SlideShare una empresa de Scribd logo
1 de 73
Andrew W. Wong MBA, CFIFireE, CFEI, CFII, CCFI April 13, 2010 Explosion Venting  for Low & High-Strength Enclosures Toronto Chapter
Applicable Law ,[object Object],[object Object],[object Object]
Changes to NFPA 68 - 2007 ,[object Object],[object Object],[object Object],[object Object],[object Object]
Low Strength Enclosures ,[object Object],[object Object]
 
Enclosure Strength [P es ] ,[object Object],[object Object],[object Object],[object Object]
Enclosure Strength [P es ] ,[object Object],[object Object]
Deflagration Index ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Maximum Pressure [P max ] ,[object Object]
Reduced Pressure [P red ] ,[object Object]
Static Activation Pressure [P stat ] ,[object Object]
Explosion Vents Explo-vent ®
Pressure Relief Panel
Reduced-shank machine bolt  installed to fail in shear.
Collapsing washer used with a single-layer panel.
Collapsing washer installed.
Collapsing washer in action.
Explosion Venting
Fire Rated Blast-Resistant Door
Ministry of Labour Engineering Data Sheet #4-01 ,[object Object],[object Object]
Ministry of Labour Engineering Data Sheet #4-01 ,[object Object]
Ministry of Labour Engineering Data Sheet #4-01 ,[object Object]
Problem #1 ,[object Object],[object Object]
Answer to Problem #1 ,[object Object],[object Object],[object Object],[object Object]
Factory Mutual Global Property Loss Prevention Data Sheet #1-44 ,[object Object],[object Object],[object Object],[object Object]
Problem #2 ,[object Object],[object Object],[object Object],[object Object]
Answer to Problem #2 ,[object Object],[object Object],[object Object],[object Object]
Answer to Problem #2  (cont’d) ,[object Object],[object Object],[object Object],[object Object],[object Object]
NFPA 68 ,[object Object],C (A  s ) ---------------  P  red   1/2 A  v  =
NFPA 68 C (A  s ) ---------------  P  red   1/2 A  v  = C = Venting equation constant P  red  = Maximum pressure developed in a vented enclosure during a vented deflagration
Assumptions of Equation ,[object Object],[object Object],[object Object]
Problem #3 ,[object Object],[object Object],[object Object]
---------------  P  red   1/2 A  v  = C (A  s ) A  v  = (0.17) (1560) / 0.5  ½ A  v  = 375 sq.ft.
NFPA 68 - Other design criteria ,[object Object],[object Object],[object Object]
 
Ontario Fire Code, O.Reg. 213/07 made under the Fire Protection and Prevention Act, 1997, as amended. High Strength Enclosures
Fire Code Requirements ,[object Object],[object Object],[object Object]
Combustible Dust Producing Process ,[object Object],[object Object]
 
 
Origin of Requirement
Verification of Data - P stat ,[object Object],[object Object]
Verification of Data – P max  & K St ,[object Object],100 9.0 Wood Grinding dust 144 8.9 Wood Chips/dust 149 8.9 Sawdust K St bar m/s P max bar Dust Type
Verification of Data - K St ,[object Object],[object Object],[object Object],[object Object],[object Object]
Verification of Data - P red ,[object Object],[object Object]
Verification of Volume ,[object Object],[object Object],[object Object]
 
Alternative Vent Area Methodology for Dusts ,[object Object],[object Object],[object Object]
Vent size calculation ,[object Object],[object Object]
 
 
 
 
 
 
 
 
 
 
 
Example Problem ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Model Answer ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Other Considerations 1. Classification of Hazardous Locations 2. Explosion Venting and Size of Fireball 3. Warning sign on Vent Closures 4. Automatic Sprinkler System
Existing Explosion Venting to the Outdoors ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Discharge of Deflagration (End slideshow to play wmv file)
Dust Explosion Inside  Dust Collector Flame discharged from explosion vent Diameter of Fire Ball
Flame Front of the Fire Ball
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Fireball Diameter Calculation for Dust Explosion
Scenario ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],Fireball Diameter Calculation for Gas Explosion
Scenario ,[object Object],[object Object],[object Object],[object Object],[object Object],[object Object],[object Object]
Mitigating Exposure Risk
Warning Sign on Vent Closure WARNING:  Explosion relief device. or As per ANSI Z535 Product Safety Signs and Symbols

Más contenido relacionado

La actualidad más candente

Aspen polymersunitopsv8 2-usr
Aspen polymersunitopsv8 2-usrAspen polymersunitopsv8 2-usr
Aspen polymersunitopsv8 2-usr
g_bumbac
 
Design of stirred batch reactor
Design of stirred batch reactorDesign of stirred batch reactor
Design of stirred batch reactor
zahiduet43
 

La actualidad más candente (20)

Fire Resistant Coating & Benefits
Fire Resistant Coating & Benefits Fire Resistant Coating & Benefits
Fire Resistant Coating & Benefits
 
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
Design Calculations of Venting in Atmospheric and Low-pressure Storage Tanks ...
 
