SlideShare a Scribd company logo
1 of 8
Download to read offline
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
SCHOOL OF ARCHITECTURE, BUILDING & DESIGN
Research Unit for Modern Architecture Studies in Southeast Asia
Foundation of Natural and Built Environments
INTRODUCTION TO THE CONSTRUCTION INDUSTRY [FNBE 0125]
Prerequisite: None
Lecturer : Normah Sulaiman . Delliya Mohd.Zain
_____________________________________________________________________
Final Project – The Project Brief
40% marks (30% Individual – 10% Group)
Submission date: 29.07.2013
Introduction
“Trying to manage a project without project management is like trying to play a football game without a
game plan”.
K. Tate
Objectives
1. To introduce the scope of work handled by professionals and sub-professionals in their respective
professions both in the public and the private sectors in Malaysia.
2. To enable students to develop an understanding of the building team, its organization, their duties,
responsibilities and the inter-relationship within which they will seek employment, career
progression or further study.
Learning Outcomes
On successful completion of this subject, students will be able to demonstrate the following:
1. Explain the need to coordinate and develop an understanding of coherent working relations among
various industry players and to improve the communication channels.
2. Ability to document their observations and understanding from interview session and research
resources as well as to communicate their findings in a systematic and convincing presentation and
reports.
3. Obtain confidence through reporting and presenting their works in the class to discuss matters of
design and construction issues and inter-relationship among design/construction parties involved in
the construction industry.
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
Part I – Group Task
In a group work of 4-5 students, you need to find a specific land within campus area and you, act as a
client who want to initiate a small construction project which relate to the field that you are involved in.
The size of land shall not be more than 30m x 30m. Students need to prepare a project brief as a group
and propose ONE project that is appropriate to your site. The proposal from all group members will be
incorporate in the project brief as alternative.
You need to study:-
i. TYPES of BUILDING DEVELOPMENT – Includes suggestion, rationale, benefits, site analysis,
evaluation and the needs of the project to the client and to the community.
ii. AUTHORITIES ROLE IN CONSTRUCTION INDUSTRY – Focus on Building Plan Approval Process
and Procedures
Part II – Individual Task
You need to prepare a company profile on role that you represent in the project. This includes
developing
i. Company Profile (Name Card, Letterhead and etc)
ii. Organization Structure
ii. Financial Statement
From Part I – The Project Brief, you need to focus on the below in order to complete your project in
your report
iv. BUILDING AND PROCESS – Focus on Architects/Quantity Surveyor/Engineer/ Contractor /
Landscape Architect roles, process and procedures in completing a project.
Submission Requirement
Compilation of Part I and Part II in A4 and comb bound format. (Refer to Guidelines of Compilation)
Submission date: 29.07.2013
Good Luck!
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
Assessment – Group
General Understanding
Quality of form and level of execution
of understanding the project brief.
Clear visual and verbal communication
of the project.
Describes thoroughly
and introduction leads
to excellent
justification of the
choice of project
Describes
thoroughly and
with a good
justification of the
choice of project
Fair introduction with
acceptable facts
being discussed of
the project
Minimal
discussion on the
important facts of
the project
No basic facts were
discussed on the
project
3.95 – 5.0 3.25 – 3.94 2.5 – 3.24 1.25- 2.44 0 – 1.24 5
Content
Thorough research,
study, depth and the effectiveness way
to communicate information that is
relevant to the project
Evidence of
extensive
research and
study translated into
report
Evidence of very
good research
and study
translated into
report
Evidence of
good research and
study translated into
report
Evidence of
minimal research
and study
translated into
report
Evidence of lack
of research and
study translated into
report
3.95 – 5.0 3.25 – 3.94 2.5 – 3.24 1.25- 2.44 0 – 1.24 5
TOTAL 10
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
Assessment – Individual
General Understanding
Quality of form and level of
execution of understanding the
project brief.
Clear visual and verbal
communication of the project.
Describes
thoroughly and
introduction leads
to excellent
justification of the
choice of project
Describes
thoroughly and
with a good
justification of
the choice of
project
Fair introduction
with acceptable
facts being
discussed of the
project
Minimal
discussion on
the important
facts of the
project
No basic facts
were discussed
on the project
8.0 - 10 6.5 – 7.9 5.0 – 6.4 2.5 – 4.9 0 – 2.5 10
Content
Thorough research,
study, depth and the
effectiveness way to
communicate information that is
