CTQ Matrix Identify possible “Hidden” Factories Anand Subramaniam
[object Object],[object Object]
CT Matrix = Leverage Point Factor Process A  Process B  Process C  Operation 1  Tool A  Product  System A  Sub-System 1  Element A  Characteristic 2 Characteristic 1 Characteristic 3 Characteristic 1 Characteristic 2 Characteristic 3 CTP CTQ System B  System C  Sub-System 2  Sub-System 3  Element B  Element C  Operation 3  Operation 2  Tool B  Tool C  Y = f (X) Product (Y) Tree Process (X) Tree
Relationship - CTS, CTQ, CTP Critical to Satisfaction (CTS) Business Success Critical to Quality (CTQ) Customer Satisfaction Critical to Process (CTP) Product Quality CTQ Process Input CTY (Product Tree) CTX Tree (Process Tree) The CT Matrix Structure
Process Mapping
Process Mapping – Benefits Benefits Lists all of the process steps Assists with root cause analysis Lists all of the input variables that allow each step to be carried out (KPIV) Identifies possible “Hidden” Factories It is a living document that may change as the process improvement is developed Allows the team to better scope the project as well as documents how the process is currently being performed Lists all of the output variables (KPOV)
Process Mapping - Essentials Should indicate Major activities / tasks Key Processes & Sub-processes Inputs & Outputs Process Boundaries Customers & Suppliers Document how the process actually operates, not how it is supposed to operate Process Parameters Process Owners Reviewed frequently
Process Mapping – Key Elements Elements KPIV / KPOV Type of Input  (C, N, S) Quality Indicator Specifications RTY, PPM, COPQ Types of Gages Value Added (VA) or Non-Value Added (NVA) Control Parameters Cost Per Unit
Process Mapping - Steps Identify the process to be mapped (narrow focus) List process steps of the process is currently being performed Label each process as Value Added (VA), Non-Value Added (NVA) List all KPIV’s (X’s) per process step. (Use the Cause-and-Effect diagram to aid you in identifying the KPIV’s for each process step) Identify type of Input, categorise KPIV’s (X’s) as either Controllable (C), Standard Operating Procedure (S), or Noise (N) Document KPIV’s (X) specifications List the KPOV’s (Y) for each step Document the KPOV’s specifications
Process Parameters Why ? Root cause  of a defect is variation of the X’s Reduce defects Defects are also outputs of a process step X’s must be under control to prevent defects Identify X’s which are the sources of the process variation  Y’s are the measured results of the process and include the failure modes of the process
Process Parameters - Questions ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Process Parameters C – Controllable Factors   Process factors that can be changed to see the effect on product characteristics. N - Noise Factors Uncontrollable May be controllable,  but are not controlled by decision S - Standard Operating Procedures A procedure used to define and run those factors. Tooling, Fixtures Cr - Critical Factors Determined through FMEA,  DoE, etc
Roadmap - Process Mapping
Process Mapping Macro Level Process Level Micro Level Process - Level #1 Step #1 Process - Level #2 Step #1 Step #2 Process - Level #3 Step #3 Step #1 Step #2 Step #3 Step #3 Step #2
Process & Product Inputs Outputs Process Steps / Tasks Product Parameters,  y’s y = f(x) X’s 6 M Man  (People) Machine  (Equipment) Method  (Procedures) Material Measurement Mother Nature  (Environment) Parameters C – Controllable N – Noise P – Procedure CR - Critical
[object Object],[object Object]
CREI Statement (Concern, Requirement, Evidence, Impact)
CREI – Problem Statement Concern What is wrong?  (statement of non-conformity) Requirement What is it? (not clearly known or defined) Found in procedures, policies, drawings, specifications, etc. Evidence What data demonstrates that something is wrong?  (objective evidence observed that supports statement of nonconformity) Must be verifiable Impact How significant is the problem from a performance and / or cost standpoint?
Problem Types – Simple to Complex Simple / Cause  Known / Just Do It Reflects product or process controls established when planning the process Management decision to “live with” such conditions based on acceptable level of risk Can only be eliminated by applying disciplined problem solving to understand true root cause in order to improve process Should be routinely evaluated for cost and impact Complex / Cause Unknown / Dig Deeper May also be anticipated issues for which actual level of risk is now determined to be unacceptable Require concentrated investigation to understand source of problem and process factors leading to problem condition to allow appropriate solutions Unanticipated conditions which occur
Problem Types – Action Type Origin Method Action Just do it Known Trouble- shoot : rework Seen before; can live with impact when problem recurs Dig Deeper Unknown Root cause analysis Data-driven investigation to determine actual factors causing problem condition
[object Object],[object Object]
[object Object],[object Object]

