Requisition Receipt


Annex 3.7:       Matrix of Responsibilities between PWGSC and Client Departments for the
                 Procurement of Goods and Services (Generic)
(2008-12-12)


Introduction

1.       The following matrix provides a generic division of anticipated types of responsibilities
         between Public Works and Government Services Canada (PWGSC) and client
         departments. It forms the basis for an effective and efficient partnering relationship for
         those who are responsible for activities within the contracting process.

2.       The division of responsibilities as shown in the matrix represents a standard way of doing
         business. However, as every procurement and associated contract differs, alternate
         divisions of roles and responsibilities can be established in advance by way of a written
         agreement between PWGSC and the client department. Such client department or
         procurement-specific arrangements or matrices will take precedence over this generic
         matrix. Legislation, regulations and policy will also take precedence over this matrix.

3.       Regular communication between PWGSC and the client department is considered
         essential to success in all activities, even for those activities where no contributing role is
         indicated within the matrix.

NOTE: The matrix does not represent a delegation of procurement authority by the Minister of
      PWGSC, and does not remove from contracting officers their overall contracting
      responsibilities.




Supply Manual                                                                              Annex 3.7-1
Version 08-2
Requisition Receipt


            FOR CLIENT DEPARTMENTS NOT COVERED IN ANNEX 3.1 TO ANNEX 3.6
                            Matrix of Responsibilities between
                     PWGSC and Client Departments for the Procurement
                             of Goods and Services (Generic)

L: Lead
C: Contributing
S: Shared

    No.                                         Activities                                       Responsibility

                                                                                                Client    PWGSC

1              Requirements Definition

1.1            Define client’s operational requirements:

    1.1.1      Define essential characteristics (i.e., Statement of Requirements)                 L          C

    1.1.2      Consider all feasible solutions to meet client’s operational needs                 L          C

    1.1.3      Develop preliminary project cost estimates and schedule                            L

    1.1.4      Conduct cost benefit analysis of alternatives (including life cycle costing        L          C
               analysis)

    1.1.5      Determine total resource requirements and implications (e.g., training,            L
               priority of allocation amongst operational needs, security requirements)

    1.1.6      Obtain approval-in-principle to continue with project                              L

    1.1.7      Develop Total Project Plan, including substantive cost estimates and               L
               schedule, special project management needs, project phasing,
               maintenance support requirements, etc.



1.2            Define client’s technical requirements:

    1.2.1      Develop Statement of Work (SOW) and/or performance specifications or               L
               standards as appropriate for the goods/services required to meet the
               operational need

    1.2.2      Define technical requirements for quality assurance, acceptance,                   L
               warranty, training, documentation, packaging, transportation, initial
               provisioning, etc.



1.3            Raise the requisition (form PWGSC-TPSGC 9200):

    1.3.1      Prepare funded requisition for goods/services to be forwarded to                   L          C
               PWGSC (include Security Requirements Checklist (SRCL) if applicable)



2              PWGSC Procurement Plan

2.1            Assess potential sources of supply (Canadian vs. offshore, etc.)                   C          L

2.2            Identify applicable major contracting policy issues/ considerations which          C          L
               must be resolved to accomplish the procurement

2.3            Examine potential problems in relation to patents, licencing, royalties            C          L
               and technology transfer


Supply Manual                                                                                         Annex 3.7-2
Version 08-2
Requisition Receipt


    No.                                         Activities                                 Responsibility

                                                                                          Client    PWGSC

2.4            Develop Procurement Plan including:

    2.4.1      Delivery schedule and acceptance requirement                                 L          C

    2.4.2      Contracting approach (including sourcing strategy)                           C          L

    2.4.3      Target cost and cash flow plan                                               C          L

    2.4.4      Statement of appropriate quality and inspection system standards and         L          C
               qualification approvals

    2.4.5      Communications strategy                                                      C          L

    2.4.6      Contractual risk management                                                  C          L

    2.4.7      Evaluation methodology and selection method                                  C          L

    2.4.8      Industrial Benefits (IBs), where appropriate                                 C          L

    2.4.9      Interdepartmental and international agreements related to procurement        L          C
               plan

2.5            Obtain Procurement Plan approval                                                        L



3              Contracting Process

3.1            Translation of procurement documents                                         C          L

3.2            Prepare and distribute/post procurement notice on GETS (Government                      L
               Electronic Tendering Service) and bid solicitation package

