Ceramic Roofing System
                                                      Step by Step




 1. Pressure wash to achieve a clean surface free of dirt,         2. Fasteners, screws and fastening devices are first
  rust, corrosion, residues, and any other contaminants.           tightened and/or replaced.




3. Remove ALL scaling rust by scraping or mechanical               4. Caulk all exposed cracks and seams with Astec
wire brush. Follow with a TWO coat application of B-16-71          #2001 Acrylic Latex Caulk. Optionally, in gaps and
@ 300 sf/gal per coat. Prime ALL corroded surfaces.                cracks 1/8” or less in width, brush in Astec WPM #9.




5. Waterproof ALL Horizontal Seams with 4” wide polyester          6. Waterproof Vertical Seams with 2” wide Polyester Cloth
cloth embedded into a 8” wide wet coat of WPM #9 B&R.              embedded in a 4” wide wet coat of WPM #9 B&R. Apply a
Apply a second coat of WPM #9 B&R overlapping 2” on                second coat of WPM #9 B&R overlapping 1” on each side
each side at an average rate of 82 sf/gal per coat.                at an average rate of 82 sf/gal.



                         Insulating Coatings Corporation - 956 South Highway 41 , Inverness, FL 34450                      1
                                (800) 345-5306 - Fax : (352) 344-8370 - iccsouth@icc-astec.com
Ceramic Roofing System
                                                       Step by Step




7. Inspect surface area again to be sure it is clean, dry
and free of defects. The WPM #9 membrane must be free
of all moisture, dirt, dust, and debris before applying the
ceramic #900 finish coat.




                                                                    8. Apply Astec #900 over the WPM #9 membrane covering
                                                                    joints, flashings, and repair areas at a rate of 74 sf/gal.




9. Apply first coat Astec #900 Ceramic over the entire roof         10. Apply second coat of Astec #900 ceramic over the
surface at an average coverage rate of 148 sf/gal to lower          entire roof surface at an average rate of 148 sf/gal,
substrate surface temperature, improve the rate of curing           resulting in a final covering of no less than twelve (12) mils
and the quality of the finished appearance.                         DFT (equal to a combined minimum coverage rate of 74
                                                                    sf/gal). Over seams and repair areas the final specification
                                                                    requirements will be an average of 45 mil DFT.




                      OPTIONAL
11. Apply #2541 Skylight Sealer on Skylights at the rate of
225-335 sf/gal




                          Insulating Coatings Corporation - 956 South Highway 41 , Inverness, FL 34450                          2
                                 (800) 345-5306 - Fax : (352) 344-8370 - iccsouth@icc-astec.com

More Related Content

More from Tony Loup

How to specify paint.
How to specify paint.How to specify paint.
How to specify paint.Tony Loup
 
Cool Roofs Compendium
Cool Roofs CompendiumCool Roofs Compendium
Cool Roofs CompendiumTony Loup
 
GSA CTA Guide 2012
GSA CTA Guide 2012GSA CTA Guide 2012
GSA CTA Guide 2012Tony Loup
 
Astec Roofing Systems - French
Astec Roofing Systems - FrenchAstec Roofing Systems - French
Astec Roofing Systems - FrenchTony Loup
 
Roofing System Selection
Roofing System SelectionRoofing System Selection
Roofing System SelectionTony Loup
 
Social Media & Internet Marketing for Contractors
Social Media & Internet Marketing for ContractorsSocial Media & Internet Marketing for Contractors
Social Media & Internet Marketing for ContractorsTony Loup
 
NYC Cool Roofs Annual Report 2010
NYC Cool Roofs Annual Report 2010NYC Cool Roofs Annual Report 2010
NYC Cool Roofs Annual Report 2010Tony Loup
 
Public Housing Authorities Choose Astec
Public Housing Authorities Choose AstecPublic Housing Authorities Choose Astec
Public Housing Authorities Choose AstecTony Loup
 
High Performance Buildings
High Performance BuildingsHigh Performance Buildings
High Performance BuildingsTony Loup
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable InfrastructureTony Loup
 
