Phase 2A In this slide show: Plaza Structural Steel December 7, 2010 Update
On a gloomy day the stage is set for plaza structural steel to arrive.
Workers set up the stubs of the geo-wells where they will enter the new mechanical room. These pipes connect to all 36 geo-wells (see previous shows for geo-wells).
New seismic steel can be seen under the building in the distance. It will shore up the station against earthquakes.
Re-bar frame for seismic grade beam foundation. In the background on the lift workers prepare for the new plaza steel to connect to the Jackson Street Bridge wall.
A close-up of the new seismic steel. In front of the large beams are three thin steel supports from the original structure.
Atop the grade beam this base connects the plaza steel with diagonal cross beams that give additional support. Slides further on show the cross bars assembled.
More shots of the structural steel bases that will receive columns and crossbars.
Another shot of the grade beams with structural steel bases. The foreground shows new station utility piping.
Stubs of geo-wells popping up into what will be the mechanical room. Each stub connects to 3 wells reaching 300 feet below ground.
A northwest view of grade beams and structural steel bases that will support the new Jackson Street Plaza above.
An above-view as preparations are made to raise the structural steel for the new plaza.
The space below will eventually house the station’s new mechanical room.
Another last look beneath what will be the new plaza. It will house Amtrak baggage and other behind-the-scenes operations.
This wide view make it easy to image a new plaza spanning from this point to the edge of the building.
The first day plaza steel arrived and work began erecting the structure was also the first snow in Seattle this year.
Despite the brewing storm workers laid out steel and began to weld pieces into place.
The first load of a quarter million pounds of steel lies ready to be hoisted.
Through the growing flurries a large crane lifts the steel into place.
Here’s the snowy crane scene from a wider angle.
Ice and freezing conditions halted the work after the first pieces are welded into place.
These red beams will hold the plaza up for at least another 100 years.
Tuesday, November 23, following the storm, the construction site was closed.
Things are quiet in the snow covered station’s construction zone.
Soon after the storm, crews were back to work and the plaza steel has been quickly erected.
This aerial view shows the steel structure as it sweeps across the open area in front of the station. Tiny workers provide scale for the large beams.
The plaza surface begins to take shape.
Steel is welded in the northeast corner of the plaza. The S Jackson Street sidewalk has been closed to allow this work.
A close-up view.
Interlocking beams are lowered into place using a crane while carefully guided and connected by crews.
Connecting the beams is intricate work as safety-harnessed workers balance on the beams and swing them into place.
Looking up through the beams at the clock tower will soon not be possible as the plaza deck is put in place.
The nearly finished structure connects with the north face and east wall of the station.
The plaza structure marches north toward S Jackson Street.
A view facing south from what will be the new mechanical room housing modern, efficient heating, cooling and plumbing equipment.
When finished a lighted path will stretch from S Jackson Street  along the right side of this photo toward the tower, where a grand marble staircase will descend to the main waiting room.
The silver panels on the top right will eventually close over the plaza forming the base for a concrete deck above.
Clusters of heavy steel beams are design to absorb and control the shock of an earthquake.
The cross beams shown here also help shore the building and plaza against earthquakes.
Another view of the cross beams facing south.
A look at the first floor north of the main waiting room. Seismic steel is already in place along the back wall, with additional beams waiting to be raised.
A close up of the re-enforced steel wall just north of the waiting room where an entry door will be placed.
Welding for the elevator shaft that will connect the three floors of the building.
The elevator shaft from the first floor. The sloping, angled brick in the back right is the inside of the grand staircase.
Rebar awaits installation on the west side of the station. Currently a staging area, a wide sidewalk  with restored canopies, windows and doors will be re-install on the station’s west side.
These pavers will be reinstalled after construction.
A paver-sidewalk will be re-installed here. The center door will lead to the new baggage claim.

More Related Content

What's hot

Photos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell TowerPhotos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell TowerHRCA
 
Photos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell TowerPhotos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell TowerHRCA
 
Slides 3 of 3 - Visit National Sept 11 Memorial & Meseum
Slides 3 of 3 - Visit National Sept 11 Memorial & MeseumSlides 3 of 3 - Visit National Sept 11 Memorial & Meseum
Slides 3 of 3 - Visit National Sept 11 Memorial & MeseumAlex Green Penn State
 
High Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, TaiwanHigh Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, TaiwanPRANJAL MORE
 
[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2Baddy Peigun
 
L8 horiz struc pt.2
L8 horiz struc pt.2L8 horiz struc pt.2
L8 horiz struc pt.2chuhonsan
 