3.3            Prepare and distribute technical data packages, as required                  L          C

3.4            Receipt of bids on bid closing                                                          L

3.5            Evaluate technical elements of bids                                          L          C

3.6            Evaluate time, cost and other contractual elements of bids                              L

3.7            Prepare consolidated evaluation and selection of supplier                    C          L

3.8            Negotiate contract where applicable                                          C          L

3.9            Obtain contract approval                                                     C          L

3.10           Prepare and issue contract                                                              L

3.11           Debrief unsuccessful suppliers                                               C          L



4              Contract Administration

4.1            General:

    4.1.1      Monitor work of contractor; receive contract deliverables                    L          C

    4.1.2      Monitor cash flow                                                            L          C

    4.1.3      Report problems to contracting authority                                     L

    4.1.4      Resolve contractual problems                                                 C          L


Supply Manual                                                                                   Annex 3.7-3
Version 08-2
Requisition Receipt


    No.                                        Activities                                  Responsibility

                                                                                          Client    PWGSC

    4.1.5      Monitor compliance with terms and conditions of contract                     S          S

    4.1.6      Determine that goods and services received are in accordance with the        L          C
               requirement

    4.1.7      Determine that goods and services received are in accordance with the        C          L
               contract

    4.1.8      Process claims for payment                                                   L          C

4.2            Contract Amendments:

    4.2.1      Identify need for additional work or revisions; confirm funding              L

    4.2.2      Confirm that contract amendment is the appropriate vehicle                              L

    4.2.3      Negotiate contract amendment                                                 C          L

    4.2.4      Obtain approval for amendment/change order                                              L

    4.2.5      Prepare and issue contract amendment                                                    L



5              Contract Close-out

5.1            Settle outstanding claims for payment                                        C          L

5.2            Issue contract closing amendment                                                        L

5.3            Finalize disposition of Crown assets                                                    L




Supply Manual                                                                                   Annex 3.7-4
Version 08-2

More Related Content

What's hot

0569 project management-beenish
0569 project management-beenish0569 project management-beenish
0569 project management-beenishdfhf hfghf
 
IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1IFAD Vietnam
 
Fidic conditions of subcontract agreement
Fidic conditions of subcontract agreementFidic conditions of subcontract agreement
Fidic conditions of subcontract agreementabdmuhaiminyunus
 
香港六合彩|六合彩
香港六合彩|六合彩香港六合彩|六合彩
香港六合彩|六合彩ykscnm
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc ProjectsMy own
 

What's hot (6)

0569 project management-beenish
0569 project management-beenish0569 project management-beenish
0569 project management-beenish
 
IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1IFAD Procurement Handbooks 2010-100-r-27-add-1
IFAD Procurement Handbooks 2010-100-r-27-add-1
 
Fidic conditions of subcontract agreement
Fidic conditions of subcontract agreementFidic conditions of subcontract agreement
Fidic conditions of subcontract agreement
 
香港六合彩|六合彩
香港六合彩|六合彩香港六合彩|六合彩
香港六合彩|六合彩
 
110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects110801Proposed Fidic Contract Framework For Complex Epc Projects
110801Proposed Fidic Contract Framework For Complex Epc Projects
 
Cm mitemrate ver270206
Cm mitemrate ver270206Cm mitemrate ver270206
Cm mitemrate ver270206
 

Similar to Matrix of responsibility

CFW NEC Management of change under the NEC3
CFW NEC  Management of change under the NEC3 CFW NEC  Management of change under the NEC3
CFW NEC Management of change under the NEC3 Rae Davies
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Rae Davies
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.pptssuser32da691
 
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...Rae Davies
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011Maatla Moadi
 
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxThe importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxMy own
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsGalala University
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017DarrenTofu
 
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Project Controls Expo
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 CompleteJohn Ashton
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver bookmoodlyd
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...Praveen Premkumar
 
projectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementprojectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementakashdhewale87
 
Risk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsRisk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsClydeCoOffshore
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contractVance Ang
 

Similar to Matrix of responsibility (20)

NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014NCIT civil Syllabus 2013-2014
NCIT civil Syllabus 2013-2014
 
CFW NEC Management of change under the NEC3
CFW NEC  Management of change under the NEC3 CFW NEC  Management of change under the NEC3
CFW NEC Management of change under the NEC3
 
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
Construction Futures Wales - NEC Workshop - Importance of Program Control & M...
 
contract_management.ppt
contract_management.pptcontract_management.ppt
contract_management.ppt
 
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...Construction Futures Wales  - NEC3 Workshop - Understanding Works Information...
Construction Futures Wales - NEC3 Workshop - Understanding Works Information...
 
