The Importance of Project Cost
Management
• Projects have a poor track record for meeting cost goals
• Average cost overrun from 1995 CHAOS study was 189% of the
original estimates; improved to 145% in the 2001 study
• The 2003 CHAOS studies showed the average cost overrun (the
additional percentage or dollar amount by which actual costs exceed
estimates) was 43 percent.
• In 1995, cancelled projects cost i.e IT in the U.S. over $81 billion
• U.S. lost $55 billion in projects i.e IT in 2002 from cancelled projects
and overruns compared to $140 billion in 1994.*
*The Standish Group, “Latest Standish Group CHAOS Report Shows
Project Success Rates Have Improved by 50%,” A Standish Group
Research Note (3/25/03).
What is Cost and Project Cost
Management?
Project Cost Management Processes
1. Resource planning: determining what resources and
quantities of them should be used
2. Cost estimating: developing an estimate of the costs and
resources needed to complete a project
3. Cost budgeting: allocating the overall cost estimate to
individual work items to establish a baseline for
measuring performance
4. Cost control: controlling changes to the project budget
Basic Principles of Cost Management
• Most CEOs and boards know a lot more about finance than
technical/engineering, so technical project managers must
speak their language
– Profits are revenues minus expenses
– Life cycle costing is estimating the cost of a project plus the
maintenance costs of the products it produces
– Cash flow analysis is determining the estimated annual costs and
benefits for a project
– Benefits and costs can be tangible or intangible, direct or indirect
– Sunk cost should not be a criteria in project selection
Example : Cost of Defects
When Defect is Detected
User Requirements
Coding/Unit Testing
System Testing
Acceptance Testing
After Implementation

Typical Cost of Correction
$100-$1,000
$1,000 or more
$7,000 - $8,000
$1,000 - $100,000
Up to millions of dollars

It is important to spend money up-front on projects to
avoid spending a lot more later.
Basic Principles of Cost Management
1. Tangible costs – can easily measured.
2. Intangible costs – difficult to measure.
3. Direct costs - directly related to producing
products and services.
4. Indirect costs - not directly related to the
products or services of the project
5. Sunk cost - money that has been spent in
the past
Unit Cost

Basic Principles of Cost Management

Quantity Produced

When many items are produced repetitively, the unit
cost of those items decreases in a regular pattern as
more units are produced
Reserves are dollars included in a cost estimate to mitigate
cost risk by allowing for future situations that are difficult to
predict.
Contingency reserves allow for future situations that
may be partially planned for (sometimes called known
unknowns) and are included in the project cost baseline.

Management reserves allow for future situations that
are unpredictable (sometimes called unknown
unknowns).
Booz Allen User
Resource Planning
The nature of the project and the organization will affect
resource planning
Some questions to consider:
How difficult will it be to do specific tasks on the project?
Is there anything unique in this project’s scope statement that will
affect resources?
What is the organization’s history in doing similar tasks?
Does the organization have or can they acquire the people,
equipment, and materials that are capable and available for
performing the work?
Cost Management Plan
• A cost management plan is a document that
describes how the organization will manage cost
variances on the project.
• A large percentage of total project costs are often
labor costs, so project managers must develop
and track estimates for labor.
Figure 7-1. Surveyor Pro Project Cost Estimate
Figure 7-2. Surveyor Pro Software Development Estimate
Common Sources of Project Cost
 Labor
 Materials

 Subcontractors
 Equipment & facilities

 Travelling, Mileage, Allowances, Refreshments
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-14
Eg: Labour Costs
Name

Hours
Needed

Overhead
Charge

Personal
Time Rate

Hourly
Rate

Total Direct
Labor Cost

John

40

1.80

1.12

$21/hr.

$1,693.44

Bill

40

1.80

1.12

$40/hr.

3,225.60

J.P.

60

1.35

1.05

$10/hr.

850.50

Sonny

25

1.80

1.12

$32/hr.

