P R E P A R E D B Y :
M R . H A R D I K A . P A T E L
A S S T . P R O F .
M E C H A N I C A L E N G I N E E R I N G D E P A R T M E N T
Atmiya Institute of technology
and Science, Rajkot
POKA YOKE AND JIDOKA
Poka Yoke
 Zero Defects through Mistake-Proofing
 Methods that help to avoid mistakes in work caused by choosing the
wrong part, leaving out a part, installing a part backwards, etc. Also called
mistake-proofing, error-proofing and baka-yoke (fool-proofing).
 The term poka-yoke was applied by Shigeo Shingo in the 1960s to
industrial processes designed to prevent human errors.
 Shingo redesigned a process in which factory workers, while assembling a
small switch, would often forget to insert the required spring under one of
the switch buttons. In the redesigned process, the worker would perform
the task in two steps, first preparing the two required springs and placing
them in a placeholder, then inserting the springs from the placeholder into
the switch.
 Defects occur when the mistakes are allowed to reach the
customer.
Common examples of error-proofing
Types of poka-yoke
 Contact method where a sensor determines the presence of
a part in a process and if the part is missing, it prevents the
process from continuing. The sensors could be physical
sensors or energy sensors such infrared.
 Fixed-value method is a form of poka-yoke that uses a
sensor to determine whether a process is complete by the
number of parts that have been used or the number of process
steps taken. If the right number of steps or parts have not
been used, this indicates an error and the process is stopped.
This method is also known as the counting method of mistake
proofing.
 Motion-step method uses a sensor to determine whether
all the prerequisite process steps have been undertaken. If a
step in the process has been missed, a signal is sent to the
subsequent process to stop. This forces a correction of the
problem before the process can continue and is a very
effective error-proofing technique.
Benefits of Poka Yoke
 Quality processes resulting in quality products. It is very hard for a
process that is not of high quality to result in quality products or
services. All processes must be capable of achieving value for the
customer and this is possible through elimination of waste.
 Effective teams who work in a coordinated manner so as to deliver
value to the customer. Such teams look at the system as a whole and
know their what roles they have to play so as to achieve the overall
organization goals
 Problem solving culture where there is no blaming when problems
occur, but a concerted effort to resolve the real issues. This culture
allows constant learning to take place within an organization
because there is no finger-pointing when a problem occurs.
 Solving the root cause guarantees that it will not recur in the
future. This is achieved by conducting a root cause analysis to get
to the real reason why a problem occurred.
Benefits of Poka Yoke
 First time quality is an important principle because it ensures
that every effort is made to achieve quality within process.
This is in contrast to a culture that continuously pushes out
parts irrespective of the quality because there will be a
reworking if bad parts are produced
 Waste elimination is at the heart of lean thinking because
product quality improves and delivery times and costs are
reduced. Waste in lean thinking is defined as an action or
activity that consumes resources but does not add value to the
customer
 Continuous improvement of the solutions. This incremental
improvement takes a cyclical pattern of problem identification,
problem analysis, solution implementation and improvement.
JIDOKA
 Jidoka is about quality at source, or built in quality; no
company can survive without excellent quality of product
and service and jidoka is the route through which this is
achieved.
 Jidoka highlights the causes of problems because work
stops immediately when a problem first occurs.
 Jidoka sometimes is called automation with human
intelligence.
JIDOKA
 Toyoda's innovation let one operator control many
machines. In Japanese, jidoka is a Toyota-created word
pronounced exactly the same as the Japanese word for
automation, but with the added connotations of humanistic
and creating value.
 Jidoka is one of the two pillars of the Toyota Production
System along with just-in-time.
Development of Jidoka
 Initially Jidoka invented by Sakichi Toyoda in 1896.
 A simple device that could stop the shuttle on an automatic
textile loom if the thread broke.
 It consist of:
 Discover an abnormality in the process
 STOP alerted the operator to a problem
 Fix the immediate problem
 Investigate and correct root cause
 This principle became known as automation with a human
touch.
 The principles that were applied to machines with
Automation were applied to the whole process by Taiichi
Ohno
The Evolution towards Jidoka
Benefits of JIDOKA
 The first benefit is the reduction of repair costs.
 The second benefit of Jikoda is the reduction of
recall costs, if the products and goods are produced
with machines only, there may be inherent defects
which may not be detected through sampling.
 The third benefit of Jikoda is the minimization of law
suits and compensations to the consumers as the
goods and products being sold are of high quality
hence reducing the company’s liability.
Thank you

