1
SAFE HARBOR STATEMENT

•   Certain statements in this presentation constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of
    1995 and Canadian securities legislation. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which
    may cause the actual results, performance or achievements of the Company, or other future events, including forecast production, earnings and cash
    flows, to be materially different from any future results, performances or achievements or other events expressly or implicitly predicted by such
    forward-looking statements.
•   Such risks, uncertainties and other factors include, but are not limited to, factors associated with fluctuations in the market price of precious metals,
    mining industry risks, recent operating losses, uncertainty of title to properties, risk associated with foreign operations, environmental risks and
    hazards, proposed legislation affecting the mining industry, litigation, governmental regulation of the mining industry, properties without known
    mineable reserves, uncertainty as to calculations of reserves, mineral deposits and grades, requirement of additional financing, uninsured risks, risk of
    hedging strategies, competition, dependence on key management personnel, potential volatility of market price of the Company’s common shares,
    dilution and certain anti-takeover effects. Such information contained herein represents management’s best judgment as of the date hereof based on
    information currently available. The Company does not intend to update this information and disclaims any legal liability to the contrary.
•   Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially
    affected by the inability to obtain required environmental and other regulatory approval, environmental or operating permits. The estimate may also
    be materially affected by global economic conditions such as the price of gold and silver, the price of oil and other commodities utilized in the
    production of gold and silver. Unknown geologic or hydrologic conditions or other unknown factors may materially affect the resource estimates. Net
    smelter returns and metallurgical recoveries at Sinchao have not been considered.
•   This document uses the terms "measured resources", 'indicated resources' and 'inferred resources'. Investors are cautioned not to assume that any
    part or all of the mineral deposits in these categories will ever be converted into reserves. In addition, 'inferred resources' have a great amount of
    uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever
    be upgraded to a higher category. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally
    mineable.
•   Mr. Les Tarnai, P.Eng., General Manager of Engineering, Invicta Mining Corp., is a Qualified Person as defined by National Instrument 43-101 with the
    ability and authority to verify the authenticity and validity of the data herein. Victor Jaramillo, P. Geo., of Discover Geological Consultants Inc. is an
    Independent Qualified Person as defined by National Instrument 43-101 and is responsible for the resource estimates. Guy Lokhorst, P. Eng., of The
    Lokhorst Group, is an Independent Qualified Person as defined by NI 43-101 and is responsible for the review of the mining methodology, including the
    probable reserves and life of mine, for the Invicta Feasibility Study. Deepak Malhotra, PhD., MS in Metallurgical Engineering and PhD. in Mineral
    Economics, Independent Qualified Person as defined by NI 43-101, of Resource Development Inc., reviewed the metallurgy for the Invicta project and
    developed the finalized process flow diagram for the Invicta Feasibility Study. Leslie F. Tarnai, P. Eng., General Manager of Engineering for Invicta
    Mining Corp., is a Qualified Person as defined by NI 43-101 and is responsible for the Invicta Feasibility Study.




                                                                                                                                                            2
OVERVIEW

 •   Near Term Gold Production
     •   Invicta Project is 100% Owned
     •   Project team with over 200 years development/operations experience
     •   Environmental permits received, long lead time items purchased
     •   Commissioning expected 2nd half of 2011
     •   Projected production 160,000 Au Eq Oz per Year @ $US 275/Oz LOM
         Cash Cost

 •   World Class Assets in Pipeline
     •   Sinchao Gold/Copper project with initial inferred resource of 237 M
         tonnes containing 3.73M oz Au, 2.45B lb Cu and 92M oz Ag with average
         grades of .47% Cu, .49g/t Au and 12.1g/t Ag., using prices of $1.50/lb Cu,
         $600/oz Au and $8/oz Ag.



                                                                                      3
MANAGEMENT
 •   John F. Huguet, CEO
          8 years as President and 4 years as Managing Director of Atkinson Holdings and Commonwealth Construction.
          During his 33 years the company constructed and placed into operation 86 major mining projects, including the
          Granduc Copper Mine (Asarco), Gibraltar (Placer Development) and La Coipa (Placer Dome).

 •   David Rae, President
          Ten years in senior positions with Falconbridge/Xstrata, including Senior Vice President Europe & Africa, and
          worldwide head of sales for all Nickel Group products. Previously he managed the Sudbury Smelter and the Timmins
          Copper Operations. Prior to joining Andean American, Mr. Rae has been advising in a consulting capacity to
          companies such as Kinross, Vale Inco and Iamgold on operational, productivity and strategic challenges.

 •   Bruce Ramsden, CFO
          Vice President and CFO with noted resource companies since 1996. Received the 2006 Mining Journal Development
          Funding Award for his work with Tiomin Resources Inc.

