ELECTRIC SHORTAGE IN INDIA
Submitted By:
 Anoop Mishra
(12201005)
 Chandra Prakash
(12201011)
 Liza Bariha
(12201020)
 Sudhir Kumar
(12201038)
The electricity sector in India had an installed capacity of 223.625 GW as
of April 2013,the world's fifth largest.
 Captive power plants generate an additional 34.444 GW.
 Non Renewable Power Plants constitute 87.55% of the installed capacity
and 12.45% of Renewable Capacity.
 Installed electricity capacity:-
 Coal-fired plants account for 57% .
 Hydro plant accounts for 19%,
 renewable energy for 12% .
 natural gas for about 9%.
 Others 3%
 Per capita average annual consumption in India - 96 kWh in rural areas
& 288 kWh in urban areas
 Worldwide per capita annual average consumption - 2600 kWh
 India -world's fourth largest energy consumer after United States, China
and Russia.
Current scenario
 Total generation
capacity in India:
181,558 MW
 State contribution:
83,314 MW
 Central contribution:
56,573 MW
 Private Sector : 41,672
MW
Current scenario
 India mainly depend upon
the Thermal power plants
(55 %) for Electricity
generation.
 Hydropower plant , second
largest generating capacity
for Electricity .
 Gas power plant
accounting 10 % for
Electricity generations .
All India Installed Generating Capacity
Per-capita consumption
in states of India
STATES/UT KWH
1. Daman & N
Haveli
11863.64
2. Goa 2263.63
3.Pondicherry 1711.54
4. Delhi 1654.28
5. Gujarat 1615.21
India average per capita
consumption :
771.23 kwh
GROWTH OFALL INDIA TOTAL ELECTRICITY
CONSUMPTION
SECTORS PROBLEMS MAJOR AREAS
Industrial & Commercial
Sectors
1. Install own power
back-up, increased
their cost of
production & also
increased operation
expenses .
2. diesel demand
increases imports ,
which in turn
increases current
account deficit
Medical , hospital ,
schools , stations ,
Transportation &
factories
Domestic Sectors Regular routine disrupt Household’s (Rural &
Urban)
Agriculture Sectors increased cost of
production, Indebtness
Irrigation , Harvesting
Effects of Electricity shortage
Trend Analysis
2005-06 to 2010-11
Trend Analysis
 During the year 2010–11, demand for electricity in India far outstripped
availability. Both in terms of base load energy and peak availability.
 Base load requirement was 861,591 (MU) against availability of 788,355
MU, a 8.5% deficit. During peak loads, the demand was for 122 GW against
availability of 110 GW, a 9.8% shortfall.
 In late 2011 newspaper articles, Gujarat was declared a power surplus
state.
Trend Analysis
 80% of Indian villages have at least an electricity line.
 Just 52.5% of rural households have access to electricity.
 In urban areas, the access to electricity is 93.1%.
 The overall electrification rate in India is 64.5% while 35.5% of
the population still live without access to electricity.
Trend Analysis
 During the year 2010–11, demand for electricity in India far outstripped
availability. Both in terms of base load energy and peak availability.
 Base load requirement was 861,591 (MU) against availability of 788,355
MU, a 8.5% deficit. During peak loads, the demand was for 122 GW against
availability of 110 GW, a 9.8% shortfall.
 In late 2011 newspaper articles, Gujarat was declared a power surplus
state.
Trend Analysis
 Electricity is the main source of lighting for 53% of rural households
compared to 36% in 1993.
 The electrical energy demand for 2016–17 is expected to be at least
1392 Tera Watt Hours, with a peak electric demand of 218 GW.
 The electrical energy demand for 2021–22 is expected to be at least
1915 Tera Watt Hours, with a peak electric demand of 298 GW.
Reason of Increasing Demand
 India's manufacturing sector is likely to grow faster than in the past.
 Domestic demand will increase more rapidly as the quality of life for
more Indians improve.
 About 125,000 villages are likely to get connected to India's
electricity grid.
 Currently blackouts and load shedding artificially suppresses
demand.
 Transportation.
 Increasing Population.
 Agriculture.
Causes of Power Shortage
JhkjT
Transmission & distribution Factor
 India's T&D network losses exceeded 32% in 2010.
 Technical losses like faulty meters are about 15% to 20%
that underestimate actual consumption also contribute to
reduced payment collection.
 Non‐technical losses are caused by illegal tapping of lines.
Supply Factor
Production factor
 India's electricity sector consumes about 80% of the coal
produced in the country
 A large part of Indian coal reserve is of low calorific value and
high ash content.
 India's coal supply consume about 0.7 kg of coal to generate a
kWh, whereas United States thermal power plants consume about
0.45 kg of coal per kWh
 Lack of initiative to develop large coal and natural gas resources
present in India
 Land acquisition, environmental clearances at state and central
government level.
 Unskilled manpower Facing problem in operating latest
technology plants
Causes of Power Shortage
 http://mospi.nic.in/Mospi_New/site/home.aspx.
http://www.cea.nic.in/
http://powermin.nic.in/
http://en.wikipedia.org/wiki/Ministry_of_Power_(India)
Reference:-

