Chapter 15 Materials Requirements Planning
Material Requirements Planning Defined ,[object Object],[object Object],[object Object],[object Object]
Example of MRP Logic and Product Structure Tree Product Structure Tree for Assembly A Lead Times A 1 day B  2 days C 1 day D  3 days E 4 days F 1 day Total Unit Demand Day 10    50 A Day 8   20 B (Spares) Day 6  15 D (Spares) Given the  product structure tree  for “A” and the lead time and demand information below, provide a materials requirements plan that defines the number of units of each component and when they will be needed B(4) E(1) D(2) C(2) F(2) D(3) A
First, the number of units of “A” are scheduled backwards to allow for their lead time.  So, in the materials requirement plan below, we have to place an order for 50 units of “A” on the 9 th  day to receive them on day 10. LT = 1 day
Next, we need to start scheduling the components that make up “A”.  In the case of component “B” we need 4 B’s for each A.  Since we need 50 A’s, that means 200 B’s.  And again, we back the schedule up for the necessary 2 days of lead time. B(4) E(1) D(2) C(2) F(2) D(3) A Spares LT = 2 4x50=200
Finally, repeating the process for all components, we have the final materials requirements plan: ,[object Object],B(4) E(1) D(2) C(2) F(2) D(3) A 40 + 15 spares Part D: Day 6
Master Production Schedule (MPS) ,[object Object],Aggregate Plan (Product Groups) MPS (Specific End Items)
Types of Time Fences ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Example of Time Fences Exhibit 15.5 8 15 26 Weeks Frozen Moderately Firm Flexible Firm Customer Orders Forecast and available capacity Capacity
Material Requirements Planning System ,[object Object],[object Object],[object Object],[object Object]
From Exhibit 15.6 ,[object Object],Firm orders  from known customers Forecasts of demand  from random customers Aggregate product plan Bill of material file Engineering design changes Inventory record file Inventory transactions Master production Schedule (MPS) Primary reports Secondary reports Planned order schedule for inventory and production control Exception reports Planning reports Reports for performance control Material planning (MRP  computer  program)
Bill of Materials (BOM) File A Complete Product Description ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Inventory Records File ,[object Object],[object Object],[object Object],[object Object]
Primary MRP Reports ,[object Object],[object Object],[object Object],[object Object],[object Object]
Secondary MRP Reports ,[object Object],[object Object],[object Object]
Additional MRP Scheduling Terminology ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
MRP Example Requirements include 95 units (80 firm orders and 15 forecast) of X in week 10 A(2) B(1) D(5) C(2) X C(3)
A(2) X It takes 2 A’s for each X
B(1) A(2) X It takes 1 B for each X
A(2) B(1) X C(3) It takes 3 C’s for each A
A(2) B(1) C(2) X C(3) It takes 2 C’s for each B
A(2) B(1) D(5) C(2) X C(3) It takes 5 D’s for each B
Closed Loop MRP Production Planning Master Production Scheduling Material Requirements Planning Capacity Requirements Planning Realistic? No Feedback Execute: Capacity Plans Material Plans Yes Feedback
Manufacturing Resource Planning  (MRP II) ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Lot Sizing in MRP Programs ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]

Más contenido relacionado

La actualidad más candente

Stock requirements list md04
Stock requirements list   md04Stock requirements list   md04
Stock requirements list md04
m2k2010
 
Basics sap external service management
Basics sap external service managementBasics sap external service management
Basics sap external service management
Sachin S Bhalekar
 

La actualidad más candente (20)

Oracle eAM - Right Fit To Oil & Gas Industries
Oracle eAM - Right Fit To Oil & Gas IndustriesOracle eAM - Right Fit To Oil & Gas Industries
Oracle eAM - Right Fit To Oil & Gas Industries
 
R12.2.2 oracle projects cost break down structure overview
R12.2.2 oracle projects cost break down structure overviewR12.2.2 oracle projects cost break down structure overview
R12.2.2 oracle projects cost break down structure overview
 
Mrp structure
Mrp structureMrp structure
Mrp structure
 
Stock requirements list md04
Stock requirements list   md04Stock requirements list   md04
Stock requirements list md04
 
