Project Background

   The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely
    destroy 2,611 tons of mustard agent in mortar rounds and artillery
    projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).

   Neutralization followed by biotreatment is the technology selected by the
    Department of Defense to destroy the Pueblo chemical weapons stockpile.

   The Program Executive Officer, Assembled Chemical Weapons Alternatives
    (ACWA), headquartered at Aberdeen Proving Ground, Maryland, is
    responsible for managing all aspects of the safe and environmentally sound
    destruction of the chemical weapons stockpiles in Colorado and Kentucky.

   The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc.,
    URS, Parsons, and Battelle Memorial Institute. The BPT functions as the
    systems contractor selected to design, build, systemize, pilot test, operate,
    and close the PCAPP.



                                                                               2
     OPSEC Completed 10 September 2012
Bechtel Pueblo Team

                                         Systems Contractor

 Project management                                           Design/engineering
 Business services                                            Procurement/subcontracting
 Safety and quality                                           Construction



                                         Teaming Subcontractors




   Systemization                    Process design               Environmental permitting
   Pilot testing                    Process equipment             and compliance
   Operations                        fabrication                  Laboratory management
   Closure                          Support to systemization     Pilot testing
                                      and operations


                                                                                             3
     OPSEC Completed 10 September 2012
Staffing


                                       Bechtel Pueblo Team
                                        non-manual: 638
                                           –   Pueblo: 634 (148 local hires)

                                           – Other locations: 4


                                       Construction Workers: 366
                                           – Bechtel direct-hire craft
                                             workers: 302
                                           – Subcontractor
                                             personnel: 64




                                                                         4
  OPSEC Completed 10 September 2012
Employment Opportunities


             Hotline

     (719)549-4003

            Website

http://pueblo.bechtel.com




                                         5
     OPSEC Completed 10 September 2012
Safety


                         As of August 31, 2012,
                     PCAPP Project staff accomplished:

                                       127 Safe Work Days

                                       718,055 Safe Work Hours




                                                                  6
  OPSEC Completed 10 September 2012
Destruction Technology


  Step 1           Removal of Energetics                   Step 4    Biotreatment
                   Robotic equipment removes energetics              Microbes treat the hydrolysate,
                   (explosives) from the weapon. The                 breaking it down into brine. The brine
                   energetics will be disposed of at a               is separated with water being recycled
                   permitted facility offsite.                       back to the plant and salt cakes shipped
                                                                     for disposal at a permitted facility.

 Step 2            Removal of                               Step 5   Thermal Treatment and
                   Mustard Agent                                     Disposal of Metal Parts
                   The inside of the weapon is remotely              Metal Parts are heated to 1,000 degrees
                   accessed and mustard agent is washed              Fahrenheit for 15 minutes and can then
                   out with high-pressure water.                     be recycled.


 Step 3            Neutralization of                       Neutralization followed by
                   Mustard Agent                           biotreatment will be used to
                   The mustard agent is neutralized with   destroy the Colorado chemical
                   caustic solution and hot water. The
                   byproduct is called hydrolysate.        weapons stockpile.




                                                                                                                7
   OPSEC Completed 10 September 2012
Pueblo Chemical Agent-Destruction
Pilot Plant—Site Plan




                                      8
  OPSEC Completed 10 September 2012
PCAPP Site Overview


                           4                                              3
                                                                                        7
                                                5
                                                                2

                                           1




                                                    6
                                                                                   8




                                         Northwestern Corner - Observation Point

                    1     Enhanced Reconfiguration Building         5    Agent Filtration Area
                    2     Automated Guided Vehicle Corridor         6    Munitions Service Magazine
                    3     Agent Processing Building                 7    Control and Support Building
                    4     Biotreatment Area                         8    Munitions Service Magazine corridor

                                                                                                               9
  OPSEC Completed 10 September 2012
Construction Status – In Progress

   Enhanced Reconfiguration Building–Continuing electrical punch list items;
    completed energetics work; began coatings placement in the Munitions
    Service Magazine area.
   Agent Processing Building–Continuing electrical installations, piping and
    instrumentation installations.
   Laboratory—HVAC and electrical installations.
   Balance of Facilities–Continue final grade, sidewalks in the yard area
   Biotreatment Area–Continuing coatings preparations for the Immobilized
    Cell Bioreactor pads; Continue punch list items
   Brine Reduction System–Completed electrical installations, including
    installations for Biotreatment
    Electrical Building; working
    punch list items.
   Entry Control Facility–Continuing
    Electrical installations.




