1. SCOPE OF WORK
The work consists of the supply of all labor, material, equipment and supervision
Necessary to complete the work shown, or described by, or reasonably inferred from
These contract documents. Without limiting the qualifications of the foregoing the work
Works
2.GENERAL CONDITIONS, STANDARD SPECIFICATIONS AND DRAWINGS
All work shall be carried out in accordance with the current Selangor Province Standards
Specifications and Drawings as adopted by the Works, and the current Works Supplemental
Specifications and Drawings. The current General Conditions apply to this contract and
will be included in the legal documents.
3.SOILS REPORTS
These reports are prepared for design purposes, and when provided to the bidders are
for information only. Contractors bidding on or undertaking the works, must rely on their own
investigation and interpretation of this information, and
draw their own conclusions as to how this information will affect their bidding and
construction techniques.
4.SUBSTITUTIONS
Where, pursuant to the contract documents, the Contractor is required to supply an
article or group of related articles designated by trade or supplier’s name followed by the
words “or approved equal” or similar such terminology, the tender shall be based only
upon supplying the article or group of articles so designated, which shall be regarded as
the standard of quality required by the specifications.
No ruling on a proposed substitution and “approved equal” will be made prior to
acceptance of a tender. No substitutions shall be made without the prior approval of the
General Manager. No tender price shall be based on a presumed acceptance by the
General Manager, of a substitute item of supply.
5.TENDER INFORMATION MEETING
MANDATORY
Tenderers are invited to attend a Mandatory Tender Information Meeting in
Committee Room 2
Majlis Perbandaran Subang Jaya, Persiaran Perpaduan, Jalan USJ 5, 47610 Subang Jaya,
Selangor,
at 2:00pm local time on 24th
July 2013
The purpose of the meeting is to provide additional information, if required, and to answer
questions concerning the project and contract documents. All Tenderers are urged to attend the
Mandatory Tender Information Meeting. Any new information or project changes given at the
meeting will be covered by an Addendum to the Contract which will be issued prior to the tender
closing date.
.
6.ADDENDA
Tenderers may, during the tendering period, be advised by addenda of required
additions to, deletions from, or alterations in the requirements of the tender documents.
All Addenda shall be posted on the Works’s website.
Addenda will be issued under the following circumstances:
a)
Interpretation of tender documents as a result of queries from prospective bidders;
b)
Revision, deletions, additions or substitutions of any portion of tender documents.
All such changes as addressed in the addenda shall become an integral part of the tender
documents and shall be allowed for in arriving at the tender price.
Oral instructions shall not be considered valid unless they are confirmed in writing by the
General Manager.
7.PREQUALIFICATION
If a Tenderer has not prequalified by the Annual Prequalification Procedure then the procedure
outlined in this section shall be followed.
There will be no Annual Prequalification for work pertaining to Water Plants, Wastewater Plants,
Bridges and Environmental projects. These contracts will
haveprequalification at the time of tendering.
[When tendering Sewer, Water and/or Road Projects]
Tenderers must submit the following documents, prior to the specified deadline for application
for prequalification:
8.TENDER CONFIDENTIALITY
The Works of Greater Sudbury will consider all tenders as confidential, subject to the provisions
set out in the Municipal Freedom of Information and Protection of Privacy Act.
The names of the Tenderers and the total amount of the tenders will be made available to the
public. However, unit prices will notbe made available to the public.
9.TENDER DEPOSIT, PERFORMANCE GUARANTEE
Each tender must be accompanied
by one of the following alternatives:
A) A tender deposit in the form of a certified cheque or Letter of Credit in the amount
of RM(5% of estimate). The Tenderer must also provide an Agreement to Bond from a Bonding
Company whereby the Bonding Company agrees to provide a 100 percent Performance Bond,
in a form acceptable to the Works Solicitor. An Agreement to Bond for any previous tender, or a
Performance Bond from any previous contract is not an acceptable alternative to the
Agreement to Bond requested.
B) A tender deposit in the form of a Bid Bond in the amount of
RM(15% of estimate).The Tenderer must also provide an Agreement to Bond from a Bonding
Company whereby the Bonding Company agrees to provide a 100 percent Performance Bond,
in a form acceptable to the Works Solicitor. An Agreement to Bond for any previous tender, or a
Performance Bond from any previous contract is not an acceptable alternative to the Agreement
to Bond requested.
10.GOVERNMENT TAXES
The following government tax requirements are summarized only and full particulars are
contained in Section 108
-10 of the GENERAL CONDITIONS which shall in cases
prevail.
a)Gasoline and Fuel Taxes
The Contractor shall pay all taxesunder the Gasoline Tax Act and the Motor
Vehicle Fuel Tax Act on gasoline and diesel fuel used by him in the performance
of the contract.
b)Harmonized Sales Tax (HST)
Applicable HST shall not be included in the unit prices tendered.
HST shall be added at the end of the Schedule of Unit Prices to arrive at the
Total Contract Price.
c)Changes to Government Taxes
Where a change in Canadian Federal or Provincial taxes occur after the Tender
Closing Date for this contract, and this change could not have been anticipated at the time of
bidding, the Works will increase or decrease contract payments to account for the exact amount
of tax change involved.
11.WITHDRAWAL PROCEDURES
A bidder may request that his or her submitted tender be withdrawn, up until the closing time for
a particular contract
. Withdrawals can only be made in person and the bidder wishing to withdraw from a particular
tender must attend at the Purchasing Agent’s office and execute an appropriate withdrawal form,
signed by a principal of the bidder, or provide a letter from thebidder, signed by a principal,
withdrawing the tender. The
Agent and Treasurer together shall then open the Tender Box, retrieve the withdrawn
Tender, and hand it back unopened to the bidder. The completed withdrawal form, specific to
the time of return, shall then be signed by the Agent and Treasurer, placed into the Tender Box
and the Tender Box relocked.
The withdrawal of a tender does not disqualify a bidder from submitting another tender for the
same contract provided that all of the tender procedures are observed and the new bid is
deposited in the tender box prior to the terminal time for closure. However, unless withdrawal
procedures have been followed, more than one tender from the same bidder will result in the
disqualification of the bidder.
The Bid Deposit shall be forfeited to the Corporation when a bidder attempts to withdraw his or