1,612.80

Total Direct Labor Cost =

$7,382.34
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-15
Building Lease

Expedite

X

X

Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

X
X

X
X

8-16

Expedited

X

Normal
X

Variable

X

X

Material

Non-recurring
Fixed

X

Indirect

Direct

Direct Labor

X
X X

Costs

Recurring

Cost Classifications

X
X
Cost Estimating
• An important output of project cost management is
a cost estimate
• Several types of cost estimates and tools and
techniques to help create them
• It is also important to develop a cost management
plan that describes how cost variances will be
managed on the project
VO = Variances Order
Cost Estimation
Ballpark  Yellow Pad  Guesstimate 30%
Comparative 15%

Feasibility 10%
Definitive 5%
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-18
Types of Cost Estimates
Type of Estimate
Rough Order of
Magnitude (ROM)

Budgetary
Definitive

When Done

Why Done

How Accurate

Very early in the
project life cycle,
often 3–5 years
before project
completion
Early, 1–2 years out

Provides rough
ballpark of cost for
selection decisions

–25%, +75%

Puts dollars in the
budget plans

–10%, +25%

Later in the project, <
1 year out

Provides details for
purchases, estimate
actual costs

–5%, +10%
Cost Estimation Tools and Techniques
• 3 basic tools and techniques for cost
estimates:
–analogous or top-down: use the actual cost
of a previous, similar project as the basis for
the new estimate
–bottom-up: estimate individual work items
and sum them to get a total estimate
–parametric: use project characteristics in a
mathematical model to estimate costs
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-21
Problems with Cost Estimation
Low initial estimates
Unexpected technical difficulties

Lack of definition
Specification changes

External factors
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-22
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-23
Creating a Project Budget
WBS
Project
Plan
Scheduling

Budgeting

• Top-down
• Bottom-up
• Activity-based costing (ABC)
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-24

The budget is a plan
that identifies the
resources, goals and
schedule that allows a
firm to achieve those
goals
Activity-Based Costing
Projects use activities & activities use resources
1. Assign costs to activities that use resources
2. Identify cost drivers associated with this activity
3. Compute a cost rate per cost driver unit or
transaction
4. Multiply the cost driver rate times the volume of
cost driver units used by the project
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-25
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-26
Months
Activity

January

Survey

February

March

April

May

4,000

4,000

Design

5,000

Clear Site

4,000

Foundation
Framing
Plumb &
Wire
Monthly
Planned
Cumulative

Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

Total by
Activity

3,000

8,000
4,000

7,500

7,500
8,000

2,000

10,000

1,000

4,000

5,000

4,000

9,000

10,500

9,000

6,000

4,000

13,000

23,500

32,500

38,500

8-27

38,500
Budget Contingencies
The allocation of extra funds to cover
uncertainties and improve the chance of finishing
on time.

•
•
•
•

Contingencies are needed because
Project scope may change
Murphy’s Law is present
Cost estimation must anticipate interaction costs
Normal conditions are rarely encountered

Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-28
ABC VIDEO

Booz Allen User
Copyright © 2010 Pearson
Education, Inc. Publishing as
Prentice Hall

8-30
• Project Management Institute – home of the Project
Management Body of Knowledge (PMBOK)
http://www.pmi.org/Pages/default.aspx

• NYS Project Management Guidebook Release 2
http://www.oft.state.ny.us/pmmp/guidebook2/index.htm

• FNS Handbook 901, Chapter 5
http://www.fns.usda.gov/apd/Handbook_901/V_1-2/Chapter_5.pdf

Booz Allen User

Más contenido relacionado

La actualidad más candente

Project controls
Project controlsProject controls
Project controlsAshok Kumar
 
Project Cost Management
Project Cost Management Project Cost Management
Project Cost Management Muhammad Hanif
 
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...MMS presentation firm
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And ControllingTom Milner
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project ManagementAshish Mittal
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introductionasim78
 
Project management planning
Project management planningProject management planning
Project management planningAlvin Niere
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Ashutosh Mishra
 
Project evaluation and implementation notes and questions
Project evaluation and implementation   notes and questionsProject evaluation and implementation   notes and questions
Project evaluation and implementation notes and questionsAnirban Chakraborty
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)Nur Azwin
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Agus Suhanto
 
Project human resources management
Project human resources managementProject human resources management
Project human resources managementFirmansyah Ashari
 

La actualidad más candente (20)

Project controls
Project controlsProject controls
Project controls
 
Project Cost Management
Project Cost Management Project Cost Management
Project Cost Management
 
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
Variation: it’s Regulation & Management under the MDB-FIDIC (2006) & the PPA ...
 