Más contenido relacionado

La actualidad más candente

La actualidad más candente (20)

Poka yoke
Poka yokePoka yoke
Poka yoke
 
Lean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation SampleLean Manufacturing PowerPoint Presentation Sample
Lean Manufacturing PowerPoint Presentation Sample
 
Kaizen
KaizenKaizen
Kaizen
 
Lean manufacturing ppt
Lean manufacturing pptLean manufacturing ppt
Lean manufacturing ppt
 
Lean Manufacturing Training
Lean Manufacturing TrainingLean Manufacturing Training
Lean Manufacturing Training
 
Poka yoke (mistake proofing)
Poka yoke (mistake proofing)Poka yoke (mistake proofing)
Poka yoke (mistake proofing)
 
POKA-YOKE REPORT IN PDF FORM
POKA-YOKE REPORT IN PDF FORMPOKA-YOKE REPORT IN PDF FORM
POKA-YOKE REPORT IN PDF FORM
 
Lean ppt
Lean pptLean ppt
Lean ppt
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
SMED - Quick Change Over
SMED - Quick Change OverSMED - Quick Change Over
SMED - Quick Change Over
 
Poka Yoke Final Ppt
Poka Yoke  Final PptPoka Yoke  Final Ppt
Poka Yoke Final Ppt
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Lean presentation ppt
Lean presentation pptLean presentation ppt
Lean presentation ppt
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Kaizen Ppt
Kaizen PptKaizen Ppt
Kaizen Ppt
 
Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)Single Minute Exchange of Dies (SMED)
Single Minute Exchange of Dies (SMED)
 
Toyota production system
Toyota production systemToyota production system
Toyota production system
 
[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)[Partial Preview:] Overall Equipment Effectiveness (OEE)
[Partial Preview:] Overall Equipment Effectiveness (OEE)
 
Jidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of LeanJidoka - An Improvement Tool of Lean
Jidoka - An Improvement Tool of Lean
 
LeanKaizenTraining
LeanKaizenTrainingLeanKaizenTraining
LeanKaizenTraining
 

Destacado

Introduction to jidoka november 2016
Introduction to jidoka   november 2016Introduction to jidoka   november 2016
Introduction to jidoka november 2016W3 Group Canada Inc.
 
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011Yves Merel
 
Kaizen Thinking Vs Kaikaku Thinking
Kaizen Thinking Vs Kaikaku ThinkingKaizen Thinking Vs Kaikaku Thinking
Kaizen Thinking Vs Kaikaku Thinkingtmccann2006
 
8+jidoka+and+quick+changeover+winter+2016+003 (1)
8+jidoka+and+quick+changeover+winter+2016+003 (1)8+jidoka+and+quick+changeover+winter+2016+003 (1)
8+jidoka+and+quick+changeover+winter+2016+003 (1)Vaibhav Mishra
 
TPS+1 Through continuous PDCA
TPS+1 Through continuous PDCATPS+1 Through continuous PDCA
TPS+1 Through continuous PDCACasey Ng
 
Presentacion lean vi jidoka
Presentacion lean vi jidokaPresentacion lean vi jidoka
Presentacion lean vi jidokaLuis Perona
 
Toyotismo- Segunda Parte
Toyotismo- Segunda ParteToyotismo- Segunda Parte
Toyotismo- Segunda PartePhilippe Elias
 
A Quick Guide to Production Department
A Quick Guide to Production DepartmentA Quick Guide to Production Department
A Quick Guide to Production DepartmentAnanth Palaniappan
 
6 just in-time and lean thinking
6 just in-time and lean thinking6 just in-time and lean thinking
6 just in-time and lean thinkingmanpsingh87
 
The 7 Secrets Rhythm Ultimate Solution for Zero Defect Manufacturing
The 7 Secrets Rhythm Ultimate Solution for Zero Defect ManufacturingThe 7 Secrets Rhythm Ultimate Solution for Zero Defect Manufacturing
The 7 Secrets Rhythm Ultimate Solution for Zero Defect ManufacturingT7SR, ISOM
 

Destacado (20)

Jidoka
JidokaJidoka
Jidoka
 
Poka yoke =)
Poka yoke =)Poka yoke =)
Poka yoke =)
 
Introduction to jidoka november 2016
Introduction to jidoka   november 2016Introduction to jidoka   november 2016
Introduction to jidoka november 2016
 