Más contenido relacionado

La actualidad más candente

Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)DEEPAK SAHOO
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMDr.Raja R
 
IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesAmit Mishra
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Kiran Walimbe
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan Jitesh Gaurav
 
PROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPT
PROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPTPROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPT
PROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPTInter Alliance Werardt
 
Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009roycohen
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationGlobal Manager Group
 

La actualidad más candente (20)

Apqp ppt
Apqp pptApqp ppt
Apqp ppt
 
Introduction To Lean
Introduction To LeanIntroduction To Lean
Introduction To Lean
 
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) PosterTPM: Quality Maintenance (Hinshitsu Hozen) Poster
TPM: Quality Maintenance (Hinshitsu Hozen) Poster
 
Ch 7 qm
Ch 7 qmCh 7 qm
Ch 7 qm
 
7 QC TOOLS PRESENTATION PPT
 7 QC TOOLS PRESENTATION PPT 7 QC TOOLS PRESENTATION PPT
7 QC TOOLS PRESENTATION PPT
 
Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)Failure Mode Effect Analysis (FMEA)
Failure Mode Effect Analysis (FMEA)
 
Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)Failure Mode & Effects Analysis (FMEA)
Failure Mode & Effects Analysis (FMEA)
 
Advanced Pfmea
Advanced PfmeaAdvanced Pfmea
Advanced Pfmea
 
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQMIntroduction to Failure Mode and Effects Analysis (FMEA) in TQM
Introduction to Failure Mode and Effects Analysis (FMEA) in TQM
 
IATF 16949 2016 implementation phases
IATF 16949 2016 implementation phasesIATF 16949 2016 implementation phases
IATF 16949 2016 implementation phases
 
Fmea handout
Fmea handoutFmea handout
Fmea handout
 
Process auditing as per VDA 6.3
Process auditing as per VDA 6.3Process auditing as per VDA 6.3
Process auditing as per VDA 6.3
 
Poka yoke
Poka yokePoka yoke
Poka yoke
 
Training ppt for control plan
Training ppt for control plan   Training ppt for control plan
Training ppt for control plan
 
PROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPT
PROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPTPROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPT
PROCESS FAILURE MODE EFFECTS ANALYSIS (PFMEA) PPT
 
Root Cause And Corrective Action Workshop Cinci Asq 2009
Root Cause And Corrective Action Workshop  Cinci Asq 2009Root Cause And Corrective Action Workshop  Cinci Asq 2009
Root Cause And Corrective Action Workshop Cinci Asq 2009
 
8D analysis presentation
8D analysis presentation8D analysis presentation
8D analysis presentation
 
Pfmea process fmea
Pfmea   process fmeaPfmea   process fmea
Pfmea process fmea
 
OFFICE TPM PPT
OFFICE TPM PPTOFFICE TPM PPT
OFFICE TPM PPT
 
PPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 DocumentationPPT Presentation on IATF 16949 Documentation
PPT Presentation on IATF 16949 Documentation
 

Destacado (20)

Project Health Check
Project Health CheckProject Health Check
Project Health Check
 
Change Management Checklist
Change Management ChecklistChange Management Checklist
Change Management Checklist
 
Sales Performance Measures
Sales Performance MeasuresSales Performance Measures
Sales Performance Measures
 
Solving Client Issues
Solving Client IssuesSolving Client Issues
Solving Client Issues
 
Business Plan
Business PlanBusiness Plan
Business Plan
 
Project Execution & Control Checklist
Project Execution & Control ChecklistProject Execution & Control Checklist
Project Execution & Control Checklist
 
Benchmarking
BenchmarkingBenchmarking
Benchmarking
 
Muda in service industries
Muda in service industriesMuda in service industries
Muda in service industries
 
LSS Idea Generation to Project Execution
LSS Idea Generation to Project ExecutionLSS Idea Generation to Project Execution
LSS Idea Generation to Project Execution
 
Project Closure Report
Project Closure ReportProject Closure Report
Project Closure Report
 
CMMI & Six Sigma Integration
CMMI & Six Sigma IntegrationCMMI & Six Sigma Integration
CMMI & Six Sigma Integration
 
Process Audit
Process AuditProcess Audit
Process Audit
 
Lesson Learned Report
Lesson Learned ReportLesson Learned Report
Lesson Learned Report
 
Six Sigma Lean (SSL)
Six Sigma Lean (SSL)Six Sigma Lean (SSL)
Six Sigma Lean (SSL)
 