Project cost control
Project cost controlProject cost control
Project cost control
 
How to close a project
How to close a projectHow to close a project
How to close a project
 
Project Monitoring And Controlling
Project Monitoring And ControllingProject Monitoring And Controlling
Project Monitoring And Controlling
 
An Introduction To Project Management
An Introduction To Project ManagementAn Introduction To Project Management
An Introduction To Project Management
 
Project Manangement Introduction
Project Manangement IntroductionProject Manangement Introduction
Project Manangement Introduction
 
Contingency and management reserve
Contingency and management reserveContingency and management reserve
Contingency and management reserve
 
Project management planning
Project management planningProject management planning
Project management planning
 
Project Cost Management
Project Cost ManagementProject Cost Management
Project Cost Management
 
Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.Project Management:Life Cycle & Phases.
Project Management:Life Cycle & Phases.
 
Project evaluation and implementation notes and questions
Project evaluation and implementation   notes and questionsProject evaluation and implementation   notes and questions
Project evaluation and implementation notes and questions
 
Lecture 8 monitoring & controlling (1)
Lecture 8  monitoring & controlling (1)Lecture 8  monitoring & controlling (1)
Lecture 8 monitoring & controlling (1)
 
Project Cost Management - PMBOK6
Project Cost Management - PMBOK6Project Cost Management - PMBOK6
Project Cost Management - PMBOK6
 
Project human resources management
Project human resources managementProject human resources management
Project human resources management
 
Earned Value Analysis
Earned Value AnalysisEarned Value Analysis
Earned Value Analysis
 
Assignment project scheduling
Assignment project schedulingAssignment project scheduling
Assignment project scheduling
 
Project scheduling
Project schedulingProject scheduling
Project scheduling
 
Project evaluation
Project evaluationProject evaluation
Project evaluation
 

Destacado

Introduction to Project Finance
Introduction to Project FinanceIntroduction to Project Finance
Introduction to Project FinanceDale Butler
 
project cost management
project cost managementproject cost management
project cost managementjay mitkari
 
ادارة تكلفة المشروع
ادارة تكلفة المشروع ادارة تكلفة المشروع
ادارة تكلفة المشروع Mohamed Dahi
 
12 theory of cost and estimation
12 theory of cost and estimation12 theory of cost and estimation
12 theory of cost and estimationmalikjameel1986
 
cost estimation techniques
cost estimation techniquescost estimation techniques
cost estimation techniquesabid khaliq
 
Lecture 06 project_cost_management
Lecture 06 project_cost_managementLecture 06 project_cost_management
Lecture 06 project_cost_managementSayed Ahmed
 
Cleopatra Enterprise Added Value
Cleopatra Enterprise Added ValueCleopatra Enterprise Added Value
Cleopatra Enterprise Added ValueLeendertdegeus
 
Initiating and Planning a Project
Initiating and Planning a ProjectInitiating and Planning a Project
Initiating and Planning a ProjectMasood Ghouri
 
PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1Skillogic Solutions
 
Genuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptx
Genuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptxGenuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptx
Genuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptxDaniseck Adam
 
Building a cost-effective and high-performing public cloud
Building a cost-effective and high-performing public cloudBuilding a cost-effective and high-performing public cloud
Building a cost-effective and high-performing public cloudcloudprovider
 
3 soil formation
3 soil formation3 soil formation
3 soil formationMarvin Ken
 
Gdp and-gnp1
Gdp and-gnp1Gdp and-gnp1
Gdp and-gnp1soodakhil
 
Construction management (9) تقدير تكلفة المشروع pricing
Construction management (9) تقدير تكلفة المشروع pricing Construction management (9) تقدير تكلفة المشروع pricing
Construction management (9) تقدير تكلفة المشروع pricing Akram Suleiman
 

Destacado (20)

Introduction to Project Finance
Introduction to Project FinanceIntroduction to Project Finance
Introduction to Project Finance
 
project cost management
project cost managementproject cost management
project cost management
 
ادارة تكلفة المشروع
ادارة تكلفة المشروع ادارة تكلفة المشروع
ادارة تكلفة المشروع
 
PMP Exam Preparation Course: 06 Project Cost Management
PMP Exam Preparation Course: 06 Project Cost ManagementPMP Exam Preparation Course: 06 Project Cost Management
PMP Exam Preparation Course: 06 Project Cost Management
 
Ch26
Ch26Ch26
Ch26
 
Project Cost management in pharmaceuticals
Project Cost management in pharmaceuticalsProject Cost management in pharmaceuticals
Project Cost management in pharmaceuticals
 
12 theory of cost and estimation
12 theory of cost and estimation12 theory of cost and estimation
12 theory of cost and estimation
 
cost estimation techniques
cost estimation techniquescost estimation techniques
cost estimation techniques
 