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
Lean Jidoka for Quality lecture at Lean en France - Yves Merel on 20 may 2011
 
Jidoka Sample
Jidoka SampleJidoka Sample
Jidoka Sample
 
Sistema Poka Yoke
Sistema Poka YokeSistema Poka Yoke
Sistema Poka Yoke
 
Kaizen Thinking Vs Kaikaku Thinking
Kaizen Thinking Vs Kaikaku ThinkingKaizen Thinking Vs Kaikaku Thinking
Kaizen Thinking Vs Kaikaku Thinking
 
Kaizen or Kaikaku
Kaizen or KaikakuKaizen or Kaikaku
Kaizen or Kaikaku
 
TPM Intro
TPM IntroTPM Intro
TPM Intro
 
8+jidoka+and+quick+changeover+winter+2016+003 (1)
8+jidoka+and+quick+changeover+winter+2016+003 (1)8+jidoka+and+quick+changeover+winter+2016+003 (1)
8+jidoka+and+quick+changeover+winter+2016+003 (1)
 
Poka yoke - Lean TI
Poka yoke - Lean TIPoka yoke - Lean TI
Poka yoke - Lean TI
 
TPS+1 Through continuous PDCA
TPS+1 Through continuous PDCATPS+1 Through continuous PDCA
TPS+1 Through continuous PDCA
 
Presentacion lean vi jidoka
Presentacion lean vi jidokaPresentacion lean vi jidoka
Presentacion lean vi jidoka
 
TPS HOUSE
TPS HOUSETPS HOUSE
TPS HOUSE
 
Toyotismo- Segunda Parte
Toyotismo- Segunda ParteToyotismo- Segunda Parte
Toyotismo- Segunda Parte
 
A Quick Guide to Production Department
A Quick Guide to Production DepartmentA Quick Guide to Production Department
A Quick Guide to Production Department
 
Poka yoke kamal
Poka yoke kamalPoka yoke kamal
Poka yoke kamal
 
6 just in-time and lean thinking
6 just in-time and lean thinking6 just in-time and lean thinking
6 just in-time and lean thinking
 
The 7 Secrets Rhythm Ultimate Solution for Zero Defect Manufacturing
The 7 Secrets Rhythm Ultimate Solution for Zero Defect ManufacturingThe 7 Secrets Rhythm Ultimate Solution for Zero Defect Manufacturing
The 7 Secrets Rhythm Ultimate Solution for Zero Defect Manufacturing
 
Just in time
Just in timeJust in time
Just in time
 

Similar a Poka, yoke & jidoka

IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”
IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”
IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”IRJET Journal
 
Poka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet SurtiPoka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet SurtiPraneet Surti
 
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdfPoka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdffernandagomez120593
 
quality improving tool poka-yoke
quality improving tool poka-yokequality improving tool poka-yoke
quality improving tool poka-yokeRISHIDAYALRAJ
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Scienceresearchinventy
 
Poka yoke abstract
Poka yoke abstractPoka yoke abstract
Poka yoke abstractvinnydhakshi
 
poka yoke seminar report with index
poka yoke seminar report with indexpoka yoke seminar report with index
poka yoke seminar report with indexN Harisha
 
Poka yoke presentation
Poka yoke presentationPoka yoke presentation
Poka yoke presentationAnkur12patil
 
1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptxMimmaafrin1
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminarsomkar jagtap
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production SystemGurpreet Singh
 
Management Control System at Toyota
Management Control System at ToyotaManagement Control System at Toyota
Management Control System at ToyotaHarshad Jain
 
Internship Report honda
Internship Report hondaInternship Report honda
Internship Report hondaZain Agha
 
Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...
Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...
Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...ijtsrd
 
20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptxminhajulislam90
 

Similar a Poka, yoke & jidoka (20)

IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”
IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”
IRJET- Review Paper on “Productivity Improvement by using Poka-Yoke”
 
Poka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet SurtiPoka Yoke - Fundamentals by Praneet Surti
Poka Yoke - Fundamentals by Praneet Surti
 
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdfPoka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
Poka_Yoke_Beginner_s_Guide_by_Praneet_Surti_1711499282.pdf
 
quality improving tool poka-yoke
quality improving tool poka-yokequality improving tool poka-yoke
quality improving tool poka-yoke
 