Aspen polymersunitopsv8 2-usr
Aspen polymersunitopsv8 2-usrAspen polymersunitopsv8 2-usr
Aspen polymersunitopsv8 2-usr
 
Acoustic Enclosure
Acoustic EnclosureAcoustic Enclosure
Acoustic Enclosure
 
Glass Fused-to-Steel Bolted Tank Coating Quality
Glass Fused-to-Steel Bolted Tank Coating QualityGlass Fused-to-Steel Bolted Tank Coating Quality
Glass Fused-to-Steel Bolted Tank Coating Quality
 
Steam Reforming - Tube Design
Steam Reforming - Tube DesignSteam Reforming - Tube Design
Steam Reforming - Tube Design
 
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
Calculation of Maximum Flow of Natural Gas through a Pipeline using Dynamic S...
 
tail gas H2S/SO2 analyzer
tail gas H2S/SO2 analyzer tail gas H2S/SO2 analyzer
tail gas H2S/SO2 analyzer
 
Combustible Dust Hazards
Combustible Dust HazardsCombustible Dust Hazards
Combustible Dust Hazards
 
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
Reformer Tube Metallurgy: Design Considerations; Failure Mechanisms; Inspecti...
 
Process Heaters, Furnaces and Fired Heaters: Improving Efficiency and Reducin...
Process Heaters, Furnaces and Fired Heaters: Improving Efficiency and Reducin...Process Heaters, Furnaces and Fired Heaters: Improving Efficiency and Reducin...
Process Heaters, Furnaces and Fired Heaters: Improving Efficiency and Reducin...
 
Gas Flare Stack Process
Gas Flare Stack ProcessGas Flare Stack Process
Gas Flare Stack Process
 
BE Chemical Engineering Design Project Production Of Propylene Oxide
BE Chemical Engineering Design Project   Production Of Propylene OxideBE Chemical Engineering Design Project   Production Of Propylene Oxide
BE Chemical Engineering Design Project Production Of Propylene Oxide
 
Pipe line sizing
Pipe line sizingPipe line sizing
Pipe line sizing
 
Steam Header Design in Fluid (Steam) System
Steam Header Design in Fluid (Steam) SystemSteam Header Design in Fluid (Steam) System
Steam Header Design in Fluid (Steam) System
 
Design of stirred batch reactor
Design of stirred batch reactorDesign of stirred batch reactor
Design of stirred batch reactor
 
Steam Reforming - Catalyst Loading
Steam Reforming - Catalyst LoadingSteam Reforming - Catalyst Loading
Steam Reforming - Catalyst Loading
 
Heat exchanger training 02. 25. 15
Heat exchanger training 02. 25. 15 Heat exchanger training 02. 25. 15
Heat exchanger training 02. 25. 15
 
Relief and blowdown in
Relief and blowdown           inRelief and blowdown           in
Relief and blowdown in
 
Dow Fire and Explosion Index (Dow F&EI) and Mond Index
Dow Fire and Explosion Index (Dow F&EI) and Mond IndexDow Fire and Explosion Index (Dow F&EI) and Mond Index
Dow Fire and Explosion Index (Dow F&EI) and Mond Index
 

Destacado

Development of a Procedure for Making Inspection Plans for Corroding Oil and ...
Development of a Procedure for Making Inspection Plans for Corroding Oil and ...Development of a Procedure for Making Inspection Plans for Corroding Oil and ...
Development of a Procedure for Making Inspection Plans for Corroding Oil and ...
Christine Berner
 
Consultation Power Point Presentation - final (1)
Consultation Power Point Presentation - final (1)Consultation Power Point Presentation - final (1)
Consultation Power Point Presentation - final (1)
Deanne Carney
 
Discus In-Process Inspection Planning
Discus In-Process Inspection PlanningDiscus In-Process Inspection Planning
Discus In-Process Inspection Planning
DISCUS Software
 