her tender after tenders have been opened, in addition to any consequence or legal penalty that
may apply.Occasionally, there may be more than one contract opened at the same tender
opening. Immediately following the reading of tenders for any contract, the low Tenderer for that
contract may withdraw upon written request signed by a principal of the company, any or all of
his remaining tenders for the balance of tenders yet to be opened and read, and these will be
returned, unopened, immediately to the
Tenderer. Any such withdrawal(s) will not be reinstated under any circumstances, even if
subsequent checking proves that tenders not withdrawn are in fact n
ot the lowest of all tenders read.
12.
VALIDITY OF TENDERS
SCHEDULE "C" to By-Law 2006-270 of the Works of Greater Sudbury IRREGULARITY RESPONSE
1
Late Bid.
Automatic rejection and not opened or read publicly.
2
Unsealed Envelope.
Automatic rejection.
3
No Bid Security or agreement to bond or insufficient Bid Deposit or agreement to bond.
Automatic rejection.
4
Bids completed and/or signed in erasable medium.
Automatic rejection.
5
All required sections of Bid documents not completed.
Automatic rejection unless, in the consensual opinion of the Agent, General Manager in charge of the Bid
Solicitation and the Works Solicitor, the incomplete nature is trivial or insignificant.
6
Qualified Bids (Bids qualified or restricted by an attached statement).
Automatic rejection unless, in the consensual opinion of the Agent, General Manager in charge of the Bid
Solicitation and the Works Solicitor, the qualification or restriction is trivial or not significant.
7
Bids received on documents other than those provided or specified by the Works.
Automatic rejection.
8
Bids Containing Clerical Errors, which are trivial or insignificant.48 hours to correct and initial errors.
The determination of what constitutes trivial or insignificant errors shall be made in the consensual opinion of
the Agent, General Manager in charge of the Bid Solicitation and the Works Solicitor
9
Failure to execute Agreement to Bond (Surety's Consent) or Bonding company corporate seal or signature
missing from Agreement to Bond.
Automatic rejection.
10
(a)Failure to execute Bid Bond by Bidder and Bonding Company.
Automatic rejection.
(b)Corporate seal of the Bidder and Bonding Company, missing.48 hours to correct.11Documents
-Execution
(a)
Corporate seal or signature missing;
signatory's authority to bind the corporation or signature missing.
48 hours to rectify situation.
(b)
Corporate seal and signature missing; signatory's authority to bind the corporation and signature missing.
Automatic rejection.
12
Erasures, Overwriting or Strike-Outs which are not initialed:
(a) uninstalled changes to the Tender documents, other than unit prices, which are trivial or not significant;
48 hours to initial.
The determination of what constitutes trivial or insignificant uninitialled changes shall be made in the
consensual opinion of the Agent. General Manager in charge of the Bid Solicitation and the Works Solicitor.
(b) unit prices in the Schedule of Prices have been changed but not initialed and the Contract totals are
consistent with the price as changed;
48 hours to initial change in unit price. The determination of what constitutes trivial or insignificant uninitialled
changes shall be made in the consensual opinion of the Agent, General Manager in charge of the Bid
Solicitation and the Works Solicitor.
(c)
unit prices in the Schedule of Prices which have been changed but not initialed and the Contract totals are
inconsistent with the price as changed;
Automatic rejection.
13
Mathematical errors which are not consistent with unit prices.
48 hours to initial corrections as made by the Supplies and Services Division.
14
Bids, in which all necessary Addenda, which have financial implication, have not been acknowledged.
Automatic rejection.
15
Any other irregularities.
The Agent, General Manager in charge of the Bid
Solicitation and the Works Solicitor acting in consensus shall have authority to waive other irregularities or
grant 48 hours to initial such other irregularities, which they jointly consider to be trivial or insignificant.
13. ACCEPTANCE OF TENDER AND EXECUTION OF CONTRACT
The Tenderer agrees that, notwithstanding anything to the contrary in this Contract, that a
maximum of sixty days shall be allowed between the date that tenders are opened and the date
that a tender is awarded, cancelled, or recalled.
Following contract award, the Corporation shall notify the successful
Tenderer that his tender has been accepted. The formal contract agreement will also be sent to
the successful Tenderer, with instructions on how to properly complete and sign the document.
The successful Tenderer is to be allowed not more than Fourteen (14) days from receipt of the
document for the execution of the contract document. Failure to execute the contract documents
or to provide the necessary guarantees, insurance, etc. within the specified time may result in
the forfeiture of the Tender Deposit.
14.RIGHT OF WORKS
The Works reserves the right to reject any or all tenders.
The Works shall not accept any inconsistency in the Unit Prices bid for the various items.
The Works reserves the right to delete any portion or part of the work outlined and the bidder
agrees to such cancellation without any claim whatsoever because of such cancellation.
15. CONTRACT AWARD
The Contract award is subject to receipt of
.
Lowest or any tender not necessarily accepted.
19.
WORKPLACE SAFETY AND INSURANCE BOARD
Tenderers should submit a current Clearance Certificatefrom Workplace Safety and
Insurance Board with their tender submission orthe successful Tenderer shall be required to
provide a current Clearance Certificatefrom the Workplace Safety and Insurance Board stating
that the company is in good standing with the Board, prior to the signing of the contract
documents by the Works.
In addition, the successful Tenderer shall be required to provide a current Clearance
Certificateto Construction Services for the payment of monthly progress certificates.
Progress payment shall not be issued without a current Clearance Certificate. This also applies
to any other payment.
ACCESSIBILITY
The Works is committed to the accessibility principles of preventing and removing barriers in
accessing goods and services for people with disabilities and is bound by the
Standards under the Accessibility for Ontarians with Disabilities Act, 2005 as may be amended
from time to time.
Regulations enacted under the Act apply to every designated public sector organization and
other third parties that provide goods and services to the members of the public. The
consultant/contractor, and all sub-contractors hired by the consultant/contractor in the
completion of its work, will meet or exceed compliance with all applicable regulations under the
Accessibility for Ontarians with Disabilities Act, 2005 as may be amended from time to time.
It is the consultant/contractor’s responsibility to ensure they are fully aware of, and meet all
requirements under the Act.