Quality Tools
Quality ToolsQuality Tools
Quality Tools
 
Your Organisation
Your OrganisationYour Organisation
Your Organisation
 
Software Development
Software DevelopmentSoftware Development
Software Development
 
Professional Services (Ps) Excellence
Professional Services (Ps) ExcellenceProfessional Services (Ps) Excellence
Professional Services (Ps) Excellence
 
IT Processes & Systems
IT Processes & SystemsIT Processes & Systems
IT Processes & Systems
 
Close Loop Mrp
Close Loop MrpClose Loop Mrp
Close Loop Mrp
 

Similar a CTQ Matrix

Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Omnex Inc.
 
6 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-36 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-3jseets
 
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011El Llc Six Sigma June 2011
El Llc Six Sigma June 2011ExerciseLeanLLC
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltRajiv Tiwari
 
2011 business process management
2011 business process management2011 business process management
2011 business process managementAreté Partners
 
Managing Quality
Managing QualityManaging Quality
Managing QualityAli BARAN
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Managementhandbook
 
Sslean Validation 20070622
Sslean Validation 20070622Sslean Validation 20070622
Sslean Validation 20070622jancrielaard
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505densongco
 
Ancora 6Sigma - 3. la metodologia DMAIC
Ancora 6Sigma - 3.  la metodologia DMAICAncora 6Sigma - 3.  la metodologia DMAIC
Ancora 6Sigma - 3. la metodologia DMAICManager.it
 
L07 quality management
L07 quality managementL07 quality management
L07 quality managementAsa Chan
 
fy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptxfy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptxMarcosMaumesso
 
Statistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.pptStatistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.pptOswaldo Gonzales
 
Process excellance
Process excellanceProcess excellance
Process excellanceRDeducation
 

Similar a CTQ Matrix (20)

Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006Quality tools-asq-london-may-10-2006
Quality tools-asq-london-may-10-2006
 
Six_Sigma.pptx
Six_Sigma.pptxSix_Sigma.pptx
Six_Sigma.pptx
 
6 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-36 sigma-process-mapping-1233778357447980-3
6 sigma-process-mapping-1233778357447980-3
 
El Llc Six Sigma June 2011
El Llc Six Sigma June 2011El Llc Six Sigma June 2011
El Llc Six Sigma June 2011
 
Six Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green BeltSix Sigma for Beginners- Yellow and Green Belt
Six Sigma for Beginners- Yellow and Green Belt
 
2011 business process management
2011 business process management2011 business process management
2011 business process management
 
Managing Quality
Managing QualityManaging Quality
Managing Quality
 
Six sigma
Six sigmaSix sigma
Six sigma
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
7qc Tools 173
7qc Tools 1737qc Tools 173
7qc Tools 173
 
Quality tools
Quality toolsQuality tools
Quality tools
 
QM-026-Quality Management
QM-026-Quality ManagementQM-026-Quality Management
QM-026-Quality Management
 
Sslean Validation 20070622
Sslean Validation 20070622Sslean Validation 20070622
Sslean Validation 20070622
 
Six sigma-measure-phase2505
Six sigma-measure-phase2505Six sigma-measure-phase2505
Six sigma-measure-phase2505
 
Ancora 6Sigma - 3. la metodologia DMAIC
Ancora 6Sigma - 3.  la metodologia DMAICAncora 6Sigma - 3.  la metodologia DMAIC
Ancora 6Sigma - 3. la metodologia DMAIC
 
L07 quality management
L07 quality managementL07 quality management
L07 quality management
 
fy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptxfy11_sh-22316-11_1-3_ProcessingMapping.pptx
fy11_sh-22316-11_1-3_ProcessingMapping.pptx
 
Statistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.pptStatistical_Quality_Control esp.ppt
Statistical_Quality_Control esp.ppt
 
Process excellance
Process excellanceProcess excellance
Process excellance
 
Process excellance
Process excellanceProcess excellance
Process excellance
 

Más de Anand Subramaniam (20)

