Presentation by Andy Wall and Garry Nodwell at Building Information Modelling - redefining the role of the project manager. Conference from the APM Knowledge SIG, 27th March 2014, University of Salford
3. Contents
• A bit of fun - Lyrics quiz & BIMGO AW
• Knowledge Management and BIM AW
• Big BIM and Little BIM in UU AW
• Moving from Project information to Asset Lifecycle information AW
• Preparing for AMP6 GN
• BIM Working with our partners in AMP 6 – (challenges and opportunities) GN
• What does this mean for the Project Manager GN
4. Which one are you ?
Daydream Believer
Oh, I could hide 'neath the wings
Of the bluebird as she sings.
The six o'clock alarm would never ring.
But six rings and I rise,
Wipe the sleep out of my eyes.
My shavin' razor's cold and it stings
I’m a Believer
I thought love was only true in fairy tales
Meant for someone else but not for me.
Love was out to get me
That's the way it seemed.
Disappointment haunted all my dreams.
6. What is Knowledge Management ?
“…..the process of capturing, developing,
sharing, and effectively using
organisational knowledge. It refers to a multi-
disciplined approach to achieving organisational objectives by making the
best use of knowledge.
7. What is BIM ?
“…..the collection, organization, and managed
accessibility to data and information related to a
building or buildings that may be used for a wide range of purposes that may
include planning, construction, life-cycle monitoring, risk assessments, and
eventually decommissioning and disposal.”
http://chrisamoor.blogspot.co.uk/#!
8. Building Information Modelling (BIM)
Key Drivers
•Reducing risk and waste by improving the way in which we collect,
collate, store and reuse data.
•Improving the environment in which design, construction and asset
lifecycle data/information is authored
•Improving the process for maintaining operational, maintenance, health
and safety asset lifecycle data/information
•Realising cost savings through BIM adoption.
• Industry claim 20% savings are available
BIM is driving fundamental changes to the way industry works
11. Big BIM - What will be Different ?
• Graduated handover of asset lifecycle data
• Having access to trusted asset lifecycle data through easy to use portals
• Less documents and renditions to process
• Improved data, better information and reliable asset knowledge
• Having a common data structure
• A common data environment to store our data
• Reduced requirement for site visits
• More effective data gathering and surveys
“Our focus will be on delivering asset
lifecycle information not just delivering
projects”
13. “Deliver and maintain Digital Asset Information fully integrated with
the enterprise systems to enable us to deliver our customer promises
and outcomes”
DIGITAL ASSET INFORMATION
_INTEGRATED INFORMATION APPROACH
Preparing for AMP6 -
The VISION
15. Operation and Maintenance
Managing our Digital Asset
Engineering Information1
Delivering Digital Asset
Information during the
project phase.
2
Enterprise Asset and Content Management
Assuring Graduated Handover
of Digital Asset Information.3
Maintaining our Digital Asset Information
4
Integrated
Information
Working with our AMP6 partners
(Challenges and Opportunities)
19. Digital Asset Information (BIM data)
Integrated Information Management
Enterprise Systems
Data
Drop 1
Data and Information that lives with the asset
Common Data Environment
single source of information for
any given project, used to
collect, manage and
disseminate all relevant
approved project documents for
multi-disciplinary teams.
Project centric documents
Data and Information that lives with the project
Implementation
Detail Design and Construction
Handover and
Closedown
Maintenance and Asset Integration
Data
Drop 2
Data
Drop 3
20. What Does this mean for the Project
Manager?
• Your behaviour is important