More Related Content

What's hot

Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017
Dheeraj Sehgal
 
Sbd procurement of goods 1 general
Sbd procurement of goods   1 generalSbd procurement of goods   1 general
Sbd procurement of goods 1 general
Joy Irman
 
Wb procurement icb c1
Wb procurement icb c1Wb procurement icb c1
Wb procurement icb c1
Joy Irman
 
Tender document q4 oiljetty firefighting
Tender document q4 oiljetty firefightingTender document q4 oiljetty firefighting
Tender document q4 oiljetty firefighting
PRABIR DATTA
 
Sbd procurement of goods 4 submission and opening of bids
Sbd procurement of goods   4 submission and opening of bidsSbd procurement of goods   4 submission and opening of bids
Sbd procurement of goods 4 submission and opening of bids
Joy Irman
 

What's hot (20)

Ms.jkr.20800.2005
Ms.jkr.20800.2005Ms.jkr.20800.2005
Ms.jkr.20800.2005
 
Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017Mo rth model rfp v for epc works_jan 2017
Mo rth model rfp v for epc works_jan 2017
 
Sbd procurement of goods 1 general
Sbd procurement of goods   1 generalSbd procurement of goods   1 general
Sbd procurement of goods 1 general
 
BIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACTBIDDING-TENDER-CONTRACT
BIDDING-TENDER-CONTRACT
 
4. international procurement guideline
4. international procurement guideline4. international procurement guideline
4. international procurement guideline
 
