Allama iqbal internation airport
Project Proposal
• Walton airport was the main airport of lahore but
its handling capacity is less however, Walton was
unable to handle the large aircraft
• Over the course of the next 25 years the demand
for air travel rose
• government decided to build a new world class
airport to meet the growing needs for the future
and improve the facilities for passengers named
as Allama Iqbal International
Flights
• All flights will be switched to the new airport
and the old airport will be passed onto the
military. However, during the Hajj period, the
old airport will be used as the Hajj Terminal by
the national carrier, PIA.
Project Description:
• Site Location
• It is located in Lahore, Punjab, Pakistan. The
airport currently has three terminals; the
Allama Iqbal terminal, the Hajj terminal, and a
cargo terminal. The airport is located about 15
kilometres from the centre of the city.
• Its coordinates are 31ᴼ31’17”N, 74ᴼ24’09”E.
Project Management
• Client
Client of Allama Iqbal International airport is
Civil Aviation Authority Pakistan
• Cost of the project
estimated to be in the region of $200m
• Consultant
NESPAK + Nayyar Ali Dada + Other Architects
• Contractor
Allama Iqbal International Airport
facilities
• Flights
• Terminals
• Bridges
• Passenger’s Facilities
• Passenger terminal
complex
Airport maintenance
facilities
• Passenger
Accomondation
• Runways
• Commercial Important
Person Lounge
• Lahore air cargo and
transport
Proposed development
Walkways
Passenger drop off
Primary check in
Ticket counter
Secondary security
check in
Departure lounge
Airline lounge
Arrivals route
Baggage claim hall
Customs
Parking
Screening
• Pakistan environmental protection authority
(PEPA), require an Environmental Impact
Assessment (EIA), for every major project in
Pakistan having Physical, Biological, social and
economical impacts
Scooping
• Land environment impacts
• Water environmental impacts
• Air environmental impact
• Noise environmental impact
• Biological environmental impact
• Socio-Economic environmental impact
• Solid waste
Land environment impacts
Activity
• Earth work construction
• Fuel storage and handling:
Impacts
• Loss of vegetation
• Change in elevation of the
area
• Drainage Patterns
• Land and air pollution
Water environmental impacts
Activity
• Aircraft and vehicle washing
• Toilets, laundries, cleaning
fluids
Impacts
• Water pollution
• Land pollution
• Cause health problems
Air environmental impact
Activity
• Aircraft emissions
• Emissions from surface
vehicles
Impacts
• The maximum incremental
Ground Level
Concentrations (GLCs) due
to the airport project for
PM, SO2, NOx, CO and HC
• Pm, SO2, NOx, CO, HC
emissions to air, which
cause health hazards
Noise environmental impacts
Activity
• Construction noise
• Aircraft noise & Ground
noise
Impacts
• Noise pollution
• Effects hearing and nerves
system
• Noise pollution
• Effects hearing and nerves
system
Waste management impacts
Activity
In-flight
wastes
Scrap wastes
Catering
wastes
Aircraft
maintenance
wastes
Impacts
Water
pollution
Land
pollution
Land
pollution
by hard
metals
Water
pollution
Socio-Economic environmental
impacts
Activity
• Development project
• Vehicle emission
Impacts
• loss of cultural heritage ,
economic and commercial
value of its surrounding
land
• Ambient air
Mitigation measure
• Land Environment
• containment of any surface spillage monitored
• Aircraft maintenance, sensitivity of the location
where activities are undertaken, and control of
runoff of potential contaminants, chemicals etc.
are to be properly implemented and reported.
• Proper drainage systems
• emergency containment in the event of a major
spill during monsoon season etc. are to be
provided.
Water environment
• Storm water drains are to be built for
discharging storm water from the air-field to
avoid flooding /water logging in project area
during monsoon season / cloud bursts
Air Environment
• Continuous Descent Approach and low power- low drop
techniques,
• Design the airports to minimize aircraft holding and taxiing
times
• Avoid Aircraft line up on the ground,
• Avoiding unnecessary use of aircraft secondary power
units,
• Taxiing management (e.g. towing and single engine taxi),
• Increasing the use of public transport,
• The use of electric vehicles or less polluting fuels
Noise Environment
• The noise preferential routes which the aircraft
overfly the least populated areas after takeoff
and before landing are to be suggested.
• Night flying policy to limit the number of flights
and amount of noise generated during this most
sensitive time is to be formulated
• Mitigation measures could also include
introduction of higher landing fees for noisy
aircraft and for night landing in threshold cases
could be considered.
Waste Management
• The wastes have to be managed after
segregation and identifying the method of
management. Recycling of wastes such as
paper, glass carried out.
•
Socio-Economic Environment
• Air pollution control measures are to be
adopted. Noise control measures such as
noise absorbing building material in closed
buildings, noise barriers in Ground run bays,
are to be insured
• Health camps both for employees and local
populations are to be conducted.
EIA repot for Airport
EIA repot for Airport
EIA repot for Airport