Lecture 06 project_cost_management
Lecture 06 project_cost_managementLecture 06 project_cost_management
Lecture 06 project_cost_management
 
Cleopatra Enterprise Added Value
Cleopatra Enterprise Added ValueCleopatra Enterprise Added Value
Cleopatra Enterprise Added Value
 
Initiating and Planning a Project
Initiating and Planning a ProjectInitiating and Planning a Project
Initiating and Planning a Project
 
PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1PMP Training Project Cost Management Part 1
PMP Training Project Cost Management Part 1
 
Budgetary control
Budgetary controlBudgetary control
Budgetary control
 
Genuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptx
Genuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptxGenuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptx
Genuine%20 %2007%20-%20 government%20and%20fiscal%20policy.pptx
 
Budgetary control
Budgetary controlBudgetary control
Budgetary control
 
Building a cost-effective and high-performing public cloud
Building a cost-effective and high-performing public cloudBuilding a cost-effective and high-performing public cloud
Building a cost-effective and high-performing public cloud
 
3 soil formation
3 soil formation3 soil formation
3 soil formation
 
Gdp and-gnp1
Gdp and-gnp1Gdp and-gnp1
Gdp and-gnp1
 
Construction management (9) تقدير تكلفة المشروع pricing
Construction management (9) تقدير تكلفة المشروع pricing Construction management (9) تقدير تكلفة المشروع pricing
Construction management (9) تقدير تكلفة المشروع pricing
 
5. cost estimation
5. cost estimation5. cost estimation
5. cost estimation
 

Similar a Project Management C8 -cost_estimation_and_budgeting

L06 cost management
L06 cost managementL06 cost management
L06 cost managementAsa Chan
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenetAla Ibrahim
 
nidhi_economics[1].ppt
nidhi_economics[1].pptnidhi_economics[1].ppt
nidhi_economics[1].pptBARUNSINGH43
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdfzohir khellouf
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost managementImran Jamil
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimationssuser9d62d6
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptsheryl90
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptsheryl90
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxssusercf695b
 
1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx ggggggggggggggggg1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx gggggggggggggggggadabotor7
 
chapter-4 cost mngt.pptx
chapter-4 cost mngt.pptxchapter-4 cost mngt.pptx
chapter-4 cost mngt.pptxBekiTube
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project managementPavan Kumar
 
Lecture 17&18.ppt.pdf
Lecture 17&18.ppt.pdfLecture 17&18.ppt.pdf
Lecture 17&18.ppt.pdfnarmeen11
 
HSMC301 ejeheve susueue euwueheheue eieueu
HSMC301 ejeheve susueue euwueheheue eieueuHSMC301 ejeheve susueue euwueheheue eieueu
HSMC301 ejeheve susueue euwueheheue eieueuBARUNSINGH43
 

Similar a Project Management C8 -cost_estimation_and_budgeting (20)

ch07.ppt
ch07.pptch07.ppt
ch07.ppt
 
L06 cost management
L06 cost managementL06 cost management
L06 cost management
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenet
 
nidhi_economics[1].ppt
nidhi_economics[1].pptnidhi_economics[1].ppt
nidhi_economics[1].ppt
 
03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf03costestimation-140930114902-phpapp01.pdf
03costestimation-140930114902-phpapp01.pdf
 
A brief on project cost management
A brief on project cost managementA brief on project cost management
A brief on project cost management
 
Software Project Cost Management and estimation
Software Project Cost Management and estimationSoftware Project Cost Management and estimation
Software Project Cost Management and estimation
 
Chap07
Chap07Chap07
Chap07
 
Cost managment
Cost managmentCost managment
Cost managment
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
con_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.pptcon_mangt-lec4-project_costppt.ppt
con_mangt-lec4-project_costppt.ppt
 
Chapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptxChapter 3 Project Cost Control and Monitoring.pptx
Chapter 3 Project Cost Control and Monitoring.pptx
 
Project cost management
Project cost management Project cost management
Project cost management
 
1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx ggggggggggggggggg1 ch 1 Project CM.pptx ggggggggggggggggg
1 ch 1 Project CM.pptx ggggggggggggggggg
 
chapter-4 cost mngt.pptx
chapter-4 cost mngt.pptxchapter-4 cost mngt.pptx
chapter-4 cost mngt.pptx
 
10 me667 chap2 project management
10 me667 chap2 project management10 me667 chap2 project management
10 me667 chap2 project management
 
Lecture 17&18.ppt.pdf
Lecture 17&18.ppt.pdfLecture 17&18.ppt.pdf
Lecture 17&18.ppt.pdf
 
