AGAM BUDI SATRIA
15/392820/FA/10759
PRESENTASI AKHIR PKPA
INDUSTRI
PT. PFIZER INDONESIA
OKT – NOV 2016
- REVIEW LHF DAN FILING
- IBAS SYSTEM
- CAS REPORT: EXPIRED DATE
- KAIZEN PROJECT: LHF ROOM
- APR VISINE
- JOB AID: HOLDING TIME
STUDY
- PCOM: PFIZER COMPLAINT
- GRN FILING: PFIZER & JNJ
LEARNING OUTCOME
OBTAINED:
QUALITY
OPERATION
- THE MOST: PONSTAN
- THE THICKEST: VISINE OR
- THE THINNEST: IMPORT
PRODUCT
HF FILING
PARTS OF LHF:
RELEASE
D
VALIDATI
ON
REJECTE
D
- AVG SFG
- NO MORE ED?
- DEDICATED SHELF
• LHF COVER
• COA + FPIS
• CC
• QAP
• MP (YIELD, CONTROL
CHART)
• PI (YIELD, A+B)
• “TO WASH” CARD
• LABEL
• PHARMACY WEIGHT
• QAR (CONDITIONALLY)
- AVG 3 LOT
- PFIZER  PROSPECTIVE
- TS: VALIDATION: PCK, PROC
COMM, COMP
OBJECTIVE: COMPLY WITH DATA
INTEGRITY PRINCIPLE (ALCOA 
LEGIBLE, ORIGINAL, ACCURATE )
ADVANTAGES:
- ELEKTRONIK DATA DURABLE, UP
TO DATE, LOWERING RISK FOR MISSING
DOCUMENTS
- CLOUD COMPUTING  QO
SHAREPOINT
- HELPS TRACKING, EASING DATA
GATHERING  APR, DESTROY
SCHEDULING , RETAINED SAMPLE
MONITORING
IBAS SYSTEM
INTEGRATED BATCH RECORD AND
RETAINED SAMPLE
PFIZER  HIGHER REGULATED, HAS TO BE REPORTED
REPORT  DOCUMENTATION  COMPLY CPOB, FACILITATING AUDIT
CAS REPORT
FOR ANALYZING
GAP BETWEEN
PQS/SOP PFIZER
WITH LOCAL
REGULATORY
(INDONESIA 
BADAN POM)
QA’S KAIZEN PROJECT 
LHF ROOM OPTIMIZATION
LHF ROOM: PLACE FOR
KEEPING DOCUMENTS WITH
LIMITED ACCESS
KAIZEN
PROJECTALL STAFFS HAVE TO BE
PARTICIPATING
KAIZEN PROJECT:
LHF ROOM OPTIMIZATION
KAIZEN PROJECT: LHF ROOM OPTIMIZATION
PROBLEM
STORAGE ARRANGEMENT IN LOT HISTORY FILE (LHF) ROOM PGS JAKARTA CURRENTLY:
- ONLY BASED ON AVAILABLE RACK LOCATION WITHOUT SPECIFIC ORDER AND IDENTITY LABEL
- EXCESS MATERIAL SUPPLIES WITHOUT PROPER PLACEMENT.
- NO SPECIFIC MARK TO SEPARATE BETWEEN STAGING AREA FOR LHF TO BE DESTROYED AND LHF
TO BE FILED.
- UNCLEAR FLOW FOR ANY ACTIVITY (FILING LHF, PULLING AND DESTROYING LHF, LENDING AND
RETURNING LHF) IN LHF ROOM.
SOLUTION
IMPLEMENTS 5S:
- SORT : MOVE IT OUT
- SET IN ORDER : EVERYTHING IN ITS PLACE
- SHINE : INSPECT FOR CLEANING
- STANDARDIZE : MAKE UP THE RULE
- SUSTAIN : DURABLE, DAILY WORK, MAKE IT HABIT.
THE END

More Related Content

What's hot

List of publication by the author
List of publication by the authorList of publication by the author
List of publication by the author
Danita Hohne
 
Final SLB Project
Final SLB ProjectFinal SLB Project
Final SLB Project
Ebuka David
 
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
Fermo Balatucan,Jr.
 