relevant to the project
Evidence of
extensive
research and
study translated
into report
Evidence of
very
good research
and study
translated into
report
Evidence of
good research and
study translated
into report
Evidence of
minimal
research and
study
translated into
report
Evidence of lack
of research and
study translated
into report
8.0 - 10 6.5 – 7.9 5.0 – 6.4 2.5 – 4.9 0 – 2.5 10
Creativity
Creativity in preparation,
presentation and packaging of
company profile
The works
presented with a
strong quality of
creativity of
preparation,
presentation and
packaging
The works
presented with
a good quality
of creativity of
preparation,
presentation
and packaging
The works
presented a fair
creativity of
preparation,
presentation and
packaging
The works
presented with
minimal
creativity of
preparation,
presentation
and packaging
No evidence of
creativity in
preparation,
presentation and
packaging
8.0 - 10 6.5 – 7.9 5.0 – 6.4 2.5 – 4.9 0 – 2.5 10
TOTAL 30
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
INTRODUCTION TO THE CONSTRUCTION INDUSTRY [FNBE 0125]
Prerequisite: None
Lecturer : Normah Sulaiman . Delliya Mohd.Zain
_____________________________________________________________________
Project 2 – The Project Brief
40% marks (30% Individual – 10% Group)
Submission date: 29.07.2013
SUBMISSION LIST FOR PROJECT 2 – THE PROJECT BRIEF
Please find below the list of items that must be submitted on the day of your submission.
These must be compiled in A4 size and comb bound.
Each group only needs to submit ONE copy of this. However, you are encouraged to have your own
backup copy. Please design your own cover page with proper details on the cover.
1. Assignment brief
2. Research – types of building development proposal, suggestion, rationale, benefits, site analysis,
evaluation and the needs of the project to the client and to the community. Authorities involved in the project
and procedures needed for
3. A documentation of minutes of meeting on discussion of formulation and decision on The Project Brief.
4. Individually, A SET of Company Profile and items such as
i. 2 nos of Name Card ( Standard Size)
ii. 2nos of Letterhead (A4 Size)
iii. 2 nos of Envelope (Standard Size)
iv. Organization Structure
v. Financial Statement
5. Individually, research compilation on BUILDING AND PROCESS – the role that you represent in
procedures in completing a project.
6. Individually, provide SAMPLE documents needed for you to complete this project including submission
and approval procedure. Pick ONE or TWO procedure only.
7. Tutorial sheet and references for both text and visuals.
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
FINAL PROJECT: The Project Brief
TUTORIAL SHEET
Week Review / Comments Sign
03.06.2013
My Progress :
Lecturer’s Review :
Progress of Research and Planning Framework (Group)
Progress to date: By this tutorial session, you should show your lecturer
all possible site proposal and planning framework on execution of the
project.
Date Review / Comments Sign
10.06.2013
My Progress :
Lecturer’s Review :
Progress to date: By this tutorial session, you should show your lecturer
all photos of your site, as a group and research on the authorities involved.
Minutes of meeting and discussion need to be presented during this
session.
INTRODUCTION TO THE CONSTRUCTION INDUSTRY
[FNBE 0125]
Lecturer : Normah Sulaiman . Delliya Mohd Zain
NAME : ___________________________________
ID No : ____________________________________
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
Date Review / Comments Sign
17.06.2013
My Progress :
Lecturer’s Review :
Progress to date: By this tutorial session, you need to present the finalize
rationale, benefits, site analysis, evaluation and the needs of the project.
Information on building plan approval process and procedures need to be
obtained and analyze with reflections. Minutes of meeting and discussion
need to be presented during this session.
Date Review / Comments Sign
24.06.2013
My Progress :
Lecturer’s Review :
Progress to date: By this session, GROUP COMPONENT IS READY and
PRINTED. Individually, you need to show library research on logo, layout,
graphics and colors is a good start. DO NOT PRINT BLINDLY CONTENT
FROM INTERNET.
Date Review / Comments Sign
08.07.2013
My Progress :
Lecturer’s Review :
Progress to date: By this session, you need to come up with proposal on
the company organization, profile and building and process on the roles
(assigned/selected by you) involved for your project. Supporting research
online need to be printed and with reflections.
FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ
Date Review / Comments Sign
15.07.2013
My Progress :
Lecturer’s Review :
Progress to date: By this session, draft and mock up on the proposal is
presented. Discussion will continue on how the building process on the
project is applied, students need to prepare in advance for this discussion.
Date Review / Comments Sign
22.07.2013
My Progress :
Lecturer’s Review :
Progress to date: By this session, final proposal is presented and finalized.
Students are advice to print the materials for discussion.
SUBMISSION | 29.07.2013 |
Good Luck!

