Characteristic of a project
A project is a temporary Endeavour involving a connected sequence of
activities and a range of resources, which is designed to achieve a
specific and unique outcome and which operates within time, cost
and quality constraints and which is often used to introduce change.
2
A unique, one-time operational activity or effort
Requires the completion of a large number of interrelated activities
Established to achieve specific objective
Resources, such as time and/or money, are limited
Typically has its own management structure
Need leadership
Project
Examples
– constructing houses, factories, shopping malls,
athletic stadiums.
– developing military weapons systems, aircrafts,
new ships
– launching satellite systems
– constructing oil pipelines
– developing and implementing new computer
systems
– planning concert, football games, or basketball
tournaments
– introducing new products into market
3
What is project management
• The application of a collection of tools and
techniques to direct the use of diverse resources
towards the accomplishment of a unique,
complex, one time task within time, cost and
quality constraints.
4
Project Management Process
• Project planning
• Project scheduling
• Project control
• Project team
– made up of individuals from various areas and departments within a
company
• Matrix organization (Trade)
– a team structure with members from functional areas, depending on skills
required
• Project Manager
– most important member of project team
• Scope statement
– a document that provides an understanding, justification, and expected result
of a project
• Statement of work
– written description of objectives of a project
• Organizational Breakdown Structure
– a chart that shows which organizational units are responsible for work items
• Responsibility Assignment Matrix
– shows who is responsible for work in a project
5
Work breakdown structure
• A method of breaking down a project into individual
elements ( components, subcomponents, activities and
tasks) in a hierarchical structure which can be scheduled
and cost.
• It defines tasks that can be completed independently of
other tasks, facilitating resource allocation, assignment
of responsibilities and measurement and control of the
project.
• It is foundation of project planning.
• It is developed before identification of dependencies and
estimation of activity durations.
6
Project Planning
• Resource Availability and/or Limits
– Due date, late penalties, early completion
incentives
– Budget
• Activity Information
– Identify all required activities
– Estimate the resources required (time) to complete
each activity
– Immediate predecessor(s) to each activity needed
to create interrelationships
7
Project Scheduling and Control Techniques
8
Gantt Chart
Critical Path Method (CPM)
9
Graph or bar chart with a bar for each project activity that shows
passage of time
Provides visual display of project scheduleProvides visual display of project schedule
Gantt Chart
Project Network
• Use of nodes and arrows
Arrows An arrow leads from tail to head directionally
– Indicate ACTIVITY, a time consuming effort that is required to perform a
part of the work.
Nodes  A node is represented by a circle
- Indicate EVENT, a point in time where one or more activities start and/or
finish.
10
• Network analysis is the general name given to certain specific
techniques which can be used for the planning, management and
control of projects
• Activity
– A task or a certain amount of work required in the project
– Requires time to complete
– Represented by an arrow
• Dummy Activity
– Indicates only precedence relationships
– Does not require any time of effort
• Event
– Signals the beginning or ending of an activity
– Designates a point in time
– Represented by a circle (node)
• Network
– Shows the sequential relationships among activities using nodes
and arrows
11
Activity-on-node (AON)
nodes represent activities, and arrows show precedence
relationships
Activity-on-arrow (AOA)