Oracle Inventory – Types of Move Orders
Oracle Inventory – Types of Move OrdersOracle Inventory – Types of Move Orders
Oracle Inventory – Types of Move Orders
 
Oracle ASCP Training
Oracle ASCP TrainingOracle ASCP Training
Oracle ASCP Training
 
Basics sap external service management
Basics sap external service managementBasics sap external service management
Basics sap external service management
 
Operation Level Costing - Part 1
Operation Level Costing - Part 1Operation Level Costing - Part 1
Operation Level Costing - Part 1
 
DLW vocational training report
DLW vocational training reportDLW vocational training report
DLW vocational training report
 
Work clearance management process
Work clearance management processWork clearance management process
Work clearance management process
 
DLW Varanasi Training report
DLW Varanasi Training reportDLW Varanasi Training report
DLW Varanasi Training report
 
Phantom bills of material
Phantom bills of materialPhantom bills of material
Phantom bills of material
 
WM - PP Interface
WM - PP InterfaceWM - PP Interface
WM - PP Interface
 
Plant Maintenance user manual MTTR Report
Plant Maintenance user manual MTTR Report Plant Maintenance user manual MTTR Report
Plant Maintenance user manual MTTR Report
 
SAP EWM BATCH MANAGEMENT
SAP EWM BATCH MANAGEMENTSAP EWM BATCH MANAGEMENT
SAP EWM BATCH MANAGEMENT
 
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...
SAP Warehouse Management (SAP WM) or SAP Extended Warehouse Management (SAP E...
 
Capacity planning
Capacity planningCapacity planning
Capacity planning
 
58528447 oracle-e am
58528447 oracle-e am58528447 oracle-e am
58528447 oracle-e am
 
Manage the slotting process in sap ewm
Manage the slotting process in sap ewmManage the slotting process in sap ewm
Manage the slotting process in sap ewm
 
Sap sales and distribution
Sap sales and distribution Sap sales and distribution
Sap sales and distribution
 

Destacado

Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
Biswajit Ghosh
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
jhanakshah
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management
Thomas Tanel
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
Delwin Arikatt
 
Topic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial StatementsTopic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial Statements
guest441011
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
videoaakash15
 

Destacado (20)

Ch16 mrp
Ch16 mrpCh16 mrp
Ch16 mrp
 
PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITYPRODUCTION & OPERATIONS MANAGEMENT- QUALITY
PRODUCTION & OPERATIONS MANAGEMENT- QUALITY
 
Material Requirement Planning
Material Requirement PlanningMaterial Requirement Planning
Material Requirement Planning
 
Material Resource Planning
Material Resource PlanningMaterial Resource Planning
Material Resource Planning
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
MIS - IT Infrastructure (Part I)
MIS  - IT Infrastructure (Part I)MIS  - IT Infrastructure (Part I)
MIS - IT Infrastructure (Part I)
 
Jit & Lean Operations
Jit & Lean OperationsJit & Lean Operations
Jit & Lean Operations
 
Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management Warehouse Operations and Inventory Management
Warehouse Operations and Inventory Management
 
Information System Plan
Information System PlanInformation System Plan
Information System Plan
 
Risk management
Risk managementRisk management
Risk management
 
The Project Management Process - Week 1
The Project Management Process -  Week 1The Project Management Process -  Week 1
The Project Management Process - Week 1
 
Types of production processes
Types of production processesTypes of production processes
Types of production processes
 
Chapter three com 6 (1)
Chapter three com 6 (1)Chapter three com 6 (1)
Chapter three com 6 (1)
 
MRP 10 point plan
MRP 10 point planMRP 10 point plan
MRP 10 point plan
 
Advanced Planning from Standard MPS/MRP
Advanced Planning from Standard MPS/MRPAdvanced Planning from Standard MPS/MRP
Advanced Planning from Standard MPS/MRP
 
Material requirement planning presentation
Material requirement planning presentationMaterial requirement planning presentation
Material requirement planning presentation
 
Topic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial StatementsTopic 9 Comparison Of Financial Statements
Topic 9 Comparison Of Financial Statements
 
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_siesOm lect 06(r1-sep08)_basics of mrp_erp _mms_sies
Om lect 06(r1-sep08)_basics of mrp_erp _mms_sies
 