More Related Content

Viewers also liked

Enbe.project one 04.13
Enbe.project one 04.13Enbe.project one 04.13
Enbe.project one 04.13Anthony Chew
 
B sc (hons)(arch) tau arc61301 project mac 2016 (2)
B sc (hons)(arch)  tau arc61301 project mac 2016 (2)B sc (hons)(arch)  tau arc61301 project mac 2016 (2)
B sc (hons)(arch) tau arc61301 project mac 2016 (2)Anthony Chew
 
Arc60103 (arc1313) march 2014 module outline
Arc60103 (arc1313) march 2014 module outlineArc60103 (arc1313) march 2014 module outline
Arc60103 (arc1313) march 2014 module outlineAnthony Chew
 
Project 1 sketchbook and journal jan2015
Project 1 sketchbook and journal jan2015Project 1 sketchbook and journal jan2015
Project 1 sketchbook and journal jan2015Anthony Chew
 
Course outline (fnbe 0155) dv - temporary
Course outline (fnbe 0155)   dv - temporaryCourse outline (fnbe 0155)   dv - temporary
Course outline (fnbe 0155) dv - temporaryAnthony Chew
 
Arc1126 project 2a site analysis and birdwatch tower at fraser s hill
Arc1126 project 2a site analysis and birdwatch tower at fraser s hillArc1126 project 2a site analysis and birdwatch tower at fraser s hill
Arc1126 project 2a site analysis and birdwatch tower at fraser s hillAnthony Chew
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxoAnthony Chew
 
Dv final project pc
Dv final project pcDv final project pc
Dv final project pcAnthony Chew
 
The idea journal 1
The idea journal 1The idea journal 1
The idea journal 1Anthony Chew
 
Module outline building science1 aug 2014
Module outline building science1 aug 2014Module outline building science1 aug 2014
Module outline building science1 aug 2014Anthony Chew
 
Course outline culture and history
Course outline culture and historyCourse outline culture and history
Course outline culture and historyAnthony Chew
 
Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)Anthony Chew
 
Project 2 integration (1)
Project 2  integration (1)Project 2  integration (1)
Project 2 integration (1)Anthony Chew
 

Viewers also liked (20)

Enbe.project one 04.13
Enbe.project one 04.13Enbe.project one 04.13
Enbe.project one 04.13
 
B sc (hons)(arch) tau arc61301 project mac 2016 (2)
B sc (hons)(arch)  tau arc61301 project mac 2016 (2)B sc (hons)(arch)  tau arc61301 project mac 2016 (2)
B sc (hons)(arch) tau arc61301 project mac 2016 (2)
 
F inal ici super project
F inal ici super projectF inal ici super project
F inal ici super project
 
Arc60103 (arc1313) march 2014 module outline
Arc60103 (arc1313) march 2014 module outlineArc60103 (arc1313) march 2014 module outline
Arc60103 (arc1313) march 2014 module outline
 
Project 1 sketchbook and journal jan2015
Project 1 sketchbook and journal jan2015Project 1 sketchbook and journal jan2015
Project 1 sketchbook and journal jan2015
 
Course outline (fnbe 0155) dv - temporary
Course outline (fnbe 0155)   dv - temporaryCourse outline (fnbe 0155)   dv - temporary
Course outline (fnbe 0155) dv - temporary
 