Más contenido relacionado

La actualidad más candente

Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentSamanth kumar
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahoreAyesha Akhtar
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment Pramoda Raj
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessmentKashmeera N.A.
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessmentParth Patel
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .onkar solshe
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentationsujit roy
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodologyJustin Joy
 
Eia methods for transportation project
Eia methods for transportation projectEia methods for transportation project
Eia methods for transportation projectKushal Patel
 
Environmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationKinza Irshad
 
Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams Sodiq Rasaq
 
EIA report on thermal power project
EIA report on thermal power projectEIA report on thermal power project
EIA report on thermal power projectAhsan Nazir
 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepalBhim Upadhyaya
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIAJenson Samraj
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsKushal Patel
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment conceptIntan Ayuna
 
Road development projects.
Road development projects.Road development projects.
Road development projects.Abhishek Rajput
 

La actualidad más candente (20)

Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
EIA Report on Ring road lahore
EIA Report on Ring road lahoreEIA Report on Ring road lahore
EIA Report on Ring road lahore
 
Eia eis fonsi
Eia eis fonsiEia eis fonsi
Eia eis fonsi
 
environmental impact assessment
environmental impact assessment environmental impact assessment
environmental impact assessment
 
Environmental impact assessment
Environmental impact assessmentEnvironmental impact assessment
Environmental impact assessment
 
Eia - environmental impact assessment
Eia - environmental impact assessmentEia - environmental impact assessment
Eia - environmental impact assessment
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
ENVIRONMENTAL IMPACT ASSESSMENT (EIA) .
 
EIA report presentation
EIA report presentationEIA report presentation
EIA report presentation
 
Environmental impact assessment methodology
Environmental impact assessment methodologyEnvironmental impact assessment methodology
Environmental impact assessment methodology
 
EIA Process
EIA ProcessEIA Process
EIA Process
 
Eia methods for transportation project
Eia methods for transportation projectEia methods for transportation project
Eia methods for transportation project
 
Environmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental ExaminationEnvironmental impact assessment and Initial Environmental Examination
Environmental impact assessment and Initial Environmental Examination
 
Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams  Environmental Impact Assessment on Dams
Environmental Impact Assessment on Dams
 
EIA report on thermal power project
EIA report on thermal power projectEIA report on thermal power project
EIA report on thermal power project
 
Environmental impact assessment in nepal
Environmental impact assessment in nepalEnvironmental impact assessment in nepal
Environmental impact assessment in nepal
 
Baseline study for EIA
Baseline study for EIABaseline study for EIA
Baseline study for EIA
 
Enviromental impact assesment for highway projects
Enviromental impact assesment for highway projectsEnviromental impact assesment for highway projects
Enviromental impact assesment for highway projects
 
Environmental impact assessment concept
Environmental impact assessment conceptEnvironmental impact assessment concept
Environmental impact assessment concept
 
Road development projects.
Road development projects.Road development projects.
Road development projects.
 
EIA Methodologies
EIA MethodologiesEIA Methodologies
EIA Methodologies
 

Destacado

Mitigation of environmental issues of Aviation
Mitigation of environmental issues of AviationMitigation of environmental issues of Aviation
Mitigation of environmental issues of AviationAkanksha Singh
 
Airport master plan
Airport master planAirport master plan
Airport master planAravind Raj
 
Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaKetan Wadodkar
 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportVivekanand Prasad Moril
 
Risk Management for Airlines – Financial Risks
Risk Management for Airlines – Financial RisksRisk Management for Airlines – Financial Risks
Risk Management for Airlines – Financial Risks1BlueHorizon Group
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)eAmbiente
 
Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)Mike Joseph
 
Presentation On Aviation
Presentation On AviationPresentation On Aviation
Presentation On Aviationway2sharif
 

Destacado (12)

Floating airport
Floating airportFloating airport
Floating airport
 
Mitigation of environmental issues of Aviation
Mitigation of environmental issues of AviationMitigation of environmental issues of Aviation
Mitigation of environmental issues of Aviation
 