Session 9 4th edition PMP
Session 9 4th edition PMPSession 9 4th edition PMP
Session 9 4th edition PMP
 
PMP-Cost Management area
PMP-Cost Management areaPMP-Cost Management area
PMP-Cost Management area
 
HSMC301 ejeheve susueue euwueheheue eieueu
HSMC301 ejeheve susueue euwueheheue eieueuHSMC301 ejeheve susueue euwueheheue eieueu
HSMC301 ejeheve susueue euwueheheue eieueu
 

Más de Izah Asmadi

Aircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systemsAircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systemsIzah Asmadi
 
Aircraft Communication Topic 9 vhf omni range (vor)
Aircraft Communication  Topic 9 vhf omni range (vor)Aircraft Communication  Topic 9 vhf omni range (vor)
Aircraft Communication Topic 9 vhf omni range (vor)Izah Asmadi
 
Aircraft Communication Topic 8 automatic direction finder
Aircraft Communication  Topic 8 automatic direction finderAircraft Communication  Topic 8 automatic direction finder
Aircraft Communication Topic 8 automatic direction finderIzah Asmadi
 
Aircraft Communication Topic 7 elt, cvr and fdr
Aircraft Communication  Topic 7 elt, cvr and fdrAircraft Communication  Topic 7 elt, cvr and fdr
Aircraft Communication Topic 7 elt, cvr and fdrIzah Asmadi
 
Aircraft Communication Topic 6 pa system
Aircraft Communication  Topic 6 pa systemAircraft Communication  Topic 6 pa system
Aircraft Communication Topic 6 pa systemIzah Asmadi
 
Aircraft Communication Topic 5 selcal and data link system
Aircraft Communication  Topic 5 selcal and data link systemAircraft Communication  Topic 5 selcal and data link system
Aircraft Communication Topic 5 selcal and data link systemIzah Asmadi
 
Aircraft Communication Topic 4 vhf communication system
Aircraft Communication  Topic 4 vhf communication systemAircraft Communication  Topic 4 vhf communication system
Aircraft Communication Topic 4 vhf communication systemIzah Asmadi
 
Aircraft Communication Topic 4 hf communication system
Aircraft Communication  Topic 4 hf communication systemAircraft Communication  Topic 4 hf communication system
Aircraft Communication Topic 4 hf communication systemIzah Asmadi
 
Aircraft Communication Topic 2 modulation and propagation of radio waves
Aircraft Communication  Topic 2 modulation and propagation of radio wavesAircraft Communication  Topic 2 modulation and propagation of radio waves
Aircraft Communication Topic 2 modulation and propagation of radio wavesIzah Asmadi
 
Topic 1 basic radio wave properties
Topic 1 basic radio wave propertiesTopic 1 basic radio wave properties
Topic 1 basic radio wave propertiesIzah Asmadi
 
Aircraft Communication Topic 3 radio components
Aircraft Communication  Topic 3 radio componentsAircraft Communication  Topic 3 radio components
Aircraft Communication Topic 3 radio componentsIzah Asmadi
 
Business ethics C8 -ethics_technology
Business ethics C8  -ethics_technologyBusiness ethics C8  -ethics_technology
Business ethics C8 -ethics_technologyIzah Asmadi
 
Business ethics C7 -business_ethics_environmental_issues
Business ethics C7  -business_ethics_environmental_issuesBusiness ethics C7  -business_ethics_environmental_issues
Business ethics C7 -business_ethics_environmental_issuesIzah Asmadi
 
C6 -ethics_and_government_compatibility_mode_
C6  -ethics_and_government_compatibility_mode_C6  -ethics_and_government_compatibility_mode_
C6 -ethics_and_government_compatibility_mode_Izah Asmadi
 
Business ethics C5 -organizational_ethics_compatibility_mode_
Business ethics C5  -organizational_ethics_compatibility_mode_Business ethics C5  -organizational_ethics_compatibility_mode_
Business ethics C5 -organizational_ethics_compatibility_mode_Izah Asmadi
 
Business ethics C4 -corporate_social_responsibility_compatibility_mode_
Business ethics C4  -corporate_social_responsibility_compatibility_mode_Business ethics C4  -corporate_social_responsibility_compatibility_mode_
Business ethics C4 -corporate_social_responsibility_compatibility_mode_Izah Asmadi
 
Business ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsBusiness ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsIzah Asmadi
 
