INFRASTRUCTURE AND
CIVIL ENGINEERING

- PLANNING & PROJECTS
- CONTROL AND SUPERVISION

ROADS DEPARTMENT

www.atjconsultores.com
SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA
SPAIN-PARAGUAY- PERU-URUGUAY
VIELLA

PLANNING & PROJECT
ROAD DEPARTMENT

ACTIVITY INFORMATION STUDY OF THE ROAD
N-230 SOPEIRA- FRENCH BORDER.
SECTION: NORTH ENTRANCE OF THE TUNNEL
VIELLA-FRENCH BORDER KK.PP. 151+000 TO
187+100
SELECTED ALTERNATIVE BUDGET
273.557.435 USD
BUDGET CONSULTING
1.102.959 USD

DOCUMENTACION GRAFICA

PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
DE CATALUÑA
PURPOSE OF THE STUDY HIGHLIGHT THE 2A SHAFT
TUNNEL (WITH A 4.560 METERS DEVELOPMENT AND
A 3% SLOPE WITH WHICH DESCENDS MORE THAN 130
METERS OF ALTITUDE) AND THE VIADUCT ( 2H SHAFT,
KP 2+155) OVER THE RIVER GARONA WITH A LENGTH OF
955 METERS.

GENERAL INFORMATION:
- APPROXIMATE LENGTH: 36 KM
- PROJECT SPEED: 80 KM/H
- ROAD WIDTH: 7,00 M.
- ROAD VERGES: 1,50 M. OF ALTITUDE
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

PLANNING & PROJECT

	
  
PLANNING & PROJECT
ROAD DEPARTMENT

ZARAGOZA

ACTIVITY LAYOUT AND CONSTRUCTION PROJECT.
A-68 HIGHWAY.
SECTION: EL BURGO DE EBRO – FUENTES DE
EBRO ( APPROXIMATE K.K.P.P. OF THE CURRENT
N-232 ROAD: 207,5 TO 224,9)
BUDGET
55.500.000 USD
BUDGET CONSULTING
1.335.870 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
EN ARAGÓN.
PURPOSE OF THE STUDY THE STRETCH OF THE
ROAD PROJECTED BETWEEN K.P. 208 AND 212,5
CORRESPONDS TO ONE RELIEF ROAD WHICH WILL
PREVENT THE PASSAGE OF LONG JOURNEY TRAFFIC BY
THE MUNICIPALITY OF FUENTES DE EBRO, PROVINCE
OF ZARAGOZA. THE PROJECT PROVIDES THE FUTURE
DUPLICATION OF THE ROAD BY THE SOUTH, THE PART
MOST DISTANT FROM THE MUNICIPALITY.

CROSS SECTION TWO LANES AND 7 M WIDE ROAD. 1,50 M WIDE ROAD VERGES.
THE BERMS WIDE IN THE CROSS SECTION IS 1,90 M AT THE LEFT MARGIN AND 0,90 M
AT THE RIGHT MARGIN.
GENERAL INFORMATION:
- APPROXIMATE LENGTH: 17,7 KM
- SPEED PROJECT: 100 KM/H
- ROAD WIDTH: 7,00 M
- ROAD VERGES: 2,50 M (EXTERNAL) Y 1,50
(INTERIOR).
- MEDIAN: 8,00 M
PLANNING & PROJECT

TOTAL NUMBER OF PLANNED STRUCTURES: THREE OVERPASSES AND FOUR UNDERPASSES, PLUS THREE MORE FRAMEWORKS TO PASS PATHS. IS THE TYPE OF PREFABRICATED BEAM BRIDGES, TYPE “DOUBLE T” OR “DRAWER”, AND THE FOUNDATION IS
GENERALLY SUPERFICIAL, USING BRAKE SHOES.
TALAVERA
DE LA REINA

PLANNING & PROJECT
ROAD DEPARTMENT

ACTIVITY CONSTRUCTION PROJECT: TALAVERA
DE LA REINA SOUTHWEST RELIEF ROAD.
SECTION: CURRENT LINK FROM THE N-V TO
APPROXIMATELY THE 122,5 K.P. OF THE N-502
ROAD, SOUTH OF TALAVERA.
BUDGET
47.935.262 USD
BUDGET CONSULTING
746.140 USD

PLANO DE CONJUNTO DE ALTERNATIVAS
PROCESO CONSTRUCTIVO DEL VIADUCTO:

PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
EN CASTILLA-LA MANCHA.
VIADUCT OVER THE RIVER TAJO PRESTRESSED
CONCRETE VIADUCT. BUILDING USING THE SUCCESSIVE
CANTILEVER TECHNIQUE WITH TRAVELLING FORMWORK.
TOTAL LENGTH: 253,75 METERS
MAIN LIGHT ON THE RIVER: 114 METERS

VIADUCT over the river tajo K.P. 5+400

DOCUMENTACION GRAFICA

GENERAL INFORMATION:
- APPROXIMATE LENGTH: 6.025 METROS
- CONVENTIONAL ROAD
- SPEED PROJECT: 100 KM/H
- ROAD WIDTH: 7,00 M
- ROAD VERGES: 1,50 M
OTHER FEATURES: THOSE CONTAINED IN THE CURRENT
STANDARD 3.1-IC LAYOUT FOR A CONVENTIONAL ROAD
FINAL PROJECT SPEED.
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

PLANNING & PROJECT
PLANNING & PROJECT
ROAD DEPARTMENT

ACTIVITY IMPROVING CONNECTION AND ACCESSIBILITY BETWEEN THE ROADS OF BAIX LLOBREGAT ENVIRONMENT.
ITS PURPOSE IS TO OFFSET THE TRAFFIC CONGESTION PROBLEMS IN THIS AREA AND IMPROVE THE CONNECTION BETWEEN ROUTES OF
LARGE CAPACITY, LIKE BAIX LLOBREGAT FREEWAY (A-2), AP-2 HIGHWAY AND B-24 FREEWAY.
BUDGET
53.798.000 USD
BUDGET CONSULTING
1.309.659 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
EN CAtaluña.
PURPOSE OF THE STUDY Improve connectivity
and accessibility between the roads of the study
area, around Baix Llobregat.
Its purpose is to alleviate the traffic congestion
problems in that area and to improve the connection between high capacity roads such as the
Baix Llobregat freeway (A-2), the AP-2 highway
and the B-24 freeway.

GENERAL INFORMATION:
- APPROXIMATE LENGTH: 17,7 KM
- SPEED PROJECT: 100 KM/H
- ROAD WIDTH: 7,00 M
- ROAD VERGES: 2,50 M (EXTERNAL) Y 1,50
(INTERIOR).
- MEDIAN: 8,00 M
PLANNING & PROJECT

BAIX
BAEZA

CONTROL AND SUPERVISION
ROAD DEPARTMENT

ACTivity FREEWAY A-316
SECTIONS: BAEZA WEST LINK TO PUENTE DEL
OBISPO NORTH LINK.
BUDGET
46.079.986 USD
BUDGET CONSULTING
1.603.565 USD
PROMOTER
- JUNTA DE ANDALUCÍA
- GESTIÓN DE INFRAESTRUCTURAS DE
ANDALUCÍA, S.A.
- CONSEJERÍA DE OBRAS PÚBLICAS Y
TRANSPORTES.
GRAPHIC DOCUMENTATION:

GENERAL INFORMATION:
- APPROXIMATE LENGTH: 4,660 KM
- PROJECT SPEED: 100 KM/H
- TYPE SECTION: 2 CARRIAGEWAYS (WIDTH: 7,00
METERS EACH)
- ROAD VERGES: 2,50 M (EXTERNAL) AND 1 M (INTERIOR)
- EXTERIOR BERMS WIDTH: 1 M
- MEDIAN WIDTH: 6 M (BETWEEN EDGES AND ROAD
VERGES)
- MINIMUM RADIUS: 800 METERS
- MAXIMUM SLOPE: 7%
- MINIMUM SLOPE: 4 %
- UNDERPASS: 4
- LOWER PASS: 3
- CLEARING: 1.403.875 M³
- FILL: 1.216.406 M³
- ESPLANADE VOLUME: 153.598 M³
- HMA (HOT MIX ASPHALT): 64.588,26 TM
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

