SlideShare una empresa de Scribd logo
1 de 7
RUSCo
(Resource Utilization Service Company)
Low-fidelity model of our product
Sixth Wave Innovation Team –
Targeting a path towards radical resource productivity
Product definition
(in words)
• Our product is a service that includes:
– A plan (customized by client) for maximizing
utilization of material inputs through
• Reducing material inputs
• Recycling any waste remaining after reductions made
– Financing to implement the above plan
– Implementation of the plan and financing of that
implementation
Product definition
(in diagram)
Plan for Maximizing Use
of Material Resources
Part I:
Reduction of
Material
Inputs
Part 2:
Recycling of
Remaining
Waste
Project Financing Plan
Implementation
Plan for Maximizing Use of Material
Resources – the RESOURCE PLAN REPORT
• Results of audit of current resource use:
– Processes carried out by machines (for every such station)
– Processes carried out by team (for every such station)
• Report – listing and description of mini-plan increasing
efficiency or completely revamping resource use at
each station in production process, including:
– New, improved machines
– Substituting of alternative material inputs for current ones
– Adjustment to current machines
– Adjustment in arrangement of machines
– Change to process steps carried out by team members
Plan for Recycling Remaining Waste –
the RECYCLING PLAN REPORT
• Results of audit of current wastes of
production process
• Based on preceding RESOURCE PLAN REPORT,
projected wastes of new, improved production
processes
• For each waste stream from new, improved
production process, a recycling plan including:
– Internal reuse of waste stream
– Recycling waste stream to market
Project Finance
• RUSCo will arrange project finance to implement
the two plans (RESOURCE USE PLAN and
RECYCLING PLAN)
– RUSCo prepares financial projections of the project
representing combined implementation of the two
plans
– RUSCo negotiates with banks for project finance
– RUSCo serves as sponsor for project, providing the
financing through the bank
– RUSCo negotiates plan for client to repay RUSCo over
time through (1) documented savings in resource use
(2) revenue from sale of waste materials for recycling
Product
• Now what exactly will the pieces of this
product look like physically?
RESOURCE
UTILIZATION
AUDIT
(all four of the above are written reports with copious data and diagrams; the first
three are based on findings at the client’s facilities, while the last is based on
finding in other three reports combined with liaison work with the banking sector)
RESOURCE
PLAN
REPORT
RECYCLING
PLAN
REPORT
FINANCING
PLAN
REPORT
Implementation of RESOURCE PLAN and RECYCLING PLAN
Implementation of FINANCING PLAN
Results in less resources in, less resources out, and fuller, more profitable
recycling of resources out. Overall, results in strong benefits to bottom line.
Results in required up-front investment to achieve implementation below

Más contenido relacionado

Destacado

Supervisory training
Supervisory trainingSupervisory training
Supervisory trainingrkurniawancf
 
Connect and Combine Presentation
Connect and Combine PresentationConnect and Combine Presentation
Connect and Combine Presentationanonymouslearner
 
тенденции развития доступа к мировым информационным ресурсам
тенденции развития доступа к мировым информационным ресурсамтенденции развития доступа к мировым информационным ресурсам
тенденции развития доступа к мировым информационным ресурсамTamarka_Br
 
Palmprint recognition presentation
Palmprint recognition presentationPalmprint recognition presentation
Palmprint recognition presentationAlexandru Dorobantu
 

Destacado (7)

Supervisory training
Supervisory trainingSupervisory training
Supervisory training
 
Connect and Combine Presentation
Connect and Combine PresentationConnect and Combine Presentation
Connect and Combine Presentation
 
тенденции развития доступа к мировым информационным ресурсам
тенденции развития доступа к мировым информационным ресурсамтенденции развития доступа к мировым информационным ресурсам
тенденции развития доступа к мировым информационным ресурсам
 
9780335246243
97803352462439780335246243
9780335246243
 
O lume a prezentarilor
O lume a prezentarilorO lume a prezentarilor
O lume a prezentarilor
 
Outliers
OutliersOutliers
Outliers
 
Palmprint recognition presentation
Palmprint recognition presentationPalmprint recognition presentation
Palmprint recognition presentation
 

Similar a Rus co low fidelity model of our product

Aggregate Planning and RCCP
Aggregate Planning and RCCPAggregate Planning and RCCP
Aggregate Planning and RCCPAmalia Syafitri
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenetAla Ibrahim
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhManiMj6
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic conceptsgokulfea
 
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-SlidesICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-SlidesRussell Archibald
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & schedulingvarun0610
 
Rolling Stock Programme for locomotives-SK.pdf
Rolling Stock Programme for locomotives-SK.pdfRolling Stock Programme for locomotives-SK.pdf
Rolling Stock Programme for locomotives-SK.pdfHARENDRASINGH159221
 
Quality Function Deployment in Construction Industry
Quality Function Deployment in Construction IndustryQuality Function Deployment in Construction Industry
Quality Function Deployment in Construction IndustryAmit Kumar
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSNEHA GAUTAM
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFRubab Tanveer
 
Apel-GEF GHG accounting methods and requirements.pdf
Apel-GEF GHG accounting methods and requirements.pdfApel-GEF GHG accounting methods and requirements.pdf
Apel-GEF GHG accounting methods and requirements.pdfJalpanDave2
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesFellowBuddy.com
 
Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop  Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop pyoungkyova
 
Frepple overview for production planners
Frepple overview for production plannersFrepple overview for production planners
Frepple overview for production plannersJohan De Taeye
 
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of ContributorsIgnalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of ContributorsOsvaldas Ciuksys
 

Similar a Rus co low fidelity model of our product (20)