Estimation
EstimationEstimation
Estimation
 
Tenders
TendersTenders
Tenders
 
Wb procurement icb c1
Wb procurement icb c1Wb procurement icb c1
Wb procurement icb c1
 
Grinding & drilling machines bid
Grinding & drilling machines   bidGrinding & drilling machines   bid
Grinding & drilling machines bid
 
Fidic conditions of contract presentation
Fidic conditions of contract presentationFidic conditions of contract presentation
Fidic conditions of contract presentation
 
Oht tender
Oht tenderOht tender
Oht tender
 
1324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-13654943321324 2013 04-09-13-28-52-1365494332
1324 2013 04-09-13-28-52-1365494332
 
Bid document for Solar Plant in Jharkhand
Bid document for Solar Plant in JharkhandBid document for Solar Plant in Jharkhand
Bid document for Solar Plant in Jharkhand
 
5. international standard contract for construction
5. international standard contract for construction5. international standard contract for construction
5. international standard contract for construction
 
Haryana Solar Bid Document RFS
Haryana Solar Bid Document RFSHaryana Solar Bid Document RFS
Haryana Solar Bid Document RFS
 
Tenders in professional practice
Tenders in professional practiceTenders in professional practice
Tenders in professional practice
 
Railway Tender
Railway TenderRailway Tender
Railway Tender
 
Tender document q4 oiljetty firefighting
Tender document q4 oiljetty firefightingTender document q4 oiljetty firefighting
Tender document q4 oiljetty firefighting
 
Procurement of infrastructure projects
Procurement of infrastructure projectsProcurement of infrastructure projects
Procurement of infrastructure projects
 
Sbd procurement of goods 4 submission and opening of bids
Sbd procurement of goods   4 submission and opening of bidsSbd procurement of goods   4 submission and opening of bids
Sbd procurement of goods 4 submission and opening of bids
 

Viewers also liked

Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
FitBlar Mit
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
prodv
 

Viewers also liked (6)

Fidic flow charts final
Fidic flow charts finalFidic flow charts final
Fidic flow charts final
 
Bo Q Preamble Td2 3 Jan 20
Bo Q Preamble Td2 3  Jan 20Bo Q Preamble Td2 3  Jan 20
Bo Q Preamble Td2 3 Jan 20
 
User Requirement Specification for Tender Alert Website
User Requirement Specification for Tender Alert WebsiteUser Requirement Specification for Tender Alert Website
User Requirement Specification for Tender Alert Website
 
The Basics of Tendering & Bidding
The Basics of Tendering & BiddingThe Basics of Tendering & Bidding
The Basics of Tendering & Bidding
 
Tender Document for Solar Power Plant in Gujarat Part 1
Tender Document for Solar Power Plant in Gujarat Part 1Tender Document for Solar Power Plant in Gujarat Part 1
Tender Document for Solar Power Plant in Gujarat Part 1
 
Tender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at DamanTender Document for 1 MW Solar at Daman
Tender Document for 1 MW Solar at Daman
 

Similar to Document samples

Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
jagadish108
 
CSCM Sla cscm
CSCM Sla cscmCSCM Sla cscm
CSCM Sla cscm
Est
 
ZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docxZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docx
FairFASST
 
Edmonds Community College
Edmonds Community CollegeEdmonds Community College
Edmonds Community College
Thomas Smith
 

Similar to Document samples (20)

tendering
 tendering tendering
tendering
 
Tenders contract -arti
Tenders contract -artiTenders contract -arti
Tenders contract -arti
 
Unit-2_Tender
Unit-2_TenderUnit-2_Tender
Unit-2_Tender
 
1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf1545313910708_TENDER_NOTICE_LAD.pdf
1545313910708_TENDER_NOTICE_LAD.pdf
 
CE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdfCE-CONTRACTS-REPORT.pdf
CE-CONTRACTS-REPORT.pdf
 
Mode of Tendering.pptx
 Mode of Tendering.pptx Mode of Tendering.pptx
Mode of Tendering.pptx
 
CSCM Sla cscm
CSCM Sla cscmCSCM Sla cscm
CSCM Sla cscm
 
Cpm ch 2tender
Cpm ch 2tenderCpm ch 2tender
Cpm ch 2tender
 
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
CPS RFP - 14 250020 bid for window mounted air conditioning units 042514
 
tamil nadu tenders act.pptx
tamil nadu tenders act.pptxtamil nadu tenders act.pptx
tamil nadu tenders act.pptx
 
World bank price adjustment documents.PDF
World bank price adjustment documents.PDFWorld bank price adjustment documents.PDF
World bank price adjustment documents.PDF
 
ZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docxZA CONTRACT AL NOOR.docx
ZA CONTRACT AL NOOR.docx
 
scope - CCTV Tender.pdf
scope - CCTV Tender.pdfscope - CCTV Tender.pdf
scope - CCTV Tender.pdf
 
Types of tender and their processing.
Types of tender and their processing.Types of tender and their processing.
Types of tender and their processing.
 