                                                                             10
     OPSEC Completed 10 September 2012
Systemization

As the project transitions from construction to systemization, the
following systems have been turned over to the start-up group to begin
the systemization process:
                                                                Steam and Condensate—APB/Biotreatment Area
   Instrument Air—IA Compressor “A,” Dryer “A,”
                                                                 (BTA)/Brine Reduction System (BRS) Distribution
    Main Air Receiver and Yard Distribution Piping
                                                                Bulk Chemical Storage and Distribution—DAP, UREA
   Hot Process Water—Agent Processing Building
                                                                 and 25% caustic
    (APB) Hot Process Water Tank and Heating Coil.
                                                                Water Recovery—Tanks "A“, “B”, and “C’
   Agent Collection and Neutralization System—
    Hydrolysate Collection and Storage—Yard

   HVAC Hot Water—Pumps and related tanks, Heat
    Exchangers and Outside Rack Piping

   Breathing Air—A & B Compressor/Purifier
    Packages, Receiver and Chiller*, Bottle Filling
    Station

   Enhanced Reconfiguration Building (ERB) Supply
    Air Handling Units/Control Room and Support
    Areas Ventilation System

   Steam Supply—Fuel Oil Piping, Natural Gas
    Piping, Amine Feed Skid, Boilers A & B*" and
    Outside Rack Steam


                                      To learn more about Systemization, watch the video at
                                 http://www.pmacwa.army.mil/info/video/systemization_yt.html

                                                                                                           11
     OPSEC Completed 10 September 2012
Systemization (cont.)
    Projectile Handling and Projectile
                                                         Process Cooling Water—PCW Pumps, Tanks, Chemical Feed
     Disassembly—Projectile Mortar Disassembly
                                                          Skids, Cooling Towers, BRS Distribution*
     systems and Related Equipment—Lines 1, 2,
     and 3                                               Main Sanitary Waste—Lift Stations, Waste Tank and Pumps
    ERB 480V Substation                                 Non-Essential Power Panel-Entry Control Facility (ECF)
    Brine Reduction Belt Feed System                    Critical Power Panels—ERB
    Water Recovery— Brine concentrator Feed             Essential Power Panel—ECF
     Tanks Off-Gas Treatment

    Chilled Water—Chillers*, Distribution to
     various HVAC units, recirculation units,
     autoclave and Off-Gas Treatment scrubber

    Decon Solution Storage and Distribution—
     APB

    Immobilized Cell Bioreactor (ICB) Feed,
     Biotreatment, ICB Blower and Off Gas
     Treatment*—Modules 1/2/3/4

    Plant Air–BTA, APB* and ERB* Distribution

    Process Cooling Water—BRS Distribution

    Potable Water—ERB*, APB and BRS*

    ERB Electrical Room Ventilation System*

    Munitions/Parts Monitoring-ERB*
                                        To learn more about Systemization, watch the video at           *Newly added
                                   http://www.pmacwa.army.mil/info/video/systemization_yt.html

                                                                                                                   12
       OPSEC Completed 10 September 2012
Agent Processing Building




                A worker installs lightening protection on the supply air duct of the
                Agent Processing Building.
                                                                                   13
  OPSEC Completed 10 September 2012
Biotreatment Area




                  Distillate carbon filters (foreground) will remove organic
                  compounds from the distillate stream before it is returned to
                  the plant for use as plant water.

                                                                                  14
  OPSEC Completed 10 September 2012
Control and Support Building




                  Inside the maintenance shop of the Control and Support Building,
                  boxes of equipment are ready to be unwrapped and installed.

                                                                                 15
   OPSEC Completed 10 September 2012
Rep. Scott Tipton at PCAPP




                   Plant Manager Jerry Tiller (right) gives Rep. Tipton (center) and
                   Lee Colburn, senior military advisor to Rep. Doug Lamborn (left),
                   a tour of the PCAPP facility. Bechtel Pueblo Team Project Manager
                   Doug Omichinski is shown in back (third from left.)
                                                                                  16
   OPSEC Completed 10 September 2012
Contact Information


    Pueblo Chemical                          U.S. Army
Stockpile Outreach Office              Pueblo Chemical Depot
       104 West B Street                 45825 Highway 96 East
         719-546-0400                        719-549-4135