Dv project one a
Dv project one aDv project one a
Dv project one a
 
Arc1126 project 2a site analysis and birdwatch tower at fraser s hill
Arc1126 project 2a site analysis and birdwatch tower at fraser s hillArc1126 project 2a site analysis and birdwatch tower at fraser s hill
Arc1126 project 2a site analysis and birdwatch tower at fraser s hill
 
Building structure report xoxoxo
Building structure report xoxoxoBuilding structure report xoxoxo
Building structure report xoxoxo
 
Dv final project pc
Dv final project pcDv final project pc
Dv final project pc
 
The idea journal 1
The idea journal 1The idea journal 1
The idea journal 1
 
Module outline building science1 aug 2014
Module outline building science1 aug 2014Module outline building science1 aug 2014
Module outline building science1 aug 2014
 
Course outline culture and history
Course outline culture and historyCourse outline culture and history
Course outline culture and history
 
Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)Studio 4 arc60206 module outline (august 2015)
Studio 4 arc60206 module outline (august 2015)
 
Project 1
Project 1Project 1
Project 1
 
Building process
Building processBuilding process
Building process
 
Project 1 cube
Project 1   cubeProject 1   cube
Project 1 cube
 
Project 2 integration (1)
Project 2  integration (1)Project 2  integration (1)
Project 2 integration (1)
 
Site visit
Site visitSite visit
Site visit
 
Ici p1 0413
Ici p1 0413Ici p1 0413
Ici p1 0413
 

Similar to Final projectcomplete

Ici final project brief
Ici final project briefIci final project brief
Ici final project briefsuehwa533
 
SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...
SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...
SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...University of Nottingham
 
Final project ici
Final project iciFinal project ici
Final project icirivenhau
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdfPe Zhi Yong
 
ICI - Final Brief
ICI - Final BriefICI - Final Brief
ICI - Final Briefmasonsth
 
ICI Final Project Brief
ICI Final Project BriefICI Final Project Brief
ICI Final Project BriefBolin Loong
 
Project 2 - The Project Proposal
Project 2 - The Project ProposalProject 2 - The Project Proposal
Project 2 - The Project ProposalKai Yun Pang
 
Final project ici
Final project iciFinal project ici
Final project iciJs Cheok
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdfrivenhau
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdfJordon Wong
 
ICI Final Project Brief
ICI Final Project BriefICI Final Project Brief
ICI Final Project BriefForestedTiger
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdfJordon Wong
 
Final project ici (1)
Final project ici (1)Final project ici (1)
Final project ici (1)zerkai
 
Final project ici
Final project iciFinal project ici
Final project icikychong1105
 
aFinal project ici
aFinal project iciaFinal project ici
aFinal project icidanielsong15
 
Final project brief
Final project briefFinal project brief
Final project briefsuehwa533
 

Similar to Final projectcomplete (20)

Ici final project brief
Ici final project briefIci final project brief
Ici final project brief
 
Ici final project brief
Ici final project briefIci final project brief
Ici final project brief
 
SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...
SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...
SEMESTER 1: Introduction to Construction Industry Final Project Brief - The P...
 
Final project ici
Final project iciFinal project ici
Final project ici
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdf
 
ICI - Final Brief
ICI - Final BriefICI - Final Brief
ICI - Final Brief
 
ICI Final Project Brief
ICI Final Project BriefICI Final Project Brief
ICI Final Project Brief
 
Project 2 - The Project Proposal
Project 2 - The Project ProposalProject 2 - The Project Proposal
Project 2 - The Project Proposal
 
Final project ici
Final project iciFinal project ici
Final project ici
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdf
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdf
 
ICI Final Project Brief
ICI Final Project BriefICI Final Project Brief
ICI Final Project Brief
 
Final Project ICI.pdf
Final Project ICI.pdfFinal Project ICI.pdf
Final Project ICI.pdf
 
Final project ici
Final project iciFinal project ici
Final project ici
 
Final project ici (1)
Final project ici (1)Final project ici (1)
Final project ici (1)
 
Final project ici
Final project iciFinal project ici
Final project ici
 
aFinal project ici
aFinal project iciaFinal project ici
aFinal project ici
 
Final project ici
Final project iciFinal project ici
Final project ici
 
Final project ici
Final project iciFinal project ici
Final project ici
 
Final project brief
Final project briefFinal project brief
Final project brief
 

More from Anthony Chew

Project 1-performance-evaluation-2
Project 1-performance-evaluation-2Project 1-performance-evaluation-2
Project 1-performance-evaluation-2Anthony Chew
 