Tender
TenderTender
Tender
 
Tender & Tender Notice
Tender & Tender NoticeTender & Tender Notice
Tender & Tender Notice
 
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
Guidelines on The Use of Consultants by Asian Development Bank and Its Borrow...
 
Edmonds Community College
Edmonds Community CollegeEdmonds Community College
Edmonds Community College
 
Estimation and Costing - Contracts
Estimation and Costing - ContractsEstimation and Costing - Contracts
Estimation and Costing - Contracts
 
Fidic 99 ppt by dr karim
Fidic 99 ppt by dr karimFidic 99 ppt by dr karim
Fidic 99 ppt by dr karim
 

More from Arthur Wilson

Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
Arthur Wilson
 
Law relating-to-payment
Law relating-to-paymentLaw relating-to-payment
Law relating-to-payment
Arthur Wilson
 
Vm assignment - presentation slide (1)
Vm   assignment - presentation slide (1)Vm   assignment - presentation slide (1)
Vm assignment - presentation slide (1)
Arthur Wilson
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
Arthur Wilson
 
De assignment-finalized-28112017
De assignment-finalized-28112017De assignment-finalized-28112017
De assignment-finalized-28112017
Arthur Wilson
 
De assignment-finalized-28112017 6
De assignment-finalized-28112017 6De assignment-finalized-28112017 6
De assignment-finalized-28112017 6
Arthur Wilson
 
De assignment-finalized-28112017 5
De assignment-finalized-28112017 5De assignment-finalized-28112017 5
De assignment-finalized-28112017 5
Arthur Wilson
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4
Arthur Wilson
 
De assignment-finalized-28112017 3
De assignment-finalized-28112017 3De assignment-finalized-28112017 3
De assignment-finalized-28112017 3
Arthur Wilson
 
De assignment-finalized-28112017 2
De assignment-finalized-28112017 2De assignment-finalized-28112017 2
De assignment-finalized-28112017 2
Arthur Wilson
 
Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0
Arthur Wilson
 
De & be final workshop submission
De & be final workshop submissionDe & be final workshop submission
De & be final workshop submission
Arthur Wilson
 

More from Arthur Wilson (20)

Pm group-compileddd
Pm group-compiledddPm group-compileddd
Pm group-compileddd
 
Activity id
Activity idActivity id
Activity id
 
Pm project-control-compiled
Pm project-control-compiledPm project-control-compiled
Pm project-control-compiled
 
Final 2
Final  2Final  2
Final 2
 
Law relating-to-payment
Law relating-to-paymentLaw relating-to-payment
Law relating-to-payment
 
Cl report final
Cl report finalCl report final
Cl report final
 
Vm assignment - presentation slide (1)
Vm   assignment - presentation slide (1)Vm   assignment - presentation slide (1)
Vm assignment - presentation slide (1)
 
Vm compiled-edited (print)
Vm compiled-edited (print)Vm compiled-edited (print)
Vm compiled-edited (print)
 
De assignment-finalized-28112017
De assignment-finalized-28112017De assignment-finalized-28112017
De assignment-finalized-28112017
 
De assignment-finalized-28112017 6
De assignment-finalized-28112017 6De assignment-finalized-28112017 6
De assignment-finalized-28112017 6
 
De assignment-finalized-28112017 5
De assignment-finalized-28112017 5De assignment-finalized-28112017 5
De assignment-finalized-28112017 5
 
De assignment-finalized-28112017 4
De assignment-finalized-28112017 4De assignment-finalized-28112017 4
De assignment-finalized-28112017 4
 
De assignment-finalized-28112017 3
De assignment-finalized-28112017 3De assignment-finalized-28112017 3
De assignment-finalized-28112017 3
 
De assignment-finalized-28112017 2
De assignment-finalized-28112017 2De assignment-finalized-28112017 2
De assignment-finalized-28112017 2
 
Research proposal draft v3
Research proposal draft v3Research proposal draft v3
Research proposal draft v3
 
Chapter 2 draft v1
Chapter 2 draft v1Chapter 2 draft v1
Chapter 2 draft v1
 
Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0Fm assignment-final-updated v2.0
Fm assignment-final-updated v2.0
 
De & be final workshop submission
De & be final workshop submissionDe & be final workshop submission
De & be final workshop submission
 
Community service
Community serviceCommunity service
Community service
 
Excavation
ExcavationExcavation
Excavation
 

Recently uploaded

Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
vu2urc
 

Recently uploaded (20)

A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)A Domino Admins Adventures (Engage 2024)
A Domino Admins Adventures (Engage 2024)
 
2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...2024: Domino Containers - The Next Step. News from the Domino Container commu...
2024: Domino Containers - The Next Step. News from the Domino Container commu...
 