 •   Miguel Huaman, VP Operations
          From 2004 to 2009, Mr. Huaman was the President of Minera Huallanca, where he managed the 1000tpd Pucarrajo
          Zn-Pb-Ag mine and the 850tpd Contonga Zn-Pb-Ag-Cu mine, both underground operations. From 2002 to 2004, he
          was General Manager of Cedimin SAC, a subsidiary of the BRGM–France and Buenaventura Mining Company Peru.
          Mr. Huaman is an Engineering Graduate of the Universidad Nacional Mayor de San Marcos and a Geologist Engineer
          with a Postgraduate degree in Exploration and Valuation of Mineral Resources from the University of Nancy, France.
          Mr. Huaman is a former President of the Geological Society of Peru




                                                                                                                               4
THE INVICTA PROJECT

  •   Underground Operation: 3,000 tpd Year 1, up to 5,000 tpd Year 3+
  •   Initial 5 Year Mine Life, target 12 Years after resource definition
      drilling
  •   Exciting exploration potential
  •   Located in Peru, close to other operating mines
  •   Excellent metallurgy and flow sheet: high recoveries, low grinding
      costs, flexible process
  •   Power supply via line extension of state power grid
  •   Very strong community support and a talented labor pool
  •   Water rights obtained, wells drilled and tested




                                                                            5
LOCATION


 Invicta

           Cajamarca




            Lima
                       Sinchao Metals
                          (TSX.V:SMZ)




                                        6
PERU   Mines and exploration
       projects near Invicta




                               7
Flor de Loto,
past producing
Au/Ag mine




                 8
Measured
            20,000m drill program to be completed during construction
Indicated
            with goal to extend mine life to 10 years
Inferred




                                                                        9
RESERVES/RESOURCES

 Category      Tonnes           Density     Gold          Silver          Copper         Lead               Zinc           Gold
                                            g/t           g/t             %              %                  %              Oz
 Measured            868,000         2.77          2.71          31.26         0.69             0.73                0.61         75,724
 Indicated          9,866,735        2.73          1.99          14.74             0.4          0.28                0.27        632,336
 Inferred          14,224,661        2.75          0.67            11.2        0.36             0.24                0.15        306,913



Mineable Reserves - First 5 years
Tonnes                                      7,807,157
Metal                                              Au              Ag              Cu                  Pb                  Zn
Grade (g/t or %)                                  2.14          18.76         0.52%              0.38%                 0.30%
Contained metal (Oz or lb)                    538,946     4,724,589       89,476,265         65,386,501            51,620,922




                                                                                                                                          10
3D MODEL OF OREBODY
                            W                E
N               S




             Adit
             3400

                                     Adit
                                     3400




             Work to Date:
             -28,877 m of drilling
             -1200 m of Adit


                                            11
SUBLEVEL STOPING


 • Bulk Underground Mining
 Method

 • At Invicta:
      • 40m x 15m x 20m panels
      • Longhole blasting
      • Development on-reef




                                 12
3D VIEW – TAILINGS/PLANT/MINE

                           Concentrate Plant



         Tailing




                                                     Mine




                   Main Road from Choques to Plant




                                                            13
INFRASTRUCTURE
 •   POWER (Cost $6M US)
     •    Government backed 29km extension of the 220kv national grid

     •    Detailed engineering has been completed by CESEL

     •    27 towers to be erected mostly on our land packaged (purchased land)

     •    Power cost for the project is 6c/kwh

 •   WATER (Cost $1M US)

     •    Sourced from well drilled next to the Huaura River close to Paran at the 1100m elevation

     •    Project requires flow of 20l/s, the well has been engineered and tested by CESEL and performs at
          50l/s. Water is pumped to a storage pond at the 2400 elevation

     •    Excess water goes to the communities

 •   ROADS (Cost $2M US)

     •    A 10m wide concentrate haul road runs13km from the project

     •    We are building a 13,8km long, 10m wide connection from the 1100 masl to plant at 2300 masl

     •    Second road from plant to the mine site at 3400 masl, 4km long, 3m wide access road




                                                                                                         14
(internal)

Recoveries July 2010

Au        91%
Ag        82%
Cu        75%
Pb        80%
Zn        80%




                                    (Dry tailings)




                                         15
FEASIBILITY STUDY

      •        Average Annual Production of 97,931 Oz Gold and 160,8571 Oz Gold Equivalent over 5 Year
               Initial Mine Life

      •        LOM Cash Cost Per Oz Gold1
               •        On a co-product basis: $451.38 US;

               •        On a gold-equivalent basis: $274.80 US;

               •        On a by-product basis: ($126.91) US

      •        Estimated CapEx $68M: $49M project costs, $9M in refundable IGV taxes, $7M in contingency
               funds, $3M Startup Facility

      •        Operating costs of $28.31 US/tonne;

      •        1 Year Payback

      •        The project surpasses the environmental standards of Peru: the project is a contained process
               with zero liquid effluents
 1.       The following price deck was used: Gold $900/oz, Silver $12.50/oz, Copper $2.50/lb, Lead $0.70/lb, Zinc $0.75/lb.