Research Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and ScienceResearch Inventy : International Journal of Engineering and Science
Research Inventy : International Journal of Engineering and Science
 
Poka–Yoke – solution to human errors in the production process
Poka–Yoke – solution to human errors in the production processPoka–Yoke – solution to human errors in the production process
Poka–Yoke – solution to human errors in the production process
 
Poka yoke abstract
Poka yoke abstractPoka yoke abstract
Poka yoke abstract
 
poka yoke seminar report with index
poka yoke seminar report with indexpoka yoke seminar report with index
poka yoke seminar report with index
 
poka yoke
poka yoke poka yoke
poka yoke
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Jidoka Andon
Jidoka AndonJidoka Andon
Jidoka Andon
 
Poka yoke presentation
Poka yoke presentationPoka yoke presentation
Poka yoke presentation
 
1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx1603960041059_20 Six Sigma Good Tools.pptx
1603960041059_20 Six Sigma Good Tools.pptx
 
Report on JIT , for Projects and Seminars
Report on JIT , for Projects and SeminarsReport on JIT , for Projects and Seminars
Report on JIT , for Projects and Seminars
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Toyota Production System
Toyota Production SystemToyota Production System
Toyota Production System
 
Management Control System at Toyota
Management Control System at ToyotaManagement Control System at Toyota
Management Control System at Toyota
 
Internship Report honda
Internship Report hondaInternship Report honda
Internship Report honda
 
Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...
Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...
Implementation of Poka Yoke and Safety Push Button in Rubber Grommet and Slee...
 
20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx20 Tools of Six Sigma.pptx
20 Tools of Six Sigma.pptx
 

Más de Akash Patel

Design Procedure
Design ProcedureDesign Procedure
Design ProcedureAkash Patel
 
Supply chain mangement
Supply chain mangementSupply chain mangement
Supply chain mangementAkash Patel
 
6 Sigma Implatation
6 Sigma Implatation6 Sigma Implatation
6 Sigma ImplatationAkash Patel
 
pattern allownaces
pattern allownacespattern allownaces
pattern allownacesAkash Patel
 
Pressure measuring devices
Pressure measuring devicesPressure measuring devices
Pressure measuring devicesAkash Patel
 
linear and angular measuremnts
linear and angular measuremntslinear and angular measuremnts
linear and angular measuremntsAkash Patel
 
Classification of Engineering Materials, Engineering requirements of materials.
Classification of Engineering Materials, Engineering requirements of materials. Classification of Engineering Materials, Engineering requirements of materials.
Classification of Engineering Materials, Engineering requirements of materials. Akash Patel
 
Tool Geometry & It’s Signature.
Tool Geometry & It’s Signature. Tool Geometry & It’s Signature.
Tool Geometry & It’s Signature. Akash Patel
 
COPLANNER & NON-CONCURRENT FORCES
COPLANNER & NON-CONCURRENT FORCESCOPLANNER & NON-CONCURRENT FORCES
COPLANNER & NON-CONCURRENT FORCESAkash Patel
 
Branches of TOM, Machine & Structure, Kinematic Links
Branches of TOM, Machine & Structure, Kinematic LinksBranches of TOM, Machine & Structure, Kinematic Links
Branches of TOM, Machine & Structure, Kinematic LinksAkash Patel
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear MeasurementsAkash Patel
 
Non-Destructive Tests
Non-Destructive TestsNon-Destructive Tests
Non-Destructive TestsAkash Patel
 
Non-Ferrous Alloy
Non-Ferrous AlloyNon-Ferrous Alloy
Non-Ferrous AlloyAkash Patel
 

Más de Akash Patel (20)

Design Procedure
Design ProcedureDesign Procedure
Design Procedure
 
Supply chain mangement
Supply chain mangementSupply chain mangement
Supply chain mangement
 
Kaizen
KaizenKaizen
Kaizen
 
Kanban
KanbanKanban
Kanban
 
Quality circle
Quality circleQuality circle
Quality circle
 
Oep
OepOep
Oep
 
Lean mangement
Lean mangementLean mangement
Lean mangement
 
6 Sigma Implatation
6 Sigma Implatation6 Sigma Implatation
6 Sigma Implatation
 
pattern allownaces
pattern allownacespattern allownaces
pattern allownaces
 
Pressure measuring devices
Pressure measuring devicesPressure measuring devices
Pressure measuring devices
 
linear and angular measuremnts
linear and angular measuremntslinear and angular measuremnts
linear and angular measuremnts
 
Classification of Engineering Materials, Engineering requirements of materials.
Classification of Engineering Materials, Engineering requirements of materials. Classification of Engineering Materials, Engineering requirements of materials.
Classification of Engineering Materials, Engineering requirements of materials.
 