Hazard Monitors for Grain Elevators
Hazard Monitors for Grain ElevatorsHazard Monitors for Grain Elevators
Hazard Monitors for Grain Elevators
4B Braime Components
 
Explosion protection theory and practice
Explosion protection   theory and practiceExplosion protection   theory and practice
Explosion protection theory and practice
David Pires
 

Destacado (19)

SMART Explosion Venting
SMART Explosion VentingSMART Explosion Venting
SMART Explosion Venting
 
Combustible dust
Combustible dust Combustible dust
Combustible dust
 
W505+Control+of+Hazardous+Substances
W505+Control+of+Hazardous+SubstancesW505+Control+of+Hazardous+Substances
W505+Control+of+Hazardous+Substances
 
Development of a Procedure for Making Inspection Plans for Corroding Oil and ...
Development of a Procedure for Making Inspection Plans for Corroding Oil and ...Development of a Procedure for Making Inspection Plans for Corroding Oil and ...
Development of a Procedure for Making Inspection Plans for Corroding Oil and ...
 
STORAGE: Dust explosion protection
STORAGE: Dust explosion protectionSTORAGE: Dust explosion protection
STORAGE: Dust explosion protection
 
Safety at grain terminals
Safety at grain terminalsSafety at grain terminals
Safety at grain terminals
 
Consultation Power Point Presentation - final (1)
Consultation Power Point Presentation - final (1)Consultation Power Point Presentation - final (1)
Consultation Power Point Presentation - final (1)
 
STORAGE: Aerating stored grain
STORAGE: Aerating stored grainSTORAGE: Aerating stored grain
STORAGE: Aerating stored grain
 
Discus In-Process Inspection Planning
Discus In-Process Inspection PlanningDiscus In-Process Inspection Planning
Discus In-Process Inspection Planning
 
4B Electronic Hazard Monitoring Components
4B Electronic Hazard Monitoring Components4B Electronic Hazard Monitoring Components
4B Electronic Hazard Monitoring Components
 
Nfpa 10-2013
Nfpa 10-2013Nfpa 10-2013
Nfpa 10-2013
 
Site Inspection Guidelines and Protocol
Site Inspection Guidelines and ProtocolSite Inspection Guidelines and Protocol
Site Inspection Guidelines and Protocol
 
Commodities - Grain and Feed Annual: 2016 Grain and Feed Annual Mexico
Commodities - Grain and Feed Annual: 2016 Grain and Feed Annual Mexico Commodities - Grain and Feed Annual: 2016 Grain and Feed Annual Mexico
Commodities - Grain and Feed Annual: 2016 Grain and Feed Annual Mexico
 
Hazard Monitors for Grain Elevators
Hazard Monitors for Grain ElevatorsHazard Monitors for Grain Elevators
Hazard Monitors for Grain Elevators
 
What is Combustible Dust, What are the Dangers, and how to lessen your risk
What is Combustible Dust, What are the Dangers, and how to lessen your riskWhat is Combustible Dust, What are the Dangers, and how to lessen your risk
What is Combustible Dust, What are the Dangers, and how to lessen your risk
 
Combustible Dust: More than just Industrial Housekeeping
Combustible Dust: More than just Industrial HousekeepingCombustible Dust: More than just Industrial Housekeeping
Combustible Dust: More than just Industrial Housekeeping
 
Hazardous location protection methods e book by pepperl+ fuchs
Hazardous location protection methods e book by pepperl+ fuchsHazardous location protection methods e book by pepperl+ fuchs
Hazardous location protection methods e book by pepperl+ fuchs
 
Explosion protection theory and practice
Explosion protection   theory and practiceExplosion protection   theory and practice
Explosion protection theory and practice
 
Dust Explosion Prevention
Dust Explosion PreventionDust Explosion Prevention
Dust Explosion Prevention
 

Similar a 2010 Sfpe Cpd On Explosion Venting

8 secondary ventilation
8 secondary ventilation8 secondary ventilation
8 secondary ventilation
Riswan Badu
 
Project By Rcdohare& Miss Kakoli Shaw
Project By Rcdohare& Miss Kakoli ShawProject By Rcdohare& Miss Kakoli Shaw
Project By Rcdohare& Miss Kakoli Shaw
BHILAI STEEL PLANT
 
Basics of fire sprinkler design ascet meeting 2 5
Basics of fire sprinkler design ascet meeting 2 5Basics of fire sprinkler design ascet meeting 2 5
Basics of fire sprinkler design ascet meeting 2 5
Sohaib Faraz Khan
 