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptxFactors to Consider When Choosing Accounts Payable Services Providers.pptx
Factors to Consider When Choosing Accounts Payable Services Providers.pptx
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
Scaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organizationScaling API-first – The story of a global engineering organization
Scaling API-first – The story of a global engineering organization
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024Tata AIG General Insurance Company - Insurer Innovation Award 2024
Tata AIG General Insurance Company - Insurer Innovation Award 2024
 
Presentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreterPresentation on how to chat with PDF using ChatGPT code interpreter
Presentation on how to chat with PDF using ChatGPT code interpreter
 
Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...Driving Behavioral Change for Information Management through Data-Driven Gree...
Driving Behavioral Change for Information Management through Data-Driven Gree...
 
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdfUnderstanding Discord NSFW Servers A Guide for Responsible Users.pdf
Understanding Discord NSFW Servers A Guide for Responsible Users.pdf
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men08448380779 Call Girls In Civil Lines Women Seeking Men
08448380779 Call Girls In Civil Lines Women Seeking Men
 
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time AutomationFrom Event to Action: Accelerate Your Decision Making with Real-Time Automation
From Event to Action: Accelerate Your Decision Making with Real-Time Automation
 
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
Strategies for Unlocking Knowledge Management in Microsoft 365 in the Copilot...
 
A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024A Call to Action for Generative AI in 2024
A Call to Action for Generative AI in 2024
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
GenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day PresentationGenCyber Cyber Security Day Presentation
GenCyber Cyber Security Day Presentation
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 