          Tom Schultz                      Chuck Sprague
            PCAPP                          Public Affairs Officer
   Public Affairs Specialist
                                              Ken Roque
       Bob Kennemer                    Deputy Public Affairs Officer
    Community Outreach
        Manager

        Sandy Romero
  Bechtel Communications
          Manager


                                                                    17
   OPSEC Completed 10 September 2012

Más contenido relacionado

Destacado

Gazzetta 5-9-2011 Serie A Streaming
Gazzetta 5-9-2011 Serie A StreamingGazzetta 5-9-2011 Serie A Streaming
Gazzetta 5-9-2011 Serie A Streamingserieastreaming
 
V55 - Session 5 - Assignment Summary - VCoach Hypermarketing Class
V55 - Session 5 - Assignment Summary - VCoach Hypermarketing ClassV55 - Session 5 - Assignment Summary - VCoach Hypermarketing Class
V55 - Session 5 - Assignment Summary - VCoach Hypermarketing ClassMaureen Martine Lee
 
IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...
IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...
IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...Finance Network marcus evans
 
Order of pythagorans[1](1)
Order of pythagorans[1](1)Order of pythagorans[1](1)
Order of pythagorans[1](1)tytewerk
 
6 Years After Startup: How I Got Here and What I’ve Learned
6 Years After Startup: How I Got Here and What I’ve Learned 6 Years After Startup: How I Got Here and What I’ve Learned
6 Years After Startup: How I Got Here and What I’ve Learned Scott Salkin
 

Destacado (7)

Gazzetta 5-9-2011 Serie A Streaming
Gazzetta 5-9-2011 Serie A StreamingGazzetta 5-9-2011 Serie A Streaming
Gazzetta 5-9-2011 Serie A Streaming
 
Gazzetta 24 8-2011
Gazzetta 24 8-2011Gazzetta 24 8-2011
Gazzetta 24 8-2011
 
V55 - Session 5 - Assignment Summary - VCoach Hypermarketing Class
V55 - Session 5 - Assignment Summary - VCoach Hypermarketing ClassV55 - Session 5 - Assignment Summary - VCoach Hypermarketing Class
V55 - Session 5 - Assignment Summary - VCoach Hypermarketing Class
 
IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...
IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...
IRS Exam: Assumptions, Expectations and Collaboration - Bryan Peterson, ACI W...
 
Order of pythagorans[1](1)
Order of pythagorans[1](1)Order of pythagorans[1](1)
Order of pythagorans[1](1)
 
6 Years After Startup: How I Got Here and What I’ve Learned
6 Years After Startup: How I Got Here and What I’ve Learned 6 Years After Startup: How I Got Here and What I’ve Learned
6 Years After Startup: How I Got Here and What I’ve Learned
 
Google + Agent
Google + AgentGoogle + Agent
Google + Agent
 

Más de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA)

Más de Program Executive Office, Assembled Chemical Weapons Alternatives (PEO ACWA) (20)

CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013CAC/CDCAB Vent Recommendation 5 March 2013
CAC/CDCAB Vent Recommendation 5 March 2013
 
Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014Secondary Waste Working Group 12 March 2014
Secondary Waste Working Group 12 March 2014
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update March 12...
 
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
Chemical Destruction Citizens' Advisory Board Working Group Update 12 March 2013
 
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...Blue Grass Chemical Activity  M55 Rocket Separation Operation Update 11 June ...
Blue Grass Chemical Activity M55 Rocket Separation Operation Update 11 June ...
 
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
Blue Grass Chemical Agent-Destruction Pilot Plant Quarterly Update June 11,...
 
June '13 cdcab
June '13 cdcabJune '13 cdcab
June '13 cdcab
 
M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013M55 Rocket Separation Operation 11 Dec 2013
M55 Rocket Separation Operation 11 Dec 2013
 
2015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 20142015 ACWA Funding 11 June 2014
2015 ACWA Funding 11 June 2014
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...Implementation of Explosive Destruction Technology for Mustard Projectiles ...
Implementation of Explosive Destruction Technology for Mustard Projectiles ...
 
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
EDT Involvement History of the Citizens' Advisory Commission/Citizens' Adviso...
 
Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014Explosive Destruction Working Group Update 11 June 2014
Explosive Destruction Working Group Update 11 June 2014
 
BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013BGCAPP Year in Review Dec. 11, 2013
BGCAPP Year in Review Dec. 11, 2013
 
BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012BGCAPP Year in Review Dec. 11, 2012
BGCAPP Year in Review Dec. 11, 2012
 
Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013Economic Development Working Group 11 September 2013
Economic Development Working Group 11 September 2013
 
Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012Chemical Weapons Convention Update 13 June 2012
Chemical Weapons Convention Update 13 June 2012
 
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons ConventionOPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
OPCW’s 18th Conference of States Parties to the Chemical Weapons Convention
 
CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012CDCAB Working Group Updates 11 December 2012
CDCAB Working Group Updates 11 December 2012
 
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
BGCAPP EDT EA CDCAB NEPA and Army Decision Process 23 October 2013
 

September 2012 PCAPP Monthly Status Briefing

  • 2. Project Background  The Pueblo Chemical Agent-Destruction Pilot Plant (PCAPP) will safely destroy 2,611 tons of mustard agent in mortar rounds and artillery projectiles stored at the U.S. Army Pueblo Chemical Depot (PCD).  Neutralization followed by biotreatment is the technology selected by the Department of Defense to destroy the Pueblo chemical weapons stockpile.  The Program Executive Officer, Assembled Chemical Weapons Alternatives (ACWA), headquartered at Aberdeen Proving Ground, Maryland, is responsible for managing all aspects of the safe and environmentally sound destruction of the chemical weapons stockpiles in Colorado and Kentucky.  The Bechtel Pueblo Team (BPT) is a partnership of Bechtel National, Inc., URS, Parsons, and Battelle Memorial Institute. The BPT functions as the systems contractor selected to design, build, systemize, pilot test, operate, and close the PCAPP. 2 OPSEC Completed 10 September 2012
  • 3. Bechtel Pueblo Team Systems Contractor  Project management  Design/engineering  Business services  Procurement/subcontracting  Safety and quality  Construction Teaming Subcontractors  Systemization  Process design  Environmental permitting  Pilot testing  Process equipment and compliance  Operations fabrication  Laboratory management  Closure  Support to systemization  Pilot testing and operations 3 OPSEC Completed 10 September 2012
  • 4. Staffing  Bechtel Pueblo Team non-manual: 638 – Pueblo: 634 (148 local hires) – Other locations: 4  Construction Workers: 366 – Bechtel direct-hire craft workers: 302 – Subcontractor personnel: 64 4 OPSEC Completed 10 September 2012
  • 5. Employment Opportunities Hotline (719)549-4003 Website http://pueblo.bechtel.com 5 OPSEC Completed 10 September 2012
  • 6. Safety As of August 31, 2012, PCAPP Project staff accomplished:  127 Safe Work Days  718,055 Safe Work Hours 6 OPSEC Completed 10 September 2012
  • 7. Destruction Technology Step 1 Removal of Energetics Step 4 Biotreatment Robotic equipment removes energetics Microbes treat the hydrolysate, (explosives) from the weapon. The breaking it down into brine. The brine energetics will be disposed of at a is separated with water being recycled permitted facility offsite. back to the plant and salt cakes shipped for disposal at a permitted facility. Step 2 Removal of Step 5 Thermal Treatment and Mustard Agent Disposal of Metal Parts The inside of the weapon is remotely Metal Parts are heated to 1,000 degrees accessed and mustard agent is washed Fahrenheit for 15 minutes and can then out with high-pressure water. be recycled. Step 3 Neutralization of Neutralization followed by Mustard Agent biotreatment will be used to The mustard agent is neutralized with destroy the Colorado chemical caustic solution and hot water. The byproduct is called hydrolysate. weapons stockpile. 7 OPSEC Completed 10 September 2012
  • 8. Pueblo Chemical Agent-Destruction Pilot Plant—Site Plan 8 OPSEC Completed 10 September 2012
  • 9. PCAPP Site Overview 4 3 7 5 2 1 6 8 Northwestern Corner - Observation Point 1 Enhanced Reconfiguration Building 5 Agent Filtration Area 2 Automated Guided Vehicle Corridor 6 Munitions Service Magazine 3 Agent Processing Building 7 Control and Support Building 4 Biotreatment Area 8 Munitions Service Magazine corridor 9 OPSEC Completed 10 September 2012