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
Joel Justice Okine
 

What's hot (12)

JIP CRYTRANSFER external
JIP CRYTRANSFER externalJIP CRYTRANSFER external
JIP CRYTRANSFER external
 
List of publication by the author
List of publication by the authorList of publication by the author
List of publication by the author
 
Wqtc2013 dist syswq-modeling-20131107
Wqtc2013 dist syswq-modeling-20131107Wqtc2013 dist syswq-modeling-20131107
Wqtc2013 dist syswq-modeling-20131107
 
Final SLB Project
Final SLB ProjectFinal SLB Project
Final SLB Project
 
SVR Presentation
SVR PresentationSVR Presentation
SVR Presentation
 
Parcel c workplan figure 19
Parcel c workplan figure 19Parcel c workplan figure 19
Parcel c workplan figure 19
 
Process Simulation using DWSIM
Process Simulation using DWSIMProcess Simulation using DWSIM
Process Simulation using DWSIM
 
Prestea underground presentation final
Prestea underground presentation finalPrestea underground presentation final
Prestea underground presentation final
 
Joe Peterson
Joe PetersonJoe Peterson
Joe Peterson
 
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
PROGRESS OVERALL PROGRESS SUMMARY(Al JANADREA) 25 JAN,16
 
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
PPT ON IMPROVING DISTRIBUTOR ETA COMPLIANCE RATE DEC.2015
 
FARSANA-CV
FARSANA-CVFARSANA-CV
FARSANA-CV
 

PRESENTASI AKHIR PFIZER_agam_linkedIn

  • 1.
  • 2. BY: AGAM BUDI SATRIA 15/392820/FA/10759 PRESENTASI AKHIR PKPA INDUSTRI PT. PFIZER INDONESIA OKT – NOV 2016
  • 3. - REVIEW LHF DAN FILING - IBAS SYSTEM - CAS REPORT: EXPIRED DATE - KAIZEN PROJECT: LHF ROOM - APR VISINE - JOB AID: HOLDING TIME STUDY - PCOM: PFIZER COMPLAINT - GRN FILING: PFIZER & JNJ LEARNING OUTCOME OBTAINED: QUALITY OPERATION
  • 4. - THE MOST: PONSTAN - THE THICKEST: VISINE OR - THE THINNEST: IMPORT PRODUCT HF FILING PARTS OF LHF: RELEASE D VALIDATI ON REJECTE D - AVG SFG - NO MORE ED? - DEDICATED SHELF • LHF COVER • COA + FPIS • CC • QAP • MP (YIELD, CONTROL CHART) • PI (YIELD, A+B) • “TO WASH” CARD • LABEL • PHARMACY WEIGHT • QAR (CONDITIONALLY) - AVG 3 LOT - PFIZER  PROSPECTIVE - TS: VALIDATION: PCK, PROC COMM, COMP
  • 5. OBJECTIVE: COMPLY WITH DATA INTEGRITY PRINCIPLE (ALCOA  LEGIBLE, ORIGINAL, ACCURATE ) ADVANTAGES: - ELEKTRONIK DATA DURABLE, UP TO DATE, LOWERING RISK FOR MISSING DOCUMENTS - CLOUD COMPUTING  QO SHAREPOINT - HELPS TRACKING, EASING DATA GATHERING  APR, DESTROY SCHEDULING , RETAINED SAMPLE MONITORING IBAS SYSTEM INTEGRATED BATCH RECORD AND RETAINED SAMPLE
  • 6. PFIZER  HIGHER REGULATED, HAS TO BE REPORTED REPORT  DOCUMENTATION  COMPLY CPOB, FACILITATING AUDIT CAS REPORT FOR ANALYZING GAP BETWEEN PQS/SOP PFIZER WITH LOCAL REGULATORY (INDONESIA  BADAN POM)
  • 7. QA’S KAIZEN PROJECT  LHF ROOM OPTIMIZATION LHF ROOM: PLACE FOR KEEPING DOCUMENTS WITH LIMITED ACCESS KAIZEN PROJECTALL STAFFS HAVE TO BE PARTICIPATING
  • 9. KAIZEN PROJECT: LHF ROOM OPTIMIZATION PROBLEM STORAGE ARRANGEMENT IN LOT HISTORY FILE (LHF) ROOM PGS JAKARTA CURRENTLY: - ONLY BASED ON AVAILABLE RACK LOCATION WITHOUT SPECIFIC ORDER AND IDENTITY LABEL - EXCESS MATERIAL SUPPLIES WITHOUT PROPER PLACEMENT. - NO SPECIFIC MARK TO SEPARATE BETWEEN STAGING AREA FOR LHF TO BE DESTROYED AND LHF TO BE FILED. - UNCLEAR FLOW FOR ANY ACTIVITY (FILING LHF, PULLING AND DESTROYING LHF, LENDING AND RETURNING LHF) IN LHF ROOM. SOLUTION IMPLEMENTS 5S: - SORT : MOVE IT OUT - SET IN ORDER : EVERYTHING IN ITS PLACE - SHINE : INSPECT FOR CLEANING - STANDARDIZE : MAKE UP THE RULE - SUSTAIN : DURABLE, DAILY WORK, MAKE IT HABIT.