arrows represent activities and nodes are events for points in
time
Project Network
AOA Project Network for House
12
3
2 0
1
3
1 1
1
1 2 4 6 7
3
5
Lay
foundation
Design house
and obtain
financing
Order and
receive
materials
Dummy
Finish
work
Select
carpet
Select
paint
Build
house
AON Project Network for House
1
3
2
2
4
3
3
1 5
1
6
1
7
1Start
Design house and
obtain financing
Order and receive
materials
Select paint
Select carpet
Lay foundations Build house
Finish work
Situations in network diagram
13
A
B
C
A must finish before either B or C can start
A
B
C both A and B must finish before C can start
D
C
B
A
both A and B must finish before either of
C or D can start
A
C
B
D
Dummy
A must finish before B can start
both A and C must finish before D can start
Network example
14
Illustration of network analysis of a minor redesign of a product and
its associated packaging.
The key question is: How long will it take to complete this project ?
15
For clarity, this list is kept to a minimum by specifying only
immediate relationships, that is relationships involving activities
that "occur near to each other in time".
Questions to prepare activity network
• Is this a Start Activity?
• Is this a Finish Activity?
• What Activity Precedes this?
• What Activity Follows this?
• What Activity is Concurrent with this?
16
CPM calculation
• Path
– A connected sequence of activities leading from
the starting event to the ending event
• Critical Path
– The longest path (time); determines the project
duration
• Critical Activities
– All of the activities that make up the critical path
17
Forward Pass
• Earliest Start Time (ES)
– earliest time an activity can start
– ES = maximum EF of immediate predecessors
• Earliest finish time (EF)
– earliest time an activity can finish
– earliest start time plus activity time
EF= ES + D
18
Latest Start Time (LS)
Latest time an activity can start without delaying critical path
time
LS= LF - D
Latest finish time (LF)
latest time an activity can be completed without delaying
critical path time
LS = minimum LS of immediate predecessors
Backward Pass
CPM analysis
• Draw the CPM network
• Analyze the paths through the network
• Determine the float for each activity
– Compute the activity’s float
float = LS - ES = LF - EF
– Float is the maximum amount of time that this activity can be
delay in its completion before it becomes a critical activity,
i.e., delays completion of the project
• Find the critical path is that the sequence of activities and events
where there is no “slack” i.e.. Zero slack
– Longest path through a network
• Find the project duration is minimum project completion time
19
CPM Example:
• CPM Network
20
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17 h, 9h, 9
i, 6i, 6
j, 12j, 12
CPM Example
• ES and EF Times
21
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17 h, 9h, 9
i, 6i, 6
j, 12j, 12
0 6
0 8
0 5
CPM Example
• ES and EF Times
22
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17 h, 9h, 9
i, 6i, 6
j, 12j, 12
0 6
0 8
0 5
5 14
8 21
6 23
6 21
CPM Example
• ES and EF Times
23
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17 h, 9h, 9
i, 6i, 6
j, 12j, 12
0 6
0 8
0 5
5 14
8 21 21 33
6 23
21 30
23 29
6 21
Project’s EF = 33Project’s EF = 33
CPM Example
• LS and LF Times
24
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17
h, 9h, 9
i, 6i, 6
j, 12j, 12
0 6
0 8
0 5
5 14
8 21
21 33
6 23
21 30
23 29
6 21
21 33
27 33
24 33
CPM Example
• LS and LF Times
25
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17
h, 9h, 9
i, 6i, 6
j, 12j, 12
0 6
0 8
0 5
5 14
8 21
21 33
6 23
21 30
23 29
6 21
4 10
0 8
7 12
12 21
21 33
27 33
8 21
10 27
24 33
18 24
CPM Example
• Float
26
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17
h, 9h, 9
i, 6i, 6
j, 12j, 12
0 6
0 8
0 5
5 14
8 21 21 33
6 23
21 30
23 29
6 21
3 9
0 8
7 12
12 21
21 33
27 33
8 21
10 27
24 33
9 24
3 4
3
3
4
0
0
7
7
0
CPM Example
• Critical Path
27
a, 6a, 6
f, 15f, 15
b, 8b, 8
c, 5c, 5
e, 9e, 9
d, 13d, 13
g, 17g, 17 h, 9h, 9
i, 6i, 6
j, 12j, 12
28