Airport master plan
Airport master planAirport master plan
Airport master plan
 
Eia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (NmiaEia Of Navi Mumbai International Airport (Nmia
Eia Of Navi Mumbai International Airport (Nmia
 
Environment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airportEnvironment impact assessment of navi mumbai airport
Environment impact assessment of navi mumbai airport
 
Risk Management for Airlines – Financial Risks
Risk Management for Airlines – Financial RisksRisk Management for Airlines – Financial Risks
Risk Management for Airlines – Financial Risks
 
Airport lighting
Airport lightingAirport lighting
Airport lighting
 
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
ENVIRONMENTAL IMPACT ASSESSMENT (EIA)
 
Environmental impact assessment (EIA)
Environmental impact assessment (EIA)Environmental impact assessment (EIA)
Environmental impact assessment (EIA)
 
Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)Airport Ground Handling (Introduction)
Airport Ground Handling (Introduction)
 
Environmental Impact Assessment
Environmental Impact AssessmentEnvironmental Impact Assessment
Environmental Impact Assessment
 
Presentation On Aviation
Presentation On AviationPresentation On Aviation
Presentation On Aviation
 

Similar a EIA repot for Airport

Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH RAMPRASAD KUMAWAT
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptxAnujyadav514462
 
Sustainability OF AIR Transportation
Sustainability OF AIR Transportation Sustainability OF AIR Transportation
Sustainability OF AIR Transportation Reefear Ajang
 
airports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxairports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxNeha Kajulkar
 
airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptxcuhp21rdtt12
 
1.introduction
1.introduction1.introduction
1.introductionMani Vel
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAMNIT,JAIPUR
 
Incheon international airport
Incheon international airportIncheon international airport
Incheon international airportNatsuko Iwashita
 
Compartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportCompartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportJayakrishnan Jayarajan
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSJayashreeIyer14
 
literaturestudy-190217161742.pdf
literaturestudy-190217161742.pdfliteraturestudy-190217161742.pdf
literaturestudy-190217161742.pdfBurkaDinka
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport EngineeringArbaz Kazi
 
Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4AJEETH B
 
Final Presentation STL UAM.pptx
Final Presentation STL UAM.pptxFinal Presentation STL UAM.pptx
Final Presentation STL UAM.pptxsanathviswanathan
 
Airport engg.pptx
Airport  engg.pptxAirport  engg.pptx
Airport engg.pptxyogananda41
 
Airport Planning and Design
Airport Planning and Design Airport Planning and Design
Airport Planning and Design Jetline Marvel
 

Similar a EIA repot for Airport (20)

Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
Planning OF AIRPORT REQUIREMENTS OF AIR PORT TERMINAL AREA RUNWAY LENGTH
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Airport
AirportAirport
Airport
 
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptxAIRPORT PAVEMENT -  CONSTRUCTION & REPAIR.pptx
AIRPORT PAVEMENT - CONSTRUCTION & REPAIR.pptx
 
Sustainability OF AIR Transportation
Sustainability OF AIR Transportation Sustainability OF AIR Transportation
Sustainability OF AIR Transportation
 
airports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptxairports-140217060642-phpapp01.pptx
airports-140217060642-phpapp01.pptx
 
airports-140217060642-phpapp01 .pptx
airports-140217060642-phpapp01     .pptxairports-140217060642-phpapp01     .pptx
airports-140217060642-phpapp01 .pptx
 
Airports
AirportsAirports
Airports
 
1.introduction
1.introduction1.introduction
1.introduction
 
KISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIAKISHANGARH AIRPORT EIA
KISHANGARH AIRPORT EIA
 
Incheon international airport
Incheon international airportIncheon international airport
Incheon international airport
 
Compartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliportCompartive study of surface heliport and elevated heliport
Compartive study of surface heliport and elevated heliport
 
MIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICSMIXED USE DESIGN -BASICS
MIXED USE DESIGN -BASICS
 
literaturestudy-190217161742.pdf
literaturestudy-190217161742.pdfliteraturestudy-190217161742.pdf
literaturestudy-190217161742.pdf
 
Airport Engineering
Airport EngineeringAirport Engineering
Airport Engineering
 
Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4Airport Planning RHTA - VTU Module 4
Airport Planning RHTA - VTU Module 4
 
Final Presentation STL UAM.pptx
Final Presentation STL UAM.pptxFinal Presentation STL UAM.pptx
Final Presentation STL UAM.pptx
 