  • 10. Construction Status – In Progress  Enhanced Reconfiguration Building–Continuing electrical punch list items; completed energetics work; began coatings placement in the Munitions Service Magazine area.  Agent Processing Building–Continuing electrical installations, piping and instrumentation installations.  Laboratory—HVAC and electrical installations.  Balance of Facilities–Continue final grade, sidewalks in the yard area  Biotreatment Area–Continuing coatings preparations for the Immobilized Cell Bioreactor pads; Continue punch list items  Brine Reduction System–Completed electrical installations, including installations for Biotreatment Electrical Building; working punch list items.  Entry Control Facility–Continuing Electrical installations. 10 OPSEC Completed 10 September 2012
  • 11. Systemization As the project transitions from construction to systemization, the following systems have been turned over to the start-up group to begin the systemization process:  Steam and Condensate—APB/Biotreatment Area  Instrument Air—IA Compressor “A,” Dryer “A,” (BTA)/Brine Reduction System (BRS) Distribution Main Air Receiver and Yard Distribution Piping  Bulk Chemical Storage and Distribution—DAP, UREA  Hot Process Water—Agent Processing Building and 25% caustic (APB) Hot Process Water Tank and Heating Coil.  Water Recovery—Tanks "A“, “B”, and “C’  Agent Collection and Neutralization System— Hydrolysate Collection and Storage—Yard  HVAC Hot Water—Pumps and related tanks, Heat Exchangers and Outside Rack Piping  Breathing Air—A & B Compressor/Purifier Packages, Receiver and Chiller*, Bottle Filling Station  Enhanced Reconfiguration Building (ERB) Supply Air Handling Units/Control Room and Support Areas Ventilation System  Steam Supply—Fuel Oil Piping, Natural Gas Piping, Amine Feed Skid, Boilers A & B*" and Outside Rack Steam To learn more about Systemization, watch the video at http://www.pmacwa.army.mil/info/video/systemization_yt.html 11 OPSEC Completed 10 September 2012
  • 12. Systemization (cont.)  Projectile Handling and Projectile  Process Cooling Water—PCW Pumps, Tanks, Chemical Feed Disassembly—Projectile Mortar Disassembly Skids, Cooling Towers, BRS Distribution* systems and Related Equipment—Lines 1, 2, and 3  Main Sanitary Waste—Lift Stations, Waste Tank and Pumps  ERB 480V Substation  Non-Essential Power Panel-Entry Control Facility (ECF)  Brine Reduction Belt Feed System  Critical Power Panels—ERB  Water Recovery— Brine concentrator Feed  Essential Power Panel—ECF Tanks Off-Gas Treatment  Chilled Water—Chillers*, Distribution to various HVAC units, recirculation units, autoclave and Off-Gas Treatment scrubber  Decon Solution Storage and Distribution— APB  Immobilized Cell Bioreactor (ICB) Feed, Biotreatment, ICB Blower and Off Gas Treatment*—Modules 1/2/3/4  Plant Air–BTA, APB* and ERB* Distribution  Process Cooling Water—BRS Distribution  Potable Water—ERB*, APB and BRS*  ERB Electrical Room Ventilation System*  Munitions/Parts Monitoring-ERB* To learn more about Systemization, watch the video at *Newly added http://www.pmacwa.army.mil/info/video/systemization_yt.html 12 OPSEC Completed 10 September 2012
  • 13. Agent Processing Building A worker installs lightening protection on the supply air duct of the Agent Processing Building. 13 OPSEC Completed 10 September 2012
  • 14. Biotreatment Area Distillate carbon filters (foreground) will remove organic compounds from the distillate stream before it is returned to the plant for use as plant water. 14 OPSEC Completed 10 September 2012
  • 15. Control and Support Building Inside the maintenance shop of the Control and Support Building, boxes of equipment are ready to be unwrapped and installed. 15 OPSEC Completed 10 September 2012
  • 16. Rep. Scott Tipton at PCAPP Plant Manager Jerry Tiller (right) gives Rep. Tipton (center) and Lee Colburn, senior military advisor to Rep. Doug Lamborn (left), a tour of the PCAPP facility. Bechtel Pueblo Team Project Manager Doug Omichinski is shown in back (third from left.) 16 OPSEC Completed 10 September 2012
  • 17. Contact Information Pueblo Chemical U.S. Army Stockpile Outreach Office Pueblo Chemical Depot 104 West B Street 45825 Highway 96 East 719-546-0400 719-549-4135 Tom Schultz Chuck Sprague PCAPP Public Affairs Officer Public Affairs Specialist Ken Roque Bob Kennemer Deputy Public Affairs Officer Community Outreach Manager Sandy Romero Bechtel Communications Manager 17 OPSEC Completed 10 September 2012