Cbb512 examination november_2011
Cbb512 examination november_2011Cbb512 examination november_2011
Cbb512 examination november_2011
 
Ak contract management
Ak contract managementAk contract management
Ak contract management
 
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docxThe importance of 3 Core NEC Time Clauses when submitting a programme.docx
The importance of 3 Core NEC Time Clauses when submitting a programme.docx
 
Architectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction DocumentsArchitectural Professional Practice - Construction Documents
Architectural Professional Practice - Construction Documents
 
Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017Construction lawprint-final-update-21112017
Construction lawprint-final-update-21112017
 
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
Planning and Project Controls under NEC4 – the choice isn’t yours! by "Glenn ...
 
Assignment 1 Complete
Assignment 1 CompleteAssignment 1 Complete
Assignment 1 Complete
 
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation SlidesExtension of Time (EOT) & Related Costs in Construction - Presentation Slides
Extension of Time (EOT) & Related Costs in Construction - Presentation Slides
 
Fi dic silver book
Fi dic silver bookFi dic silver book
Fi dic silver book
 
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
3.0 Common Types of Construction Contracts & Standard Conditions of Contract ...
 
Tiffany
TiffanyTiffany
Tiffany
 
projectclosure-rutik.pptx project management
projectclosure-rutik.pptx project managementprojectclosure-rutik.pptx project management
projectclosure-rutik.pptx project management
 
TOPIC7.pdf
TOPIC7.pdfTOPIC7.pdf
TOPIC7.pdf
 
Risk allocation in offshore E&P projects
Risk allocation in offshore E&P projectsRisk allocation in offshore E&P projects
Risk allocation in offshore E&P projects
 
Psscoc 2008 db contract
Psscoc 2008 db contractPsscoc 2008 db contract
Psscoc 2008 db contract
 

Recently uploaded

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...noida100girls
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageMatteo Carbone
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfPaul Menig
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.Aaiza Hassan
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfOnline Income Engine
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesDipal Arora
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in managementchhavia330
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 

Recently uploaded (20)

9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...BEST ✨ Call Girls In  Indirapuram Ghaziabad  ✔️ 9871031762 ✔️ Escorts Service...
BEST ✨ Call Girls In Indirapuram Ghaziabad ✔️ 9871031762 ✔️ Escorts Service...
 
Insurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usageInsurers' journeys to build a mastery in the IoT usage
Insurers' journeys to build a mastery in the IoT usage
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Grateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdfGrateful 7 speech thanking everyone that has helped.pdf
Grateful 7 speech thanking everyone that has helped.pdf
 
M.C Lodges -- Guest House in Jhang.
M.C Lodges --  Guest House in Jhang.M.C Lodges --  Guest House in Jhang.
M.C Lodges -- Guest House in Jhang.
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Unlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdfUnlocking the Secrets of Affiliate Marketing.pdf
Unlocking the Secrets of Affiliate Marketing.pdf
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best ServicesMysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
Mysore Call Girls 8617370543 WhatsApp Number 24x7 Best Services
 
GD Birla and his contribution in management
GD Birla and his contribution in managementGD Birla and his contribution in management
GD Birla and his contribution in management
 