More Related Content

What's hot

Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering EconomicsDeepak Paithankar
 
PPM5D - The BIM Integrated Project Delivery Specialists
PPM5D -  The  BIM Integrated Project Delivery SpecialistsPPM5D -  The  BIM Integrated Project Delivery Specialists
PPM5D - The BIM Integrated Project Delivery Specialistsinistioge
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysistutor2u
 
Critical Path Method/ Program Evaluation and Review Technique
Critical Path Method/ Program Evaluation and Review TechniqueCritical Path Method/ Program Evaluation and Review Technique
Critical Path Method/ Program Evaluation and Review TechniqueJomari Gingo Selibio
 
Critical path method
Critical path methodCritical path method
Critical path methodNicola2903
 
C10 project management
C10 project managementC10 project management
C10 project managementhakimizaki
 
Network problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMARNetwork problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMARMitesh Kumar
 
Critical path method
Critical path methodCritical path method
Critical path methodDhruv Shah
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path MethodSimplilearn
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)El Moro
 
Management science
Management scienceManagement science
Management sciencekamrul islam
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)Areef Khan
 
CPM - Critical Path Method
CPM - Critical Path Method CPM - Critical Path Method
CPM - Critical Path Method Mkaur01
 
Critical path method
Critical path methodCritical path method
Critical path methodShubhi Verma
 

What's hot (19)

Project Management & Engineering Economics
Project Management & Engineering EconomicsProject Management & Engineering Economics
Project Management & Engineering Economics
 
PPM5D - The BIM Integrated Project Delivery Specialists
PPM5D -  The  BIM Integrated Project Delivery SpecialistsPPM5D -  The  BIM Integrated Project Delivery Specialists
PPM5D - The BIM Integrated Project Delivery Specialists
 
Critical Path Analysis
Critical Path AnalysisCritical Path Analysis
Critical Path Analysis
 
Critical Path Method/ Program Evaluation and Review Technique
Critical Path Method/ Program Evaluation and Review TechniqueCritical Path Method/ Program Evaluation and Review Technique
Critical Path Method/ Program Evaluation and Review Technique
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
(Aoa) and (aon) networks
(Aoa) and (aon) networks(Aoa) and (aon) networks
(Aoa) and (aon) networks
 
Critical path method
Critical path methodCritical path method
Critical path method
 
C10 project management
C10 project managementC10 project management
C10 project management
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Network problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMARNetwork problem cpm and pert BY MITESH KUMAR
Network problem cpm and pert BY MITESH KUMAR
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Critical path method
Critical path methodCritical path method
Critical path method
 
Critical Path Method
Critical Path MethodCritical Path Method
Critical Path Method
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
Management science
Management scienceManagement science
Management science
 
Cpm (critical path method)
Cpm (critical path method)Cpm (critical path method)
Cpm (critical path method)
 
CPM - Critical Path Method
CPM - Critical Path Method CPM - Critical Path Method
CPM - Critical Path Method
 
06 pert cpm
06 pert cpm06 pert cpm
06 pert cpm
 
Critical path method
Critical path methodCritical path method
Critical path method
 

Viewers also liked

Coriosolis
CoriosolisCoriosolis
Coriosolismhr56
 
Odf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-plOdf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-plodfoundation
 
Komfo - DDM Alliance Summit Marketing on Facebook
Komfo - DDM Alliance Summit Marketing on FacebookKomfo - DDM Alliance Summit Marketing on Facebook
Komfo - DDM Alliance Summit Marketing on FacebookDDM Alliance
 
Sca digital disruption - march 2016
Sca digital disruption -  march 2016Sca digital disruption -  march 2016
Sca digital disruption - march 2016Vijay Solanki
 
13.02.2014 odf ukraine_attacks_on_journalists_en
13.02.2014 odf ukraine_attacks_on_journalists_en13.02.2014 odf ukraine_attacks_on_journalists_en
13.02.2014 odf ukraine_attacks_on_journalists_enodfoundation
 
Macroestructura- Santiago Mariño
Macroestructura- Santiago MariñoMacroestructura- Santiago Mariño
Macroestructura- Santiago MariñoAndreina Navarro
 
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014Ilona Strzelczyk
 
Practica 05 jesus garza
Practica 05 jesus garzaPractica 05 jesus garza
Practica 05 jesus garzaprepa mante
 
MI MUNDO / Fotografia.
MI MUNDO / Fotografia. MI MUNDO / Fotografia.
MI MUNDO / Fotografia. Pepe Palma
 
Graduate Marketing Association(GMARK)2015 2016 General Meeting Presentation
Graduate Marketing Association(GMARK)2015 2016 General Meeting PresentationGraduate Marketing Association(GMARK)2015 2016 General Meeting Presentation
Graduate Marketing Association(GMARK)2015 2016 General Meeting PresentationShilpa Mohanty
 
Mysql, MongoDb feat. Doctrine2
Mysql, MongoDb feat. Doctrine2Mysql, MongoDb feat. Doctrine2
Mysql, MongoDb feat. Doctrine2DA-14
 
Procetni racun
Procetni racunProcetni racun
Procetni racunsanjablag
 
Catalogo de ventas
Catalogo de ventasCatalogo de ventas
Catalogo de ventas7480462
 
El prado
El pradoEl prado
El pradomhr56
 
Our week in istanbul
Our week in istanbulOur week in istanbul
Our week in istanbulmhr56
 