Business ethics C1 -moral_ethics_ethical_dilemma
Business ethics C1  -moral_ethics_ethical_dilemmaBusiness ethics C1  -moral_ethics_ethical_dilemma
Business ethics C1 -moral_ethics_ethical_dilemmaIzah Asmadi
 
Business ethics C2 -business_and_society
Business ethics C2  -business_and_societyBusiness ethics C2  -business_and_society
Business ethics C2 -business_and_societyIzah Asmadi
 
Project Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical ChainProject Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical ChainIzah Asmadi
 

Más de Izah Asmadi (20)

Aircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systemsAircraft Communication Topic 10 instrument landing systems
Aircraft Communication Topic 10 instrument landing systems
 
Aircraft Communication Topic 9 vhf omni range (vor)
Aircraft Communication  Topic 9 vhf omni range (vor)Aircraft Communication  Topic 9 vhf omni range (vor)
Aircraft Communication Topic 9 vhf omni range (vor)
 
Aircraft Communication Topic 8 automatic direction finder
Aircraft Communication  Topic 8 automatic direction finderAircraft Communication  Topic 8 automatic direction finder
Aircraft Communication Topic 8 automatic direction finder
 
Aircraft Communication Topic 7 elt, cvr and fdr
Aircraft Communication  Topic 7 elt, cvr and fdrAircraft Communication  Topic 7 elt, cvr and fdr
Aircraft Communication Topic 7 elt, cvr and fdr
 
Aircraft Communication Topic 6 pa system
Aircraft Communication  Topic 6 pa systemAircraft Communication  Topic 6 pa system
Aircraft Communication Topic 6 pa system
 
Aircraft Communication Topic 5 selcal and data link system
Aircraft Communication  Topic 5 selcal and data link systemAircraft Communication  Topic 5 selcal and data link system
Aircraft Communication Topic 5 selcal and data link system
 
Aircraft Communication Topic 4 vhf communication system
Aircraft Communication  Topic 4 vhf communication systemAircraft Communication  Topic 4 vhf communication system
Aircraft Communication Topic 4 vhf communication system
 
Aircraft Communication Topic 4 hf communication system
Aircraft Communication  Topic 4 hf communication systemAircraft Communication  Topic 4 hf communication system
Aircraft Communication Topic 4 hf communication system
 
Aircraft Communication Topic 2 modulation and propagation of radio waves
Aircraft Communication  Topic 2 modulation and propagation of radio wavesAircraft Communication  Topic 2 modulation and propagation of radio waves
Aircraft Communication Topic 2 modulation and propagation of radio waves
 
Topic 1 basic radio wave properties
Topic 1 basic radio wave propertiesTopic 1 basic radio wave properties
Topic 1 basic radio wave properties
 
Aircraft Communication Topic 3 radio components
Aircraft Communication  Topic 3 radio componentsAircraft Communication  Topic 3 radio components
Aircraft Communication Topic 3 radio components
 
Business ethics C8 -ethics_technology
Business ethics C8  -ethics_technologyBusiness ethics C8  -ethics_technology
Business ethics C8 -ethics_technology
 
Business ethics C7 -business_ethics_environmental_issues
Business ethics C7  -business_ethics_environmental_issuesBusiness ethics C7  -business_ethics_environmental_issues
Business ethics C7 -business_ethics_environmental_issues
 
C6 -ethics_and_government_compatibility_mode_
C6  -ethics_and_government_compatibility_mode_C6  -ethics_and_government_compatibility_mode_
C6 -ethics_and_government_compatibility_mode_
 
Business ethics C5 -organizational_ethics_compatibility_mode_
Business ethics C5  -organizational_ethics_compatibility_mode_Business ethics C5  -organizational_ethics_compatibility_mode_
Business ethics C5 -organizational_ethics_compatibility_mode_
 
Business ethics C4 -corporate_social_responsibility_compatibility_mode_
Business ethics C4  -corporate_social_responsibility_compatibility_mode_Business ethics C4  -corporate_social_responsibility_compatibility_mode_
Business ethics C4 -corporate_social_responsibility_compatibility_mode_
 
Business ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethicsBusiness ethics C3 theories principles in_business_ethics
Business ethics C3 theories principles in_business_ethics
 
Business ethics C1 -moral_ethics_ethical_dilemma
Business ethics C1  -moral_ethics_ethical_dilemmaBusiness ethics C1  -moral_ethics_ethical_dilemma
Business ethics C1 -moral_ethics_ethical_dilemma
 