Más contenido relacionado

La actualidad más candente

Renewable energy Sources, Efficiency, Uses and latest Research
Renewable energy Sources, Efficiency, Uses and latest Research Renewable energy Sources, Efficiency, Uses and latest Research
Renewable energy Sources, Efficiency, Uses and latest Research
Zohaib HUSSAIN
 
Green energy powerpoint ppt slides.
Green energy powerpoint ppt slides.Green energy powerpoint ppt slides.
Green energy powerpoint ppt slides.
SlideTeam.net
 
solar power generation
solar power generationsolar power generation
solar power generation
Patnam Shruthi
 

La actualidad más candente (20)

Project on Solar Energy
Project on Solar EnergyProject on Solar Energy
Project on Solar Energy
 
Power sector in India
Power sector in IndiaPower sector in India
Power sector in India
 
Wind power in india
Wind power in indiaWind power in india
Wind power in india
 
Renewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and PolicyRenewable energy in India: Present Status and Policy
Renewable energy in India: Present Status and Policy
 
Wind energy its potential in india
Wind energy  its potential in indiaWind energy  its potential in india
Wind energy its potential in india
 
Jaisalmer wind park rajasthan
Jaisalmer wind park rajasthanJaisalmer wind park rajasthan
Jaisalmer wind park rajasthan
 
Solar Energy
Solar EnergySolar Energy
Solar Energy
 
Presentation on Green Energy
Presentation on Green EnergyPresentation on Green Energy
Presentation on Green Energy
 
Solar Policy in India (Article)
Solar Policy in India (Article) Solar Policy in India (Article)
Solar Policy in India (Article)
 
Final Year Project WSE
Final Year Project WSEFinal Year Project WSE
Final Year Project WSE
 
Wind Power in India
Wind Power in IndiaWind Power in India
Wind Power in India
 
Rural electrification
Rural electrificationRural electrification
Rural electrification
 
Renewable energy Sources, Efficiency, Uses and latest Research
Renewable energy Sources, Efficiency, Uses and latest Research Renewable energy Sources, Efficiency, Uses and latest Research
Renewable energy Sources, Efficiency, Uses and latest Research
 
Wind energy
Wind energyWind energy
Wind energy
 
Make in india and future of renewable energy
Make in india and future of renewable energyMake in india and future of renewable energy
Make in india and future of renewable energy
 
Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018Present Scenario of Renewable energy in India 2018
Present Scenario of Renewable energy in India 2018
 
ENERGY CONSERVATION PPT by ee-63
ENERGY CONSERVATION PPT by ee-63ENERGY CONSERVATION PPT by ee-63
ENERGY CONSERVATION PPT by ee-63
 
Green energy powerpoint ppt slides.
Green energy powerpoint ppt slides.Green energy powerpoint ppt slides.
Green energy powerpoint ppt slides.
 