Viewers also liked (17)

Coriosolis
CoriosolisCoriosolis
Coriosolis
 
Odf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-plOdf report-massacre-in-odessa-pl
Odf report-massacre-in-odessa-pl
 
Komfo - DDM Alliance Summit Marketing on Facebook
Komfo - DDM Alliance Summit Marketing on FacebookKomfo - DDM Alliance Summit Marketing on Facebook
Komfo - DDM Alliance Summit Marketing on Facebook
 
Sca digital disruption - march 2016
Sca digital disruption -  march 2016Sca digital disruption -  march 2016
Sca digital disruption - march 2016
 
13.02.2014 odf ukraine_attacks_on_journalists_en
13.02.2014 odf ukraine_attacks_on_journalists_en13.02.2014 odf ukraine_attacks_on_journalists_en
13.02.2014 odf ukraine_attacks_on_journalists_en
 
Macroestructura- Santiago Mariño
Macroestructura- Santiago MariñoMacroestructura- Santiago Mariño
Macroestructura- Santiago Mariño
 
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014
Podsumowanie działań Stowarzyszenia Uśmiech Nadziei 2014
 
Thunderbird rss
Thunderbird rssThunderbird rss
Thunderbird rss
 
Practica 05 jesus garza
Practica 05 jesus garzaPractica 05 jesus garza
Practica 05 jesus garza
 
MI MUNDO / Fotografia.
MI MUNDO / Fotografia. MI MUNDO / Fotografia.
MI MUNDO / Fotografia.
 
Graduate Marketing Association(GMARK)2015 2016 General Meeting Presentation
Graduate Marketing Association(GMARK)2015 2016 General Meeting PresentationGraduate Marketing Association(GMARK)2015 2016 General Meeting Presentation
Graduate Marketing Association(GMARK)2015 2016 General Meeting Presentation
 
Project Management
Project ManagementProject Management
Project Management
 
Mysql, MongoDb feat. Doctrine2
Mysql, MongoDb feat. Doctrine2Mysql, MongoDb feat. Doctrine2
Mysql, MongoDb feat. Doctrine2
 
Procetni racun
Procetni racunProcetni racun
Procetni racun
 
Catalogo de ventas
Catalogo de ventasCatalogo de ventas
Catalogo de ventas
 
El prado
El pradoEl prado
El prado
 
Our week in istanbul
Our week in istanbulOur week in istanbul
Our week in istanbul
 

Similar to 13 lecture project management

PMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For BeginnersPMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For BeginnersIIMSE Edu
 
Pertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOLPertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOLSiddanna Balapgol
 
Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02kongara
 
ITFT - Project Management
ITFT - Project ManagementITFT - Project Management
ITFT - Project ManagementPooja
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management UploadBhuWan Khadka
 
chapter 6.ppt
chapter 6.pptchapter 6.ppt
chapter 6.pptDejeneDay
 
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptxSession 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptxAlRashedinKawser2
 
L2_Project_Management.pdf
L2_Project_Management.pdfL2_Project_Management.pdf
L2_Project_Management.pdfJerryHung19
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pertAbu Bashar
 
Unit 3 PERT.pptx in related to supply chain
Unit 3 PERT.pptx in related to supply chainUnit 3 PERT.pptx in related to supply chain
Unit 3 PERT.pptx in related to supply chaintanishkagupta907
 
ABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning SlidesABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning SlidesYousef Abugosh, PMP, MA
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertRaj J Das
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1adeelmunir158
 

Similar to 13 lecture project management (20)

PMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For BeginnersPMP Project Management Basics Tutorial For Beginners
PMP Project Management Basics Tutorial For Beginners
 
Pertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOLPertcpm projectmanagement SIDDANNA M BALAPGOL
Pertcpm projectmanagement SIDDANNA M BALAPGOL
 
Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02Pertcpm projectmanagement-120628224438-phpapp02
Pertcpm projectmanagement-120628224438-phpapp02
 
ITFT - Project Management
ITFT - Project ManagementITFT - Project Management
ITFT - Project Management
 
cpmpertmy (1)
cpmpertmy (1)cpmpertmy (1)
cpmpertmy (1)
 