Tool Geometry & It’s Signature.
Tool Geometry & It’s Signature. Tool Geometry & It’s Signature.
Tool Geometry & It’s Signature.
 
COPLANNER & NON-CONCURRENT FORCES
COPLANNER & NON-CONCURRENT FORCESCOPLANNER & NON-CONCURRENT FORCES
COPLANNER & NON-CONCURRENT FORCES
 
Branches of TOM, Machine & Structure, Kinematic Links
Branches of TOM, Machine & Structure, Kinematic LinksBranches of TOM, Machine & Structure, Kinematic Links
Branches of TOM, Machine & Structure, Kinematic Links
 
Linear Measurements
Linear MeasurementsLinear Measurements
Linear Measurements
 
Cast Iron
Cast IronCast Iron
Cast Iron
 
Non-Destructive Tests
Non-Destructive TestsNon-Destructive Tests
Non-Destructive Tests
 
Non-Ferrous Alloy
Non-Ferrous AlloyNon-Ferrous Alloy
Non-Ferrous Alloy
 
Alloy Steel
Alloy SteelAlloy Steel
Alloy Steel
 

Último

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01KreezheaRecto
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXssuser89054b
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptMsecMca
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdfankushspencer015
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Christo Ananth
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapRishantSharmaFr
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfKamal Acharya
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLManishPatel169454
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performancesivaprakash250
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringmulugeta48
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...roncy bisnoi
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spaintimesproduction05
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueBhangaleSonal
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...Call Girls in Nagpur High Profile
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Bookingroncy bisnoi
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Bookingdharasingh5698
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdfKamal Acharya
 

Último (20)

VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Ankleshwar 7001035870 Whatsapp Number, 24/07 Booking
 
Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01Double rodded leveling 1 pdf activity 01
Double rodded leveling 1 pdf activity 01
 
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX
 
notes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.pptnotes on Evolution Of Analytic Scalability.ppt
notes on Evolution Of Analytic Scalability.ppt
 
AKTU Computer Networks notes --- Unit 3.pdf
AKTU Computer Networks notes ---  Unit 3.pdfAKTU Computer Networks notes ---  Unit 3.pdf
AKTU Computer Networks notes --- Unit 3.pdf
 
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
(INDIRA) Call Girl Aurangabad Call Now 8617697112 Aurangabad Escorts 24x7
 
Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...Call for Papers - International Journal of Intelligent Systems and Applicatio...
Call for Papers - International Journal of Intelligent Systems and Applicatio...
 
Unleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leapUnleashing the Power of the SORA AI lastest leap
Unleashing the Power of the SORA AI lastest leap
 
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdfONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
ONLINE FOOD ORDER SYSTEM PROJECT REPORT.pdf
 
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELLPVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
PVC VS. FIBERGLASS (FRP) GRAVITY SEWER - UNI BELL
 
UNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its PerformanceUNIT - IV - Air Compressors and its Performance
UNIT - IV - Air Compressors and its Performance
 
chapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineeringchapter 5.pptx: drainage and irrigation engineering
chapter 5.pptx: drainage and irrigation engineering
 
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
Call Girls Pimpri Chinchwad Call Me 7737669865 Budget Friendly No Advance Boo...
 
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
(INDIRA) Call Girl Meerut Call Now 8617697112 Meerut Escorts 24x7
 
Vivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design SpainVivazz, Mieres Social Housing Design Spain
Vivazz, Mieres Social Housing Design Spain
 
Double Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torqueDouble Revolving field theory-how the rotor develops torque
Double Revolving field theory-how the rotor develops torque
 
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...Booking open Available Pune Call Girls Koregaon Park  6297143586 Call Hot Ind...
Booking open Available Pune Call Girls Koregaon Park 6297143586 Call Hot Ind...
 