Lean transformation
Lean transformationLean transformation
Lean transformation
 
Lean principles
Lean principlesLean principles
Lean principles
 
Lean thinking
Lean thinkingLean thinking
Lean thinking
 
Anand dossier 2
Anand dossier 2Anand dossier 2
Anand dossier 2
 
Anand short dossier
Anand short dossierAnand short dossier
Anand short dossier
 
Set up reduction
Set up reductionSet up reduction
Set up reduction
 
Waste Walk ~ Audit
Waste Walk ~ AuditWaste Walk ~ Audit
Waste Walk ~ Audit
 
Defects Vs. Errors
Defects Vs. ErrorsDefects Vs. Errors
Defects Vs. Errors
 
3 MU
3 MU3 MU
3 MU
 
Ninbennoaru Jidoka
Ninbennoaru JidokaNinbennoaru Jidoka
Ninbennoaru Jidoka
 
Gemba kaizen
Gemba kaizenGemba kaizen
Gemba kaizen
 
LSS - 5 Year Strategy
LSS -  5 Year StrategyLSS -  5 Year Strategy
LSS - 5 Year Strategy
 
Lean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy LinkageLean Six Sigma Projects & Strategy Linkage
Lean Six Sigma Projects & Strategy Linkage
 
CMMI Capability Maturity Model Integration
CMMI   Capability Maturity Model Integration CMMI   Capability Maturity Model Integration
CMMI Capability Maturity Model Integration
 
8 D – Problem Solving Process
8 D – Problem Solving Process8 D – Problem Solving Process
8 D – Problem Solving Process
 
Total Productive Maintenance
Total Productive MaintenanceTotal Productive Maintenance
Total Productive Maintenance
 
TPM Implementation Strategy
TPM Implementation StrategyTPM Implementation Strategy
TPM Implementation Strategy
 
Overall Equipment Effectiveness
Overall Equipment EffectivenessOverall Equipment Effectiveness
Overall Equipment Effectiveness
 
Autonomous Maintenance
Autonomous MaintenanceAutonomous Maintenance
Autonomous Maintenance
 
Material Handling
Material Handling Material Handling
Material Handling
 

Último

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...anilsa9823
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxAndy Lambert
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Neil Kimberley
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Delhi Call girls
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechNewman George Leech
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear RegressionRavindra Nath Shukla
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdfOrient Homes
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...lizamodels9
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Dipal Arora
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Dave Litwiller
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayNZSG
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyEthan lee
 

Último (20)

Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
Lucknow 💋 Escorts in Lucknow - 450+ Call Girl Cash Payment 8923113531 Neha Th...
 
Monthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptxMonthly Social Media Update April 2024 pptx.pptx
Monthly Social Media Update April 2024 pptx.pptx
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023Mondelez State of Snacking and Future Trends 2023
Mondelez State of Snacking and Future Trends 2023
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
Best VIP Call Girls Noida Sector 40 Call Me: 8448380779
 
RE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman LeechRE Capital's Visionary Leadership under Newman Leech
RE Capital's Visionary Leadership under Newman Leech
 
Regression analysis: Simple Linear Regression Multiple Linear Regression
Regression analysis:  Simple Linear Regression Multiple Linear RegressionRegression analysis:  Simple Linear Regression Multiple Linear Regression
Regression analysis: Simple Linear Regression Multiple Linear Regression
 
Catalogue ONG NUOC PPR DE NHAT .pdf
Catalogue ONG NUOC PPR DE NHAT      .pdfCatalogue ONG NUOC PPR DE NHAT      .pdf
Catalogue ONG NUOC PPR DE NHAT .pdf
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Best Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting PartnershipBest Practices for Implementing an External Recruiting Partnership
Best Practices for Implementing an External Recruiting Partnership
 
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
Call Girls In DLf Gurgaon ➥99902@11544 ( Best price)100% Genuine Escort In 24...
 
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
Call Girls Navi Mumbai Just Call 9907093804 Top Class Call Girl Service Avail...
 
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
Enhancing and Restoring Safety & Quality Cultures - Dave Litwiller - May 2024...
 
Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.Eni 2024 1Q Results - 24.04.24 business.
Eni 2024 1Q Results - 24.04.24 business.
 
Forklift Operations: Safety through Cartoons
Forklift Operations: Safety through CartoonsForklift Operations: Safety through Cartoons
Forklift Operations: Safety through Cartoons
 
It will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 MayIt will be International Nurses' Day on 12 May
It will be International Nurses' Day on 12 May
 
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case studyThe Coffee Bean & Tea Leaf(CBTL), Business strategy case study
The Coffee Bean & Tea Leaf(CBTL), Business strategy case study
 
KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)KestrelPro Flyer Japan IT Week 2024 (English)
KestrelPro Flyer Japan IT Week 2024 (English)
 