                                                                                                                              16
FEASIBILITY STUDY

 After Tax Free Cash Flow and NPV Sensitivity Analysis on a Project Basis1
                                       Total Free         5 YR AVG Free
    Gold Price                         Cash Flow              Cash Flow        NPV 8%            NPV 10%
         $900                      $264,691,245             $52,938,249   $215,191,049        $203,542,333
       $1,000                      $295,525,040             $59,105,008   $249,917,929        $227,112,434
       $1,100                      $326,366,991             $65,273,398   $265,057,808        $250,688,663
       $1,200                      $357,185,186             $71,437,037   $289,974,787        $274,246,114



 Project Revenue Distribution2
                                            Au               Ag           Cu             Pb            Zn
 Revenue %                            65.5%                5.9%       20.3%          4.5%            3.8%


 1. Prices: $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn
 2. Prices: $900 Au, $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn




                                                                                                             17
FINANCING
      Capital Costs                                                                   $MM USD
      Project Costs                                                                   $49
      IGV (Refundable Tax)                                                            $9
      Contingency                                                                     $7
      Start-up Facility                                                               $3

      Total Capital Cost                                                              $68

      Source of Funds
      Senior Secured Project Debt Facility                                            $68
      Subordinated Debt                                                               $15

      Total Capital Cost                                                              $83


•   $15M already invested in the project by Andean American Gold
•   Senior Secured Project Debt Facility underwritten by international banks Barclays Capital and West LB
•   Subordinated Debt Facility provides the required Cost Overrun and Working Capital Facility for the project,
    arranged by Trafigura Beheer B.V., our Strategic Partner




                                                                                                                  18
RELATIONSHIP WITH TRAFIGURA
  •        2nd largest non-ferrous trading company in the world

  •        Sales of $47.3 Billion in 2009, 1,900 employees in 44 countries

  •        Over $1 Billion in AUM invested through proprietary Galena Asset Management

  •        Highlights of Agreements:
  •        Trafigura to provide $15M USD Sub Debt Facility for Cost Overruns and Working Capital

  •        Trafigura acquires the rights to buy all base metal concentrates from Invicta Project

  •        Trafigura acquires an Option, whereby:

      IF

      The Project Debt Lenders do not fund Invicta Project Capex by December 31st

      THEN

      Trafigura may purchase an additional 16% interest in AAG, name two additional directors to the
      Board, and underwrite the Invicta Project Debt via one of their credit facilities




                                                                                                       19
CAPITAL STRUCTURE

  Capital Structure
  Basic Shares Outstanding   101,887,287
  Options                      8,685,588
  Warrants                     5,305,918




                                           20
MILESTONES


 Q4 2010   Complete Independent Engineers Technical Report
 Q4 2010   Full mine funding drawdown
 Q4 2010   Results from exploration drilling and high grade zone
           sampling

 Q2 2011   Revised, extended mine plan including results from
           planned definition drilling

 Q4 2011   Commissioning Q4 2011, depending on completion
           date of mine financing




                                                                   21
CATALYSTS – LAST 6 MONTHS
  •   Operations
      •    Appointment of Mill Manager and Chief Metallurgist

      •    Environmental Impact Assessment Approval

      •    Appointment of Miguel Huaman as VP Operations – Previously manager of 2
           underground mines in Peru

      •    Appointment of Mr. Juan Ortiz to the Board of Directors – Corporate Project Manager of
           the Mining Division of Trafigura Group

  •   Strategic
      •    Appointment of Barclays Capital and WestLB as Debt Arrangers

      •    $3M Private Placement with Trafigura Beheer B.V. and initiation of Strategic Relationship

      •    Completion of Optimized Feasibility Study Audit

      •    Appointment of David Rae as President

      •    Appointment of Mr. Bruce Ramsden as CFO




                                                                                                  22
COMPANY COMPARISONS

COMPANY                                              MCAP           Est. Annual                 Est. By-                 Est. Annual                Multiple of Est.
                                                                    Prod. OzAu             Product Cash              Free Cash Flow                   Annual Free
                                                                                               Cost / Oz                 ($1,100 Au)                    Cash Flow

Timmins Gold                              $200,000,000                      90,000                       $412              $44,100,000                                4.53
Brigus Gold                               $177,000,000                      90,000                       $600              $25,000,000                                7.08
Luna Gold Corp                            $230,000,000                      75,000                       $450              $39,000,000                                5.90
Gold Resource Corp                        $686,000,000                    100,000                        $200              $60,000,000                               11.43
Minefinders                               $600,000,000                      85,000                       $450              $35,000,000                               17.14
Alamos gold                             $1,700,000,000                    165,000                        $338              $83,000,000                               20.48


Average                                   $600,000,000                    100,833                        $408              $47,683,333                                12.5


Andean American                             $70,000,000                     97,000                     ($126)              $65,000,000                                1.07
 Company comparisons are for illustrative purposes only based on publicly available information. Andean American Gold is not responsible for the validity of this
 information. The Company's projects are not currently in production and all estimates are based on data from the Invicta Project Feasibility Study of July, 2010.
 Please refer to Safe Harbor Statement on Slide #2




                                                                                                                                                                       23
CONCLUSION

  •   Near Term Production

  •   Bottom Quartile Cash Cost

  •   Projected Production of 160,000 Gold Equivalent Oz Per Year

  •   Strong Strategic Partners

  •   Strong Exploration Upside

  •   Production-Ready Management Team

  •   Undervalued



                                                                    24

Más contenido relacionado

La actualidad más candente

Andean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor PresentationAndean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor PresentationAndean American Gold
 
Agm presentation feb 7 2012
Agm presentation feb 7 2012Agm presentation feb 7 2012
Agm presentation feb 7 2012aldridgeminerals
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfaldridgeminerals
 
Agm presentation dec_12__2011
Agm presentation dec_12__2011Agm presentation dec_12__2011
Agm presentation dec_12__2011aldridgeminerals
 
AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012aldridgeminerals
 
TNR Gold Investor Presentation
TNR Gold Investor PresentationTNR Gold Investor Presentation
TNR Gold Investor PresentationViral Network Inc
 
Manitobas Next Copper Mine
Manitobas Next Copper MineManitobas Next Copper Mine
Manitobas Next Copper MineVMS Ventures
 
20130228 mgg investor_presentation
20130228 mgg investor_presentation20130228 mgg investor_presentation
20130228 mgg investor_presentationAdnet Communications
 
20130108 mgg-investor-presentation
20130108 mgg-investor-presentation20130108 mgg-investor-presentation
20130108 mgg-investor-presentationAdnet Communications
 
20130117 mgg-investor-presentation
20130117 mgg-investor-presentation20130117 mgg-investor-presentation
20130117 mgg-investor-presentationAdnet Communications
 
20130124 mgg-investor-presentation
20130124 mgg-investor-presentation20130124 mgg-investor-presentation
20130124 mgg-investor-presentationAdnet Communications
 

La actualidad más candente (20)

Andean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor PresentationAndean American Mining Inc. - Investor Presentation
Andean American Mining Inc. - Investor Presentation
 
Agm presentation feb 7 2012
Agm presentation feb 7 2012Agm presentation feb 7 2012
Agm presentation feb 7 2012
 
Agm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdfAgm presentation jan_18_2012_pdf
Agm presentation jan_18_2012_pdf
 
Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Corporate Presentation April 2011
Corporate Presentation April 2011Corporate Presentation April 2011
Corporate Presentation April 2011
 
Agm presentation dec_12__2011
Agm presentation dec_12__2011Agm presentation dec_12__2011
Agm presentation dec_12__2011
 
Presentation
PresentationPresentation
Presentation
 
AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012AGM Presentation Jan 5, 2012
AGM Presentation Jan 5, 2012
 
Edgewater Corporate Presentation
Edgewater Corporate PresentationEdgewater Corporate Presentation
Edgewater Corporate Presentation
 
Feb edw-presentation-2013
Feb edw-presentation-2013Feb edw-presentation-2013
Feb edw-presentation-2013
 
Corporate Presentation March 2011
Corporate Presentation March 2011Corporate Presentation March 2011
Corporate Presentation March 2011
 
Extorre June Powerpoint
Extorre June Powerpoint  Extorre June Powerpoint
Extorre June Powerpoint
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
TNR Gold Investor Presentation
TNR Gold Investor PresentationTNR Gold Investor Presentation
TNR Gold Investor Presentation
 
Tnr shotgun
Tnr shotgunTnr shotgun
Tnr shotgun
 
Manitobas Next Copper Mine
Manitobas Next Copper MineManitobas Next Copper Mine
Manitobas Next Copper Mine
 
20130228 mgg investor_presentation
20130228 mgg investor_presentation20130228 mgg investor_presentation
20130228 mgg investor_presentation
 
20130108 mgg-investor-presentation
20130108 mgg-investor-presentation20130108 mgg-investor-presentation
20130108 mgg-investor-presentation
 
20130117 mgg-investor-presentation
20130117 mgg-investor-presentation20130117 mgg-investor-presentation
20130117 mgg-investor-presentation
 
20130124 mgg-investor-presentation
20130124 mgg-investor-presentation20130124 mgg-investor-presentation
20130124 mgg-investor-presentation
 

Destacado

Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Gold
 
Presentacion BvaExport 2016
Presentacion BvaExport 2016Presentacion BvaExport 2016
Presentacion BvaExport 2016Beatriz Mena
 
Upstream Planning for Inclusive Just-in-Time Training (I-JITT))
Upstream Planning for Inclusive Just-in-Time Training (I-JITT))Upstream Planning for Inclusive Just-in-Time Training (I-JITT))
Upstream Planning for Inclusive Just-in-Time Training (I-JITT))Multnomah County Health Dept.
 
Love by Helen Fisher, a presentation for February 14
Love by Helen Fisher, a presentation for February 14Love by Helen Fisher, a presentation for February 14
Love by Helen Fisher, a presentation for February 14Anna Zelenskaya
 
Environmental Health Workforce Development Post Secondary Internship Program
Environmental Health Workforce Development Post Secondary Internship ProgramEnvironmental Health Workforce Development Post Secondary Internship Program
Environmental Health Workforce Development Post Secondary Internship ProgramMultnomah County Health Dept.
 