Similar a 2010 Sfpe Cpd On Explosion Venting (20)

8 secondary ventilation
8 secondary ventilation8 secondary ventilation
8 secondary ventilation
 
International standards in comparison
International standards in comparisonInternational standards in comparison
International standards in comparison
 
Project By Rcdohare& Miss Kakoli Shaw
Project By Rcdohare& Miss Kakoli ShawProject By Rcdohare& Miss Kakoli Shaw
Project By Rcdohare& Miss Kakoli Shaw
 
Cryogenic air separation plant design
Cryogenic air separation plant designCryogenic air separation plant design
Cryogenic air separation plant design
 
Smoke fan sizing
Smoke fan sizingSmoke fan sizing
Smoke fan sizing
 
GLP.lean room fundamentals
GLP.lean room fundamentalsGLP.lean room fundamentals
GLP.lean room fundamentals
 
Process Tank Blanketing Valve
Process Tank Blanketing ValveProcess Tank Blanketing Valve
Process Tank Blanketing Valve
 
Concept of save max boiler design (1)
Concept of save max boiler design (1)Concept of save max boiler design (1)
Concept of save max boiler design (1)
 
Concept of save max boiler design
Concept of save max boiler designConcept of save max boiler design
Concept of save max boiler design
 
Fire Resistance of Materials & Structures - Modelling of Fire Scenario
Fire Resistance of Materials & Structures - Modelling of Fire ScenarioFire Resistance of Materials & Structures - Modelling of Fire Scenario
Fire Resistance of Materials & Structures - Modelling of Fire Scenario
 
Acoustical Design Considerations
Acoustical Design ConsiderationsAcoustical Design Considerations
Acoustical Design Considerations
 
Pittcon 2002
Pittcon 2002Pittcon 2002
Pittcon 2002
 
LexanHF1110R
LexanHF1110RLexanHF1110R
LexanHF1110R
 
Silencers dampeners stabilizers report
Silencers dampeners stabilizers reportSilencers dampeners stabilizers report
Silencers dampeners stabilizers report
 
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
Improving Gas Turbine – HRSG output using Inlet Air Chilling and Converted Ev...
 
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons BrinkerhoffDMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
DMUG 2016 - Bethan Tuckett-Jones, WSP Parsons Brinkerhoff
 
13 venting requirements
13 venting requirements13 venting requirements
13 venting requirements
 
Basics of Fire Sprinkler Design ascet meeting 2-5.pptx
Basics of Fire Sprinkler Design ascet meeting 2-5.pptxBasics of Fire Sprinkler Design ascet meeting 2-5.pptx
Basics of Fire Sprinkler Design ascet meeting 2-5.pptx
 
Basics of fire sprinkler design ascet meeting 2 5 (1)
Basics of fire sprinkler design ascet meeting 2 5 (1)Basics of fire sprinkler design ascet meeting 2 5 (1)
Basics of fire sprinkler design ascet meeting 2 5 (1)
 
Basics of fire sprinkler design ascet meeting 2 5
Basics of fire sprinkler design ascet meeting 2 5Basics of fire sprinkler design ascet meeting 2 5
Basics of fire sprinkler design ascet meeting 2 5
 

Más de andrewwcwong (7)

2010 Commissioning Of Bldg Fp Systems
2010 Commissioning Of Bldg Fp Systems2010 Commissioning Of Bldg Fp Systems
2010 Commissioning Of Bldg Fp Systems
 
2010 Ife Canada
2010 Ife Canada2010 Ife Canada
2010 Ife Canada
 
2009 Sfpe Technical Changes To The Part 4 Fire Code
2009 Sfpe Technical Changes To The Part 4 Fire Code2009 Sfpe Technical Changes To The Part 4 Fire Code
2009 Sfpe Technical Changes To The Part 4 Fire Code
 
2010 Fsp Overview W Objective Statements
2010 Fsp Overview W Objective Statements2010 Fsp Overview W Objective Statements
2010 Fsp Overview W Objective Statements
 
Aircraft Portable Fire Extinguishers
Aircraft Portable Fire ExtinguishersAircraft Portable Fire Extinguishers
Aircraft Portable Fire Extinguishers
 
2008 Cfsa Seminar A Wong
2008 Cfsa Seminar A Wong2008 Cfsa Seminar A Wong
2008 Cfsa Seminar A Wong
 
Continuing Professional Development
Continuing Professional DevelopmentContinuing Professional Development
Continuing Professional Development
 

2010 Sfpe Cpd On Explosion Venting