CONTROL AND SUPERVISION
control and supervision
ROAD DEPARTMENT

MÁLAGA

ACTIVITY
CONSULTING AND ASSISTANCE IN
SAFETY AND HEALTH OF THE WEST MALAGA NEW
ROUND RING.
SECTION I: CONNECTION AP-7/MA-417.
SECTION II: CONNECTION MA-417 WITH GUADALHORCE FREEWAY A-357
SECTION III: CONNECTION GUADALHORCE FREEWAY A-357 WITH C-3310
SECTION IV: CONNECTION C-3310 WITH FREEWAY
A-7.
BUDGET
591.722.944 USD
BUDGET CONSULTING
1.120.473.96 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
DE ANDALUCIA ORIENTAL.
CHURRIANA TUNNEL STRUCTURE: THE ROAD TUNNEL WITH THE LARGEST SECTION OF EUROPE. COMPOSED
BY 2 TUBES OF 1.250 METERS AND 1.213 METERS OF
LENGTH THAT RUN PARALLEL SEPARATED 50 METERS
BETWEEN THEM.
TUNNEL SECTION: 119,85 M². EVERY TUBE WILL HAVE
CAPACITY FOR 4 LANES OF 3,5 METERS OF WIDTH, WITH
ROAD VERGES AND SIDEWALK OF 1 METER AT BOTH
SIDES OF THE TUNNEL. THE PROJECT SPEED IS 100 KM/
HOUR. SECTION EXCAVATED IS 18 METERS WIDE.
MERCAMALAGA VIADUCT

CONTROL AND SUPERVISION

GRAPHIC DOCUMENTATION:
BAIX

CONTROL AND SUPERVISION
ROAD DEPARTMENT

ACTIVITY EXTENSION OF THE BAIX-LLOBREGAT
FREEWAY.
SECTIONS: RONDA LITORAL (COASTAL RING ROAD)
– HIGHWAY A16
BUDGET
88.462.696 USD
BUDGET CONSULTING
1.326.694 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
EN CAtaluña.

GENERAL INFORMATION:
- TOTAL LENGTH (TRUNK): 2.000 METERS
- PROJECT SPEED: 80 KM/H
- GENERIC MINIMUM RADIUS: 500 METERS
- MAXIMUM SLOPE: 4, 29 %
- ROAD TYPE SECTION:
- LANES 2x3,5 METERS
- ROAD VERGES: 2,50/1,00 METERS
- EXCAVATION: 476.778,95 M³
- FILL: 497.083,70 M³
- MIX ASPHALT: 101.084,133 TM
23 STRUCTURES, THE LARGEST IS 180 METERS LONG.
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

CONTROL AND SUPERVISION
control and supervision
ROAD DEPARTMENT

ACTIVITY IN THE BED OF THE RIVER LLOBREGAT.
BUDGET
59.772.092,26 USD
BUDGET CONSULTING
1.877.519 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
EN CATALUÑA.

CONTROL AND SUPERVISION

SANT BOI DE
LLOBREGAT
graphic documentation:

TALAVERA DE
LA REINA

CONTROL AND SUPERVISION
ROAD DEPARTMENT

ACTivity TALAVERA DE LA REINA SOUTHWEST
RELIEF ROAD.
SECTION: CURRENT LINK FROM THE N-V TO APPROXIMATELY THE 122,5 K.P. OF THE N-502
ROAD, SOUTH OF TALAVERA.
BUDGET
34.047.639 USD
BUDGET CONSULTING
2.176.443 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE ESTADO DE INFRAESTRUCTURAS
Y PLANIFICACIÓN
- DIRECCIÓN GENERAL DE CARRETERAS
- DEMARCACIÓN DE CARRETERAS DEL ESTADO
EN CASTILLA LA MANCHA.
GRAPHIC DOCUMENTATION:

GENERAL INFORMATION:
- EXCAVATION: 206.793 M³
- FILLS: 1.328.487 M³
- SOIL STABILIZED WITH CEMENT: 23.551 M³
- ARTIFICIAL GRAVEL: 17.944 M³
- MIX ASPHALT: 49.105 TM
- CROSS DRAINAGE WORKS: 9+8 UNITS
- LINKS: 3 UNITS
- STRUCTURES: 15 UNITS
- VIADUCTS: 4 UNITS (VIADUCT ON BRANCH 6 ON THE
CREEK BATADÍEZ AND ALBERCHE CHANNEL: 120 M;
VIADUCT ON BATADÍEZ CREEK K.P. 1+660: 160 M; VIADUCT ON BÁRRAGO CREEK K.P. 3+530:81 M; BRIDGE
ON THE RIVER TAJO K.P. 5+400: 253,75 M).
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

CONTROL AND SUPERVISION
control and supervision
ROAD DEPARTMENT

AGÜIMES

ACTIVITY REMODELING AND CONSTRUCTION OF
LINKS AND SERVICE ROADS.
ROAD GC-1
K.P. 23,080 TO 28,500
SECTION: AGÜIMES-SANTA LUCÍA
BUDGET
23.023.405,32 USD
BUDGET CONSULTING
1.912.865 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE CARRETERAS
- GOBIERNO DE CANARIAS
- DIRECCIÓN GENERAL DE INFRAESTRUCTURA
VIARIA
- ÁREA DE CARRETERAS

GRAPHIC DOCUMENTATION

CONTROL AND SUPERVISION
PLANO DE CONJUNTO

PISIGA

CONTROL AND SUPERVISION
ROAD DEPARTMENT

ACTIVITY SUPERVISION OF THE HUACHACALLAPISIGA ROAD CONSTRUCTION
BUDGET
28.779.853,16 USD
BUDGET CONSULTING
305.813 USD
PROMOTER
- ADMINISTRADORA BOLIVIANA DE CARRETERAS

GENERAL INFORMATION:
- TOTAL LENGTH: 71+248 KM
- ROAD WIDTH: 10 METERS ( 2 BERMS TO BOTH SIDES
OF 1 METER LANE, AND 4 METRES OF TWO-WAY
LANE).
- PAVEMENT TYPE: RIGID PAVEMENT
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

CONTROL AND SUPERVISION
control and supervision
ROAD DEPARTMENT

ACTIVITY ZUDAÑEZ - PADILLA
BUDGET
204.391.690,57 USD
BUDGET CONSULTING
989.200 USD
PROMOTER
- ADMINISTRADORA BOLIVIANA DE CARRETERAS

GENERAL INFORMATION:
- TOTAL LENGTH: 68 + 688 KILÓMETROS.
- ROAD WIDTH: 7 METERS ( 2 BERMS TO BOTH SIDES
OF 1 METER LANE, AND 3,5 METRES OF TWO-WAY
LANE).
- PAVEMENT TYPE: double superficial treatment 204.391.690,57 BS of contract from
contractor company.
CONTROL AND SUPERVISION

ZUDAÑEZ-PADILLA
INFRASTRUCTURE AND
CIVIL ENGINEERING

- PLANNING & PROJECTS
- CONTROL AND SUPERVISION

RAILWAY DEPARTMENT

www.atjconsultores.com
SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA
SPAIN-PARAGUAY- PERU-URUGUAY
SANTA CATALINA

PLANNING & PROJECT
RAILWAY DEPARTMENT

ACTIVITY SANTA CATALINA STATION
CONSTRUCTION PROJECT.
BUDGET
8.756.428 USD
BUDGET CONSULTING
327.942,29 USD
PROMOTER
- CANARY ISLAND GOVERNMENT

LOCATION OF THE STATION

WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

PLANNING & PROJECT
ZARAGOZA-TERUEL

control and supervision
RAILWAY DEPARTMENT

ACTIVITY CANOPIES INSTALLATION AND
ADEQUEACY OF PEDESTRIAN ZONES.
TERUEL-ZARAGOZA RAILWAY.
BUDGET
18.833.163 USD
BUDGET CONSULTING
1.204.371 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y
ESTRUCTURAS.
- DIRECCIÓN GENERAL DE INFRAESTRUCTURAS
FERROVIARIAS.