Destacado (11)

Academic champion
Academic championAcademic champion
Academic champion
 
Training Module for Behavioral Health Mobilization
Training Module for Behavioral Health MobilizationTraining Module for Behavioral Health Mobilization
Training Module for Behavioral Health Mobilization
 
CTR
CTRCTR
CTR
 
Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010Andean American Mining Inc. - Investor Presentation - July, 2010
Andean American Mining Inc. - Investor Presentation - July, 2010
 
Presentacion BvaExport 2016
Presentacion BvaExport 2016Presentacion BvaExport 2016
Presentacion BvaExport 2016
 
Upstream Planning for Inclusive Just-in-Time Training (I-JITT))
Upstream Planning for Inclusive Just-in-Time Training (I-JITT))Upstream Planning for Inclusive Just-in-Time Training (I-JITT))
Upstream Planning for Inclusive Just-in-Time Training (I-JITT))
 
My favorite music
My favorite musicMy favorite music
My favorite music
 
Aa ggold presentation
Aa ggold presentationAa ggold presentation
Aa ggold presentation
 
Love by Helen Fisher, a presentation for February 14
Love by Helen Fisher, a presentation for February 14Love by Helen Fisher, a presentation for February 14
Love by Helen Fisher, a presentation for February 14
 
Environmental Health Workforce Development Post Secondary Internship Program
Environmental Health Workforce Development Post Secondary Internship ProgramEnvironmental Health Workforce Development Post Secondary Internship Program
Environmental Health Workforce Development Post Secondary Internship Program
 
Waste, Fraud & Abuse Training
Waste, Fraud & Abuse TrainingWaste, Fraud & Abuse Training
Waste, Fraud & Abuse Training
 

Similar a Safe Harbor Statement Overview

Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Symposium
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010PENTA
 
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold LimitedGold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold LimitedSymposium
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Symposium
 
Gold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold LimitedGold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold LimitedSymposium
 
Klondex Mines Corporate Presentation KDX.T
Klondex Mines Corporate Presentation KDX.TKlondex Mines Corporate Presentation KDX.T
Klondex Mines Corporate Presentation KDX.Tatullis
 
Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3AlderResources
 
RVL_Corporate Presentation_2016-10-04_Final
RVL_Corporate Presentation_2016-10-04_FinalRVL_Corporate Presentation_2016-10-04_Final
RVL_Corporate Presentation_2016-10-04_FinalTim Beale
 
South American Silver Corp March 2012 Corporate Presentation
South American Silver Corp March 2012 Corporate PresentationSouth American Silver Corp March 2012 Corporate Presentation
South American Silver Corp March 2012 Corporate Presentationsoamsilver
 
Resources roadshow april geoff laing, exco resources ltd
Resources roadshow april  geoff laing, exco resources ltdResources roadshow april  geoff laing, exco resources ltd
Resources roadshow april geoff laing, exco resources ltdSymposium
 
Batero Gold Corporate Presentation
Batero Gold Corporate PresentationBatero Gold Corporate Presentation
Batero Gold Corporate PresentationCompany Spotlight
 
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Conferences
 
Agm presentation july 11 2011
Agm presentation july 11 2011Agm presentation july 11 2011
Agm presentation july 11 2011aldridge23
 

Similar a Safe Harbor Statement Overview (20)

Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012Sandfire- Resources & Energy Symposium 2012
Sandfire- Resources & Energy Symposium 2012
 
Investor Presentation June 2010
Investor Presentation June 2010Investor Presentation June 2010
Investor Presentation June 2010
 
Brixton presentation 2015 June
Brixton presentation 2015 JuneBrixton presentation 2015 June
Brixton presentation 2015 June
 
Avion Gold Corp
Avion Gold CorpAvion Gold Corp
Avion Gold Corp
 
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold LimitedGold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
Gold Investment Symposium 2012 - Company Presentation - Mutiny Gold Limited
 
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
Investor Presentation | Mutiny Gold (ASX:MYG) | Gold Investment Symposium 2014
 
Gold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold LimitedGold Investment Symposium 2012 - Company Presentation - Ausgold Limited
Gold Investment Symposium 2012 - Company Presentation - Ausgold Limited
 
Minaurum Presentation
Minaurum PresentationMinaurum Presentation
Minaurum Presentation
 
Klondex Mines Corporate Presentation KDX.T
Klondex Mines Corporate Presentation KDX.TKlondex Mines Corporate Presentation KDX.T
Klondex Mines Corporate Presentation KDX.T
 
Extorre Powerpoint April 2012
Extorre Powerpoint April 2012Extorre Powerpoint April 2012
Extorre Powerpoint April 2012
 
Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3Alder pres 03_2_12_ver3
Alder pres 03_2_12_ver3
 
RVL_Corporate Presentation_2016-10-04_Final
RVL_Corporate Presentation_2016-10-04_FinalRVL_Corporate Presentation_2016-10-04_Final
RVL_Corporate Presentation_2016-10-04_Final
 
South American Silver Corp March 2012 Corporate Presentation
South American Silver Corp March 2012 Corporate PresentationSouth American Silver Corp March 2012 Corporate Presentation
South American Silver Corp March 2012 Corporate Presentation
 
Resources roadshow april geoff laing, exco resources ltd
Resources roadshow april  geoff laing, exco resources ltdResources roadshow april  geoff laing, exco resources ltd
Resources roadshow april geoff laing, exco resources ltd
 
Batero Gold Corporate Presentation
Batero Gold Corporate PresentationBatero Gold Corporate Presentation
Batero Gold Corporate Presentation
 
2012 Presentation
2012 Presentation2012 Presentation
2012 Presentation
 
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
Objective Capital Rare Earth and Minor Metals Investment Summit: Overview of ...
 