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 

Matrix of responsibility

  • 1. Supply Manual VERSION 08-02 December 12, 2008 Prepared by: Acquisition Policy and Process Directorate Public Works and Government Services Canada
  • 2. Requisition Receipt Annex 3.7: Matrix of Responsibilities between PWGSC and Client Departments for the Procurement of Goods and Services (Generic) (2008-12-12) Introduction 1. The following matrix provides a generic division of anticipated types of responsibilities between Public Works and Government Services Canada (PWGSC) and client departments. It forms the basis for an effective and efficient partnering relationship for those who are responsible for activities within the contracting process. 2. The division of responsibilities as shown in the matrix represents a standard way of doing business. However, as every procurement and associated contract differs, alternate divisions of roles and responsibilities can be established in advance by way of a written agreement between PWGSC and the client department. Such client department or procurement-specific arrangements or matrices will take precedence over this generic matrix. Legislation, regulations and policy will also take precedence over this matrix. 3. Regular communication between PWGSC and the client department is considered essential to success in all activities, even for those activities where no contributing role is indicated within the matrix. NOTE: The matrix does not represent a delegation of procurement authority by the Minister of PWGSC, and does not remove from contracting officers their overall contracting responsibilities. Supply Manual Annex 3.7-1 Version 08-2
  • 3. Requisition Receipt FOR CLIENT DEPARTMENTS NOT COVERED IN ANNEX 3.1 TO ANNEX 3.6 Matrix of Responsibilities between PWGSC and Client Departments for the Procurement of Goods and Services (Generic) L: Lead C: Contributing S: Shared No. Activities Responsibility Client PWGSC 1 Requirements Definition 1.1 Define client’s operational requirements: 1.1.1 Define essential characteristics (i.e., Statement of Requirements) L C 1.1.2 Consider all feasible solutions to meet client’s operational needs L C 1.1.3 Develop preliminary project cost estimates and schedule L 1.1.4 Conduct cost benefit analysis of alternatives (including life cycle costing L C analysis) 1.1.5 Determine total resource requirements and implications (e.g., training, L priority of allocation amongst operational needs, security requirements) 1.1.6 Obtain approval-in-principle to continue with project L 1.1.7 Develop Total Project Plan, including substantive cost estimates and L schedule, special project management needs, project phasing, maintenance support requirements, etc. 1.2 Define client’s technical requirements: 1.2.1 Develop Statement of Work (SOW) and/or performance specifications or L standards as appropriate for the goods/services required to meet the operational need 1.2.2 Define technical requirements for quality assurance, acceptance, L warranty, training, documentation, packaging, transportation, initial provisioning, etc. 1.3 Raise the requisition (form PWGSC-TPSGC 9200): 1.3.1 Prepare funded requisition for goods/services to be forwarded to L C PWGSC (include Security Requirements Checklist (SRCL) if applicable) 2 PWGSC Procurement Plan 2.1 Assess potential sources of supply (Canadian vs. offshore, etc.) C L 2.2 Identify applicable major contracting policy issues/ considerations which C L must be resolved to accomplish the procurement 2.3 Examine potential problems in relation to patents, licencing, royalties C L and technology transfer Supply Manual Annex 3.7-2 Version 08-2
  • 4. Requisition Receipt No. Activities Responsibility Client PWGSC 2.4 Develop Procurement Plan including: 2.4.1 Delivery schedule and acceptance requirement L C 2.4.2 Contracting approach (including sourcing strategy) C L 2.4.3 Target cost and cash flow plan C L 2.4.4 Statement of appropriate quality and inspection system standards and L C qualification approvals 2.4.5 Communications strategy C L 2.4.6 Contractual risk management C L 2.4.7 Evaluation methodology and selection method C L 2.4.8 Industrial Benefits (IBs), where appropriate C L 2.4.9 Interdepartmental and international agreements related to procurement L C plan 2.5 Obtain Procurement Plan approval L 3 Contracting Process 3.1 Translation of procurement documents C L 3.2 Prepare and distribute/post procurement notice on GETS (Government L Electronic Tendering Service) and bid solicitation package 3.3 Prepare and distribute technical data packages, as required L C 3.4 Receipt of bids on bid closing L 3.5 Evaluate technical elements of bids L C 3.6 Evaluate time, cost and other contractual elements of bids L 3.7 Prepare consolidated evaluation and selection of supplier C L 3.8 Negotiate contract where applicable C L 3.9 Obtain contract approval C L 3.10 Prepare and issue contract L 3.11 Debrief unsuccessful suppliers C L 4 Contract Administration 4.1 General: 4.1.1 Monitor work of contractor; receive contract deliverables L C 4.1.2 Monitor cash flow L C 4.1.3 Report problems to contracting authority L 4.1.4 Resolve contractual problems C L Supply Manual Annex 3.7-3 Version 08-2
  • 5. Requisition Receipt No. Activities Responsibility Client PWGSC 4.1.5 Monitor compliance with terms and conditions of contract S S 4.1.6 Determine that goods and services received are in accordance with the L C requirement 4.1.7 Determine that goods and services received are in accordance with the C L contract 4.1.8 Process claims for payment L C 4.2 Contract Amendments: 4.2.1 Identify need for additional work or revisions; confirm funding L 4.2.2 Confirm that contract amendment is the appropriate vehicle L 4.2.3 Negotiate contract amendment C L 4.2.4 Obtain approval for amendment/change order L 4.2.5 Prepare and issue contract amendment L 5 Contract Close-out 5.1 Settle outstanding claims for payment C L 5.2 Issue contract closing amendment L 5.3 Finalize disposition of Crown assets L Supply Manual Annex 3.7-4 Version 08-2