US Army Reduces Energy Usage by 26%
US Army Reduces Energy Usage by 26%US Army Reduces Energy Usage by 26%
US Army Reduces Energy Usage by 26%Tony Loup
 
United States Government: Energy Management in Federal Facilities
United States Government: Energy Management in Federal FacilitiesUnited States Government: Energy Management in Federal Facilities
United States Government: Energy Management in Federal FacilitiesTony Loup
 
Sustainability Matters
Sustainability MattersSustainability Matters
Sustainability MattersTony Loup
 
GSA Green Building Performance
GSA Green Building PerformanceGSA Green Building Performance
GSA Green Building PerformanceTony Loup
 
Building Energy Codes 101
Building Energy Codes 101Building Energy Codes 101
Building Energy Codes 101Tony Loup
 
Emerging Technologies for Energy Savings Performance Contracting in the Feder...
Emerging Technologies for Energy Savings Performance Contracting in the Feder...Emerging Technologies for Energy Savings Performance Contracting in the Feder...
Emerging Technologies for Energy Savings Performance Contracting in the Feder...Tony Loup
 
Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...
Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...
Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...Tony Loup
 
Selling Energy-Efficient Products to the Federal Government
Selling Energy-Efficient Products to the Federal GovernmentSelling Energy-Efficient Products to the Federal Government
Selling Energy-Efficient Products to the Federal GovernmentTony Loup
 
Government Contracting: The Basics
Government Contracting: The BasicsGovernment Contracting: The Basics
Government Contracting: The BasicsTony Loup
 
How to Buy "Cool" Roof Products
How to Buy "Cool" Roof ProductsHow to Buy "Cool" Roof Products
How to Buy "Cool" Roof ProductsTony Loup
 

More from Tony Loup (20)

How to specify paint.
How to specify paint.How to specify paint.
How to specify paint.
 
Cool Roofs Compendium
Cool Roofs CompendiumCool Roofs Compendium
Cool Roofs Compendium
 
GSA CTA Guide 2012
GSA CTA Guide 2012GSA CTA Guide 2012
GSA CTA Guide 2012
 
Astec Roofing Systems - French
Astec Roofing Systems - FrenchAstec Roofing Systems - French
Astec Roofing Systems - French
 
Roofing System Selection
Roofing System SelectionRoofing System Selection
Roofing System Selection
 
Social Media & Internet Marketing for Contractors
Social Media & Internet Marketing for ContractorsSocial Media & Internet Marketing for Contractors
Social Media & Internet Marketing for Contractors
 
NYC Cool Roofs Annual Report 2010
NYC Cool Roofs Annual Report 2010NYC Cool Roofs Annual Report 2010
NYC Cool Roofs Annual Report 2010
 
Public Housing Authorities Choose Astec
Public Housing Authorities Choose AstecPublic Housing Authorities Choose Astec
Public Housing Authorities Choose Astec
 
High Performance Buildings
High Performance BuildingsHigh Performance Buildings
High Performance Buildings
 
Sustainable Infrastructure
Sustainable InfrastructureSustainable Infrastructure
Sustainable Infrastructure
 
US Army Reduces Energy Usage by 26%
US Army Reduces Energy Usage by 26%US Army Reduces Energy Usage by 26%
US Army Reduces Energy Usage by 26%
 
United States Government: Energy Management in Federal Facilities
United States Government: Energy Management in Federal FacilitiesUnited States Government: Energy Management in Federal Facilities
United States Government: Energy Management in Federal Facilities
 
Sustainability Matters
Sustainability MattersSustainability Matters
Sustainability Matters
 
GSA Green Building Performance
GSA Green Building PerformanceGSA Green Building Performance
GSA Green Building Performance
 
Building Energy Codes 101
Building Energy Codes 101Building Energy Codes 101
Building Energy Codes 101
 
Emerging Technologies for Energy Savings Performance Contracting in the Feder...
Emerging Technologies for Energy Savings Performance Contracting in the Feder...Emerging Technologies for Energy Savings Performance Contracting in the Feder...
Emerging Technologies for Energy Savings Performance Contracting in the Feder...
 
Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...
Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...
Cool Roofs Are Ready to Save Energy, Cool Urban Heat Islands, and Help Slow G...
 