Aggregate Planning and RCCP
Aggregate Planning and RCCPAggregate Planning and RCCP
Aggregate Planning and RCCP
 
7 cost managmenet
7 cost managmenet7 cost managmenet
7 cost managmenet
 
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lhOM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
OM Unit_ IV.pptxucoxpuxofupupf Fuppfoufuflhlchjllh lh
 
Apel GEF GHG accounting methods requirements Nov 10 2014
Apel GEF GHG accounting methods requirements Nov 10 2014Apel GEF GHG accounting methods requirements Nov 10 2014
Apel GEF GHG accounting methods requirements Nov 10 2014
 
Erp chapter 3
Erp chapter 3Erp chapter 3
Erp chapter 3
 
Production planning and control - Basic concepts
Production planning and control - Basic conceptsProduction planning and control - Basic concepts
Production planning and control - Basic concepts
 
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-SlidesICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
ICEC 2014 Linking 6 Phase Project Life Cycle with TCM Framework-Slides
 
Pm assignment
Pm assignmentPm assignment
Pm assignment
 
Mrp systems & scheduling
Mrp systems & schedulingMrp systems & scheduling
Mrp systems & scheduling
 
2023-1025 Environmental Product Declarations - An Overview by the UCPRC
2023-1025 Environmental Product Declarations - An Overview by the UCPRC2023-1025 Environmental Product Declarations - An Overview by the UCPRC
2023-1025 Environmental Product Declarations - An Overview by the UCPRC
 
Rolling Stock Programme for locomotives-SK.pdf
Rolling Stock Programme for locomotives-SK.pdfRolling Stock Programme for locomotives-SK.pdf
Rolling Stock Programme for locomotives-SK.pdf
 
Business Case _ PM.pptx
Business Case _ PM.pptxBusiness Case _ PM.pptx
Business Case _ PM.pptx
 
Quality Function Deployment in Construction Industry
Quality Function Deployment in Construction IndustryQuality Function Deployment in Construction Industry
Quality Function Deployment in Construction Industry
 
MATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESSMATERIAL PLANNING PROCESS
MATERIAL PLANNING PROCESS
 
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDFProject-Charter_Rubab Tanveer_PTC_AKF_PDF
Project-Charter_Rubab Tanveer_PTC_AKF_PDF
 
Apel-GEF GHG accounting methods and requirements.pdf
Apel-GEF GHG accounting methods and requirements.pdfApel-GEF GHG accounting methods and requirements.pdf
Apel-GEF GHG accounting methods and requirements.pdf
 
Industrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture NotesIndustrial Engineering & Operation Research Lecture Notes
Industrial Engineering & Operation Research Lecture Notes
 
Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop  Oarc slides c02 assessment workshop
Oarc slides c02 assessment workshop
 
Frepple overview for production planners
Frepple overview for production plannersFrepple overview for production planners
Frepple overview for production planners
 
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of ContributorsIgnalina Nuclear Power Plant Presentation to the Assembly of Contributors
Ignalina Nuclear Power Plant Presentation to the Assembly of Contributors
 

Rus co low fidelity model of our product

  • 1. RUSCo (Resource Utilization Service Company) Low-fidelity model of our product Sixth Wave Innovation Team – Targeting a path towards radical resource productivity
  • 2. Product definition (in words) • Our product is a service that includes: – A plan (customized by client) for maximizing utilization of material inputs through • Reducing material inputs • Recycling any waste remaining after reductions made – Financing to implement the above plan – Implementation of the plan and financing of that implementation
  • 3. Product definition (in diagram) Plan for Maximizing Use of Material Resources Part I: Reduction of Material Inputs Part 2: Recycling of Remaining Waste Project Financing Plan Implementation
  • 4. Plan for Maximizing Use of Material Resources – the RESOURCE PLAN REPORT • Results of audit of current resource use: – Processes carried out by machines (for every such station) – Processes carried out by team (for every such station) • Report – listing and description of mini-plan increasing efficiency or completely revamping resource use at each station in production process, including: – New, improved machines – Substituting of alternative material inputs for current ones – Adjustment to current machines – Adjustment in arrangement of machines – Change to process steps carried out by team members
  • 5. Plan for Recycling Remaining Waste – the RECYCLING PLAN REPORT • Results of audit of current wastes of production process • Based on preceding RESOURCE PLAN REPORT, projected wastes of new, improved production processes • For each waste stream from new, improved production process, a recycling plan including: – Internal reuse of waste stream – Recycling waste stream to market
  • 6. Project Finance • RUSCo will arrange project finance to implement the two plans (RESOURCE USE PLAN and RECYCLING PLAN) – RUSCo prepares financial projections of the project representing combined implementation of the two plans – RUSCo negotiates with banks for project finance – RUSCo serves as sponsor for project, providing the financing through the bank – RUSCo negotiates plan for client to repay RUSCo over time through (1) documented savings in resource use (2) revenue from sale of waste materials for recycling
  • 7. Product • Now what exactly will the pieces of this product look like physically? RESOURCE UTILIZATION AUDIT (all four of the above are written reports with copious data and diagrams; the first three are based on findings at the client’s facilities, while the last is based on finding in other three reports combined with liaison work with the banking sector) RESOURCE PLAN REPORT RECYCLING PLAN REPORT FINANCING PLAN REPORT Implementation of RESOURCE PLAN and RECYCLING PLAN Implementation of FINANCING PLAN Results in less resources in, less resources out, and fuller, more profitable recycling of resources out. Overall, results in strong benefits to bottom line. Results in required up-front investment to achieve implementation below