GRAPHIC DOCUMENTATION :

GENERAL INFORMATION:
- LENGHT: 200 KILOMETERS
- RAILWAY TYPE: TWO-TRACK RAIL LINE
- TRAFIC: GOODS AND PASSENGERS
CONTROL AND SUPERVISION
control and supervision
RAILWAY DEPARTMENT

PICAMOIXONSRODA DE BARA

ACTIVITY SUPPRESSION OF LEVEL CROSSING
AT THE PLANA DE PICAMOIXONS-RODA DE BARÀ
LINE.
SECTION: KILOMETER POINTS 0/049, 0/715,
8/453, 10/470, 15/200, 16/964, 20/970,
23/174, 24/628
BUDGET
15.200.120 USD
BUDGET CONSULTING
1.838.180 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE PLANIFICACIÓN E
INFRAESTRUCTURAS
- DIRECCIÓN GENERAL DE INFRAESTRUCTURAS
FERROVIARIAS.

GENERAL INFORMATION:
- NUMBER OF LEVEL CROSSING: 10
- RAILWAY TYPE: Two-track rail line
- TRAFFIC: GOODS AND PASSENGERS
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

CONTROL AND SUPERVISI0N
CHINCHILLACARTAGENA

control and supervision
RAILWAY DEPARTMENT

ACTIVITY CONTROL AND SUPERVISION OF THE
CONSTRUCTION “IMPROVEMENT OF ROADS AND
ANCILLARY CONSTRUCTIONS AT CHINCHILLACARTAGENA LINE, SECTION:
CHINCHILLA-AGRAMON” AND L.C. SUPPRESSION
AT: CHINCHILLA-TOBARRA
TOBARRA-ABRAMON
BUDGET
90.761.646 USD
BUDGET CONSULTING
1.693.128 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y
ESTRUCTURAS.
- DIRECCIÓN GENERAL DE INFRAESTRUCTURAS
FERROVIARIAS.

GRAPHIC DOCUMENTATION :

CONTROL AND SUPERVISION
INFRASTRUCTURE AND
CIVIL ENGINEERING

- PLANNING & PROJECTS
- CONTROL AND SUPERVISION

HYDRAULIC PROJECTS DEPARTMENT

www.atjconsultores.com
SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA
SPAIN-PARAGUAY- PERU-URUGUAY
CUENCA

PLANNING & PROJECT
HYDRAULIC PROJECTS DEPARTMENT

ACTIVITY TECHNICAL ASSISTANCE FOR
DRAFTING SANTA MARINA´S TANK
CONSTRUCTION PROJECT.
BUDGET
15.565.928 USD
BUDGET CONSULTING
1.300.562 USD
PROMOTER
- AGUA DE LAS CUENCAS DEL SUR

PIPELINE
SECTION

TANK
VIEW

GENERAL INFORMATION:

CROSS
SECTION
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

8000 m3 TANK CAPACITY DIVIDED INTO TWO EQUAL
VESSELS AND WITH A PUMPING SYSTEM WITH A MAXIMUM FLOW OF 446,4 m3/H AND 33 mETERS OF MANOMETRIC HEIGHT. THIS DEPOSIT WILL SUPLY FROM THE
“MANCOMUNIDAD DE GIRASOL” DRINKING-WATER
TREATMENT PLANT, THROUGH A 200 METERS
DIAMETER DUCTIL IRON PIPELINE, INCLUDED WITHIN
THE PERIMETER RING CONSTRUCTION IN TARANCON.
PLANNING & PROJECT
ORENSE

CONTROL AND SUPERVISION
HYDRAULIC PROJECTS DEPARTMENT

ACTIVITY IMPROVING CONTAINMENT DEFENSE
ELEMENTS ON THE “RIAS BAIXAS” FREEWAY.
SECTIONS: A-52, K.P. 112,230 TO 267,100
PROVINCE OF ORENSE (SPAIN).
BUDGET
38.480.000 USD
BUDGET CONSULTING
1.066.399 USD
PROMOTER
- MINISTERIO DE FOMENTO
- SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y
ESTRUCTURAS.
- DIRECCIÓN GENERAL DE CARRETERAS.
GRAPHIC DOCUMENTATION :

GRAPHIC DOCUMENTATION :

CONTROL AND SUPERVISION
CONTROL AND SUPERVISION
HYDRAULIC PROJECTS DEPARTMENT

VELILLA

ACTIVITY TECHNICAL ASSISTANCE FOR THE
DEVELOPMENT OF TERTIARY TREATMENT
CONSTRUCTION (VELILLA DE SAN ANTONIO
Y ARANJUEZ NORTH´S WWTP-WASTEWATER
TREATMENT PLANT) AND IRRIGATION WATER
SUPPLY WITH RECLAIMED WATER
(MUNICIPALITIES OF ARANJUEZ AND
TRES CANTOS, MADRID, SPAIN)
BUDGET
12.565.235 USD
BUDGET CONSULTING
605.308 USD
PROMOTER
- CANAL DE ISABEL II

GRAPHIC DOCUMENTATION :

GENERAL INFORMATION:
PROVIDE THE VELILLA DE SAN ANTONIO´S (MADRID)
WASTEWATER TREATMENT PLANT WITH A TERTIARY
TREATMENT THAT ALLOWS THE REUSE OF THE
TREATED WATER FOR THE PUBLIC GREEN ZONES
IRRIGATION IN THE MUNICIPALITIES OF SAN ANTONIO
AND MEJORADA DEL CAMPO, SPAIN.
THE TERTIARY TREATMENT WILL BE SIZE FOR A CAPACITY OF 3.000 m3/DAY.
THE PLANT WILL BE IMPLEMENTED IN CIVIL
CONSTRUCTION FOR THE FUTURE FLOW AND ONLY
WILL BE EQUIPPED FOR THIS FIRST PHASE, SO THAT
IN THE FUTURE EXTENSION ONLY THE REQUIRED
EQUIPMENT SHOULD BE PLACED.
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

CONTROL AND SUPERVISION
RIVAS VACIAMADRID

CONTROL AND SUPERVISION
HYDRAULIC PROJECTS DEPARTMENT

ACTIVITY TECHNICAL ASSISTANCE SERVICE
TO PROJECTS OF REUSING CONSTRUCTIONS
(NETWORKS AND TERTIARY). TERTIARY TREATMENT OF SUR ORIENTAL´S (RIVAS VACIAMADRID,
SPAIN) WWTP.
BUDGET
7.379.000 USD
BUDGET CONSULTING
456.617 USD
PROMOTER
- CANAL DE ISABEL II

GRAPHIC DOCUMENTATION :

TERTIARY TREATMENT

INFLUENT PARAMETERS

EFFLUENT PARAMETERS

Caudales

Actual

Parámetro

Unidad Valor límite

Parámetro

Unidad

Valor límite

Metro diario (m2/día)
Nº de horas de

7000
12

funcionamiento (h)
Medio horario (m2/h)