solar power generation
solar power generationsolar power generation
solar power generation
 
ENERGY CONSERVATION report in PDF
ENERGY CONSERVATION report in PDFENERGY CONSERVATION report in PDF
ENERGY CONSERVATION report in PDF
 

Similar a Electricity ppt

Electricity in india
Electricity in indiaElectricity in india
Electricity in india
Dev Garg
 
7.energy scenarios pp. 7 17
7.energy scenarios pp. 7 177.energy scenarios pp. 7 17
7.energy scenarios pp. 7 17
Jhon Smith
 
Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)
subhadip manna
 
Integrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platformIntegrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platform
Farhan Beg
 
Raman Lambas Nuclear Power
Raman Lambas Nuclear PowerRaman Lambas Nuclear Power
Raman Lambas Nuclear Power
neeraj25
 
Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
goodamazing
 

Similar a Electricity ppt (20)

Unit 1(res)
Unit  1(res)Unit  1(res)
Unit 1(res)
 
Electricity in india
Electricity in indiaElectricity in india
Electricity in india
 
power for all reality or myth
power for all reality or myth power for all reality or myth
power for all reality or myth
 
7.energy scenarios pp. 7 17
7.energy scenarios pp. 7 177.energy scenarios pp. 7 17
7.energy scenarios pp. 7 17
 
Electricity in India_SMS_R1.pptx
Electricity in India_SMS_R1.pptxElectricity in India_SMS_R1.pptx
Electricity in India_SMS_R1.pptx
 
Electrical consumtion in india
Electrical consumtion in indiaElectrical consumtion in india
Electrical consumtion in india
 
Electricity and power consumption in india (1)
Electricity and power consumption in india (1)Electricity and power consumption in india (1)
Electricity and power consumption in india (1)
 
Dabhol ques-2
Dabhol ques-2Dabhol ques-2
Dabhol ques-2
 
Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)Problems and prospects of setting up a thermal power plant (1)
Problems and prospects of setting up a thermal power plant (1)
 
POWER FOR ALL:MYTH OR REALITY?
  POWER FOR ALL:MYTH OR REALITY?  POWER FOR ALL:MYTH OR REALITY?
POWER FOR ALL:MYTH OR REALITY?
 
Integrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platformIntegrating wind and solar energy in India for a Smart Grid platform
Integrating wind and solar energy in India for a Smart Grid platform
 
Energy
EnergyEnergy
Energy
 
Evaluation and Solution of energy Crisis in Nepal
Evaluation and Solution of energy Crisis in Nepal Evaluation and Solution of energy Crisis in Nepal
Evaluation and Solution of energy Crisis in Nepal
 
Raman Lambas Nuclear Power
Raman Lambas Nuclear PowerRaman Lambas Nuclear Power
Raman Lambas Nuclear Power
 
Vamshi tech ppt
Vamshi tech pptVamshi tech ppt
Vamshi tech ppt
 
Energy crises in pakistan butt presentation
Energy crises in pakistan butt presentationEnergy crises in pakistan butt presentation
Energy crises in pakistan butt presentation
 
Energy Scenario in India
Energy Scenario in IndiaEnergy Scenario in India
Energy Scenario in India
 
Indian future of Renewable energy
Indian future of Renewable energyIndian future of Renewable energy
Indian future of Renewable energy
 
J0364057060
J0364057060J0364057060
J0364057060
 
Heijunka iim ahmedabad-cleantech
Heijunka iim ahmedabad-cleantechHeijunka iim ahmedabad-cleantech
Heijunka iim ahmedabad-cleantech
 

Más de Anoop K Mishra

Village study and Srijan's project understandings at Duni, Rajasthan
Village study and Srijan's project understandings at Duni, RajasthanVillage study and Srijan's project understandings at Duni, Rajasthan
Village study and Srijan's project understandings at Duni, Rajasthan
Anoop K Mishra
 