Bscience report ff
Bscience report ffBscience report ff
Bscience report ffAnthony Chew
 
B sc (hons)(arch) tau arc61301 synopsis mac 2016
B sc (hons)(arch)  tau arc61301 synopsis mac 2016B sc (hons)(arch)  tau arc61301 synopsis mac 2016
B sc (hons)(arch) tau arc61301 synopsis mac 2016Anthony Chew
 
Sunshading device studies 1 05-02-16
Sunshading device studies 1   05-02-16Sunshading device studies 1   05-02-16
Sunshading device studies 1 05-02-16Anthony Chew
 
Building structure (1) (1)
Building structure (1) (1)Building structure (1) (1)
Building structure (1) (1)Anthony Chew
 
B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)Anthony Chew
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015Anthony Chew
 
Asian architecture
Asian architectureAsian architecture
Asian architectureAnthony Chew
 
Abstract ( asian architecture )
Abstract ( asian architecture )Abstract ( asian architecture )
Abstract ( asian architecture )Anthony Chew
 
Topic issue proposal 2014
Topic  issue proposal 2014Topic  issue proposal 2014
Topic issue proposal 2014Anthony Chew
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)Anthony Chew
 
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)Anthony Chew
 
Module intro aug 2015
Module intro aug 2015Module intro aug 2015
Module intro aug 2015Anthony Chew
 

More from Anthony Chew (20)

Project 1-performance-evaluation-2
Project 1-performance-evaluation-2Project 1-performance-evaluation-2
Project 1-performance-evaluation-2
 
Bscience report ff
Bscience report ffBscience report ff
Bscience report ff
 
Theories report
Theories reportTheories report
Theories report
 
Synopsis 4
Synopsis 4Synopsis 4
Synopsis 4
 
Sypnosis 3
Sypnosis 3Sypnosis 3
Sypnosis 3
 
Synopsis 2
Synopsis 2Synopsis 2
Synopsis 2
 
Synopsis 1
Synopsis 1Synopsis 1
Synopsis 1
 
B sc (hons)(arch) tau arc61301 synopsis mac 2016
B sc (hons)(arch)  tau arc61301 synopsis mac 2016B sc (hons)(arch)  tau arc61301 synopsis mac 2016
B sc (hons)(arch) tau arc61301 synopsis mac 2016
 
Tau march 2016
Tau march 2016Tau march 2016
Tau march 2016
 
Sunshading device studies 1 05-02-16
Sunshading device studies 1   05-02-16Sunshading device studies 1   05-02-16
Sunshading device studies 1 05-02-16
 
Building structure (1) (1)
Building structure (1) (1)Building structure (1) (1)
Building structure (1) (1)
 
B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)B. structure project 2 brief august 2015 (1)
B. structure project 2 brief august 2015 (1)
 
B. structure project 1 brief august 2015
B. structure project 1 brief august 2015B. structure project 1 brief august 2015
B. structure project 1 brief august 2015
 
Asian architecture
Asian architectureAsian architecture
Asian architecture
 
Aa presentatin
Aa presentatinAa presentatin
Aa presentatin
 
Abstract ( asian architecture )
Abstract ( asian architecture )Abstract ( asian architecture )
Abstract ( asian architecture )
 
Topic issue proposal 2014
Topic  issue proposal 2014Topic  issue proposal 2014
Topic issue proposal 2014
 
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)B sc (hons)(arch)  asian architecture arc60403 project aug 2015 (4)
B sc (hons)(arch) asian architecture arc60403 project aug 2015 (4)
 
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)B sc (hons)(arch)  asian architecture arc60403 outline aug 2015 (2)
B sc (hons)(arch) asian architecture arc60403 outline aug 2015 (2)
 
Module intro aug 2015
Module intro aug 2015Module intro aug 2015
Module intro aug 2015
 