583.3

DBO2
DQO
SST
Reducción

mg/l
mg/l
mg/l
%

<=25.0
<=125.0
<=35.0
=>80.0

de fósforo
pH

DBO2
SST
Turbidez
pH
Coliformes

mg/l
mg/l
NTU
UFC/100 ml

<=5.0
<=5.0
<=10.0
6.0<=pH<=9.0
<=200

-

6.0<=pH<=9.0

fecales
Nematodos

huevos/10 l <=1.0

intestinales
Cloro residual

mg/l

CONTROL AND SUPERVISION

>=0.6
Contact

web address: www.atjconsultores.com
email: international@atjconsultores.com

HEADQUARTERS (HQ)
La Coruña, 13. 3º Planta.
28020 Madrid, Spain
Contact.: 91 556 38 54 - Fax: 91 556 65

SPAIN
Mallorca, 221. 6é-2a
08008 Barcelona
Contact.: 93 454 06 11
Joaquim Auger, 64-66
08830 Sant Boi de Llobregat
Adelfas, 17
35260 Las Palmas de Gran Canaria (Agüimes)
Contact.: 676 22 39 44
Clariano, Nº 32-2º-4º
46021 Valencia
Contact.: 96 369 70 75

SAUDI ARABIA
Al Khobar/Al-Salah Tower #701.
P.Faisal Bin Fahad Road
Contact.: +966(55).732.8851

ARGENTINA
Sarmiento, 654. Piso 10 Dpto C
B1878GEN, Buenos Aires
Contact.: +54.11.4139.8785

BOLIVIA
Chaco, Pasaje 824. nº 2088.
Zona Sopocachi, La Paz
Contact.: +73007086

URUGUAY
Charrua, 2027
11200, Montevideo
Contact.: +59.122.42.45.49

PARAGUAY
Asunción Boquerón, 594
Contact.: +595.21.224.131

PERU
Jr. Brasil 370
Chosica, 15. Lima
Contact.: +511.767.05.29
WWW.ATJCONSULTORES.COM
WWW.FACEBOOK.COM/ATJCONSULTORES
WWW.TWITTER.COM/ATJCONSULTORES

Más contenido relacionado

Destacado

Relations professionnelles
Relations professionnellesRelations professionnelles
Relations professionnellesartxtra
 
Cómo los beacons y las tecnologías de proximidad ayudan a la industria minorista
Cómo los beacons y las tecnologías de proximidad ayudan a la industria minoristaCómo los beacons y las tecnologías de proximidad ayudan a la industria minorista
Cómo los beacons y las tecnologías de proximidad ayudan a la industria minoristaOpenbravo
 
Civilización Azteca
Civilización AztecaCivilización Azteca
Civilización Aztecali.touma
 
Il campo magnetico
Il campo magneticoIl campo magnetico
Il campo magneticoalbpo
 
Mercadeo en red para la salud
Mercadeo en red para la saludMercadeo en red para la salud
Mercadeo en red para la saludCamilo Acosta
 
Presentación Tecnología MSABP
Presentación Tecnología MSABPPresentación Tecnología MSABP
Presentación Tecnología MSABPJose E Garde
 
Le Scienze Web News Brochure 4145
Le Scienze Web News Brochure 4145Le Scienze Web News Brochure 4145
Le Scienze Web News Brochure 4145PaoloMicheli
 
Integrador Web de Formación para el Empleo en Navarra
Integrador Web de Formación para el Empleo en NavarraIntegrador Web de Formación para el Empleo en Navarra
Integrador Web de Formación para el Empleo en NavarraCarlos Adin Sanz
 
Guía marketing digital contenidos 2.0
Guía marketing digital contenidos 2.0Guía marketing digital contenidos 2.0
Guía marketing digital contenidos 2.0Iñaki Lázaro
 
Zagor - 005 - zivi pokopani part 2
Zagor - 005 - zivi pokopani part 2Zagor - 005 - zivi pokopani part 2
Zagor - 005 - zivi pokopani part 2Blagojce Treneski
 
i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...
i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...
i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...Rezonance
 
obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...
obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...
obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...foamyvirtue3053
 
Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...
Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...
Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...RPKONFIDENTIELLES
 

Destacado (20)

Ponencia MCH
Ponencia MCHPonencia MCH
Ponencia MCH
 
Media ReleaseUS$
Media ReleaseUS$Media ReleaseUS$
Media ReleaseUS$
 
Relations professionnelles
Relations professionnellesRelations professionnelles
Relations professionnelles
 
Cómo los beacons y las tecnologías de proximidad ayudan a la industria minorista
Cómo los beacons y las tecnologías de proximidad ayudan a la industria minoristaCómo los beacons y las tecnologías de proximidad ayudan a la industria minorista
Cómo los beacons y las tecnologías de proximidad ayudan a la industria minorista
 
Civilización Azteca
Civilización AztecaCivilización Azteca
Civilización Azteca
 
Sesión N°2 Lógica PPS Unimet
Sesión N°2 Lógica PPS UnimetSesión N°2 Lógica PPS Unimet
Sesión N°2 Lógica PPS Unimet
 
Il campo magnetico
Il campo magneticoIl campo magnetico
Il campo magnetico
 
Mercadeo en red para la salud
Mercadeo en red para la saludMercadeo en red para la salud
Mercadeo en red para la salud
 
17 reino animalia
17   reino animalia17   reino animalia
17 reino animalia
 
Presentación Tecnología MSABP
Presentación Tecnología MSABPPresentación Tecnología MSABP
Presentación Tecnología MSABP
 
Le Scienze Web News Brochure 4145
Le Scienze Web News Brochure 4145Le Scienze Web News Brochure 4145
Le Scienze Web News Brochure 4145
 
Integrador Web de Formación para el Empleo en Navarra
Integrador Web de Formación para el Empleo en NavarraIntegrador Web de Formación para el Empleo en Navarra
Integrador Web de Formación para el Empleo en Navarra
 
Dossiernavidad2011
Dossiernavidad2011Dossiernavidad2011
Dossiernavidad2011
 
Guía marketing digital contenidos 2.0
Guía marketing digital contenidos 2.0Guía marketing digital contenidos 2.0
Guía marketing digital contenidos 2.0
 
Zagor - 005 - zivi pokopani part 2
Zagor - 005 - zivi pokopani part 2Zagor - 005 - zivi pokopani part 2
Zagor - 005 - zivi pokopani part 2
 
i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...
i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...
i-brain : La plateforme HES qui favorise l'innovation en mode "open" - Sophie...
 
Umor britanic
Umor britanicUmor britanic
Umor britanic
 
obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...
obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...
obsédé de la baise percute énergiquement la moule épilée d'une pompeuse charm...
 
Cp documation 2006 lancement
Cp documation 2006 lancementCp documation 2006 lancement
Cp documation 2006 lancement
 
Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...
Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...
Vol annulé, vol retardé, surbooking ? Air indemnite vous aide à toucher vos i...
 

