1. S.M.BABU.
Phone: 8220896668 &
8124035050
E-mail:
Sabababu13@gmail.com
Address for Correspondence:
S/O K.S.Mani
NO:33A, perumal kovil st,
Amanampakkam nadu kandigai,
vengal post,
Thiruvallur (Dt),
Pin-601103.
Tamilnadu
India.
Personal Profile:
D.O.B : 13.11.1988
Father : K.S.Mani
Gender: Male
Age : 26
Nationality : Indian / Hindu
Marital Status: Single
Community: MBC-VANNIYAR
RESUME
OBJECTIVE:
To attain a challenging position in MANUFACTURING Industry providing the
opportunity to make a strong contribution to organizational goals through
continued development of professional skills.
STILL WORKING:
PAINTING ENGINEER(COATING)- (PRESENT-MAY-2012-Till now)
TECHNO FAB MFG LTD- Heavy Steel Fabrication.
CHENNAI -52
TAMILNADU-INDIA.
EXPERIENCE:
Diploma Mechanicalwith 5 yrs. of Experience in Leading steel
fabrication & automotive manufacturers with good problem solving ability and
capable of meeting deadlines and delivering Results under pressure.
Current Industry : Heavy steel Fabrication, Machining and Assy.
Functional Area : Production / Quality / Project Management.
INPLANT TRAINING:
Completed 6 months in-plant training in WHEELS INDIA LIMITED-
PADI
Completed 6 months in-plant training in TI METAL FORMING-
THIRUNINRAVUR.
DETAILS OF EXPERIENCE:
1. HANIL AUTOMOTIVE INDIA PVT LTD,
Designation : QUALITY ENGINEER
Period : DECEMBER 2009 to DECEMBER 2010.
2. HI-TECH FABRICATION ENGINEERING.
Designation : SR. QUALITY ENGINEER
Period : JANUARY 2011 to MAY 2012.
2. Hobbies:
Playing cricket
Reading books
Hearing Songs
Browsing internet
Linguistic Abilities:
English
To Speak
To Read
To Write
Tamil
To Speak
To Read
To Write
Hindi
To Speak
JOB PROFILE:
JOB RESPONSIBILITIES HANDLING:
Responsible for handling the production operations and managing the
workmen.
Workers team arrangement for achieve targets.
Responsible to manage the production / quality targets for the detailed
manufacturing.
Study the given drawing.
Perform all required inspections as per the requirements of quality
control plan. and test plan maintaining relevant documents as per
project specification.
Report on daily inspection and testing activities to higher authority.
Monitoring of welders performance and repair control.
Fabrication completed jobs to move to paint yard.
Visually checked in spatters, under cut and other welding problem is
cleared.
Coordinating the inspection activities such as material identification, fit
up, weld visual and NDT inspection with clients and agency.
Co ordinate with customer and third party for stage inspection.
Planning and executing the shop floor inspections at all stages.
To move in blasting yard and before four hours primer is applied.
Than humidity and steel temperature is checked and wet film thickness
(WFT) also checking.
After painting is visuals is checked.
Than after drying DFT (dry film thickness) also calculated in coat
meter.
Stenciling and identification mark number is checking.
Workers team arrangement to achieve target.
Tools, Equipments and consumables arrangement to the worker.
Follow up and guiding and motivating the workers.
Ensure safety activities to all workers.
Ensure Cleanliness and proper housekeeping at work place.
Inspection offering and co-ordination to NTPC & IRS and Customer
inspection such as,
Visual Inspection
Hard punch and stenciling checking
DFT checking.
Packing list Preparation.
Dispatch clearances get from NTPC approved.
Dispatch work arrangements and co-ordination.
Making meeting occasionally with management to Inform current work
status and associated problems.
Production planning and follow up based on overall schedule.
3. Inspection such as :
1.Fit-up (Before welding) 2.After welding (Welding visual and
NDT-NON DESTRUCTIVE TESTING).
3. Individual Inspection (Dimensional and Visual), 4.Assembly
Inspection 5.Painting Inspection.
Workers requirements and Consumable related costs to provide
information for management decisions.
Prepare the equipment for trials and comply with all the deviation
pointed by QC/Client.
Prepare the equipment for dispatch and maintain associated records.
Ensure compliance of Dispatch Checklist.
Ensure Cleanliness and proper housekeeping at work place. Ensure No
site issues due to Workmanship and Quality.
Attend weekly work Progress meeting and Review meetings with
management.
PROJECTS HANDLING:
Power Projects: Boiler Supporting Structures, Different Types of Ducts,
Trusses, Feed Hoppers, and Bracings Dry pet set, Heavy Columns,
Gantries, Trestles, Transfer Towers, Bag Filters, Cable Trays and
Accessories, Guide Van Assemblies, Inlet and Outlet Casings, gear
motor, Gear boxes for Thermal Power through Alston, Cethar Vessels
and BHEL.
CUSTOMER& INSPECTION HANDLING
BHARAT HEAVY ELECTRICALS LIMITED
DOOSAN POWER SYSTEMS INDIA PRIVATE LTD
BGR BOILERS PRIVATE LIMITED
STEEL AUTHORITY OF INDIA LTD
KITCO LTD
THIRD PARTY INSPECTION HANDLED
NTPC (National Thermal Power Corporation)
IRS (Indian Register of Shipping).
ACADEMIC RECORD:
COURSE INSTITUTION YEAR
OF PASSING
PERCENTAGE
DME MURUGAPPA POLYTECHNIC COLLEGE,
AVADI 2009 71
H.S.C GOVT HIGHER SECONDARY SCHOOL,
VELLIYUR. 2009 59
S.S.L.C GOVT HIGHER SECONDARY SCHOOL,
VELLIYUR. 2007 90
AREA OF INTEREST:
PRODUCTION & PAINTING ENGINEER
QUALITY CONTROL ENGINEER
INCOMING QUALITY ENGINEER
4. COMPUTER PROFICIENCY:
Platform used :Windows 7
Package known: MS-Office
INTERPERSONALSKILLS:
Keen to learn new things
Smart Worker
Positive Attitude
Adaptability
Quick Learner
Leadership
PROJECT:
Completed diploma project in AUTOMATICDIMENSION MEASURING
MACHINE.
DECLARATION:
I hereby declare that the above information is true to the best of my
Knowledge.
Place :
Date : YOURS FAITHFULLY,
S.M.BABU