SAC May Presentation 2012
SAC May Presentation 2012SAC May Presentation 2012
SAC May Presentation 2012
 
AGM Presentation
AGM Presentation AGM Presentation
AGM Presentation
 
Agm presentation july 11 2011
Agm presentation july 11 2011Agm presentation july 11 2011
Agm presentation july 11 2011
 

Último

Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfFrancenel Paul
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfProbe Gold
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000Sapana Sha
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfProbe Gold
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024CollectiveMining1
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...USDAReapgrants.com
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024Hector Del Castillo, CPM, CPMM
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfsansanir
 

Último (11)

Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Serviceyoung call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
young call girls in Hauz Khas,🔝 9953056974 🔝 escort Service
 
the 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdfthe 25 most beautiful words for a loving and lasting relationship.pdf
the 25 most beautiful words for a loving and lasting relationship.pdf
 
Q1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdfQ1 Quarterly Update - April 16, 2024.pdf
Q1 Quarterly Update - April 16, 2024.pdf
 
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 60009654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
9654467111 Call Girls In Katwaria Sarai Short 1500 Night 6000
 
Corporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdfCorporate Presentation Probe April 2024.pdf
Corporate Presentation Probe April 2024.pdf
 
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCRCall Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
Call Girls in South Ex⎝⎝9953056974⎝⎝ Escort Delhi NCR
 
Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024Collective Mining | Corporate Presentation - April 2024
Collective Mining | Corporate Presentation - April 2024
 
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
Leveraging USDA Rural Development Grants for Community Growth and Sustainabil...
 
WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024WheelTug PLC Pitch Deck | Investor Insights | April 2024
WheelTug PLC Pitch Deck | Investor Insights | April 2024
 
slideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdfslideshare_2404_presentation materials_en.pdf
slideshare_2404_presentation materials_en.pdf
 