Similar a AtjConsultores_WorksSheet

Cotes-de-Fer Master Plan / Haiti Tourist Development Project
Cotes-de-Fer Master Plan / Haiti Tourist Development ProjectCotes-de-Fer Master Plan / Haiti Tourist Development Project
Cotes-de-Fer Master Plan / Haiti Tourist Development ProjectStephanie Villedrouin
 
Informe mejoramieto de la via
Informe mejoramieto de la viaInforme mejoramieto de la via
Informe mejoramieto de la viaEDWINMOISES1
 
APP Canal del Dique
APP Canal del DiqueAPP Canal del Dique
APP Canal del DiqueProColombia
 
Apett Presidential Lecture The National Network Of Highway Projects And The...
Apett Presidential Lecture   The National Network Of Highway Projects And The...Apett Presidential Lecture   The National Network Of Highway Projects And The...
Apett Presidential Lecture The National Network Of Highway Projects And The...ceal2005
 
Scp improving urban resilience and housing renewal @ junglighat colony.
Scp   improving urban resilience and housing renewal @ junglighat colony.Scp   improving urban resilience and housing renewal @ junglighat colony.
Scp improving urban resilience and housing renewal @ junglighat colony.ANIRBAN CHOUDHURY
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdfQuote5
 
1. informe final estudio hidrologico e hidraulico - chazuta -dic. 2015
1. informe final   estudio hidrologico e hidraulico - chazuta -dic. 20151. informe final   estudio hidrologico e hidraulico - chazuta -dic. 2015
1. informe final estudio hidrologico e hidraulico - chazuta -dic. 2015KelerPanduroTorres
 
Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...
Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...
Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...Brookings Metropolitan Policy Program
 
Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects NALED Serbia
 
Geometric Design of Channel and Volumetric items and budget estimate - 2015
Geometric Design of Channel and Volumetric items and budget estimate - 2015Geometric Design of Channel and Volumetric items and budget estimate - 2015
Geometric Design of Channel and Volumetric items and budget estimate - 2015Carlos Andrés Castaño Vargas
 
KMTTP PROJECT PROGRESS_14-12-2018.ppt
KMTTP PROJECT PROGRESS_14-12-2018.pptKMTTP PROJECT PROGRESS_14-12-2018.ppt
KMTTP PROJECT PROGRESS_14-12-2018.pptswaongniyogi
 

Similar a AtjConsultores_WorksSheet (18)

StrategicProjects
StrategicProjectsStrategicProjects
StrategicProjects
 
O-3
O-3O-3
O-3
 
Cotes-de-Fer Master Plan / Haiti Tourist Development Project
Cotes-de-Fer Master Plan / Haiti Tourist Development ProjectCotes-de-Fer Master Plan / Haiti Tourist Development Project
Cotes-de-Fer Master Plan / Haiti Tourist Development Project
 
Informe mejoramieto de la via
Informe mejoramieto de la viaInforme mejoramieto de la via
Informe mejoramieto de la via
 
APP Canal del Dique
APP Canal del DiqueAPP Canal del Dique
APP Canal del Dique
 
Oct 2009 acp
Oct 2009 acpOct 2009 acp
Oct 2009 acp
 
Apett Presidential Lecture The National Network Of Highway Projects And The...
Apett Presidential Lecture   The National Network Of Highway Projects And The...Apett Presidential Lecture   The National Network Of Highway Projects And The...
Apett Presidential Lecture The National Network Of Highway Projects And The...
 
Scp improving urban resilience and housing renewal @ junglighat colony.
Scp   improving urban resilience and housing renewal @ junglighat colony.Scp   improving urban resilience and housing renewal @ junglighat colony.
Scp improving urban resilience and housing renewal @ junglighat colony.
 
21dj0036 plan.pdf
21dj0036 plan.pdf21dj0036 plan.pdf
21dj0036 plan.pdf
 
Ssr panos2020
Ssr panos2020Ssr panos2020
Ssr panos2020
 
BAJA OVERVIEW 2013 (ENG V.2.2) (2)
BAJA OVERVIEW 2013 (ENG V.2.2) (2)BAJA OVERVIEW 2013 (ENG V.2.2) (2)
BAJA OVERVIEW 2013 (ENG V.2.2) (2)
 
1. informe final estudio hidrologico e hidraulico - chazuta -dic. 2015
1. informe final   estudio hidrologico e hidraulico - chazuta -dic. 20151. informe final   estudio hidrologico e hidraulico - chazuta -dic. 2015
1. informe final estudio hidrologico e hidraulico - chazuta -dic. 2015
 
Freelance works JLapido
Freelance works JLapidoFreelance works JLapido
Freelance works JLapido
 
Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...
Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...
Edson Aparecido | Metro to Macro Development in São Paulo | Global Cities Ini...
 
Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects Capital Summit 2015: Tirana - Strategic Projects
Capital Summit 2015: Tirana - Strategic Projects
 
Geometric Design of Channel and Volumetric items and budget estimate - 2015
Geometric Design of Channel and Volumetric items and budget estimate - 2015Geometric Design of Channel and Volumetric items and budget estimate - 2015
Geometric Design of Channel and Volumetric items and budget estimate - 2015
 
KMTTP PROJECT PROGRESS_14-12-2018.ppt
KMTTP PROJECT PROGRESS_14-12-2018.pptKMTTP PROJECT PROGRESS_14-12-2018.ppt
KMTTP PROJECT PROGRESS_14-12-2018.ppt
 
Final Project
Final ProjectFinal Project
Final Project
 

Último

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Manik S Magar
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demoHarshalMandlekar2
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024Lonnie McRorey
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Commit University
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfAddepto
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr BaganFwdays
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfAlex Barbosa Coqueiro
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebUiPathCommunity
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxLoriGlavin3
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionDilum Bandara
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenHervé Boutemy
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .Alan Dix
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESmohitsingh558521
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxLoriGlavin3
 

Último (20)

The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!Anypoint Exchange: It’s Not Just a Repo!
Anypoint Exchange: It’s Not Just a Repo!
 
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data PrivacyTrustArc Webinar - How to Build Consumer Trust Through Data Privacy
TrustArc Webinar - How to Build Consumer Trust Through Data Privacy
 
Sample pptx for embedding into website for demo
Sample pptx for embedding into website for demoSample pptx for embedding into website for demo
Sample pptx for embedding into website for demo
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024TeamStation AI System Report LATAM IT Salaries 2024
TeamStation AI System Report LATAM IT Salaries 2024
 
Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!Nell’iperspazio con Rocket: il Framework Web di Rust!
Nell’iperspazio con Rocket: il Framework Web di Rust!
 
Gen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdfGen AI in Business - Global Trends Report 2024.pdf
Gen AI in Business - Global Trends Report 2024.pdf
 
"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan"ML in Production",Oleksandr Bagan
"ML in Production",Oleksandr Bagan
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
Unraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdfUnraveling Multimodality with Large Language Models.pdf
Unraveling Multimodality with Large Language Models.pdf
 
Dev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio WebDev Dives: Streamline document processing with UiPath Studio Web
Dev Dives: Streamline document processing with UiPath Studio Web
 
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptxPasskey Providers and Enabling Portability: FIDO Paris Seminar.pptx
Passkey Providers and Enabling Portability: FIDO Paris Seminar.pptx
 
Advanced Computer Architecture – An Introduction
Advanced Computer Architecture – An IntroductionAdvanced Computer Architecture – An Introduction
Advanced Computer Architecture – An Introduction
 
DevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache MavenDevoxxFR 2024 Reproducible Builds with Apache Maven
DevoxxFR 2024 Reproducible Builds with Apache Maven
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .From Family Reminiscence to Scholarly Archive .
From Family Reminiscence to Scholarly Archive .
 