Business ethics C2 -business_and_society
Business ethics C2  -business_and_societyBusiness ethics C2  -business_and_society
Business ethics C2 -business_and_society
 
Project Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical ChainProject Management Ch11 Project Scheduling Critical Chain
Project Management Ch11 Project Scheduling Critical Chain
 

Último

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformChameera Dedduwage
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpinRaunakKeshri1
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...EduSkills OECD
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfagholdier
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Krashi Coaching
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...christianmathematics
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfciinovamais
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfJayanti Pande
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Disha Kariya
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 

Último (20)

A Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy ReformA Critique of the Proposed National Education Policy Reform
A Critique of the Proposed National Education Policy Reform
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
Student login on Anyboli platform.helpin
Student login on Anyboli platform.helpinStudent login on Anyboli platform.helpin
Student login on Anyboli platform.helpin
 
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
Presentation by Andreas Schleicher Tackling the School Absenteeism Crisis 30 ...
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
Kisan Call Centre - To harness potential of ICT in Agriculture by answer farm...
 
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
Explore beautiful and ugly buildings. Mathematics helps us create beautiful d...
 
Activity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdfActivity 01 - Artificial Culture (1).pdf
Activity 01 - Artificial Culture (1).pdf
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Web & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdfWeb & Social Media Analytics Previous Year Question Paper.pdf
Web & Social Media Analytics Previous Year Question Paper.pdf
 
Advance Mobile Application Development class 07
Advance Mobile Application Development class 07Advance Mobile Application Development class 07
Advance Mobile Application Development class 07
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..Sports & Fitness Value Added Course FY..
Sports & Fitness Value Added Course FY..
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 