Airport engineering
Airport engineering Airport engineering
Airport engineering
 
Airport engg.pptx
Airport  engg.pptxAirport  engg.pptx
Airport engg.pptx
 
Airport Planning and Design
Airport Planning and Design Airport Planning and Design
Airport Planning and Design
 

Último

Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxRakhi Bazaar
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifeBhavana Pujan Kendra
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Careerr98588472
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterJamesConcepcion7
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxRich Reba
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfDanny Diep To
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamArik Fletcher
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverseSiemens
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...ssuserf63bd7
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsIndiaMART InterMESH Limited
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAScathy664059
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIBGregory DeShields
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdfSherl Simon
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreNZSG
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfJamesConcepcion7
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdfChris Skinner
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckHajeJanKamps
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdfChris Skinner
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHelp Desk Migration
 

Último (20)

Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptxGo for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
Go for Rakhi Bazaar and Pick the Latest Bhaiya Bhabhi Rakhi.pptx
 
Planetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in LifePlanetary and Vedic Yagyas Bring Positive Impacts in Life
Planetary and Vedic Yagyas Bring Positive Impacts in Life
 
Neha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and CareerNeha Jhalani Hiranandani: A Guide to Her Life and Career
Neha Jhalani Hiranandani: A Guide to Her Life and Career
 
Healthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare NewsletterHealthcare Feb. & Mar. Healthcare Newsletter
Healthcare Feb. & Mar. Healthcare Newsletter
 
Implementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptxImplementing Exponential Accelerators.pptx
Implementing Exponential Accelerators.pptx
 
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdfGUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
GUIDELINES ON USEFUL FORMS IN FREIGHT FORWARDING (F) Danny Diep Toh MBA.pdf
 
Technical Leaders - Working with the Management Team
Technical Leaders - Working with the Management TeamTechnical Leaders - Working with the Management Team
Technical Leaders - Working with the Management Team
 
Interoperability and ecosystems: Assembling the industrial metaverse
Interoperability and ecosystems:  Assembling the industrial metaverseInteroperability and ecosystems:  Assembling the industrial metaverse
Interoperability and ecosystems: Assembling the industrial metaverse
 
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
Intermediate Accounting, Volume 2, 13th Canadian Edition by Donald E. Kieso t...
 
Welding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan DynamicsWelding Electrode Making Machine By Deccan Dynamics
Welding Electrode Making Machine By Deccan Dynamics
 
14680-51-4.pdf Good quality CAS Good quality CAS
14680-51-4.pdf  Good  quality CAS Good  quality CAS14680-51-4.pdf  Good  quality CAS Good  quality CAS
14680-51-4.pdf Good quality CAS Good quality CAS
 
Fundamentals Welcome and Inclusive DEIB
Fundamentals Welcome and  Inclusive DEIBFundamentals Welcome and  Inclusive DEIB
Fundamentals Welcome and Inclusive DEIB
 
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
5-Step Framework to Convert Any Business into a Wealth Generation Machine.pdf
 
Jewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource CentreJewish Resources in the Family Resource Centre
Jewish Resources in the Family Resource Centre
 
WSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdfWSMM Media and Entertainment Feb_March_Final.pdf
WSMM Media and Entertainment Feb_March_Final.pdf
 
20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf20200128 Ethical by Design - Whitepaper.pdf
20200128 Ethical by Design - Whitepaper.pdf
 
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptxThe Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
The Bizz Quiz-E-Summit-E-Cell-IITPatna.pptx
 
Pitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deckPitch Deck Teardown: Xpanceo's $40M Seed deck
Pitch Deck Teardown: Xpanceo's $40M Seed deck
 
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
20220816-EthicsGrade_Scorecard-JP_Morgan_Chase-Q2-63_57.pdf
 
How to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your BusinessHow to Conduct a Service Gap Analysis for Your Business
How to Conduct a Service Gap Analysis for Your Business
 