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICESSALESFORCE EDUCATION CLOUD | FEXLE SERVICES
SALESFORCE EDUCATION CLOUD | FEXLE SERVICES
 
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptxThe Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
The Role of FIDO in a Cyber Secure Netherlands: FIDO Paris Seminar.pptx
 

AtjConsultores_WorksSheet

  • 1. INFRASTRUCTURE AND CIVIL ENGINEERING - PLANNING & PROJECTS - CONTROL AND SUPERVISION ROADS DEPARTMENT www.atjconsultores.com SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA SPAIN-PARAGUAY- PERU-URUGUAY
  • 2.
  • 3. VIELLA PLANNING & PROJECT ROAD DEPARTMENT ACTIVITY INFORMATION STUDY OF THE ROAD N-230 SOPEIRA- FRENCH BORDER. SECTION: NORTH ENTRANCE OF THE TUNNEL VIELLA-FRENCH BORDER KK.PP. 151+000 TO 187+100 SELECTED ALTERNATIVE BUDGET 273.557.435 USD BUDGET CONSULTING 1.102.959 USD DOCUMENTACION GRAFICA PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO DE CATALUÑA PURPOSE OF THE STUDY HIGHLIGHT THE 2A SHAFT TUNNEL (WITH A 4.560 METERS DEVELOPMENT AND A 3% SLOPE WITH WHICH DESCENDS MORE THAN 130 METERS OF ALTITUDE) AND THE VIADUCT ( 2H SHAFT, KP 2+155) OVER THE RIVER GARONA WITH A LENGTH OF 955 METERS. GENERAL INFORMATION: - APPROXIMATE LENGTH: 36 KM - PROJECT SPEED: 80 KM/H - ROAD WIDTH: 7,00 M. - ROAD VERGES: 1,50 M. OF ALTITUDE WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES PLANNING & PROJECT  
  • 4. PLANNING & PROJECT ROAD DEPARTMENT ZARAGOZA ACTIVITY LAYOUT AND CONSTRUCTION PROJECT. A-68 HIGHWAY. SECTION: EL BURGO DE EBRO – FUENTES DE EBRO ( APPROXIMATE K.K.P.P. OF THE CURRENT N-232 ROAD: 207,5 TO 224,9) BUDGET 55.500.000 USD BUDGET CONSULTING 1.335.870 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN ARAGÓN. PURPOSE OF THE STUDY THE STRETCH OF THE ROAD PROJECTED BETWEEN K.P. 208 AND 212,5 CORRESPONDS TO ONE RELIEF ROAD WHICH WILL PREVENT THE PASSAGE OF LONG JOURNEY TRAFFIC BY THE MUNICIPALITY OF FUENTES DE EBRO, PROVINCE OF ZARAGOZA. THE PROJECT PROVIDES THE FUTURE DUPLICATION OF THE ROAD BY THE SOUTH, THE PART MOST DISTANT FROM THE MUNICIPALITY. CROSS SECTION TWO LANES AND 7 M WIDE ROAD. 1,50 M WIDE ROAD VERGES. THE BERMS WIDE IN THE CROSS SECTION IS 1,90 M AT THE LEFT MARGIN AND 0,90 M AT THE RIGHT MARGIN. GENERAL INFORMATION: - APPROXIMATE LENGTH: 17,7 KM - SPEED PROJECT: 100 KM/H - ROAD WIDTH: 7,00 M - ROAD VERGES: 2,50 M (EXTERNAL) Y 1,50 (INTERIOR). - MEDIAN: 8,00 M PLANNING & PROJECT TOTAL NUMBER OF PLANNED STRUCTURES: THREE OVERPASSES AND FOUR UNDERPASSES, PLUS THREE MORE FRAMEWORKS TO PASS PATHS. IS THE TYPE OF PREFABRICATED BEAM BRIDGES, TYPE “DOUBLE T” OR “DRAWER”, AND THE FOUNDATION IS GENERALLY SUPERFICIAL, USING BRAKE SHOES.
  • 5. TALAVERA DE LA REINA PLANNING & PROJECT ROAD DEPARTMENT ACTIVITY CONSTRUCTION PROJECT: TALAVERA DE LA REINA SOUTHWEST RELIEF ROAD. SECTION: CURRENT LINK FROM THE N-V TO APPROXIMATELY THE 122,5 K.P. OF THE N-502 ROAD, SOUTH OF TALAVERA. BUDGET 47.935.262 USD BUDGET CONSULTING 746.140 USD PLANO DE CONJUNTO DE ALTERNATIVAS PROCESO CONSTRUCTIVO DEL VIADUCTO: PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CASTILLA-LA MANCHA. VIADUCT OVER THE RIVER TAJO PRESTRESSED CONCRETE VIADUCT. BUILDING USING THE SUCCESSIVE CANTILEVER TECHNIQUE WITH TRAVELLING FORMWORK. TOTAL LENGTH: 253,75 METERS MAIN LIGHT ON THE RIVER: 114 METERS VIADUCT over the river tajo K.P. 5+400 DOCUMENTACION GRAFICA GENERAL INFORMATION: - APPROXIMATE LENGTH: 6.025 METROS - CONVENTIONAL ROAD - SPEED PROJECT: 100 KM/H - ROAD WIDTH: 7,00 M - ROAD VERGES: 1,50 M OTHER FEATURES: THOSE CONTAINED IN THE CURRENT STANDARD 3.1-IC LAYOUT FOR A CONVENTIONAL ROAD FINAL PROJECT SPEED. WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES PLANNING & PROJECT
  • 6. PLANNING & PROJECT ROAD DEPARTMENT ACTIVITY IMPROVING CONNECTION AND ACCESSIBILITY BETWEEN THE ROADS OF BAIX LLOBREGAT ENVIRONMENT. ITS PURPOSE IS TO OFFSET THE TRAFFIC CONGESTION PROBLEMS IN THIS AREA AND IMPROVE THE CONNECTION BETWEEN ROUTES OF LARGE CAPACITY, LIKE BAIX LLOBREGAT FREEWAY (A-2), AP-2 HIGHWAY AND B-24 FREEWAY. BUDGET 53.798.000 USD BUDGET CONSULTING 1.309.659 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CAtaluña. PURPOSE OF THE STUDY Improve connectivity and accessibility between the roads of the study area, around Baix Llobregat. Its purpose is to alleviate the traffic congestion problems in that area and to improve the connection between high capacity roads such as the Baix Llobregat freeway (A-2), the AP-2 highway and the B-24 freeway. GENERAL INFORMATION: - APPROXIMATE LENGTH: 17,7 KM - SPEED PROJECT: 100 KM/H - ROAD WIDTH: 7,00 M - ROAD VERGES: 2,50 M (EXTERNAL) Y 1,50 (INTERIOR). - MEDIAN: 8,00 M PLANNING & PROJECT BAIX