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance BookingCall Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
Call Girls Wakad Call Me 7737669865 Budget Friendly No Advance Booking
 
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 BookingVIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
VIP Call Girls Palanpur 7001035870 Whatsapp Number, 24/07 Booking
 
Online banking management system project.pdf
Online banking management system project.pdfOnline banking management system project.pdf
Online banking management system project.pdf
 

Poka, yoke & jidoka

  • 1. P R E P A R E D B Y : M R . H A R D I K A . P A T E L A S S T . P R O F . M E C H A N I C A L E N G I N E E R I N G D E P A R T M E N T Atmiya Institute of technology and Science, Rajkot POKA YOKE AND JIDOKA
  • 2.
  • 3. Poka Yoke  Zero Defects through Mistake-Proofing  Methods that help to avoid mistakes in work caused by choosing the wrong part, leaving out a part, installing a part backwards, etc. Also called mistake-proofing, error-proofing and baka-yoke (fool-proofing).  The term poka-yoke was applied by Shigeo Shingo in the 1960s to industrial processes designed to prevent human errors.  Shingo redesigned a process in which factory workers, while assembling a small switch, would often forget to insert the required spring under one of the switch buttons. In the redesigned process, the worker would perform the task in two steps, first preparing the two required springs and placing them in a placeholder, then inserting the springs from the placeholder into the switch.  Defects occur when the mistakes are allowed to reach the customer.
  • 4. Common examples of error-proofing
  • 5. Types of poka-yoke  Contact method where a sensor determines the presence of a part in a process and if the part is missing, it prevents the process from continuing. The sensors could be physical sensors or energy sensors such infrared.  Fixed-value method is a form of poka-yoke that uses a sensor to determine whether a process is complete by the number of parts that have been used or the number of process steps taken. If the right number of steps or parts have not been used, this indicates an error and the process is stopped. This method is also known as the counting method of mistake proofing.  Motion-step method uses a sensor to determine whether all the prerequisite process steps have been undertaken. If a step in the process has been missed, a signal is sent to the subsequent process to stop. This forces a correction of the problem before the process can continue and is a very effective error-proofing technique.
  • 6. Benefits of Poka Yoke  Quality processes resulting in quality products. It is very hard for a process that is not of high quality to result in quality products or services. All processes must be capable of achieving value for the customer and this is possible through elimination of waste.  Effective teams who work in a coordinated manner so as to deliver value to the customer. Such teams look at the system as a whole and know their what roles they have to play so as to achieve the overall organization goals  Problem solving culture where there is no blaming when problems occur, but a concerted effort to resolve the real issues. This culture allows constant learning to take place within an organization because there is no finger-pointing when a problem occurs.  Solving the root cause guarantees that it will not recur in the future. This is achieved by conducting a root cause analysis to get to the real reason why a problem occurred.
  • 7. Benefits of Poka Yoke  First time quality is an important principle because it ensures that every effort is made to achieve quality within process. This is in contrast to a culture that continuously pushes out parts irrespective of the quality because there will be a reworking if bad parts are produced  Waste elimination is at the heart of lean thinking because product quality improves and delivery times and costs are reduced. Waste in lean thinking is defined as an action or activity that consumes resources but does not add value to the customer  Continuous improvement of the solutions. This incremental improvement takes a cyclical pattern of problem identification, problem analysis, solution implementation and improvement.
  • 8. JIDOKA  Jidoka is about quality at source, or built in quality; no company can survive without excellent quality of product and service and jidoka is the route through which this is achieved.  Jidoka highlights the causes of problems because work stops immediately when a problem first occurs.  Jidoka sometimes is called automation with human intelligence.
  • 9. JIDOKA  Toyoda's innovation let one operator control many machines. In Japanese, jidoka is a Toyota-created word pronounced exactly the same as the Japanese word for automation, but with the added connotations of humanistic and creating value.  Jidoka is one of the two pillars of the Toyota Production System along with just-in-time.
  • 10.
  • 11.
  • 12. Development of Jidoka  Initially Jidoka invented by Sakichi Toyoda in 1896.  A simple device that could stop the shuttle on an automatic textile loom if the thread broke.  It consist of:  Discover an abnormality in the process  STOP alerted the operator to a problem  Fix the immediate problem  Investigate and correct root cause  This principle became known as automation with a human touch.  The principles that were applied to machines with Automation were applied to the whole process by Taiichi Ohno
  • 14. Benefits of JIDOKA  The first benefit is the reduction of repair costs.  The second benefit of Jikoda is the reduction of recall costs, if the products and goods are produced with machines only, there may be inherent defects which may not be detected through sampling.  The third benefit of Jikoda is the minimization of law suits and compensations to the consumers as the goods and products being sold are of high quality hence reducing the company’s liability.