Safe Harbor Statement Overview

  • 1. 1
  • 2. SAFE HARBOR STATEMENT • Certain statements in this presentation constitute “forward-looking statements” within the meaning of the Private Securities Litigation Reform Act of 1995 and Canadian securities legislation. Such forward-looking statements involve known and unknown risks, uncertainties and other factors which may cause the actual results, performance or achievements of the Company, or other future events, including forecast production, earnings and cash flows, to be materially different from any future results, performances or achievements or other events expressly or implicitly predicted by such forward-looking statements. • Such risks, uncertainties and other factors include, but are not limited to, factors associated with fluctuations in the market price of precious metals, mining industry risks, recent operating losses, uncertainty of title to properties, risk associated with foreign operations, environmental risks and hazards, proposed legislation affecting the mining industry, litigation, governmental regulation of the mining industry, properties without known mineable reserves, uncertainty as to calculations of reserves, mineral deposits and grades, requirement of additional financing, uninsured risks, risk of hedging strategies, competition, dependence on key management personnel, potential volatility of market price of the Company’s common shares, dilution and certain anti-takeover effects. Such information contained herein represents management’s best judgment as of the date hereof based on information currently available. The Company does not intend to update this information and disclaims any legal liability to the contrary. • Mineral resources that are not mineral reserves do not have demonstrated economic viability. The estimate of mineral resources may be materially affected by the inability to obtain required environmental and other regulatory approval, environmental or operating permits. The estimate may also be materially affected by global economic conditions such as the price of gold and silver, the price of oil and other commodities utilized in the production of gold and silver. Unknown geologic or hydrologic conditions or other unknown factors may materially affect the resource estimates. Net smelter returns and metallurgical recoveries at Sinchao have not been considered. • This document uses the terms "measured resources", 'indicated resources' and 'inferred resources'. Investors are cautioned not to assume that any part or all of the mineral deposits in these categories will ever be converted into reserves. In addition, 'inferred resources' have a great amount of uncertainty as to their existence, and economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Investors are cautioned not to assume that part or all of an inferred resource exists, or is economically or legally mineable. • Mr. Les Tarnai, P.Eng., General Manager of Engineering, Invicta Mining Corp., is a Qualified Person as defined by National Instrument 43-101 with the ability and authority to verify the authenticity and validity of the data herein. Victor Jaramillo, P. Geo., of Discover Geological Consultants Inc. is an Independent Qualified Person as defined by National Instrument 43-101 and is responsible for the resource estimates. Guy Lokhorst, P. Eng., of The Lokhorst Group, is an Independent Qualified Person as defined by NI 43-101 and is responsible for the review of the mining methodology, including the probable reserves and life of mine, for the Invicta Feasibility Study. Deepak Malhotra, PhD., MS in Metallurgical Engineering and PhD. in Mineral Economics, Independent Qualified Person as defined by NI 43-101, of Resource Development Inc., reviewed the metallurgy for the Invicta project and developed the finalized process flow diagram for the Invicta Feasibility Study. Leslie F. Tarnai, P. Eng., General Manager of Engineering for Invicta Mining Corp., is a Qualified Person as defined by NI 43-101 and is responsible for the Invicta Feasibility Study. 2
  • 3. OVERVIEW • Near Term Gold Production • Invicta Project is 100% Owned • Project team with over 200 years development/operations experience • Environmental permits received, long lead time items purchased • Commissioning expected 2nd half of 2011 • Projected production 160,000 Au Eq Oz per Year @ $US 275/Oz LOM Cash Cost • World Class Assets in Pipeline • Sinchao Gold/Copper project with initial inferred resource of 237 M tonnes containing 3.73M oz Au, 2.45B lb Cu and 92M oz Ag with average grades of .47% Cu, .49g/t Au and 12.1g/t Ag., using prices of $1.50/lb Cu, $600/oz Au and $8/oz Ag. 3
  • 4. MANAGEMENT • John F. Huguet, CEO 8 years as President and 4 years as Managing Director of Atkinson Holdings and Commonwealth Construction. During his 33 years the company constructed and placed into operation 86 major mining projects, including the Granduc Copper Mine (Asarco), Gibraltar (Placer Development) and La Coipa (Placer Dome). • David Rae, President Ten years in senior positions with Falconbridge/Xstrata, including Senior Vice President Europe & Africa, and worldwide head of sales for all Nickel Group products. Previously he managed the Sudbury Smelter and the Timmins Copper Operations. Prior to joining Andean American, Mr. Rae has been advising in a consulting capacity to companies such as Kinross, Vale Inco and Iamgold on operational, productivity and strategic challenges. • Bruce Ramsden, CFO Vice President and CFO with noted resource companies since 1996. Received the 2006 Mining Journal Development Funding Award for his work with Tiomin Resources Inc. • Miguel Huaman, VP Operations From 2004 to 2009, Mr. Huaman was the President of Minera Huallanca, where he managed the 1000tpd Pucarrajo Zn-Pb-Ag mine and the 850tpd Contonga Zn-Pb-Ag-Cu mine, both underground operations. From 2002 to 2004, he was General Manager of Cedimin SAC, a subsidiary of the BRGM–France and Buenaventura Mining Company Peru. Mr. Huaman is an Engineering Graduate of the Universidad Nacional Mayor de San Marcos and a Geologist Engineer with a Postgraduate degree in Exploration and Valuation of Mineral Resources from the University of Nancy, France. Mr. Huaman is a former President of the Geological Society of Peru 4
  • 5. THE INVICTA PROJECT • Underground Operation: 3,000 tpd Year 1, up to 5,000 tpd Year 3+ • Initial 5 Year Mine Life, target 12 Years after resource definition drilling • Exciting exploration potential • Located in Peru, close to other operating mines • Excellent metallurgy and flow sheet: high recoveries, low grinding costs, flexible process • Power supply via line extension of state power grid • Very strong community support and a talented labor pool • Water rights obtained, wells drilled and tested 5
  • 6. LOCATION Invicta Cajamarca Lima Sinchao Metals (TSX.V:SMZ) 6
  • 7. PERU Mines and exploration projects near Invicta 7