L6 Vert Struc Pt 4
L6 Vert Struc Pt 4L6 Vert Struc Pt 4
L6 Vert Struc Pt 4chuhonsan
 

What's hot (13)

Photos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell TowerPhotos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell Tower
 
Bcon
BconBcon
Bcon
 
Photos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell TowerPhotos for Proposed Verizon Cell Tower
Photos for Proposed Verizon Cell Tower
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
Slides 3 of 3 - Visit National Sept 11 Memorial & Meseum
Slides 3 of 3 - Visit National Sept 11 Memorial & MeseumSlides 3 of 3 - Visit National Sept 11 Memorial & Meseum
Slides 3 of 3 - Visit National Sept 11 Memorial & Meseum
 
High Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, TaiwanHigh Rise Building- Taipei 101, Taiwan
High Rise Building- Taipei 101, Taiwan
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2[ARC2513] Building construction2 project 2
[ARC2513] Building construction2 project 2
 
Taipei 101
Taipei 101Taipei 101
Taipei 101
 
L8 horiz struc pt.2
L8 horiz struc pt.2L8 horiz struc pt.2
L8 horiz struc pt.2
 
Project Taipei 101
Project Taipei 101Project Taipei 101
Project Taipei 101
 
L6 Vert Struc Pt 4
L6 Vert Struc Pt 4L6 Vert Struc Pt 4
L6 Vert Struc Pt 4
 
Turning torso
Turning torsoTurning torso
Turning torso
 

Viewers also liked

1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILS
1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILS1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILS
1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILSCarlos Zapanta
 
Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update
Dr. Prem Reddy Health Sciences Building - End of Year 2014 - UpdateDr. Prem Reddy Health Sciences Building - End of Year 2014 - Update
Dr. Prem Reddy Health Sciences Building - End of Year 2014 - UpdateJustin Gatewood
 
The New CISC Architecturally Exposed Structural Steel Documents
The New CISC Architecturally Exposed Structural Steel DocumentsThe New CISC Architecturally Exposed Structural Steel Documents
The New CISC Architecturally Exposed Structural Steel DocumentsTerri Meyer Boake
 
construction equipment by suman
construction equipment by sumanconstruction equipment by suman
construction equipment by sumansuman pal
 
En 10225 weldable structural steel for fixed offshore stru
En 10225   weldable structural steel for fixed offshore struEn 10225   weldable structural steel for fixed offshore stru
En 10225 weldable structural steel for fixed offshore struMAS AYU SHAMSUDDIN
 
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...Duy Dang
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarMukesh Bhavsar
 
Fink truss (w type)
Fink truss (w type)Fink truss (w type)
Fink truss (w type)mnauth
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt ritShubham Parab
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildingshlksd
 

Viewers also liked (16)

1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILS
1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILS1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILS
1214 A Carola - Sheet - A-110 - ROOF TRUSS DETAILS
 
Normas geotecnicas.4
Normas geotecnicas.4Normas geotecnicas.4
Normas geotecnicas.4
 
Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update
Dr. Prem Reddy Health Sciences Building - End of Year 2014 - UpdateDr. Prem Reddy Health Sciences Building - End of Year 2014 - Update
Dr. Prem Reddy Health Sciences Building - End of Year 2014 - Update
 
The New CISC Architecturally Exposed Structural Steel Documents
The New CISC Architecturally Exposed Structural Steel DocumentsThe New CISC Architecturally Exposed Structural Steel Documents
The New CISC Architecturally Exposed Structural Steel Documents
 
construction equipment by suman
construction equipment by sumanconstruction equipment by suman
construction equipment by suman
 
En 10225 weldable structural steel for fixed offshore stru
En 10225   weldable structural steel for fixed offshore struEn 10225   weldable structural steel for fixed offshore stru
En 10225 weldable structural steel for fixed offshore stru
 
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
PEB Steel Building, Projects of Pre Engineered Steel Building, Metal structur...
 