SAP SD Practice Exam
SAP SD Practice ExamSAP SD Practice Exam
SAP SD Practice Exam
 
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
Dynamics Day 2013 Microsoft Dynamics NAV Tips and Tricks 45 in 45
 

Similar a Material Requisite Planning

Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
JOHN PAUL ROBERTO
 
Session 5
Session 5Session 5
Session 5
thangv
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
Mostafa Ewees
 
samer amale mrp presentation
samer amale   mrp presentationsamer amale   mrp presentation
samer amale mrp presentation
Akash Maurya
 

Similar a Material Requisite Planning (20)

Mrpmep
MrpmepMrpmep
Mrpmep
 
Module11. Material requirement plan..pdf
Module11. Material requirement plan..pdfModule11. Material requirement plan..pdf
Module11. Material requirement plan..pdf
 
Scps -materials_requirements_planning
Scps  -materials_requirements_planningScps  -materials_requirements_planning
Scps -materials_requirements_planning
 
Session 5
Session 5Session 5
Session 5
 
Operations Management Material Requirements Planning (MRP)
Operations ManagementMaterial Requirements Planning (MRP)Operations ManagementMaterial Requirements Planning (MRP)
Operations Management Material Requirements Planning (MRP)
 
Heizer 14
Heizer 14Heizer 14
Heizer 14
 
MRP in English
MRP in EnglishMRP in English
MRP in English
 
MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)MATERIAL REQUIREMENTS PLANNING (MRP)
MATERIAL REQUIREMENTS PLANNING (MRP)
 
Material requirements planning & erp ppt @ bec doms
Material requirements planning & erp  ppt @ bec domsMaterial requirements planning & erp  ppt @ bec doms
Material requirements planning & erp ppt @ bec doms
 
MRP and ERP
MRP and ERPMRP and ERP
MRP and ERP
 
Material requirement planning
Material requirement planningMaterial requirement planning
Material requirement planning
 
Planned order release
Planned order releasePlanned order release
Planned order release
 
samer amale mrp presentation
samer amale   mrp presentationsamer amale   mrp presentation
samer amale mrp presentation
 
5089529.ppt
5089529.ppt5089529.ppt
5089529.ppt
 
Mrp
MrpMrp
Mrp
 
Mrp
MrpMrp
Mrp
 
MRP
MRP MRP
MRP
 
Resource Requirement Planning
Resource Requirement PlanningResource Requirement Planning
Resource Requirement Planning
 
Material and capacity requirements planning (mrp and crp) part 1
Material and capacity requirements planning (mrp and crp) part  1Material and capacity requirements planning (mrp and crp) part  1
Material and capacity requirements planning (mrp and crp) part 1
 
Material and capacity requirements planning (mrp and crp) part 2
Material and capacity requirements planning (mrp and crp) part  2Material and capacity requirements planning (mrp and crp) part  2
Material and capacity requirements planning (mrp and crp) part 2
 

Más de ajithsrc

New Ethics 5
New Ethics 5New Ethics 5
New Ethics 5
ajithsrc
 
New Ethics 4
New Ethics 4New Ethics 4
New Ethics 4
ajithsrc
 
Valuation Of S Ecurities
Valuation Of S EcuritiesValuation Of S Ecurities
Valuation Of S Ecurities
ajithsrc
 
Ajith Resume
Ajith ResumeAjith Resume
Ajith Resume
ajithsrc
 
Operations Research
Operations ResearchOperations Research
Operations Research
ajithsrc
 
Evolution Of Operations Management
Evolution Of Operations ManagementEvolution Of Operations Management
Evolution Of Operations Management
ajithsrc
 
Textile Industry
Textile IndustryTextile Industry
Textile Industry
ajithsrc
 
Syndicate 1 Tqm
Syndicate 1 TqmSyndicate 1 Tqm
Syndicate 1 Tqm
ajithsrc
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
ajithsrc
 
Stevenson9e Ch04
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04
ajithsrc
 

Más de ajithsrc (20)

Business Plan On Retail Mall
Business Plan On Retail MallBusiness Plan On Retail Mall
Business Plan On Retail Mall
 