08. Project Time Management Upload
08. Project Time Management Upload08. Project Time Management Upload
08. Project Time Management Upload
 
pert-cpm.pptx
pert-cpm.pptxpert-cpm.pptx
pert-cpm.pptx
 
Ch 5.pptx
Ch 5.pptxCh 5.pptx
Ch 5.pptx
 
chapter 6.ppt
chapter 6.pptchapter 6.ppt
chapter 6.ppt
 
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptxSession 9 - Project scheduling-PERT-CPM-Network diagram.pptx
Session 9 - Project scheduling-PERT-CPM-Network diagram.pptx
 
L2_Project_Management.pdf
L2_Project_Management.pdfL2_Project_Management.pdf
L2_Project_Management.pdf
 
Project management cpm-pert
Project management   cpm-pertProject management   cpm-pert
Project management cpm-pert
 
Cpm pert
Cpm pertCpm pert
Cpm pert
 
PM-Problems.pptx
PM-Problems.pptxPM-Problems.pptx
PM-Problems.pptx
 
Unit 3 PERT.pptx in related to supply chain
Unit 3 PERT.pptx in related to supply chainUnit 3 PERT.pptx in related to supply chain
Unit 3 PERT.pptx in related to supply chain
 
project network
project networkproject network
project network
 
ABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning SlidesABCs Of Project Time Management Planning Slides
ABCs Of Project Time Management Planning Slides
 
Pert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gertPert,cpm, resource allocation and gert
Pert,cpm, resource allocation and gert
 
Project Management.pptx
Project Management.pptxProject Management.pptx
Project Management.pptx
 
Cpm n pert lecture 1
Cpm n pert lecture 1Cpm n pert lecture 1
Cpm n pert lecture 1
 

More from Ahmad Basim Hamza

History of Afghanistan Railway Network
History of Afghanistan Railway NetworkHistory of Afghanistan Railway Network
History of Afghanistan Railway NetworkAhmad Basim Hamza
 
History of afghanistan railway network
History of afghanistan railway networkHistory of afghanistan railway network
History of afghanistan railway networkAhmad Basim Hamza
 
12 lecture project scheduling 4
12 lecture project scheduling 412 lecture project scheduling 4
12 lecture project scheduling 4Ahmad Basim Hamza
 
11 lecture project scheduling 3
11 lecture project scheduling 311 lecture project scheduling 3
11 lecture project scheduling 3Ahmad Basim Hamza
 
10 lecture project scheduling 2
10 lecture project scheduling 210 lecture project scheduling 2
10 lecture project scheduling 2Ahmad Basim Hamza
 
09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1Ahmad Basim Hamza
 

More from Ahmad Basim Hamza (7)

History of Afghanistan Railway Network
History of Afghanistan Railway NetworkHistory of Afghanistan Railway Network
History of Afghanistan Railway Network
 
History of afghanistan railway network
History of afghanistan railway networkHistory of afghanistan railway network
History of afghanistan railway network
 
Project Management (Soft)
Project Management (Soft)Project Management (Soft)
Project Management (Soft)
 
12 lecture project scheduling 4
12 lecture project scheduling 412 lecture project scheduling 4
12 lecture project scheduling 4
 
11 lecture project scheduling 3
11 lecture project scheduling 311 lecture project scheduling 3
11 lecture project scheduling 3
 
10 lecture project scheduling 2
10 lecture project scheduling 210 lecture project scheduling 2
10 lecture project scheduling 2
 
09 lecture project scheduling 1
09 lecture project scheduling 109 lecture project scheduling 1
09 lecture project scheduling 1
 

Recently uploaded

Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniquesugginaramesh
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfAsst.prof M.Gokilavani
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEroselinkalist12
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024Mark Billinghurst
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfAsst.prof M.Gokilavani
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidNikhilNagaraju
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)Dr SOUNDIRARAJ N
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.eptoze12
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxDeepakSakkari2
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile servicerehmti665
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...srsj9000
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catcherssdickerson1
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxPoojaBan
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitterShivangiSharma879191
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girlsssuser7cb4ff
 

Recently uploaded (20)

Comparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization TechniquesComparative Analysis of Text Summarization Techniques
Comparative Analysis of Text Summarization Techniques
 
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdfCCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
CCS355 Neural Networks & Deep Learning Unit 1 PDF notes with Question bank .pdf
 
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETEINFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
INFLUENCE OF NANOSILICA ON THE PROPERTIES OF CONCRETE
 
IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024IVE Industry Focused Event - Defence Sector 2024
IVE Industry Focused Event - Defence Sector 2024
 
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCRCall Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
Call Us -/9953056974- Call Girls In Vikaspuri-/- Delhi NCR
 
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdfCCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
CCS355 Neural Network & Deep Learning Unit II Notes with Question bank .pdf
 
main PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfidmain PPT.pptx of girls hostel security using rfid
main PPT.pptx of girls hostel security using rfid
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
UNIT III ANALOG ELECTRONICS (BASIC ELECTRONICS)
 
Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.Oxy acetylene welding presentation note.
Oxy acetylene welding presentation note.
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Biology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptxBiology for Computer Engineers Course Handout.pptx
Biology for Computer Engineers Course Handout.pptx
 
Call Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile serviceCall Girls Delhi {Jodhpur} 9711199012 high profile service
Call Girls Delhi {Jodhpur} 9711199012 high profile service
 
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
Gfe Mayur Vihar Call Girls Service WhatsApp -> 9999965857 Available 24x7 ^ De...
 
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor CatchersTechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
TechTAC® CFD Report Summary: A Comparison of Two Types of Tubing Anchor Catchers
 
Heart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptxHeart Disease Prediction using machine learning.pptx
Heart Disease Prediction using machine learning.pptx
 
8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter8251 universal synchronous asynchronous receiver transmitter
8251 universal synchronous asynchronous receiver transmitter
 
Call Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call GirlsCall Girls Narol 7397865700 Independent Call Girls
Call Girls Narol 7397865700 Independent Call Girls
 

