systemsvincent_ruter
 
E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)BCreaven
 
Opus case studies - March2012
Opus case studies - March2012Opus case studies - March2012
Opus case studies - March2012glenmcl
 

La actualidad más candente (13)

BGCAPP Monthly Status Briefing November 2011
BGCAPP Monthly Status Briefing November 2011BGCAPP Monthly Status Briefing November 2011
BGCAPP Monthly Status Briefing November 2011
 
April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
April 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
 
BGCAPP Monthly Status Briefing - September 2011
BGCAPP Monthly Status Briefing - September 2011BGCAPP Monthly Status Briefing - September 2011
BGCAPP Monthly Status Briefing - September 2011
 
March 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
March 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...March 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
March 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status...
 
Modelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining ProcessesModelling, Simulation and Optimization of Refining Processes
Modelling, Simulation and Optimization of Refining Processes
 
BGCAPP Monthly Status Briefing October 2011
BGCAPP Monthly Status Briefing October 2011BGCAPP Monthly Status Briefing October 2011
BGCAPP Monthly Status Briefing October 2011
 
Desalination
DesalinationDesalination
Desalination
 
May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...
May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...
May 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Brief...
 
Homeowner's Guide to Testing Water Wells Near Oil & Gas Drilling
Homeowner's Guide to Testing Water Wells Near Oil & Gas DrillingHomeowner's Guide to Testing Water Wells Near Oil & Gas Drilling
Homeowner's Guide to Testing Water Wells Near Oil & Gas Drilling
 
Bio Storage Labs & Repository Overview
Bio Storage  Labs & Repository OverviewBio Storage  Labs & Repository Overview
Bio Storage Labs & Repository Overview
 
D Projects Process Systems
D Projects Process SystemsD Projects Process Systems
D Projects Process Systems
 
E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)E+PC Uranium Capability Statement (Final)
E+PC Uranium Capability Statement (Final)
 
Opus case studies - March2012
Opus case studies - March2012Opus case studies - March2012
Opus case studies - March2012
 

Destacado

Social media marketing
Social media marketingSocial media marketing
Social media marketingAngela Baker
 
Ley del Ejercicio del Periodismo
Ley del Ejercicio del PeriodismoLey del Ejercicio del Periodismo
Ley del Ejercicio del PeriodismoCarlos Saer
 
Presentación tv informativa
Presentación tv informativaPresentación tv informativa
Presentación tv informativaJuan Guzmán
 
Del nuevo periodismo al periodismo narrativo
Del nuevo periodismo al periodismo narrativoDel nuevo periodismo al periodismo narrativo
Del nuevo periodismo al periodismo narrativoCarina Novarese
 
2012 Volvo C70 For Sale CO | Volvo Dealer Colorado
2012 Volvo C70 For Sale CO | Volvo Dealer Colorado2012 Volvo C70 For Sale CO | Volvo Dealer Colorado
2012 Volvo C70 For Sale CO | Volvo Dealer ColoradoMcDonald Volvo
 

Destacado (8)

Social media marketing
Social media marketingSocial media marketing
Social media marketing
 
Ley del Ejercicio del Periodismo
Ley del Ejercicio del PeriodismoLey del Ejercicio del Periodismo
Ley del Ejercicio del Periodismo
 
Presentación tv informativa
Presentación tv informativaPresentación tv informativa
Presentación tv informativa
 
Evolucio n de la comunicacio n humana
Evolucio n de la comunicacio n humanaEvolucio n de la comunicacio n humana
Evolucio n de la comunicacio n humana
 
Esquemas redaccion web
Esquemas redaccion webEsquemas redaccion web
Esquemas redaccion web
 
Del nuevo periodismo al periodismo narrativo
Del nuevo periodismo al periodismo narrativoDel nuevo periodismo al periodismo narrativo
Del nuevo periodismo al periodismo narrativo
 
2012 Volvo C70 For Sale CO | Volvo Dealer Colorado
2012 Volvo C70 For Sale CO | Volvo Dealer Colorado2012 Volvo C70 For Sale CO | Volvo Dealer Colorado
2012 Volvo C70 For Sale CO | Volvo Dealer Colorado
 