Ethics
EthicsEthics
Ethics
 
Ethics
EthicsEthics
Ethics
 
Ethics
EthicsEthics
Ethics
 
New Ethics 5
New Ethics 5New Ethics 5
New Ethics 5
 
New Ethics 4
New Ethics 4New Ethics 4
New Ethics 4
 
Valuation Of S Ecurities
Valuation Of S EcuritiesValuation Of S Ecurities
Valuation Of S Ecurities
 
Transport
TransportTransport
Transport
 
Inflation
InflationInflation
Inflation
 
Auto
AutoAuto
Auto
 
Ajith Resume
Ajith ResumeAjith Resume
Ajith Resume
 
Ksrtc
KsrtcKsrtc
Ksrtc
 
Operations Research
Operations ResearchOperations Research
Operations Research
 
Evolution Of Operations Management
Evolution Of Operations ManagementEvolution Of Operations Management
Evolution Of Operations Management
 
Tqm Tool2
Tqm Tool2Tqm Tool2
Tqm Tool2
 
Tqm Tool1
Tqm Tool1Tqm Tool1
Tqm Tool1
 
Textile Industry
Textile IndustryTextile Industry
Textile Industry
 
Syndicate 1 Tqm
Syndicate 1 TqmSyndicate 1 Tqm
Syndicate 1 Tqm
 
Supply Chain Mgmt Jit
Supply Chain Mgmt JitSupply Chain Mgmt Jit
Supply Chain Mgmt Jit
 
Stevenson9e Ch04
Stevenson9e Ch04Stevenson9e Ch04
Stevenson9e Ch04
 

Material Requisite Planning

  • 1. Chapter 15 Materials Requirements Planning
  • 2.
  • 3. Example of MRP Logic and Product Structure Tree Product Structure Tree for Assembly A Lead Times A 1 day B 2 days C 1 day D 3 days E 4 days F 1 day Total Unit Demand Day 10 50 A Day 8 20 B (Spares) Day 6 15 D (Spares) Given the product structure tree for “A” and the lead time and demand information below, provide a materials requirements plan that defines the number of units of each component and when they will be needed B(4) E(1) D(2) C(2) F(2) D(3) A
  • 4. First, the number of units of “A” are scheduled backwards to allow for their lead time. So, in the materials requirement plan below, we have to place an order for 50 units of “A” on the 9 th day to receive them on day 10. LT = 1 day
  • 5. Next, we need to start scheduling the components that make up “A”. In the case of component “B” we need 4 B’s for each A. Since we need 50 A’s, that means 200 B’s. And again, we back the schedule up for the necessary 2 days of lead time. B(4) E(1) D(2) C(2) F(2) D(3) A Spares LT = 2 4x50=200
  • 6.
  • 7.
  • 8.
  • 9. Example of Time Fences Exhibit 15.5 8 15 26 Weeks Frozen Moderately Firm Flexible Firm Customer Orders Forecast and available capacity Capacity
  • 10.
  • 11.
  • 12.
  • 13.
  • 14.
  • 15.
  • 16.
  • 17. MRP Example Requirements include 95 units (80 firm orders and 15 forecast) of X in week 10 A(2) B(1) D(5) C(2) X C(3)
  • 18. A(2) X It takes 2 A’s for each X
  • 19. B(1) A(2) X It takes 1 B for each X
  • 20. A(2) B(1) X C(3) It takes 3 C’s for each A
  • 21. A(2) B(1) C(2) X C(3) It takes 2 C’s for each B
  • 22. A(2) B(1) D(5) C(2) X C(3) It takes 5 D’s for each B
  • 23. Closed Loop MRP Production Planning Master Production Scheduling Material Requirements Planning Capacity Requirements Planning Realistic? No Feedback Execute: Capacity Plans Material Plans Yes Feedback
  • 24.
  • 25.

Notas del editor

  1. 3 3
  2. 4 4
  3. 5 5
  4. 6 6
  5. 7 7
  6. 8 8
  7. 9 9
  8. 10 10
  9. 11 11
  10. 12 12
  11. 13 13
  12. 14 14
  13. 15 15
  14. 15 15
  15. 19 19
  16. 18 18
  17. 21 21
  18. 21 21
  19. 21 21
  20. 21 21
  21. 21 21
  22. 22 22
  23. 23 23
  24. 23 23