13 lecture project management

  • 1. Project Management Prepared by Sebghatullah Karimi ( Lecturer of Kabul Polytechnic University) 1392 Kardan University Civil Engineering Faculty
  • 2. Characteristic of a project A project is a temporary Endeavour involving a connected sequence of activities and a range of resources, which is designed to achieve a specific and unique outcome and which operates within time, cost and quality constraints and which is often used to introduce change. 2 A unique, one-time operational activity or effort Requires the completion of a large number of interrelated activities Established to achieve specific objective Resources, such as time and/or money, are limited Typically has its own management structure Need leadership Project
  • 3. Examples – constructing houses, factories, shopping malls, athletic stadiums. – developing military weapons systems, aircrafts, new ships – launching satellite systems – constructing oil pipelines – developing and implementing new computer systems – planning concert, football games, or basketball tournaments – introducing new products into market 3
  • 4. What is project management • The application of a collection of tools and techniques to direct the use of diverse resources towards the accomplishment of a unique, complex, one time task within time, cost and quality constraints. 4
  • 5. Project Management Process • Project planning • Project scheduling • Project control • Project team – made up of individuals from various areas and departments within a company • Matrix organization (Trade) – a team structure with members from functional areas, depending on skills required • Project Manager – most important member of project team • Scope statement – a document that provides an understanding, justification, and expected result of a project • Statement of work – written description of objectives of a project • Organizational Breakdown Structure – a chart that shows which organizational units are responsible for work items • Responsibility Assignment Matrix – shows who is responsible for work in a project 5
  • 6. Work breakdown structure • A method of breaking down a project into individual elements ( components, subcomponents, activities and tasks) in a hierarchical structure which can be scheduled and cost. • It defines tasks that can be completed independently of other tasks, facilitating resource allocation, assignment of responsibilities and measurement and control of the project. • It is foundation of project planning. • It is developed before identification of dependencies and estimation of activity durations. 6
  • 7. Project Planning • Resource Availability and/or Limits – Due date, late penalties, early completion incentives – Budget • Activity Information – Identify all required activities – Estimate the resources required (time) to complete each activity – Immediate predecessor(s) to each activity needed to create interrelationships 7
  • 8. Project Scheduling and Control Techniques 8 Gantt Chart Critical Path Method (CPM)
  • 9. 9 Graph or bar chart with a bar for each project activity that shows passage of time Provides visual display of project scheduleProvides visual display of project schedule Gantt Chart
  • 10. Project Network • Use of nodes and arrows Arrows An arrow leads from tail to head directionally – Indicate ACTIVITY, a time consuming effort that is required to perform a part of the work. Nodes  A node is represented by a circle - Indicate EVENT, a point in time where one or more activities start and/or finish. 10 • Network analysis is the general name given to certain specific techniques which can be used for the planning, management and control of projects • Activity – A task or a certain amount of work required in the project – Requires time to complete – Represented by an arrow • Dummy Activity – Indicates only precedence relationships – Does not require any time of effort
  • 11. • Event – Signals the beginning or ending of an activity – Designates a point in time – Represented by a circle (node) • Network – Shows the sequential relationships among activities using nodes and arrows 11 Activity-on-node (AON) nodes represent activities, and arrows show precedence relationships Activity-on-arrow (AOA) arrows represent activities and nodes are events for points in time Project Network
  • 12. AOA Project Network for House 12 3 2 0 1 3 1 1 1 1 2 4 6 7 3 5 Lay foundation Design house and obtain financing Order and receive materials Dummy Finish work Select carpet Select paint Build house AON Project Network for House 1 3 2 2 4 3 3 1 5 1 6 1 7 1Start Design house and obtain financing Order and receive materials Select paint Select carpet Lay foundations Build house Finish work
  • 13. Situations in network diagram 13 A B C A must finish before either B or C can start A B C both A and B must finish before C can start D C B A both A and B must finish before either of C or D can start A C B D Dummy A must finish before B can start both A and C must finish before D can start
  • 14. Network example 14 Illustration of network analysis of a minor redesign of a product and its associated packaging. The key question is: How long will it take to complete this project ?
  • 15. 15 For clarity, this list is kept to a minimum by specifying only immediate relationships, that is relationships involving activities that "occur near to each other in time".
  • 16. Questions to prepare activity network • Is this a Start Activity? • Is this a Finish Activity? • What Activity Precedes this? • What Activity Follows this? • What Activity is Concurrent with this? 16
  • 17. CPM calculation • Path – A connected sequence of activities leading from the starting event to the ending event • Critical Path – The longest path (time); determines the project duration • Critical Activities – All of the activities that make up the critical path 17
  • 18. Forward Pass • Earliest Start Time (ES) – earliest time an activity can start – ES = maximum EF of immediate predecessors • Earliest finish time (EF) – earliest time an activity can finish – earliest start time plus activity time EF= ES + D 18 Latest Start Time (LS) Latest time an activity can start without delaying critical path time LS= LF - D Latest finish time (LF) latest time an activity can be completed without delaying critical path time LS = minimum LS of immediate predecessors Backward Pass
  • 19. CPM analysis • Draw the CPM network • Analyze the paths through the network • Determine the float for each activity – Compute the activity’s float float = LS - ES = LF - EF – Float is the maximum amount of time that this activity can be delay in its completion before it becomes a critical activity, i.e., delays completion of the project • Find the critical path is that the sequence of activities and events where there is no “slack” i.e.. Zero slack – Longest path through a network • Find the project duration is minimum project completion time 19
  • 20. CPM Example: • CPM Network 20 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12
  • 21. CPM Example • ES and EF Times 21 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12 0 6 0 8 0 5
  • 22. CPM Example • ES and EF Times 22 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12 0 6 0 8 0 5 5 14 8 21 6 23 6 21
  • 23. CPM Example • ES and EF Times 23 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12 0 6 0 8 0 5 5 14 8 21 21 33 6 23 21 30 23 29 6 21 Project’s EF = 33Project’s EF = 33
  • 24. CPM Example • LS and LF Times 24 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12 0 6 0 8 0 5 5 14 8 21 21 33 6 23 21 30 23 29 6 21 21 33 27 33 24 33
  • 25. CPM Example • LS and LF Times 25 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12 0 6 0 8 0 5 5 14 8 21 21 33 6 23 21 30 23 29 6 21 4 10 0 8 7 12 12 21 21 33 27 33 8 21 10 27 24 33 18 24
  • 26. CPM Example • Float 26 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12 0 6 0 8 0 5 5 14 8 21 21 33 6 23 21 30 23 29 6 21 3 9 0 8 7 12 12 21 21 33 27 33 8 21 10 27 24 33 9 24 3 4 3 3 4 0 0 7 7 0
  • 27. CPM Example • Critical Path 27 a, 6a, 6 f, 15f, 15 b, 8b, 8 c, 5c, 5 e, 9e, 9 d, 13d, 13 g, 17g, 17 h, 9h, 9 i, 6i, 6 j, 12j, 12