An assignment on csr visa steel
An assignment on csr visa steelAn assignment on csr visa steel
An assignment on csr visa steel
Anoop K Mishra
 
E-governance e-mamta assignment ppt
E-governance e-mamta assignment pptE-governance e-mamta assignment ppt
E-governance e-mamta assignment ppt
Anoop K Mishra
 
Ksrm aarohan special awards 2014
Ksrm aarohan special awards 2014Ksrm aarohan special awards 2014
Ksrm aarohan special awards 2014
Anoop K Mishra
 
Papad co operative project plan group unknown
Papad co operative project plan group unknownPapad co operative project plan group unknown
Papad co operative project plan group unknown
Anoop K Mishra
 
ICT4D: Indian Post Office
ICT4D: Indian Post OfficeICT4D: Indian Post Office
ICT4D: Indian Post Office
Anoop K Mishra
 
Co operative business plan group-1
Co operative business plan group-1Co operative business plan group-1
Co operative business plan group-1
Anoop K Mishra
 
Collaborative Value Creation
Collaborative Value CreationCollaborative Value Creation
Collaborative Value Creation
Anoop K Mishra
 
City and cliamte change
City and cliamte changeCity and cliamte change
City and cliamte change
Anoop K Mishra
 
Final sm assignment-groupr_3_mission_vission
Final sm  assignment-groupr_3_mission_vissionFinal sm  assignment-groupr_3_mission_vission
Final sm assignment-groupr_3_mission_vission
Anoop K Mishra
 
Group 1 role of ng_os in development and challenges faced
Group 1 role of ng_os in development and challenges facedGroup 1 role of ng_os in development and challenges faced
Group 1 role of ng_os in development and challenges faced
Anoop K Mishra
 
Group 2 case study indosulfan farming
Group 2 case study indosulfan farmingGroup 2 case study indosulfan farming
Group 2 case study indosulfan farming
Anoop K Mishra
 

Más de Anoop K Mishra (20)

Phase 7 Village study and Srijan's project understandings at Chhindwara
Phase 7 Village study and Srijan's project understandings at ChhindwaraPhase 7 Village study and Srijan's project understandings at Chhindwara
Phase 7 Village study and Srijan's project understandings at Chhindwara
 
Phase 6 Village study and Srijan's project understandings at Chhindwara
Phase 6 Village study and Srijan's project understandings at ChhindwaraPhase 6 Village study and Srijan's project understandings at Chhindwara
Phase 6 Village study and Srijan's project understandings at Chhindwara
 
Phase 5 Village study and Srijan's project understandings at Chhindwara
Phase 5 Village study and Srijan's project understandings at ChhindwaraPhase 5 Village study and Srijan's project understandings at Chhindwara
Phase 5 Village study and Srijan's project understandings at Chhindwara
 
Phase 4 Village study and Srijan's project understandings at Chhindwara
Phase 4 Village study and Srijan's project understandings at ChhindwaraPhase 4 Village study and Srijan's project understandings at Chhindwara
Phase 4 Village study and Srijan's project understandings at Chhindwara
 
Phase 3 Village study and Srijan's project understandings at Chhindwara
Phase 3 Village study and Srijan's project understandings at ChhindwaraPhase 3 Village study and Srijan's project understandings at Chhindwara
Phase 3 Village study and Srijan's project understandings at Chhindwara
 
Phase 2 Village study and Srijan's project understandings at Chhindwara
Phase 2 Village study and Srijan's project understandings at ChhindwaraPhase 2 Village study and Srijan's project understandings at Chhindwara
Phase 2 Village study and Srijan's project understandings at Chhindwara
 
Phase 1 Village study and Srijan's project understandings at Chhindwara
Phase 1 Village study and Srijan's project understandings at ChhindwaraPhase 1 Village study and Srijan's project understandings at Chhindwara
Phase 1 Village study and Srijan's project understandings at Chhindwara
 