PEB construction-Mukesh Bhavsar
PEB construction-Mukesh BhavsarPEB construction-Mukesh Bhavsar
PEB construction-Mukesh Bhavsar
 
Fink truss (w type)
Fink truss (w type)Fink truss (w type)
Fink truss (w type)
 
Pre engineered building ppt rit
Pre engineered building ppt ritPre engineered building ppt rit
Pre engineered building ppt rit
 
115659118 pre-engineered-buildings
115659118 pre-engineered-buildings115659118 pre-engineered-buildings
115659118 pre-engineered-buildings
 
Roof trusses
Roof trussesRoof trusses
Roof trusses
 
Pre Engineered Steel Buildings
Pre Engineered Steel BuildingsPre Engineered Steel Buildings
Pre Engineered Steel Buildings
 
Trusses
TrussesTrusses
Trusses
 
PPT OF TRUSSES
PPT OF TRUSSESPPT OF TRUSSES
PPT OF TRUSSES
 
Types roof trusses
Types roof trussesTypes roof trusses
Types roof trusses
 

Similar to 11.30.10 King Street Station Update

King Street Station 8.23.10 update
King Street Station 8.23.10 updateKing Street Station 8.23.10 update
King Street Station 8.23.10 updateallieger
 
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plazaallieger
 
7.8.11 Grand Staircase & Under Jackson Plaza
7.8.11 Grand Staircase &  Under Jackson Plaza7.8.11 Grand Staircase &  Under Jackson Plaza
7.8.11 Grand Staircase & Under Jackson Plazaallieger
 
King Street Station Update 4.27.11
King Street Station Update 4.27.11King Street Station Update 4.27.11
King Street Station Update 4.27.11allieger
 
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide showKing Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide showallieger
 
1.1.11 King Street Station Update
1.1.11 King Street Station Update1.1.11 King Street Station Update
1.1.11 King Street Station Updateallieger
 
King Street Station 7.27.10 update
King Street Station 7.27.10 update King Street Station 7.27.10 update
King Street Station 7.27.10 update allieger
 
King Street Station 7.13.10 website update
King Street Station 7.13.10 website updateKing Street Station 7.13.10 website update
King Street Station 7.13.10 website updateallieger
 
7.6.11 West Canopy & Interior Work
7.6.11 West Canopy & Interior Work7.6.11 West Canopy & Interior Work
7.6.11 West Canopy & Interior Workallieger
 
A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction" A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction" Debankur Baruah
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structuresParamaAthmeka
 
King Street Station 3.31.11 slide show
King Street Station 3.31.11 slide showKing Street Station 3.31.11 slide show
King Street Station 3.31.11 slide showallieger
 
Alexan Uptown Tour
Alexan Uptown TourAlexan Uptown Tour
Alexan Uptown TourKEPHART
 
Steel uses in buildings
Steel uses in buildingsSteel uses in buildings
Steel uses in buildingsRajat Rana
 
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.DevagyaGandhi
 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013Franco Bontempi
 
Radial gates psc ancho
Radial gates psc anchoRadial gates psc ancho
Radial gates psc anchoBhanu Prasad
 

Similar to 11.30.10 King Street Station Update (20)

King Street Station 8.23.10 update
King Street Station 8.23.10 updateKing Street Station 8.23.10 update
King Street Station 8.23.10 update
 
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza2.5.11 King Street Station -- Grand Staircase &  Under Jackson Plaza
2.5.11 King Street Station -- Grand Staircase & Under Jackson Plaza
 
7.8.11 Grand Staircase & Under Jackson Plaza
7.8.11 Grand Staircase &  Under Jackson Plaza7.8.11 Grand Staircase &  Under Jackson Plaza
7.8.11 Grand Staircase & Under Jackson Plaza
 
King Street Station Update 4.27.11
King Street Station Update 4.27.11King Street Station Update 4.27.11
King Street Station Update 4.27.11
 
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide showKing Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
King Street Station Jackson Plaza's Salvaged Granit Balustrade3.15.11 slide show
 
1.1.11 King Street Station Update
1.1.11 King Street Station Update1.1.11 King Street Station Update
1.1.11 King Street Station Update
 
King Street Station 7.27.10 update
King Street Station 7.27.10 update King Street Station 7.27.10 update
King Street Station 7.27.10 update
 
King Street Station 7.13.10 website update
King Street Station 7.13.10 website updateKing Street Station 7.13.10 website update
King Street Station 7.13.10 website update
 
Wellesley High School Project
Wellesley High School ProjectWellesley High School Project
Wellesley High School Project
 
7.6.11 West Canopy & Interior Work
7.6.11 West Canopy & Interior Work7.6.11 West Canopy & Interior Work
7.6.11 West Canopy & Interior Work
 
A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction" A report on "The open road-1951 Highway Construction"
A report on "The open road-1951 Highway Construction"
 
The open road
The open roadThe open road
The open road
 
Case studies for strengthening of existing structures
Case studies for strengthening of existing structuresCase studies for strengthening of existing structures
Case studies for strengthening of existing structures
 
King Street Station 3.31.11 slide show
King Street Station 3.31.11 slide showKing Street Station 3.31.11 slide show
King Street Station 3.31.11 slide show
 
Alexan Uptown Tour
Alexan Uptown TourAlexan Uptown Tour
Alexan Uptown Tour
 
Steel uses in buildings
Steel uses in buildingsSteel uses in buildings
Steel uses in buildings
 
Detail introduction of metal building kits
Detail introduction of metal building kitsDetail introduction of metal building kits
Detail introduction of metal building kits
 
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
DETAILED REPORT ON ALUMINIUM USAGE AS BUILDING MATERIAL IN 5 BUILDINGS.
 
CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013CAE Conference - Luca Romano - 21 october 2013
CAE Conference - Luca Romano - 21 october 2013
 
Radial gates psc ancho
Radial gates psc anchoRadial gates psc ancho
Radial gates psc ancho
 

More from allieger

Seattle's Protected Bike Lanes
Seattle's Protected Bike LanesSeattle's Protected Bike Lanes
Seattle's Protected Bike Lanesallieger
 
Cycletracks
CycletracksCycletracks
Cycletracksallieger
 
2.11.2013 King Street Station
2.11.2013 King Street Station 2.11.2013 King Street Station
2.11.2013 King Street Station allieger
 
5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint update5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint updateallieger
 
King Street Station 7.28.11 slide show
King Street Station 7.28.11 slide showKing Street Station 7.28.11 slide show
King Street Station 7.28.11 slide showallieger
 
King Street Station 7.16.11 slide show
King Street Station 7.16.11 slide showKing Street Station 7.16.11 slide show
King Street Station 7.16.11 slide showallieger
 
071611 slideshow phase2a
071611 slideshow phase2a071611 slideshow phase2a
071611 slideshow phase2aallieger
 
King Street Station 5.18.11 slide show
King Street Station 5.18.11 slide showKing Street Station 5.18.11 slide show
King Street Station 5.18.11 slide showallieger
 
King Street Station 4.11.11 slide show
King Street Station 4.11.11 slide showKing Street Station 4.11.11 slide show
King Street Station 4.11.11 slide showallieger
 
King Street Station 3.30.11 slide show
King Street Station 3.30.11 slide showKing Street Station 3.30.11 slide show
King Street Station 3.30.11 slide showallieger
 
King Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide showKing Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide showallieger
 
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide showKing Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide showallieger
 
Gardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park PresentationGardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park Presentationallieger
 
Greenwood 2
Greenwood 2Greenwood 2
Greenwood 2allieger
 
King Street Station 8.12.10 website update
King Street Station 8.12.10 website updateKing Street Station 8.12.10 website update
King Street Station 8.12.10 website updateallieger
 

More from allieger (15)

Seattle's Protected Bike Lanes
Seattle's Protected Bike LanesSeattle's Protected Bike Lanes
Seattle's Protected Bike Lanes
 
Cycletracks
CycletracksCycletracks
Cycletracks
 
2.11.2013 King Street Station
2.11.2013 King Street Station 2.11.2013 King Street Station
2.11.2013 King Street Station
 
5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint update5.9.12 King Street Station powerpoint update
5.9.12 King Street Station powerpoint update
 
King Street Station 7.28.11 slide show
King Street Station 7.28.11 slide showKing Street Station 7.28.11 slide show
King Street Station 7.28.11 slide show
 
King Street Station 7.16.11 slide show
King Street Station 7.16.11 slide showKing Street Station 7.16.11 slide show
King Street Station 7.16.11 slide show
 
071611 slideshow phase2a
071611 slideshow phase2a071611 slideshow phase2a
071611 slideshow phase2a
 
King Street Station 5.18.11 slide show
King Street Station 5.18.11 slide showKing Street Station 5.18.11 slide show
King Street Station 5.18.11 slide show
 
King Street Station 4.11.11 slide show
King Street Station 4.11.11 slide showKing Street Station 4.11.11 slide show
King Street Station 4.11.11 slide show
 
King Street Station 3.30.11 slide show
King Street Station 3.30.11 slide showKing Street Station 3.30.11 slide show
King Street Station 3.30.11 slide show
 
King Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide showKing Street Station Utilities Installation 2.20.11 slide show
King Street Station Utilities Installation 2.20.11 slide show
 
King Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide showKing Street Station Marble Wall Installation3.3.11 slide show
King Street Station Marble Wall Installation3.3.11 slide show
 
Gardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park PresentationGardening for Birds: Vision Greenwood Park Presentation
Gardening for Birds: Vision Greenwood Park Presentation
 