Selling Energy-Efficient Products to the Federal Government
Selling Energy-Efficient Products to the Federal GovernmentSelling Energy-Efficient Products to the Federal Government
Selling Energy-Efficient Products to the Federal Government
 
Government Contracting: The Basics
Government Contracting: The BasicsGovernment Contracting: The Basics
Government Contracting: The Basics
 
How to Buy "Cool" Roof Products
How to Buy "Cool" Roof ProductsHow to Buy "Cool" Roof Products
How to Buy "Cool" Roof Products
 

Recently uploaded

南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证kbdhl05e
 
Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...
Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...
Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...JeylaisaManabat1
 
E J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxE J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxJackieSparrow3
 
(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)oannq
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan
 
Inspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptxInspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptxShubham Rawat
 

Recently uploaded (6)

南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证南新罕布什尔大学毕业证学位证成绩单-学历认证
南新罕布什尔大学毕业证学位证成绩单-学历认证
 
Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...
Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...
Module-2-Lesson-2-COMMUNICATION-AIDS-AND-STRATEGIES-USING-TOOLS-OF-TECHNOLOGY...
 
E J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptxE J Waggoner against Kellogg's Pantheism 8.pptx
E J Waggoner against Kellogg's Pantheism 8.pptx
 
(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)(南达科他州立大学毕业证学位证成绩单-永久存档)
(南达科他州立大学毕业证学位证成绩单-永久存档)
 
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
Authentic No 1 Amil Baba In Pakistan Amil Baba In Faisalabad Amil Baba In Kar...
 
Inspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptxInspiring Through Words Power of Inspiration.pptx
Inspiring Through Words Power of Inspiration.pptx
 

Astec Step by Step Application Overview

  • 1. Ceramic Roofing System Step by Step 1. Pressure wash to achieve a clean surface free of dirt, 2. Fasteners, screws and fastening devices are first rust, corrosion, residues, and any other contaminants. tightened and/or replaced. 3. Remove ALL scaling rust by scraping or mechanical 4. Caulk all exposed cracks and seams with Astec wire brush. Follow with a TWO coat application of B-16-71 #2001 Acrylic Latex Caulk. Optionally, in gaps and @ 300 sf/gal per coat. Prime ALL corroded surfaces. cracks 1/8” or less in width, brush in Astec WPM #9. 5. Waterproof ALL Horizontal Seams with 4” wide polyester 6. Waterproof Vertical Seams with 2” wide Polyester Cloth cloth embedded into a 8” wide wet coat of WPM #9 B&R. embedded in a 4” wide wet coat of WPM #9 B&R. Apply a Apply a second coat of WPM #9 B&R overlapping 2” on second coat of WPM #9 B&R overlapping 1” on each side each side at an average rate of 82 sf/gal per coat. at an average rate of 82 sf/gal. Insulating Coatings Corporation - 956 South Highway 41 , Inverness, FL 34450 1 (800) 345-5306 - Fax : (352) 344-8370 - iccsouth@icc-astec.com
  • 2. Ceramic Roofing System Step by Step 7. Inspect surface area again to be sure it is clean, dry and free of defects. The WPM #9 membrane must be free of all moisture, dirt, dust, and debris before applying the ceramic #900 finish coat. 8. Apply Astec #900 over the WPM #9 membrane covering joints, flashings, and repair areas at a rate of 74 sf/gal. 9. Apply first coat Astec #900 Ceramic over the entire roof 10. Apply second coat of Astec #900 ceramic over the surface at an average coverage rate of 148 sf/gal to lower entire roof surface at an average rate of 148 sf/gal, substrate surface temperature, improve the rate of curing resulting in a final covering of no less than twelve (12) mils and the quality of the finished appearance. DFT (equal to a combined minimum coverage rate of 74 sf/gal). Over seams and repair areas the final specification requirements will be an average of 45 mil DFT. OPTIONAL 11. Apply #2541 Skylight Sealer on Skylights at the rate of 225-335 sf/gal Insulating Coatings Corporation - 956 South Highway 41 , Inverness, FL 34450 2 (800) 345-5306 - Fax : (352) 344-8370 - iccsouth@icc-astec.com