Village study and srijan's project understandings at chhindwara, Madhya Pradesh
Village study and srijan's project understandings at chhindwara, Madhya PradeshVillage study and srijan's project understandings at chhindwara, Madhya Pradesh
Village study and srijan's project understandings at chhindwara, Madhya Pradesh
 
Village study and Srijan's project understandings at Duni, Rajasthan
Village study and Srijan's project understandings at Duni, RajasthanVillage study and Srijan's project understandings at Duni, Rajasthan
Village study and Srijan's project understandings at Duni, Rajasthan
 
An assignment on csr visa steel
An assignment on csr visa steelAn assignment on csr visa steel
An assignment on csr visa steel
 
E-governance e-mamta assignment ppt
E-governance e-mamta assignment pptE-governance e-mamta assignment ppt
E-governance e-mamta assignment ppt
 
Ksrm aarohan special awards 2014
Ksrm aarohan special awards 2014Ksrm aarohan special awards 2014
Ksrm aarohan special awards 2014
 
Papad co operative project plan group unknown
Papad co operative project plan group unknownPapad co operative project plan group unknown
Papad co operative project plan group unknown
 
ICT4D: Indian Post Office
ICT4D: Indian Post OfficeICT4D: Indian Post Office
ICT4D: Indian Post Office
 
Co operative business plan group-1
Co operative business plan group-1Co operative business plan group-1
Co operative business plan group-1
 
Collaborative Value Creation
Collaborative Value CreationCollaborative Value Creation
Collaborative Value Creation
 
City and cliamte change
City and cliamte changeCity and cliamte change
City and cliamte change
 
Final sm assignment-groupr_3_mission_vission
Final sm  assignment-groupr_3_mission_vissionFinal sm  assignment-groupr_3_mission_vission
Final sm assignment-groupr_3_mission_vission
 
Group 1 role of ng_os in development and challenges faced
Group 1 role of ng_os in development and challenges facedGroup 1 role of ng_os in development and challenges faced
Group 1 role of ng_os in development and challenges faced
 
Group 2 case study indosulfan farming
Group 2 case study indosulfan farmingGroup 2 case study indosulfan farming
Group 2 case study indosulfan farming
 

Último

EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
Earley Information Science
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
Enterprise Knowledge
 

Último (20)

08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf[2024]Digital Global Overview Report 2024 Meltwater.pdf
[2024]Digital Global Overview Report 2024 Meltwater.pdf
 
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptxEIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
EIS-Webinar-Prompt-Knowledge-Eng-2024-04-08.pptx
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024Partners Life - Insurer Innovation Award 2024
Partners Life - Insurer Innovation Award 2024
 
A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?What Are The Drone Anti-jamming Systems Technology?
What Are The Drone Anti-jamming Systems Technology?
 
Evaluating the top large language models.pdf
Evaluating the top large language models.pdfEvaluating the top large language models.pdf
Evaluating the top large language models.pdf
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...Workshop - Best of Both Worlds_ Combine  KG and Vector search for  enhanced R...
Workshop - Best of Both Worlds_ Combine KG and Vector search for enhanced R...
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Tech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdfTech Trends Report 2024 Future Today Institute.pdf
Tech Trends Report 2024 Future Today Institute.pdf
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 