  • 8. Flor de Loto, past producing Au/Ag mine 8
  • 9. Measured 20,000m drill program to be completed during construction Indicated with goal to extend mine life to 10 years Inferred 9
  • 10. RESERVES/RESOURCES Category Tonnes Density Gold Silver Copper Lead Zinc Gold g/t g/t % % % Oz Measured 868,000 2.77 2.71 31.26 0.69 0.73 0.61 75,724 Indicated 9,866,735 2.73 1.99 14.74 0.4 0.28 0.27 632,336 Inferred 14,224,661 2.75 0.67 11.2 0.36 0.24 0.15 306,913 Mineable Reserves - First 5 years Tonnes 7,807,157 Metal Au Ag Cu Pb Zn Grade (g/t or %) 2.14 18.76 0.52% 0.38% 0.30% Contained metal (Oz or lb) 538,946 4,724,589 89,476,265 65,386,501 51,620,922 10
  • 11. 3D MODEL OF OREBODY W E N S Adit 3400 Adit 3400 Work to Date: -28,877 m of drilling -1200 m of Adit 11
  • 12. SUBLEVEL STOPING • Bulk Underground Mining Method • At Invicta: • 40m x 15m x 20m panels • Longhole blasting • Development on-reef 12
  • 13. 3D VIEW – TAILINGS/PLANT/MINE Concentrate Plant Tailing Mine Main Road from Choques to Plant 13
  • 14. INFRASTRUCTURE • POWER (Cost $6M US) • Government backed 29km extension of the 220kv national grid • Detailed engineering has been completed by CESEL • 27 towers to be erected mostly on our land packaged (purchased land) • Power cost for the project is 6c/kwh • WATER (Cost $1M US) • Sourced from well drilled next to the Huaura River close to Paran at the 1100m elevation • Project requires flow of 20l/s, the well has been engineered and tested by CESEL and performs at 50l/s. Water is pumped to a storage pond at the 2400 elevation • Excess water goes to the communities • ROADS (Cost $2M US) • A 10m wide concentrate haul road runs13km from the project • We are building a 13,8km long, 10m wide connection from the 1100 masl to plant at 2300 masl • Second road from plant to the mine site at 3400 masl, 4km long, 3m wide access road 14
  • 15. (internal) Recoveries July 2010 Au 91% Ag 82% Cu 75% Pb 80% Zn 80% (Dry tailings) 15
  • 16. FEASIBILITY STUDY • Average Annual Production of 97,931 Oz Gold and 160,8571 Oz Gold Equivalent over 5 Year Initial Mine Life • LOM Cash Cost Per Oz Gold1 • On a co-product basis: $451.38 US; • On a gold-equivalent basis: $274.80 US; • On a by-product basis: ($126.91) US • Estimated CapEx $68M: $49M project costs, $9M in refundable IGV taxes, $7M in contingency funds, $3M Startup Facility • Operating costs of $28.31 US/tonne; • 1 Year Payback • The project surpasses the environmental standards of Peru: the project is a contained process with zero liquid effluents 1. The following price deck was used: Gold $900/oz, Silver $12.50/oz, Copper $2.50/lb, Lead $0.70/lb, Zinc $0.75/lb. 16
  • 17. FEASIBILITY STUDY After Tax Free Cash Flow and NPV Sensitivity Analysis on a Project Basis1 Total Free 5 YR AVG Free Gold Price Cash Flow Cash Flow NPV 8% NPV 10% $900 $264,691,245 $52,938,249 $215,191,049 $203,542,333 $1,000 $295,525,040 $59,105,008 $249,917,929 $227,112,434 $1,100 $326,366,991 $65,273,398 $265,057,808 $250,688,663 $1,200 $357,185,186 $71,437,037 $289,974,787 $274,246,114 Project Revenue Distribution2 Au Ag Cu Pb Zn Revenue % 65.5% 5.9% 20.3% 4.5% 3.8% 1. Prices: $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn 2. Prices: $900 Au, $12 Ag, $2.50 Cu, $.70 Pb, $.75 Zn 17
  • 18. FINANCING Capital Costs $MM USD Project Costs $49 IGV (Refundable Tax) $9 Contingency $7 Start-up Facility $3 Total Capital Cost $68 Source of Funds Senior Secured Project Debt Facility $68 Subordinated Debt $15 Total Capital Cost $83 • $15M already invested in the project by Andean American Gold • Senior Secured Project Debt Facility underwritten by international banks Barclays Capital and West LB • Subordinated Debt Facility provides the required Cost Overrun and Working Capital Facility for the project, arranged by Trafigura Beheer B.V., our Strategic Partner 18
  • 19. RELATIONSHIP WITH TRAFIGURA • 2nd largest non-ferrous trading company in the world • Sales of $47.3 Billion in 2009, 1,900 employees in 44 countries • Over $1 Billion in AUM invested through proprietary Galena Asset Management • Highlights of Agreements: • Trafigura to provide $15M USD Sub Debt Facility for Cost Overruns and Working Capital • Trafigura acquires the rights to buy all base metal concentrates from Invicta Project • Trafigura acquires an Option, whereby: IF The Project Debt Lenders do not fund Invicta Project Capex by December 31st THEN Trafigura may purchase an additional 16% interest in AAG, name two additional directors to the Board, and underwrite the Invicta Project Debt via one of their credit facilities 19
  • 20. CAPITAL STRUCTURE Capital Structure Basic Shares Outstanding 101,887,287 Options 8,685,588 Warrants 5,305,918 20
  • 21. MILESTONES Q4 2010 Complete Independent Engineers Technical Report Q4 2010 Full mine funding drawdown Q4 2010 Results from exploration drilling and high grade zone sampling Q2 2011 Revised, extended mine plan including results from planned definition drilling Q4 2011 Commissioning Q4 2011, depending on completion date of mine financing 21
  • 22. CATALYSTS – LAST 6 MONTHS • Operations • Appointment of Mill Manager and Chief Metallurgist • Environmental Impact Assessment Approval • Appointment of Miguel Huaman as VP Operations – Previously manager of 2 underground mines in Peru • Appointment of Mr. Juan Ortiz to the Board of Directors – Corporate Project Manager of the Mining Division of Trafigura Group • Strategic • Appointment of Barclays Capital and WestLB as Debt Arrangers • $3M Private Placement with Trafigura Beheer B.V. and initiation of Strategic Relationship • Completion of Optimized Feasibility Study Audit • Appointment of David Rae as President • Appointment of Mr. Bruce Ramsden as CFO 22
  • 23. COMPANY COMPARISONS COMPANY MCAP Est. Annual Est. By- Est. Annual Multiple of Est. Prod. OzAu Product Cash Free Cash Flow Annual Free Cost / Oz ($1,100 Au) Cash Flow Timmins Gold $200,000,000 90,000 $412 $44,100,000 4.53 Brigus Gold $177,000,000 90,000 $600 $25,000,000 7.08 Luna Gold Corp $230,000,000 75,000 $450 $39,000,000 5.90 Gold Resource Corp $686,000,000 100,000 $200 $60,000,000 11.43 Minefinders $600,000,000 85,000 $450 $35,000,000 17.14 Alamos gold $1,700,000,000 165,000 $338 $83,000,000 20.48 Average $600,000,000 100,833 $408 $47,683,333 12.5 Andean American $70,000,000 97,000 ($126) $65,000,000 1.07 Company comparisons are for illustrative purposes only based on publicly available information. Andean American Gold is not responsible for the validity of this information. The Company's projects are not currently in production and all estimates are based on data from the Invicta Project Feasibility Study of July, 2010. Please refer to Safe Harbor Statement on Slide #2 23
  • 24. CONCLUSION • Near Term Production • Bottom Quartile Cash Cost • Projected Production of 160,000 Gold Equivalent Oz Per Year • Strong Strategic Partners • Strong Exploration Upside • Production-Ready Management Team • Undervalued 24