  • 7. BAEZA CONTROL AND SUPERVISION ROAD DEPARTMENT ACTivity FREEWAY A-316 SECTIONS: BAEZA WEST LINK TO PUENTE DEL OBISPO NORTH LINK. BUDGET 46.079.986 USD BUDGET CONSULTING 1.603.565 USD PROMOTER - JUNTA DE ANDALUCÍA - GESTIÓN DE INFRAESTRUCTURAS DE ANDALUCÍA, S.A. - CONSEJERÍA DE OBRAS PÚBLICAS Y TRANSPORTES. GRAPHIC DOCUMENTATION: GENERAL INFORMATION: - APPROXIMATE LENGTH: 4,660 KM - PROJECT SPEED: 100 KM/H - TYPE SECTION: 2 CARRIAGEWAYS (WIDTH: 7,00 METERS EACH) - ROAD VERGES: 2,50 M (EXTERNAL) AND 1 M (INTERIOR) - EXTERIOR BERMS WIDTH: 1 M - MEDIAN WIDTH: 6 M (BETWEEN EDGES AND ROAD VERGES) - MINIMUM RADIUS: 800 METERS - MAXIMUM SLOPE: 7% - MINIMUM SLOPE: 4 % - UNDERPASS: 4 - LOWER PASS: 3 - CLEARING: 1.403.875 M³ - FILL: 1.216.406 M³ - ESPLANADE VOLUME: 153.598 M³ - HMA (HOT MIX ASPHALT): 64.588,26 TM WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  • 8. control and supervision ROAD DEPARTMENT MÁLAGA ACTIVITY CONSULTING AND ASSISTANCE IN SAFETY AND HEALTH OF THE WEST MALAGA NEW ROUND RING. SECTION I: CONNECTION AP-7/MA-417. SECTION II: CONNECTION MA-417 WITH GUADALHORCE FREEWAY A-357 SECTION III: CONNECTION GUADALHORCE FREEWAY A-357 WITH C-3310 SECTION IV: CONNECTION C-3310 WITH FREEWAY A-7. BUDGET 591.722.944 USD BUDGET CONSULTING 1.120.473.96 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO DE ANDALUCIA ORIENTAL. CHURRIANA TUNNEL STRUCTURE: THE ROAD TUNNEL WITH THE LARGEST SECTION OF EUROPE. COMPOSED BY 2 TUBES OF 1.250 METERS AND 1.213 METERS OF LENGTH THAT RUN PARALLEL SEPARATED 50 METERS BETWEEN THEM. TUNNEL SECTION: 119,85 M². EVERY TUBE WILL HAVE CAPACITY FOR 4 LANES OF 3,5 METERS OF WIDTH, WITH ROAD VERGES AND SIDEWALK OF 1 METER AT BOTH SIDES OF THE TUNNEL. THE PROJECT SPEED IS 100 KM/ HOUR. SECTION EXCAVATED IS 18 METERS WIDE. MERCAMALAGA VIADUCT CONTROL AND SUPERVISION GRAPHIC DOCUMENTATION:
  • 9. BAIX CONTROL AND SUPERVISION ROAD DEPARTMENT ACTIVITY EXTENSION OF THE BAIX-LLOBREGAT FREEWAY. SECTIONS: RONDA LITORAL (COASTAL RING ROAD) – HIGHWAY A16 BUDGET 88.462.696 USD BUDGET CONSULTING 1.326.694 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CAtaluña. GENERAL INFORMATION: - TOTAL LENGTH (TRUNK): 2.000 METERS - PROJECT SPEED: 80 KM/H - GENERIC MINIMUM RADIUS: 500 METERS - MAXIMUM SLOPE: 4, 29 % - ROAD TYPE SECTION: - LANES 2x3,5 METERS - ROAD VERGES: 2,50/1,00 METERS - EXCAVATION: 476.778,95 M³ - FILL: 497.083,70 M³ - MIX ASPHALT: 101.084,133 TM 23 STRUCTURES, THE LARGEST IS 180 METERS LONG. WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  • 10. control and supervision ROAD DEPARTMENT ACTIVITY IN THE BED OF THE RIVER LLOBREGAT. BUDGET 59.772.092,26 USD BUDGET CONSULTING 1.877.519 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CATALUÑA. CONTROL AND SUPERVISION SANT BOI DE LLOBREGAT
  • 11. graphic documentation: TALAVERA DE LA REINA CONTROL AND SUPERVISION ROAD DEPARTMENT ACTivity TALAVERA DE LA REINA SOUTHWEST RELIEF ROAD. SECTION: CURRENT LINK FROM THE N-V TO APPROXIMATELY THE 122,5 K.P. OF THE N-502 ROAD, SOUTH OF TALAVERA. BUDGET 34.047.639 USD BUDGET CONSULTING 2.176.443 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE INFRAESTRUCTURAS Y PLANIFICACIÓN - DIRECCIÓN GENERAL DE CARRETERAS - DEMARCACIÓN DE CARRETERAS DEL ESTADO EN CASTILLA LA MANCHA. GRAPHIC DOCUMENTATION: GENERAL INFORMATION: - EXCAVATION: 206.793 M³ - FILLS: 1.328.487 M³ - SOIL STABILIZED WITH CEMENT: 23.551 M³ - ARTIFICIAL GRAVEL: 17.944 M³ - MIX ASPHALT: 49.105 TM - CROSS DRAINAGE WORKS: 9+8 UNITS - LINKS: 3 UNITS - STRUCTURES: 15 UNITS - VIADUCTS: 4 UNITS (VIADUCT ON BRANCH 6 ON THE CREEK BATADÍEZ AND ALBERCHE CHANNEL: 120 M; VIADUCT ON BATADÍEZ CREEK K.P. 1+660: 160 M; VIADUCT ON BÁRRAGO CREEK K.P. 3+530:81 M; BRIDGE ON THE RIVER TAJO K.P. 5+400: 253,75 M). WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  • 12. control and supervision ROAD DEPARTMENT AGÜIMES ACTIVITY REMODELING AND CONSTRUCTION OF LINKS AND SERVICE ROADS. ROAD GC-1 K.P. 23,080 TO 28,500 SECTION: AGÜIMES-SANTA LUCÍA BUDGET 23.023.405,32 USD BUDGET CONSULTING 1.912.865 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE CARRETERAS - GOBIERNO DE CANARIAS - DIRECCIÓN GENERAL DE INFRAESTRUCTURA VIARIA - ÁREA DE CARRETERAS GRAPHIC DOCUMENTATION CONTROL AND SUPERVISION
  • 13. PLANO DE CONJUNTO PISIGA CONTROL AND SUPERVISION ROAD DEPARTMENT ACTIVITY SUPERVISION OF THE HUACHACALLAPISIGA ROAD CONSTRUCTION BUDGET 28.779.853,16 USD BUDGET CONSULTING 305.813 USD PROMOTER - ADMINISTRADORA BOLIVIANA DE CARRETERAS GENERAL INFORMATION: - TOTAL LENGTH: 71+248 KM - ROAD WIDTH: 10 METERS ( 2 BERMS TO BOTH SIDES OF 1 METER LANE, AND 4 METRES OF TWO-WAY LANE). - PAVEMENT TYPE: RIGID PAVEMENT WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  • 14. control and supervision ROAD DEPARTMENT ACTIVITY ZUDAÑEZ - PADILLA BUDGET 204.391.690,57 USD BUDGET CONSULTING 989.200 USD PROMOTER - ADMINISTRADORA BOLIVIANA DE CARRETERAS GENERAL INFORMATION: - TOTAL LENGTH: 68 + 688 KILÓMETROS. - ROAD WIDTH: 7 METERS ( 2 BERMS TO BOTH SIDES OF 1 METER LANE, AND 3,5 METRES OF TWO-WAY LANE). - PAVEMENT TYPE: double superficial treatment 204.391.690,57 BS of contract from contractor company. CONTROL AND SUPERVISION ZUDAÑEZ-PADILLA
  • 15. INFRASTRUCTURE AND CIVIL ENGINEERING - PLANNING & PROJECTS - CONTROL AND SUPERVISION RAILWAY DEPARTMENT www.atjconsultores.com SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA SPAIN-PARAGUAY- PERU-URUGUAY
  • 16.
  • 17. SANTA CATALINA PLANNING & PROJECT RAILWAY DEPARTMENT ACTIVITY SANTA CATALINA STATION CONSTRUCTION PROJECT. BUDGET 8.756.428 USD BUDGET CONSULTING 327.942,29 USD PROMOTER - CANARY ISLAND GOVERNMENT LOCATION OF THE STATION WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES PLANNING & PROJECT
  • 18. ZARAGOZA-TERUEL control and supervision RAILWAY DEPARTMENT ACTIVITY CANOPIES INSTALLATION AND ADEQUEACY OF PEDESTRIAN ZONES. TERUEL-ZARAGOZA RAILWAY. BUDGET 18.833.163 USD BUDGET CONSULTING 1.204.371 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y ESTRUCTURAS. - DIRECCIÓN GENERAL DE INFRAESTRUCTURAS FERROVIARIAS. GRAPHIC DOCUMENTATION : GENERAL INFORMATION: - LENGHT: 200 KILOMETERS - RAILWAY TYPE: TWO-TRACK RAIL LINE - TRAFIC: GOODS AND PASSENGERS CONTROL AND SUPERVISION