Project Management C8 -cost_estimation_and_budgeting

  • 1.
  • 2. The Importance of Project Cost Management • Projects have a poor track record for meeting cost goals • Average cost overrun from 1995 CHAOS study was 189% of the original estimates; improved to 145% in the 2001 study • The 2003 CHAOS studies showed the average cost overrun (the additional percentage or dollar amount by which actual costs exceed estimates) was 43 percent. • In 1995, cancelled projects cost i.e IT in the U.S. over $81 billion • U.S. lost $55 billion in projects i.e IT in 2002 from cancelled projects and overruns compared to $140 billion in 1994.* *The Standish Group, “Latest Standish Group CHAOS Report Shows Project Success Rates Have Improved by 50%,” A Standish Group Research Note (3/25/03).
  • 3. What is Cost and Project Cost Management?
  • 4. Project Cost Management Processes 1. Resource planning: determining what resources and quantities of them should be used 2. Cost estimating: developing an estimate of the costs and resources needed to complete a project 3. Cost budgeting: allocating the overall cost estimate to individual work items to establish a baseline for measuring performance 4. Cost control: controlling changes to the project budget
  • 5. Basic Principles of Cost Management • Most CEOs and boards know a lot more about finance than technical/engineering, so technical project managers must speak their language – Profits are revenues minus expenses – Life cycle costing is estimating the cost of a project plus the maintenance costs of the products it produces – Cash flow analysis is determining the estimated annual costs and benefits for a project – Benefits and costs can be tangible or intangible, direct or indirect – Sunk cost should not be a criteria in project selection
  • 6. Example : Cost of Defects When Defect is Detected User Requirements Coding/Unit Testing System Testing Acceptance Testing After Implementation Typical Cost of Correction $100-$1,000 $1,000 or more $7,000 - $8,000 $1,000 - $100,000 Up to millions of dollars It is important to spend money up-front on projects to avoid spending a lot more later.
  • 7. Basic Principles of Cost Management 1. Tangible costs – can easily measured. 2. Intangible costs – difficult to measure. 3. Direct costs - directly related to producing products and services. 4. Indirect costs - not directly related to the products or services of the project 5. Sunk cost - money that has been spent in the past
  • 8. Unit Cost Basic Principles of Cost Management Quantity Produced When many items are produced repetitively, the unit cost of those items decreases in a regular pattern as more units are produced
  • 9. Reserves are dollars included in a cost estimate to mitigate cost risk by allowing for future situations that are difficult to predict. Contingency reserves allow for future situations that may be partially planned for (sometimes called known unknowns) and are included in the project cost baseline. Management reserves allow for future situations that are unpredictable (sometimes called unknown unknowns). Booz Allen User
  • 10. Resource Planning The nature of the project and the organization will affect resource planning Some questions to consider: How difficult will it be to do specific tasks on the project? Is there anything unique in this project’s scope statement that will affect resources? What is the organization’s history in doing similar tasks? Does the organization have or can they acquire the people, equipment, and materials that are capable and available for performing the work?
  • 11. Cost Management Plan • A cost management plan is a document that describes how the organization will manage cost variances on the project. • A large percentage of total project costs are often labor costs, so project managers must develop and track estimates for labor.
  • 12. Figure 7-1. Surveyor Pro Project Cost Estimate
  • 13. Figure 7-2. Surveyor Pro Software Development Estimate
  • 14. Common Sources of Project Cost  Labor  Materials  Subcontractors  Equipment & facilities  Travelling, Mileage, Allowances, Refreshments Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-14
  • 15. Eg: Labour Costs Name Hours Needed Overhead Charge Personal Time Rate Hourly Rate Total Direct Labor Cost John 40 1.80 1.12 $21/hr. $1,693.44 Bill 40 1.80 1.12 $40/hr. 3,225.60 J.P. 60 1.35 1.05 $10/hr. 850.50 Sonny 25 1.80 1.12 $32/hr. 1,612.80 Total Direct Labor Cost = $7,382.34 Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-15
  • 16. Building Lease Expedite X X Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall X X X X 8-16 Expedited X Normal X Variable X X Material Non-recurring Fixed X Indirect Direct Direct Labor X X X Costs Recurring Cost Classifications X X
  • 17. Cost Estimating • An important output of project cost management is a cost estimate • Several types of cost estimates and tools and techniques to help create them • It is also important to develop a cost management plan that describes how cost variances will be managed on the project VO = Variances Order
  • 18. Cost Estimation Ballpark Yellow Pad Guesstimate 30% Comparative 15% Feasibility 10% Definitive 5% Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-18
  • 19. Types of Cost Estimates Type of Estimate Rough Order of Magnitude (ROM) Budgetary Definitive When Done Why Done How Accurate Very early in the project life cycle, often 3–5 years before project completion Early, 1–2 years out Provides rough ballpark of cost for selection decisions –25%, +75% Puts dollars in the budget plans –10%, +25% Later in the project, < 1 year out Provides details for purchases, estimate actual costs –5%, +10%
  • 20. Cost Estimation Tools and Techniques • 3 basic tools and techniques for cost estimates: –analogous or top-down: use the actual cost of a previous, similar project as the basis for the new estimate –bottom-up: estimate individual work items and sum them to get a total estimate –parametric: use project characteristics in a mathematical model to estimate costs
  • 21. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-21
  • 22. Problems with Cost Estimation Low initial estimates Unexpected technical difficulties Lack of definition Specification changes External factors Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-22
  • 23. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-23
  • 24. Creating a Project Budget WBS Project Plan Scheduling Budgeting • Top-down • Bottom-up • Activity-based costing (ABC) Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-24 The budget is a plan that identifies the resources, goals and schedule that allows a firm to achieve those goals
  • 25. Activity-Based Costing Projects use activities & activities use resources 1. Assign costs to activities that use resources 2. Identify cost drivers associated with this activity 3. Compute a cost rate per cost driver unit or transaction 4. Multiply the cost driver rate times the volume of cost driver units used by the project Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-25
  • 26. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-26
  • 27. Months Activity January Survey February March April May 4,000 4,000 Design 5,000 Clear Site 4,000 Foundation Framing Plumb & Wire Monthly Planned Cumulative Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall Total by Activity 3,000 8,000 4,000 7,500 7,500 8,000 2,000 10,000 1,000 4,000 5,000 4,000 9,000 10,500 9,000 6,000 4,000 13,000 23,500 32,500 38,500 8-27 38,500
  • 28. Budget Contingencies The allocation of extra funds to cover uncertainties and improve the chance of finishing on time. • • • • Contingencies are needed because Project scope may change Murphy’s Law is present Cost estimation must anticipate interaction costs Normal conditions are rarely encountered Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-28
  • 30. Copyright © 2010 Pearson Education, Inc. Publishing as Prentice Hall 8-30
  • 31. • Project Management Institute – home of the Project Management Body of Knowledge (PMBOK) http://www.pmi.org/Pages/default.aspx • NYS Project Management Guidebook Release 2 http://www.oft.state.ny.us/pmmp/guidebook2/index.htm • FNS Handbook 901, Chapter 5 http://www.fns.usda.gov/apd/Handbook_901/V_1-2/Chapter_5.pdf Booz Allen User