Document samples

  • 1. TENDERS DOCUMENT Ar. Wilson Y.S. Liew Director of Architect Works
  • 2. INSTRUCTIONS TO TENDERERS 1. SCOPE OF WORK The work consists of the supply of all labor, material, equipment and supervision Necessary to complete the work shown, or described by, or reasonably inferred from These contract documents. Without limiting the qualifications of the foregoing the work Works 2.GENERAL CONDITIONS, STANDARD SPECIFICATIONS AND DRAWINGS All work shall be carried out in accordance with the current Selangor Province Standards Specifications and Drawings as adopted by the Works, and the current Works Supplemental Specifications and Drawings. The current General Conditions apply to this contract and will be included in the legal documents. 3.SOILS REPORTS These reports are prepared for design purposes, and when provided to the bidders are for information only. Contractors bidding on or undertaking the works, must rely on their own investigation and interpretation of this information, and draw their own conclusions as to how this information will affect their bidding and construction techniques. 4.SUBSTITUTIONS Where, pursuant to the contract documents, the Contractor is required to supply an article or group of related articles designated by trade or supplier’s name followed by the words “or approved equal” or similar such terminology, the tender shall be based only upon supplying the article or group of articles so designated, which shall be regarded as the standard of quality required by the specifications. No ruling on a proposed substitution and “approved equal” will be made prior to acceptance of a tender. No substitutions shall be made without the prior approval of the General Manager. No tender price shall be based on a presumed acceptance by the General Manager, of a substitute item of supply. 5.TENDER INFORMATION MEETING MANDATORY Tenderers are invited to attend a Mandatory Tender Information Meeting in Committee Room 2 Majlis Perbandaran Subang Jaya, Persiaran Perpaduan, Jalan USJ 5, 47610 Subang Jaya, Selangor, at 2:00pm local time on 24th July 2013 The purpose of the meeting is to provide additional information, if required, and to answer questions concerning the project and contract documents. All Tenderers are urged to attend the Mandatory Tender Information Meeting. Any new information or project changes given at the meeting will be covered by an Addendum to the Contract which will be issued prior to the tender closing date. .
  • 3. 6.ADDENDA Tenderers may, during the tendering period, be advised by addenda of required additions to, deletions from, or alterations in the requirements of the tender documents. All Addenda shall be posted on the Works’s website. Addenda will be issued under the following circumstances: a) Interpretation of tender documents as a result of queries from prospective bidders; b) Revision, deletions, additions or substitutions of any portion of tender documents. All such changes as addressed in the addenda shall become an integral part of the tender documents and shall be allowed for in arriving at the tender price. Oral instructions shall not be considered valid unless they are confirmed in writing by the General Manager. 7.PREQUALIFICATION If a Tenderer has not prequalified by the Annual Prequalification Procedure then the procedure outlined in this section shall be followed. There will be no Annual Prequalification for work pertaining to Water Plants, Wastewater Plants, Bridges and Environmental projects. These contracts will haveprequalification at the time of tendering. [When tendering Sewer, Water and/or Road Projects] Tenderers must submit the following documents, prior to the specified deadline for application for prequalification: 8.TENDER CONFIDENTIALITY The Works of Greater Sudbury will consider all tenders as confidential, subject to the provisions set out in the Municipal Freedom of Information and Protection of Privacy Act. The names of the Tenderers and the total amount of the tenders will be made available to the public. However, unit prices will notbe made available to the public. 9.TENDER DEPOSIT, PERFORMANCE GUARANTEE Each tender must be accompanied by one of the following alternatives: A) A tender deposit in the form of a certified cheque or Letter of Credit in the amount of RM(5% of estimate). The Tenderer must also provide an Agreement to Bond from a Bonding Company whereby the Bonding Company agrees to provide a 100 percent Performance Bond, in a form acceptable to the Works Solicitor. An Agreement to Bond for any previous tender, or a Performance Bond from any previous contract is not an acceptable alternative to the Agreement to Bond requested. B) A tender deposit in the form of a Bid Bond in the amount of RM(15% of estimate).The Tenderer must also provide an Agreement to Bond from a Bonding Company whereby the Bonding Company agrees to provide a 100 percent Performance Bond, in a form acceptable to the Works Solicitor. An Agreement to Bond for any previous tender, or a Performance Bond from any previous contract is not an acceptable alternative to the Agreement to Bond requested.
  • 4. 10.GOVERNMENT TAXES The following government tax requirements are summarized only and full particulars are contained in Section 108 -10 of the GENERAL CONDITIONS which shall in cases prevail. a)Gasoline and Fuel Taxes The Contractor shall pay all taxesunder the Gasoline Tax Act and the Motor Vehicle Fuel Tax Act on gasoline and diesel fuel used by him in the performance of the contract. b)Harmonized Sales Tax (HST) Applicable HST shall not be included in the unit prices tendered. HST shall be added at the end of the Schedule of Unit Prices to arrive at the Total Contract Price. c)Changes to Government Taxes Where a change in Canadian Federal or Provincial taxes occur after the Tender Closing Date for this contract, and this change could not have been anticipated at the time of bidding, the Works will increase or decrease contract payments to account for the exact amount of tax change involved. 11.WITHDRAWAL PROCEDURES A bidder may request that his or her submitted tender be withdrawn, up until the closing time for a particular contract . Withdrawals can only be made in person and the bidder wishing to withdraw from a particular tender must attend at the Purchasing Agent’s office and execute an appropriate withdrawal form, signed by a principal of the bidder, or provide a letter from thebidder, signed by a principal, withdrawing the tender. The Agent and Treasurer together shall then open the Tender Box, retrieve the withdrawn Tender, and hand it back unopened to the bidder. The completed withdrawal form, specific to the time of return, shall then be signed by the Agent and Treasurer, placed into the Tender Box and the Tender Box relocked. The withdrawal of a tender does not disqualify a bidder from submitting another tender for the same contract provided that all of the tender procedures are observed and the new bid is deposited in the tender box prior to the terminal time for closure. However, unless withdrawal procedures have been followed, more than one tender from the same bidder will result in the disqualification of the bidder. The Bid Deposit shall be forfeited to the Corporation when a bidder attempts to withdraw his or her tender after tenders have been opened, in addition to any consequence or legal penalty that may apply.Occasionally, there may be more than one contract opened at the same tender opening. Immediately following the reading of tenders for any contract, the low Tenderer for that contract may withdraw upon written request signed by a principal of the company, any or all of his remaining tenders for the balance of tenders yet to be opened and read, and these will be returned, unopened, immediately to the Tenderer. Any such withdrawal(s) will not be reinstated under any circumstances, even if subsequent checking proves that tenders not withdrawn are in fact n ot the lowest of all tenders read.