  • 19. control and supervision RAILWAY DEPARTMENT PICAMOIXONSRODA DE BARA ACTIVITY SUPPRESSION OF LEVEL CROSSING AT THE PLANA DE PICAMOIXONS-RODA DE BARÀ LINE. SECTION: KILOMETER POINTS 0/049, 0/715, 8/453, 10/470, 15/200, 16/964, 20/970, 23/174, 24/628 BUDGET 15.200.120 USD BUDGET CONSULTING 1.838.180 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE PLANIFICACIÓN E INFRAESTRUCTURAS - DIRECCIÓN GENERAL DE INFRAESTRUCTURAS FERROVIARIAS. GENERAL INFORMATION: - NUMBER OF LEVEL CROSSING: 10 - RAILWAY TYPE: Two-track rail line - TRAFFIC: GOODS AND PASSENGERS WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISI0N
  • 20. CHINCHILLACARTAGENA control and supervision RAILWAY DEPARTMENT ACTIVITY CONTROL AND SUPERVISION OF THE CONSTRUCTION “IMPROVEMENT OF ROADS AND ANCILLARY CONSTRUCTIONS AT CHINCHILLACARTAGENA LINE, SECTION: CHINCHILLA-AGRAMON” AND L.C. SUPPRESSION AT: CHINCHILLA-TOBARRA TOBARRA-ABRAMON BUDGET 90.761.646 USD BUDGET CONSULTING 1.693.128 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y ESTRUCTURAS. - DIRECCIÓN GENERAL DE INFRAESTRUCTURAS FERROVIARIAS. GRAPHIC DOCUMENTATION : CONTROL AND SUPERVISION
  • 21. INFRASTRUCTURE AND CIVIL ENGINEERING - PLANNING & PROJECTS - CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT www.atjconsultores.com SAUDI ARABIA-ARGENTINA-BOLIVIA-COLOMBIA SPAIN-PARAGUAY- PERU-URUGUAY
  • 22.
  • 23. CUENCA PLANNING & PROJECT HYDRAULIC PROJECTS DEPARTMENT ACTIVITY TECHNICAL ASSISTANCE FOR DRAFTING SANTA MARINA´S TANK CONSTRUCTION PROJECT. BUDGET 15.565.928 USD BUDGET CONSULTING 1.300.562 USD PROMOTER - AGUA DE LAS CUENCAS DEL SUR PIPELINE SECTION TANK VIEW GENERAL INFORMATION: CROSS SECTION WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES 8000 m3 TANK CAPACITY DIVIDED INTO TWO EQUAL VESSELS AND WITH A PUMPING SYSTEM WITH A MAXIMUM FLOW OF 446,4 m3/H AND 33 mETERS OF MANOMETRIC HEIGHT. THIS DEPOSIT WILL SUPLY FROM THE “MANCOMUNIDAD DE GIRASOL” DRINKING-WATER TREATMENT PLANT, THROUGH A 200 METERS DIAMETER DUCTIL IRON PIPELINE, INCLUDED WITHIN THE PERIMETER RING CONSTRUCTION IN TARANCON. PLANNING & PROJECT
  • 24. ORENSE CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT ACTIVITY IMPROVING CONTAINMENT DEFENSE ELEMENTS ON THE “RIAS BAIXAS” FREEWAY. SECTIONS: A-52, K.P. 112,230 TO 267,100 PROVINCE OF ORENSE (SPAIN). BUDGET 38.480.000 USD BUDGET CONSULTING 1.066.399 USD PROMOTER - MINISTERIO DE FOMENTO - SECRETARÍA DE ESTADO DE PLANIFICACIÓN Y ESTRUCTURAS. - DIRECCIÓN GENERAL DE CARRETERAS. GRAPHIC DOCUMENTATION : GRAPHIC DOCUMENTATION : CONTROL AND SUPERVISION
  • 25. CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT VELILLA ACTIVITY TECHNICAL ASSISTANCE FOR THE DEVELOPMENT OF TERTIARY TREATMENT CONSTRUCTION (VELILLA DE SAN ANTONIO Y ARANJUEZ NORTH´S WWTP-WASTEWATER TREATMENT PLANT) AND IRRIGATION WATER SUPPLY WITH RECLAIMED WATER (MUNICIPALITIES OF ARANJUEZ AND TRES CANTOS, MADRID, SPAIN) BUDGET 12.565.235 USD BUDGET CONSULTING 605.308 USD PROMOTER - CANAL DE ISABEL II GRAPHIC DOCUMENTATION : GENERAL INFORMATION: PROVIDE THE VELILLA DE SAN ANTONIO´S (MADRID) WASTEWATER TREATMENT PLANT WITH A TERTIARY TREATMENT THAT ALLOWS THE REUSE OF THE TREATED WATER FOR THE PUBLIC GREEN ZONES IRRIGATION IN THE MUNICIPALITIES OF SAN ANTONIO AND MEJORADA DEL CAMPO, SPAIN. THE TERTIARY TREATMENT WILL BE SIZE FOR A CAPACITY OF 3.000 m3/DAY. THE PLANT WILL BE IMPLEMENTED IN CIVIL CONSTRUCTION FOR THE FUTURE FLOW AND ONLY WILL BE EQUIPPED FOR THIS FIRST PHASE, SO THAT IN THE FUTURE EXTENSION ONLY THE REQUIRED EQUIPMENT SHOULD BE PLACED. WWW.ATJCONSULTORES.COM WWW.FACEBOOK.COM/ATJCONSULTORES WWW.TWITTER.COM/ATJCONSULTORES CONTROL AND SUPERVISION
  • 26. RIVAS VACIAMADRID CONTROL AND SUPERVISION HYDRAULIC PROJECTS DEPARTMENT ACTIVITY TECHNICAL ASSISTANCE SERVICE TO PROJECTS OF REUSING CONSTRUCTIONS (NETWORKS AND TERTIARY). TERTIARY TREATMENT OF SUR ORIENTAL´S (RIVAS VACIAMADRID, SPAIN) WWTP. BUDGET 7.379.000 USD BUDGET CONSULTING 456.617 USD PROMOTER - CANAL DE ISABEL II GRAPHIC DOCUMENTATION : TERTIARY TREATMENT INFLUENT PARAMETERS EFFLUENT PARAMETERS Caudales Actual Parámetro Unidad Valor límite Parámetro Unidad Valor límite Metro diario (m2/día) Nº de horas de 7000 12 funcionamiento (h) Medio horario (m2/h) 583.3 DBO2 DQO SST Reducción mg/l mg/l mg/l % <=25.0 <=125.0 <=35.0 =>80.0 de fósforo pH DBO2 SST Turbidez pH Coliformes mg/l mg/l NTU UFC/100 ml <=5.0 <=5.0 <=10.0 6.0<=pH<=9.0 <=200 - 6.0<=pH<=9.0 fecales Nematodos huevos/10 l <=1.0 intestinales Cloro residual mg/l CONTROL AND SUPERVISION >=0.6
  • 27. Contact web address: www.atjconsultores.com email: international@atjconsultores.com HEADQUARTERS (HQ) La Coruña, 13. 3º Planta. 28020 Madrid, Spain Contact.: 91 556 38 54 - Fax: 91 556 65 SPAIN Mallorca, 221. 6é-2a 08008 Barcelona Contact.: 93 454 06 11 Joaquim Auger, 64-66 08830 Sant Boi de Llobregat Adelfas, 17 35260 Las Palmas de Gran Canaria (Agüimes) Contact.: 676 22 39 44 Clariano, Nº 32-2º-4º 46021 Valencia Contact.: 96 369 70 75 SAUDI ARABIA Al Khobar/Al-Salah Tower #701. P.Faisal Bin Fahad Road Contact.: +966(55).732.8851 ARGENTINA Sarmiento, 654. Piso 10 Dpto C B1878GEN, Buenos Aires Contact.: +54.11.4139.8785 BOLIVIA Chaco, Pasaje 824. nº 2088. Zona Sopocachi, La Paz Contact.: +73007086 URUGUAY Charrua, 2027 11200, Montevideo Contact.: +59.122.42.45.49 PARAGUAY Asunción Boquerón, 594 Contact.: +595.21.224.131 PERU Jr. Brasil 370 Chosica, 15. Lima Contact.: +511.767.05.29