Electricity ppt

  • 1. ELECTRIC SHORTAGE IN INDIA Submitted By:  Anoop Mishra (12201005)  Chandra Prakash (12201011)  Liza Bariha (12201020)  Sudhir Kumar (12201038)
  • 2. The electricity sector in India had an installed capacity of 223.625 GW as of April 2013,the world's fifth largest.  Captive power plants generate an additional 34.444 GW.  Non Renewable Power Plants constitute 87.55% of the installed capacity and 12.45% of Renewable Capacity.  Installed electricity capacity:-  Coal-fired plants account for 57% .  Hydro plant accounts for 19%,  renewable energy for 12% .  natural gas for about 9%.  Others 3%  Per capita average annual consumption in India - 96 kWh in rural areas & 288 kWh in urban areas  Worldwide per capita annual average consumption - 2600 kWh  India -world's fourth largest energy consumer after United States, China and Russia. Current scenario
  • 3.  Total generation capacity in India: 181,558 MW  State contribution: 83,314 MW  Central contribution: 56,573 MW  Private Sector : 41,672 MW Current scenario
  • 4.  India mainly depend upon the Thermal power plants (55 %) for Electricity generation.  Hydropower plant , second largest generating capacity for Electricity .  Gas power plant accounting 10 % for Electricity generations . All India Installed Generating Capacity
  • 5. Per-capita consumption in states of India STATES/UT KWH 1. Daman & N Haveli 11863.64 2. Goa 2263.63 3.Pondicherry 1711.54 4. Delhi 1654.28 5. Gujarat 1615.21 India average per capita consumption : 771.23 kwh GROWTH OFALL INDIA TOTAL ELECTRICITY CONSUMPTION
  • 6. SECTORS PROBLEMS MAJOR AREAS Industrial & Commercial Sectors 1. Install own power back-up, increased their cost of production & also increased operation expenses . 2. diesel demand increases imports , which in turn increases current account deficit Medical , hospital , schools , stations , Transportation & factories Domestic Sectors Regular routine disrupt Household’s (Rural & Urban) Agriculture Sectors increased cost of production, Indebtness Irrigation , Harvesting Effects of Electricity shortage
  • 8. Trend Analysis  During the year 2010–11, demand for electricity in India far outstripped availability. Both in terms of base load energy and peak availability.  Base load requirement was 861,591 (MU) against availability of 788,355 MU, a 8.5% deficit. During peak loads, the demand was for 122 GW against availability of 110 GW, a 9.8% shortfall.  In late 2011 newspaper articles, Gujarat was declared a power surplus state.
  • 9. Trend Analysis  80% of Indian villages have at least an electricity line.  Just 52.5% of rural households have access to electricity.  In urban areas, the access to electricity is 93.1%.  The overall electrification rate in India is 64.5% while 35.5% of the population still live without access to electricity.
  • 10. Trend Analysis  During the year 2010–11, demand for electricity in India far outstripped availability. Both in terms of base load energy and peak availability.  Base load requirement was 861,591 (MU) against availability of 788,355 MU, a 8.5% deficit. During peak loads, the demand was for 122 GW against availability of 110 GW, a 9.8% shortfall.  In late 2011 newspaper articles, Gujarat was declared a power surplus state.
  • 11. Trend Analysis  Electricity is the main source of lighting for 53% of rural households compared to 36% in 1993.  The electrical energy demand for 2016–17 is expected to be at least 1392 Tera Watt Hours, with a peak electric demand of 218 GW.  The electrical energy demand for 2021–22 is expected to be at least 1915 Tera Watt Hours, with a peak electric demand of 298 GW.
  • 12. Reason of Increasing Demand  India's manufacturing sector is likely to grow faster than in the past.  Domestic demand will increase more rapidly as the quality of life for more Indians improve.  About 125,000 villages are likely to get connected to India's electricity grid.  Currently blackouts and load shedding artificially suppresses demand.  Transportation.  Increasing Population.  Agriculture.
  • 13. Causes of Power Shortage JhkjT Transmission & distribution Factor  India's T&D network losses exceeded 32% in 2010.  Technical losses like faulty meters are about 15% to 20% that underestimate actual consumption also contribute to reduced payment collection.  Non‐technical losses are caused by illegal tapping of lines. Supply Factor
  • 14. Production factor  India's electricity sector consumes about 80% of the coal produced in the country  A large part of Indian coal reserve is of low calorific value and high ash content.  India's coal supply consume about 0.7 kg of coal to generate a kWh, whereas United States thermal power plants consume about 0.45 kg of coal per kWh  Lack of initiative to develop large coal and natural gas resources present in India  Land acquisition, environmental clearances at state and central government level.  Unskilled manpower Facing problem in operating latest technology plants Causes of Power Shortage