Esquema de redaccion
Esquema de redaccionEsquema de redaccion
Esquema de redaccion
 

Similar a February 2013 PCAPP Monthly Status Briefing

Selection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation ColumnsSelection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation ColumnsGerard B. Hawkins
 
General Water Treatment For Cooling Water
General Water Treatment For Cooling WaterGeneral Water Treatment For Cooling Water
General Water Treatment For Cooling WaterGerard B. Hawkins
 
Shell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling WaterShell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling WaterGerard B. Hawkins
 
Biological Systems - A Special Case
Biological Systems - A Special CaseBiological Systems - A Special Case
Biological Systems - A Special CaseGerard B. Hawkins
 
2012 ERN Conference - Oral Presentation
2012 ERN Conference - Oral Presentation2012 ERN Conference - Oral Presentation
2012 ERN Conference - Oral PresentationWilliam Broughton
 
Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Gerard B. Hawkins
 
LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010
LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010
LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010mzhou45
 
Reactor Modeling Tools - An Overview
Reactor Modeling Tools - An OverviewReactor Modeling Tools - An Overview
Reactor Modeling Tools - An OverviewGerard B. Hawkins
 

Similar a February 2013 PCAPP Monthly Status Briefing (20)

April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
April 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
 
March 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
March 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...March 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
March 2012 - Pueblo Chemical Agent-Destruction Pilot Plant Monthly Status Bri...
 
PCAPP Monthly Status Briefing October 2011
PCAPP Monthly Status Briefing October 2011PCAPP Monthly Status Briefing October 2011
PCAPP Monthly Status Briefing October 2011
 
PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011PCAPP Monthly Status Briefing - September 2011
PCAPP Monthly Status Briefing - September 2011
 
June 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
June 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...June 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
June 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
 
PCAPP Monthly Status Briefing November 2011
PCAPP Monthly Status Briefing November 2011PCAPP Monthly Status Briefing November 2011
PCAPP Monthly Status Briefing November 2011
 
September 2012 BGCAPP Monthly Status Briefing
September 2012 BGCAPP Monthly Status BriefingSeptember 2012 BGCAPP Monthly Status Briefing
September 2012 BGCAPP Monthly Status Briefing
 
August 2012 BGCAPP Monthly Status Briefing
August 2012 BGCAPP Monthly Status BriefingAugust 2012 BGCAPP Monthly Status Briefing
August 2012 BGCAPP Monthly Status Briefing
 
October 2012 BGCAPP Monthly Status Briefing
October 2012 BGCAPP Monthly Status BriefingOctober 2012 BGCAPP Monthly Status Briefing
October 2012 BGCAPP Monthly Status Briefing
 
December 2012 BGCAPP Monthly Status Briefing
December 2012 BGCAPP Monthly Status BriefingDecember 2012 BGCAPP Monthly Status Briefing
December 2012 BGCAPP Monthly Status Briefing
 
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
July 2012 - Blue Grass Chemical Agent-Destruction Pilot Plant Monthly Status ...
 
Selection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation ColumnsSelection of Reboilers for Distillation Columns
Selection of Reboilers for Distillation Columns
 
General Water Treatment For Cooling Water
General Water Treatment For Cooling WaterGeneral Water Treatment For Cooling Water
General Water Treatment For Cooling Water
 
Shell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling WaterShell and Tube Heat Exchangers Using Cooling Water
Shell and Tube Heat Exchangers Using Cooling Water
 
February 2013 BGCAPP Monthly Status Briefing
February 2013 BGCAPP Monthly Status BriefingFebruary 2013 BGCAPP Monthly Status Briefing
February 2013 BGCAPP Monthly Status Briefing
 
Biological Systems - A Special Case
Biological Systems - A Special CaseBiological Systems - A Special Case
Biological Systems - A Special Case
 
2012 ERN Conference - Oral Presentation
2012 ERN Conference - Oral Presentation2012 ERN Conference - Oral Presentation
2012 ERN Conference - Oral Presentation
 
Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance Code of Practice - Centrifugal Pump Operation and Maintenance
Code of Practice - Centrifugal Pump Operation and Maintenance
 
LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010
LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010
LC-IR Hyphenated Technology For Excipient Analysis-FDA USP Seminars-1-13-2010
 
Reactor Modeling Tools - An Overview
Reactor Modeling Tools - An OverviewReactor Modeling Tools - An Overview
Reactor Modeling Tools - An Overview
 

Más de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)

Más de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013
 
Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
June '13 cdcab
 
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013
 
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 2014
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013
 
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012
 
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012
 
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
 

February 2013 PCAPP Monthly Status Briefing

  • 2. Project Background  The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely destroy 2,611 tons of mustard agent in mortar rounds and artillery projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).  Neutralization followed by biotreatment is the technology selected by the Department of Defense to destroy the Pueblo chemical weapons stockpile.  The Program Executive Officer, Assembled Chemical Weapons Alternatives (ACWA), headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in Colorado and Kentucky.  The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc., URS, Parsons, and Battelle Memorial Institute. The BPT functions as the systems contractor selected to design, build, systemize, pilot test, operate, and close the PCAPP. 2
  • 3. Bechtel Pueblo Team Systems Contractor  Project management  Design/engineering  Business services  Procurement/subcontracting  Safety and quality  Construction Teaming Subcontractors  Systemization  Process design  Environmental permitting  Pilot testing  Process equipment and compliance  Operations fabrication  Laboratory management  Closure  Support to systemization  Pilot testing and operations 3
  • 4. Construction PCAPP Construction Completion December 12, 2012 4
  • 5. Staffing  Bechtel Pueblo Team non-manual: 585 – Pueblo: 580  Pueblo County local hires: 157  Colorado hires (outside Pueblo County): 38 – Other locations: 5  Construction Workers: 63 – Bechtel direct-hire craft workers: 26 – Subcontractor personnel: 37 5
  • 6. Employment Opportunities Hotline (719)549-4003 Website http://pueblo.bechtel.com 6
  • 7. Safety As of January 30, 2013, PCAPP Project staff accomplished:  280 Safe Work Days*  1,472,764 Safe Work Hours *Last Lost Time occurred on April 23, 2012 7
  • 8. Destruction Technology Step 1 Removal of Energetics Step 4 Biotreatment Robotic equipment removes energetics Microbes treat the hydrolysate, (explosives) from the weapon. The breaking it down into brine. The brine energetics will be disposed of at a is separated with water being recycled permitted facility offsite. back to the plant and salt cakes shipped for disposal at a permitted facility. Step 2 Removal of Step 5 Thermal Treatment and Mustard Agent Disposal of Metal Parts The inside of the weapon is remotely Metal Parts are heated to 1,000 degrees accessed and mustard agent is washed Fahrenheit for 15 minutes and can then out with high-pressure water. be recycled. Step 3 Neutralization of Neutralization followed by Mustard Agent biotreatment will be used to The mustard agent is neutralized with destroy the Colorado chemical caustic solution and hot water. The byproduct is called hydrolysate. weapons stockpile. 8
  • 10. PCAPP Site Overview 4 3 5 7 2 1 6 8 Northwestern Corner - Observation Point 1 Enhanced Reconfiguration Building 5 Agent Filtration Area 2 Automated Guided Vehicle Corridor 6 Munitions Service Magazine 3 Agent Processing Building 7 Control and Support Building 4 Biotreatment Area 8 Munitions Service Magazine corridor 10