EIA repot for Airport

  • 1.
  • 2. Group memberGROUP NO. 06 2011-TE-08 2011-TE-27 2011-TE-44 2011-TE-48 2011-TE-59 2011-TE-66 ADIL SOHAIL FAKHAR IMAM AQSA RIAZ HIBA ARSHAD MUHAMMAD ADNAN JHANGEER IHSAN
  • 4. Project Proposal • Walton airport was the main airport of lahore but its handling capacity is less however, Walton was unable to handle the large aircraft • Over the course of the next 25 years the demand for air travel rose • government decided to build a new world class airport to meet the growing needs for the future and improve the facilities for passengers named as Allama Iqbal International
  • 5. Flights • All flights will be switched to the new airport and the old airport will be passed onto the military. However, during the Hajj period, the old airport will be used as the Hajj Terminal by the national carrier, PIA.
  • 6. Project Description: • Site Location • It is located in Lahore, Punjab, Pakistan. The airport currently has three terminals; the Allama Iqbal terminal, the Hajj terminal, and a cargo terminal. The airport is located about 15 kilometres from the centre of the city. • Its coordinates are 31ᴼ31’17”N, 74ᴼ24’09”E.
  • 7.
  • 8. Project Management • Client Client of Allama Iqbal International airport is Civil Aviation Authority Pakistan • Cost of the project estimated to be in the region of $200m • Consultant NESPAK + Nayyar Ali Dada + Other Architects • Contractor
  • 9. Allama Iqbal International Airport facilities • Flights • Terminals • Bridges • Passenger’s Facilities • Passenger terminal complex Airport maintenance facilities • Passenger Accomondation • Runways • Commercial Important Person Lounge • Lahore air cargo and transport
  • 10. Proposed development Walkways Passenger drop off Primary check in Ticket counter Secondary security check in Departure lounge Airline lounge Arrivals route Baggage claim hall Customs Parking
  • 11. Screening • Pakistan environmental protection authority (PEPA), require an Environmental Impact Assessment (EIA), for every major project in Pakistan having Physical, Biological, social and economical impacts
  • 12. Scooping • Land environment impacts • Water environmental impacts • Air environmental impact • Noise environmental impact • Biological environmental impact • Socio-Economic environmental impact • Solid waste
  • 13. Land environment impacts Activity • Earth work construction • Fuel storage and handling: Impacts • Loss of vegetation • Change in elevation of the area • Drainage Patterns • Land and air pollution
  • 14. Water environmental impacts Activity • Aircraft and vehicle washing • Toilets, laundries, cleaning fluids Impacts • Water pollution • Land pollution • Cause health problems
  • 15. Air environmental impact Activity • Aircraft emissions • Emissions from surface vehicles Impacts • The maximum incremental Ground Level Concentrations (GLCs) due to the airport project for PM, SO2, NOx, CO and HC • Pm, SO2, NOx, CO, HC emissions to air, which cause health hazards
  • 16. Noise environmental impacts Activity • Construction noise • Aircraft noise & Ground noise Impacts • Noise pollution • Effects hearing and nerves system • Noise pollution • Effects hearing and nerves system
  • 17. Waste management impacts Activity In-flight wastes Scrap wastes Catering wastes Aircraft maintenance wastes Impacts Water pollution Land pollution Land pollution by hard metals Water pollution
  • 18. Socio-Economic environmental impacts Activity • Development project • Vehicle emission Impacts • loss of cultural heritage , economic and commercial value of its surrounding land • Ambient air
  • 19. Mitigation measure • Land Environment • containment of any surface spillage monitored • Aircraft maintenance, sensitivity of the location where activities are undertaken, and control of runoff of potential contaminants, chemicals etc. are to be properly implemented and reported. • Proper drainage systems • emergency containment in the event of a major spill during monsoon season etc. are to be provided.
  • 20.
  • 21. Water environment • Storm water drains are to be built for discharging storm water from the air-field to avoid flooding /water logging in project area during monsoon season / cloud bursts
  • 22. Air Environment • Continuous Descent Approach and low power- low drop techniques, • Design the airports to minimize aircraft holding and taxiing times • Avoid Aircraft line up on the ground, • Avoiding unnecessary use of aircraft secondary power units, • Taxiing management (e.g. towing and single engine taxi), • Increasing the use of public transport, • The use of electric vehicles or less polluting fuels
  • 23.
  • 24. Noise Environment • The noise preferential routes which the aircraft overfly the least populated areas after takeoff and before landing are to be suggested. • Night flying policy to limit the number of flights and amount of noise generated during this most sensitive time is to be formulated • Mitigation measures could also include introduction of higher landing fees for noisy aircraft and for night landing in threshold cases could be considered.
  • 25.
  • 26. Waste Management • The wastes have to be managed after segregation and identifying the method of management. Recycling of wastes such as paper, glass carried out. •
  • 27. Socio-Economic Environment • Air pollution control measures are to be adopted. Noise control measures such as noise absorbing building material in closed buildings, noise barriers in Ground run bays, are to be insured • Health camps both for employees and local populations are to be conducted.