Recently uploaded

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Roomdivyansh0kumar0
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessAggregage
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 DelhiCall Girls in Delhi
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMRavindra Nath Shukla
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst SummitHolger Mueller
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation SlidesKeppelCorporation
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Lviv Startup Club
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth MarketingShawn Pang
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMANIlamathiKannappan
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insightsseribangash
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communicationskarancommunications
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsMichael W. Hawkins
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdfRenandantas16
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLSeo
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...Any kyc Account
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Servicediscovermytutordmt
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurSuhani Kapoor
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Roland Driesen
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒anilsa9823
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdftbatkhuu1
 

Recently uploaded (20)

VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130  Available With RoomVIP Kolkata Call Girl Howrah 👉 8250192130  Available With Room
VIP Kolkata Call Girl Howrah 👉 8250192130 Available With Room
 
Sales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for SuccessSales & Marketing Alignment: How to Synergize for Success
Sales & Marketing Alignment: How to Synergize for Success
 
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
9599632723 Top Call Girls in Delhi at your Door Step Available 24x7 Delhi
 
Monte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSMMonte Carlo simulation : Simulation using MCSM
Monte Carlo simulation : Simulation using MCSM
 
Progress Report - Oracle Database Analyst Summit
Progress  Report - Oracle Database Analyst SummitProgress  Report - Oracle Database Analyst Summit
Progress Report - Oracle Database Analyst Summit
 
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
Keppel Ltd. 1Q 2024 Business Update  Presentation SlidesKeppel Ltd. 1Q 2024 Business Update  Presentation Slides
Keppel Ltd. 1Q 2024 Business Update Presentation Slides
 
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
Yaroslav Rozhankivskyy: Три складові і три передумови максимальної продуктивн...
 
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
Tech Startup Growth Hacking 101  - Basics on Growth MarketingTech Startup Growth Hacking 101  - Basics on Growth Marketing
Tech Startup Growth Hacking 101 - Basics on Growth Marketing
 
A DAY IN THE LIFE OF A SALESMAN / WOMAN
A DAY IN THE LIFE OF A  SALESMAN / WOMANA DAY IN THE LIFE OF A  SALESMAN / WOMAN
A DAY IN THE LIFE OF A SALESMAN / WOMAN
 
Understanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key InsightsUnderstanding the Pakistan Budgeting Process: Basics and Key Insights
Understanding the Pakistan Budgeting Process: Basics and Key Insights
 
Pharma Works Profile of Karan Communications
Pharma Works Profile of Karan CommunicationsPharma Works Profile of Karan Communications
Pharma Works Profile of Karan Communications
 
HONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael HawkinsHONOR Veterans Event Keynote by Michael Hawkins
HONOR Veterans Event Keynote by Michael Hawkins
 
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf0183760ssssssssssssssssssssssssssss00101011 (27).pdf
0183760ssssssssssssssssssssssssssss00101011 (27).pdf
 
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRLMONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
MONA 98765-12871 CALL GIRLS IN LUDHIANA LUDHIANA CALL GIRL
 
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
KYC-Verified Accounts: Helping Companies Handle Challenging Regulatory Enviro...
 
Call Girls in Gomti Nagar - 7388211116 - With room Service
Call Girls in Gomti Nagar - 7388211116  - With room ServiceCall Girls in Gomti Nagar - 7388211116  - With room Service
Call Girls in Gomti Nagar - 7388211116 - With room Service
 
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service JamshedpurVIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
VIP Call Girl Jamshedpur Aashi 8250192130 Independent Escort Service Jamshedpur
 
Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...Boost the utilization of your HCL environment by reevaluating use cases and f...
Boost the utilization of your HCL environment by reevaluating use cases and f...
 
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒VIP Call Girls In Saharaganj ( Lucknow  ) 🔝 8923113531 🔝  Cash Payment (COD) 👒
VIP Call Girls In Saharaganj ( Lucknow ) 🔝 8923113531 🔝 Cash Payment (COD) 👒
 
Event mailer assignment progress report .pdf
Event mailer assignment progress report .pdfEvent mailer assignment progress report .pdf
Event mailer assignment progress report .pdf
 