  • 11. Systemization As the project transitions from construction to systemization, the following systems have been turned over to the start-up group to begin the systemization process:  Steam and Condensate—APB/Biotreatment Area  Plant & Instrument Air (BTA)/Brine Reduction System (BRS) Distribution  Hot Process Water—Agent Processing Building  Bulk Chemical Storage and Distribution— (APB) Hot Process Water Tank and Heating Coil. DAP, UREA and 25% caustic  Agent Collection and Neutralization System—  Projectile Handling and Projectile Hydrolysate Collection and Storage—Yard Disassembly—Projectile Mortar Disassembly  HVAC Hot Water—Pumps and related tanks, Heat systems and Related Equipment—Lines 1, 2, Exchangers and Outside Rack Piping and 3  Breathing Air—A & B Compressor/Purifier  Brine Reduction Belt Feed System Packages, Receiver and Chiller, Bottle Filling  Chilled Water—Chillers, Distribution to Station various HVAC units, recirculation units,  Enhanced Reconfiguration Building (ERB) HVAC: autoclave and Off-Gas Treatment scrubber Supply Air Handling Units/Control Room and  Decon Solution Storage and Distribution— Support Areas Ventilation System APB  Steam Supply—Fuel Oil Piping, Natural Gas Piping, Amine Feed Skid, Boilers A & B and Outside Rack Steam  ERB 480V Substation To learn more about Systemization, watch the video at http://www.peoacwa.army.mil/info/video/systemization_yt.html 11
  • 12. Systemization (cont.)  Immobilized Cell Bioreactor (ICB) Feed,  Essential Power Panel—ECF Biotreatment, ICB Blower and Off Gas Treatment—Modules 1/2/3/4  Water Recovery—Brine Concentrator Feed Tanks “A“, “B”, and “C” and BC Feed Tanks Off-Gas Treatment  Plant Air–BTA, APB and ERB Distribution  APB—Decon Solution and Distribution; Munitions Washout  Process Cooling Water—BRS Distribution System (MWS) Instrument Air Distribution, Process Water  Potable Water—ERB, APB and BRS Distribution, Hydraulic Power Line 1 & 2; MWS High Pressure Wash Water Supply and Distribution; MWS Drain,  ERB Electrical Room Ventilation System Wash and Collection Line 1 & 2; Off-Gas Treatment System; Spent Decon Storage (SDS) Holding Tanks and Feed  Munitions/Parts Monitoring-ERB Pumps; SDS APB “A” Sumps; SDS APB “B” pumps  Process Cooling Water—PCW pumps, tanks,  Munitions Treatment Units #1 and #1; Munition Body chemical feed skids, cooling towers, BRS Storage Building-Gravity Conveyors Distribution  APB HVAC: Supply Air Handling Units, Battery Room  Main Sanitary Waste—Lift Stations, Waste Ventilation System; Cascade Ventilation System, Operator Tank and Pumps Work Station Ventilation System, APB Recirculation Units,  Non-Essential Power Panel-Entry Control Unit Heaters and Ventilators; APB Electrical Room Facility (ECF) Ventilation System; APB Entry Support Area Ventilation System  Critical Power Panels—ERB  Agent Monitoring: Agent Filtration Area; Laboratory, APB  Control Support Building; Medical Building; Laboratory; Utility Building To learn more about Systemization, watch the video at *Newly added http://www.peoacwa.army.mil/info/video/systemization_yt.html 12
  • 13. Training Facility The PCAPP Training Facility is now located at 4 Jetway Ct. in the Pueblo Memorial Airport Industrial Park 13
  • 14. Boiler Steam Testing Systemization workers test the steam for the boilers during testing of the Steam and Condensate System last month. 14
  • 15. Control Room Monitors are now installed in the Control Room, this is a necessary step in the process of bringing communications on line. 15
  • 16. Hazard School Board Training How many unsafe conditions can you find? PCAPP workers evaluate a simulated hazardous scene as part of ongoing safety training. The new Hazard School Board comes up with quarterly simulations to train employees about working safely. 16
  • 17. Contact Information Pueblo Chemical U.S. Army Stockpile Outreach Office Pueblo Chemical Depot 104 West B Street 45825 Highway 96 East 719-546-0400 719-549-4135 Tom Schultz Chuck Sprague PCAPP Public Affairs Officer Public Affairs Specialist Ken Roque Renee Martinez Deputy Public Affairs Officer Community Outreach Office Sandy Romero Bechtel Pueblo Team Communications Manager 17