  • 5. 12. VALIDITY OF TENDERS SCHEDULE "C" to By-Law 2006-270 of the Works of Greater Sudbury IRREGULARITY RESPONSE 1 Late Bid. Automatic rejection and not opened or read publicly. 2 Unsealed Envelope. Automatic rejection. 3 No Bid Security or agreement to bond or insufficient Bid Deposit or agreement to bond. Automatic rejection. 4 Bids completed and/or signed in erasable medium. Automatic rejection. 5 All required sections of Bid documents not completed. Automatic rejection unless, in the consensual opinion of the Agent, General Manager in charge of the Bid Solicitation and the Works Solicitor, the incomplete nature is trivial or insignificant. 6 Qualified Bids (Bids qualified or restricted by an attached statement). Automatic rejection unless, in the consensual opinion of the Agent, General Manager in charge of the Bid Solicitation and the Works Solicitor, the qualification or restriction is trivial or not significant. 7 Bids received on documents other than those provided or specified by the Works. Automatic rejection. 8 Bids Containing Clerical Errors, which are trivial or insignificant.48 hours to correct and initial errors. The determination of what constitutes trivial or insignificant errors shall be made in the consensual opinion of the Agent, General Manager in charge of the Bid Solicitation and the Works Solicitor 9 Failure to execute Agreement to Bond (Surety's Consent) or Bonding company corporate seal or signature missing from Agreement to Bond. Automatic rejection. 10 (a)Failure to execute Bid Bond by Bidder and Bonding Company. Automatic rejection. (b)Corporate seal of the Bidder and Bonding Company, missing.48 hours to correct.11Documents -Execution (a) Corporate seal or signature missing; signatory's authority to bind the corporation or signature missing. 48 hours to rectify situation. (b) Corporate seal and signature missing; signatory's authority to bind the corporation and signature missing. Automatic rejection.
  • 6. 12 Erasures, Overwriting or Strike-Outs which are not initialed: (a) uninstalled changes to the Tender documents, other than unit prices, which are trivial or not significant; 48 hours to initial. The determination of what constitutes trivial or insignificant uninitialled changes shall be made in the consensual opinion of the Agent. General Manager in charge of the Bid Solicitation and the Works Solicitor. (b) unit prices in the Schedule of Prices have been changed but not initialed and the Contract totals are consistent with the price as changed; 48 hours to initial change in unit price. The determination of what constitutes trivial or insignificant uninitialled changes shall be made in the consensual opinion of the Agent, General Manager in charge of the Bid Solicitation and the Works Solicitor. (c) unit prices in the Schedule of Prices which have been changed but not initialed and the Contract totals are inconsistent with the price as changed; Automatic rejection. 13 Mathematical errors which are not consistent with unit prices. 48 hours to initial corrections as made by the Supplies and Services Division. 14 Bids, in which all necessary Addenda, which have financial implication, have not been acknowledged. Automatic rejection. 15 Any other irregularities. The Agent, General Manager in charge of the Bid Solicitation and the Works Solicitor acting in consensus shall have authority to waive other irregularities or grant 48 hours to initial such other irregularities, which they jointly consider to be trivial or insignificant. 13. ACCEPTANCE OF TENDER AND EXECUTION OF CONTRACT The Tenderer agrees that, notwithstanding anything to the contrary in this Contract, that a maximum of sixty days shall be allowed between the date that tenders are opened and the date that a tender is awarded, cancelled, or recalled. Following contract award, the Corporation shall notify the successful Tenderer that his tender has been accepted. The formal contract agreement will also be sent to the successful Tenderer, with instructions on how to properly complete and sign the document. The successful Tenderer is to be allowed not more than Fourteen (14) days from receipt of the document for the execution of the contract document. Failure to execute the contract documents or to provide the necessary guarantees, insurance, etc. within the specified time may result in the forfeiture of the Tender Deposit. 14.RIGHT OF WORKS The Works reserves the right to reject any or all tenders. The Works shall not accept any inconsistency in the Unit Prices bid for the various items. The Works reserves the right to delete any portion or part of the work outlined and the bidder agrees to such cancellation without any claim whatsoever because of such cancellation. 15. CONTRACT AWARD The Contract award is subject to receipt of . Lowest or any tender not necessarily accepted. 19. WORKPLACE SAFETY AND INSURANCE BOARD Tenderers should submit a current Clearance Certificatefrom Workplace Safety and
  • 7. Insurance Board with their tender submission orthe successful Tenderer shall be required to provide a current Clearance Certificatefrom the Workplace Safety and Insurance Board stating that the company is in good standing with the Board, prior to the signing of the contract documents by the Works. In addition, the successful Tenderer shall be required to provide a current Clearance Certificateto Construction Services for the payment of monthly progress certificates. Progress payment shall not be issued without a current Clearance Certificate. This also applies to any other payment. ACCESSIBILITY The Works is committed to the accessibility principles of preventing and removing barriers in accessing goods and services for people with disabilities and is bound by the Standards under the Accessibility for Ontarians with Disabilities Act, 2005 as may be amended from time to time. Regulations enacted under the Act apply to every designated public sector organization and other third parties that provide goods and services to the members of the public. The consultant/contractor, and all sub-contractors hired by the consultant/contractor in the completion of its work, will meet or exceed compliance with all applicable regulations under the Accessibility for Ontarians with Disabilities Act, 2005 as may be amended from time to time. It is the consultant/contractor’s responsibility to ensure they are fully aware of, and meet all requirements under the Act.