Final projectcomplete

  • 1. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ SCHOOL OF ARCHITECTURE, BUILDING & DESIGN Research Unit for Modern Architecture Studies in Southeast Asia Foundation of Natural and Built Environments INTRODUCTION TO THE CONSTRUCTION INDUSTRY [FNBE 0125] Prerequisite: None Lecturer : Normah Sulaiman . Delliya Mohd.Zain _____________________________________________________________________ Final Project – The Project Brief 40% marks (30% Individual – 10% Group) Submission date: 29.07.2013 Introduction “Trying to manage a project without project management is like trying to play a football game without a game plan”. K. Tate Objectives 1. To introduce the scope of work handled by professionals and sub-professionals in their respective professions both in the public and the private sectors in Malaysia. 2. To enable students to develop an understanding of the building team, its organization, their duties, responsibilities and the inter-relationship within which they will seek employment, career progression or further study. Learning Outcomes On successful completion of this subject, students will be able to demonstrate the following: 1. Explain the need to coordinate and develop an understanding of coherent working relations among various industry players and to improve the communication channels. 2. Ability to document their observations and understanding from interview session and research resources as well as to communicate their findings in a systematic and convincing presentation and reports. 3. Obtain confidence through reporting and presenting their works in the class to discuss matters of design and construction issues and inter-relationship among design/construction parties involved in the construction industry.
  • 2. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ Part I – Group Task In a group work of 4-5 students, you need to find a specific land within campus area and you, act as a client who want to initiate a small construction project which relate to the field that you are involved in. The size of land shall not be more than 30m x 30m. Students need to prepare a project brief as a group and propose ONE project that is appropriate to your site. The proposal from all group members will be incorporate in the project brief as alternative. You need to study:- i. TYPES of BUILDING DEVELOPMENT – Includes suggestion, rationale, benefits, site analysis, evaluation and the needs of the project to the client and to the community. ii. AUTHORITIES ROLE IN CONSTRUCTION INDUSTRY – Focus on Building Plan Approval Process and Procedures Part II – Individual Task You need to prepare a company profile on role that you represent in the project. This includes developing i. Company Profile (Name Card, Letterhead and etc) ii. Organization Structure ii. Financial Statement From Part I – The Project Brief, you need to focus on the below in order to complete your project in your report iv. BUILDING AND PROCESS – Focus on Architects/Quantity Surveyor/Engineer/ Contractor / Landscape Architect roles, process and procedures in completing a project. Submission Requirement Compilation of Part I and Part II in A4 and comb bound format. (Refer to Guidelines of Compilation) Submission date: 29.07.2013 Good Luck!
  • 3. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ Assessment – Group General Understanding Quality of form and level of execution of understanding the project brief. Clear visual and verbal communication of the project. Describes thoroughly and introduction leads to excellent justification of the choice of project Describes thoroughly and with a good justification of the choice of project Fair introduction with acceptable facts being discussed of the project Minimal discussion on the important facts of the project No basic facts were discussed on the project 3.95 – 5.0 3.25 – 3.94 2.5 – 3.24 1.25- 2.44 0 – 1.24 5 Content Thorough research, study, depth and the effectiveness way to communicate information that is relevant to the project Evidence of extensive research and study translated into report Evidence of very good research and study translated into report Evidence of good research and study translated into report Evidence of minimal research and study translated into report Evidence of lack of research and study translated into report 3.95 – 5.0 3.25 – 3.94 2.5 – 3.24 1.25- 2.44 0 – 1.24 5 TOTAL 10