Greenwood 2
Greenwood 2Greenwood 2
Greenwood 2
 
King Street Station 8.12.10 website update
King Street Station 8.12.10 website updateKing Street Station 8.12.10 website update
King Street Station 8.12.10 website update
 

11.30.10 King Street Station Update

  • 1. Phase 2A In this slide show: Plaza Structural Steel December 7, 2010 Update
  • 2. On a gloomy day the stage is set for plaza structural steel to arrive.
  • 3. Workers set up the stubs of the geo-wells where they will enter the new mechanical room. These pipes connect to all 36 geo-wells (see previous shows for geo-wells).
  • 4. New seismic steel can be seen under the building in the distance. It will shore up the station against earthquakes.
  • 5. Re-bar frame for seismic grade beam foundation. In the background on the lift workers prepare for the new plaza steel to connect to the Jackson Street Bridge wall.
  • 6. A close-up of the new seismic steel. In front of the large beams are three thin steel supports from the original structure.
  • 7. Atop the grade beam this base connects the plaza steel with diagonal cross beams that give additional support. Slides further on show the cross bars assembled.
  • 8. More shots of the structural steel bases that will receive columns and crossbars.
  • 9. Another shot of the grade beams with structural steel bases. The foreground shows new station utility piping.
  • 10. Stubs of geo-wells popping up into what will be the mechanical room. Each stub connects to 3 wells reaching 300 feet below ground.
  • 11. A northwest view of grade beams and structural steel bases that will support the new Jackson Street Plaza above.
  • 12. An above-view as preparations are made to raise the structural steel for the new plaza.
  • 13. The space below will eventually house the station’s new mechanical room.
  • 14. Another last look beneath what will be the new plaza. It will house Amtrak baggage and other behind-the-scenes operations.
  • 15. This wide view make it easy to image a new plaza spanning from this point to the edge of the building.
  • 16. The first day plaza steel arrived and work began erecting the structure was also the first snow in Seattle this year.
  • 17. Despite the brewing storm workers laid out steel and began to weld pieces into place.
  • 18. The first load of a quarter million pounds of steel lies ready to be hoisted.
  • 19. Through the growing flurries a large crane lifts the steel into place.
  • 20. Here’s the snowy crane scene from a wider angle.
  • 21. Ice and freezing conditions halted the work after the first pieces are welded into place.
  • 22. These red beams will hold the plaza up for at least another 100 years.
  • 23. Tuesday, November 23, following the storm, the construction site was closed.
  • 24. Things are quiet in the snow covered station’s construction zone.
  • 25. Soon after the storm, crews were back to work and the plaza steel has been quickly erected.
  • 26. This aerial view shows the steel structure as it sweeps across the open area in front of the station. Tiny workers provide scale for the large beams.
  • 27. The plaza surface begins to take shape.
  • 28. Steel is welded in the northeast corner of the plaza. The S Jackson Street sidewalk has been closed to allow this work.
  • 30. Interlocking beams are lowered into place using a crane while carefully guided and connected by crews.
  • 31. Connecting the beams is intricate work as safety-harnessed workers balance on the beams and swing them into place.
  • 32. Looking up through the beams at the clock tower will soon not be possible as the plaza deck is put in place.
  • 33. The nearly finished structure connects with the north face and east wall of the station.
  • 34. The plaza structure marches north toward S Jackson Street.
  • 35. A view facing south from what will be the new mechanical room housing modern, efficient heating, cooling and plumbing equipment.
  • 36. When finished a lighted path will stretch from S Jackson Street along the right side of this photo toward the tower, where a grand marble staircase will descend to the main waiting room.
  • 37. The silver panels on the top right will eventually close over the plaza forming the base for a concrete deck above.
  • 38. Clusters of heavy steel beams are design to absorb and control the shock of an earthquake.
  • 39. The cross beams shown here also help shore the building and plaza against earthquakes.
  • 40. Another view of the cross beams facing south.
  • 41. A look at the first floor north of the main waiting room. Seismic steel is already in place along the back wall, with additional beams waiting to be raised.
  • 42. A close up of the re-enforced steel wall just north of the waiting room where an entry door will be placed.
  • 43. Welding for the elevator shaft that will connect the three floors of the building.
  • 44. The elevator shaft from the first floor. The sloping, angled brick in the back right is the inside of the grand staircase.
  • 45. Rebar awaits installation on the west side of the station. Currently a staging area, a wide sidewalk with restored canopies, windows and doors will be re-install on the station’s west side.
  • 46. These pavers will be reinstalled after construction.
  • 47. A paver-sidewalk will be re-installed here. The center door will lead to the new baggage claim.