CTQ Matrix

  • 1. CTQ Matrix Identify possible “Hidden” Factories Anand Subramaniam
  • 2.
  • 3. CT Matrix = Leverage Point Factor Process A Process B Process C Operation 1 Tool A Product System A Sub-System 1 Element A Characteristic 2 Characteristic 1 Characteristic 3 Characteristic 1 Characteristic 2 Characteristic 3 CTP CTQ System B System C Sub-System 2 Sub-System 3 Element B Element C Operation 3 Operation 2 Tool B Tool C Y = f (X) Product (Y) Tree Process (X) Tree
  • 4. Relationship - CTS, CTQ, CTP Critical to Satisfaction (CTS) Business Success Critical to Quality (CTQ) Customer Satisfaction Critical to Process (CTP) Product Quality CTQ Process Input CTY (Product Tree) CTX Tree (Process Tree) The CT Matrix Structure
  • 6. Process Mapping – Benefits Benefits Lists all of the process steps Assists with root cause analysis Lists all of the input variables that allow each step to be carried out (KPIV) Identifies possible “Hidden” Factories It is a living document that may change as the process improvement is developed Allows the team to better scope the project as well as documents how the process is currently being performed Lists all of the output variables (KPOV)
  • 7. Process Mapping - Essentials Should indicate Major activities / tasks Key Processes & Sub-processes Inputs & Outputs Process Boundaries Customers & Suppliers Document how the process actually operates, not how it is supposed to operate Process Parameters Process Owners Reviewed frequently
  • 8. Process Mapping – Key Elements Elements KPIV / KPOV Type of Input (C, N, S) Quality Indicator Specifications RTY, PPM, COPQ Types of Gages Value Added (VA) or Non-Value Added (NVA) Control Parameters Cost Per Unit
  • 9. Process Mapping - Steps Identify the process to be mapped (narrow focus) List process steps of the process is currently being performed Label each process as Value Added (VA), Non-Value Added (NVA) List all KPIV’s (X’s) per process step. (Use the Cause-and-Effect diagram to aid you in identifying the KPIV’s for each process step) Identify type of Input, categorise KPIV’s (X’s) as either Controllable (C), Standard Operating Procedure (S), or Noise (N) Document KPIV’s (X) specifications List the KPOV’s (Y) for each step Document the KPOV’s specifications
  • 10. Process Parameters Why ? Root cause of a defect is variation of the X’s Reduce defects Defects are also outputs of a process step X’s must be under control to prevent defects Identify X’s which are the sources of the process variation Y’s are the measured results of the process and include the failure modes of the process
  • 11.
  • 12. Process Parameters C – Controllable Factors Process factors that can be changed to see the effect on product characteristics. N - Noise Factors Uncontrollable May be controllable, but are not controlled by decision S - Standard Operating Procedures A procedure used to define and run those factors. Tooling, Fixtures Cr - Critical Factors Determined through FMEA, DoE, etc
  • 13. Roadmap - Process Mapping
  • 14. Process Mapping Macro Level Process Level Micro Level Process - Level #1 Step #1 Process - Level #2 Step #1 Step #2 Process - Level #3 Step #3 Step #1 Step #2 Step #3 Step #3 Step #2
  • 15. Process & Product Inputs Outputs Process Steps / Tasks Product Parameters, y’s y = f(x) X’s 6 M Man (People) Machine (Equipment) Method (Procedures) Material Measurement Mother Nature (Environment) Parameters C – Controllable N – Noise P – Procedure CR - Critical
  • 16.
  • 17. CREI Statement (Concern, Requirement, Evidence, Impact)
  • 18. CREI – Problem Statement Concern What is wrong? (statement of non-conformity) Requirement What is it? (not clearly known or defined) Found in procedures, policies, drawings, specifications, etc. Evidence What data demonstrates that something is wrong? (objective evidence observed that supports statement of nonconformity) Must be verifiable Impact How significant is the problem from a performance and / or cost standpoint?
  • 19. Problem Types – Simple to Complex Simple / Cause Known / Just Do It Reflects product or process controls established when planning the process Management decision to “live with” such conditions based on acceptable level of risk Can only be eliminated by applying disciplined problem solving to understand true root cause in order to improve process Should be routinely evaluated for cost and impact Complex / Cause Unknown / Dig Deeper May also be anticipated issues for which actual level of risk is now determined to be unacceptable Require concentrated investigation to understand source of problem and process factors leading to problem condition to allow appropriate solutions Unanticipated conditions which occur
  • 20. Problem Types – Action Type Origin Method Action Just do it Known Trouble- shoot : rework Seen before; can live with impact when problem recurs Dig Deeper Unknown Root cause analysis Data-driven investigation to determine actual factors causing problem condition
  • 21.
  • 22.