  • 4. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ Assessment – Individual General Understanding Quality of form and level of execution of understanding the project brief. Clear visual and verbal communication of the project. Describes thoroughly and introduction leads to excellent justification of the choice of project Describes thoroughly and with a good justification of the choice of project Fair introduction with acceptable facts being discussed of the project Minimal discussion on the important facts of the project No basic facts were discussed on the project 8.0 - 10 6.5 – 7.9 5.0 – 6.4 2.5 – 4.9 0 – 2.5 10 Content Thorough research, study, depth and the effectiveness way to communicate information that is relevant to the project Evidence of extensive research and study translated into report Evidence of very good research and study translated into report Evidence of good research and study translated into report Evidence of minimal research and study translated into report Evidence of lack of research and study translated into report 8.0 - 10 6.5 – 7.9 5.0 – 6.4 2.5 – 4.9 0 – 2.5 10 Creativity Creativity in preparation, presentation and packaging of company profile The works presented with a strong quality of creativity of preparation, presentation and packaging The works presented with a good quality of creativity of preparation, presentation and packaging The works presented a fair creativity of preparation, presentation and packaging The works presented with minimal creativity of preparation, presentation and packaging No evidence of creativity in preparation, presentation and packaging 8.0 - 10 6.5 – 7.9 5.0 – 6.4 2.5 – 4.9 0 – 2.5 10 TOTAL 30
  • 5. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ INTRODUCTION TO THE CONSTRUCTION INDUSTRY [FNBE 0125] Prerequisite: None Lecturer : Normah Sulaiman . Delliya Mohd.Zain _____________________________________________________________________ Project 2 – The Project Brief 40% marks (30% Individual – 10% Group) Submission date: 29.07.2013 SUBMISSION LIST FOR PROJECT 2 – THE PROJECT BRIEF Please find below the list of items that must be submitted on the day of your submission. These must be compiled in A4 size and comb bound. Each group only needs to submit ONE copy of this. However, you are encouraged to have your own backup copy. Please design your own cover page with proper details on the cover. 1. Assignment brief 2. Research – types of building development proposal, suggestion, rationale, benefits, site analysis, evaluation and the needs of the project to the client and to the community. Authorities involved in the project and procedures needed for 3. A documentation of minutes of meeting on discussion of formulation and decision on The Project Brief. 4. Individually, A SET of Company Profile and items such as i. 2 nos of Name Card ( Standard Size) ii. 2nos of Letterhead (A4 Size) iii. 2 nos of Envelope (Standard Size) iv. Organization Structure v. Financial Statement 5. Individually, research compilation on BUILDING AND PROCESS – the role that you represent in procedures in completing a project. 6. Individually, provide SAMPLE documents needed for you to complete this project including submission and approval procedure. Pick ONE or TWO procedure only. 7. Tutorial sheet and references for both text and visuals.
  • 6. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ FINAL PROJECT: The Project Brief TUTORIAL SHEET Week Review / Comments Sign 03.06.2013 My Progress : Lecturer’s Review : Progress of Research and Planning Framework (Group) Progress to date: By this tutorial session, you should show your lecturer all possible site proposal and planning framework on execution of the project. Date Review / Comments Sign 10.06.2013 My Progress : Lecturer’s Review : Progress to date: By this tutorial session, you should show your lecturer all photos of your site, as a group and research on the authorities involved. Minutes of meeting and discussion need to be presented during this session. INTRODUCTION TO THE CONSTRUCTION INDUSTRY [FNBE 0125] Lecturer : Normah Sulaiman . Delliya Mohd Zain NAME : ___________________________________ ID No : ____________________________________
  • 7. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ Date Review / Comments Sign 17.06.2013 My Progress : Lecturer’s Review : Progress to date: By this tutorial session, you need to present the finalize rationale, benefits, site analysis, evaluation and the needs of the project. Information on building plan approval process and procedures need to be obtained and analyze with reflections. Minutes of meeting and discussion need to be presented during this session. Date Review / Comments Sign 24.06.2013 My Progress : Lecturer’s Review : Progress to date: By this session, GROUP COMPONENT IS READY and PRINTED. Individually, you need to show library research on logo, layout, graphics and colors is a good start. DO NOT PRINT BLINDLY CONTENT FROM INTERNET. Date Review / Comments Sign 08.07.2013 My Progress : Lecturer’s Review : Progress to date: By this session, you need to come up with proposal on the company organization, profile and building and process on the roles (assigned/selected by you) involved for your project. Supporting research online need to be printed and with reflections.
  • 8. FNBE – Introduction to Construction Industry | April 2013 | Final Project – Group/Individual Assignment | NJ Date Review / Comments Sign 15.07.2013 My Progress : Lecturer’s Review : Progress to date: By this session, draft and mock up on the proposal is presented. Discussion will continue on how the building process on the project is applied, students need to prepare in advance for this discussion. Date Review / Comments Sign 22.07.2013 My Progress : Lecturer’s Review : Progress to date: By this session, final proposal is presented and finalized. Students are advice to print the materials for discussion. SUBMISSION | 29.07.2013 | Good Luck!