2. As of October 30, 2013
2
CONSTRUCTION ANDCONSTRUCTION AND
ENGINEERING SUPPORTENGINEERING SUPPORT
SERVICES DEPARTMENTSERVICES DEPARTMENT
3. 3
Cost estimates are based on MES Schedule of Rates.
Civil Works Procedure 1984:
• Start of work & cost estimation simultaneously.
• Procurement of materials according to Store Procedure.
• Hiring of skilled & unskilled manpower.
• Repair and maintence services during operations.
Revised Engineering Works Procedure 2013:
• Cost estimate and AFE approvals.
• Tender documents preparation and contract administration.
• Departmental works utilizing available resources.
• Procurement of material & services as per PPRA & PEC.
Working MethodologyWorking Methodology
5. 5
CIVIL WORKS DETAILSCIVIL WORKS DETAILS
PERMANENT STRUCTURE WORKS
Description Total Amount in
millions
Civil works carried out through EFPs 77 1555.97
Pipeline & WHA works carried out through FGCPs 99 442.590
Contract Section Works before going on PPRA Rules:
a.Consultancy Works completed
b.Consultancy Works in progress
c.Construction Works completed
3
3
4
Contract Section Works after adoption of PPRA Rules:
a.Tender Documents/Process for Head Office
b.Tender Documents/Process for Pre Drilling work
c.Tender Documents/Process for Field works
36
18
09
Water Supply through C&ESS Department 104.26
million Gallons
Vehicle Repaired Annually
I-9 Base Workshop Islamabad 2408 11.168
6. S.
No
Name of Work Status Approved
Cost
Works carried
out by
Contractor
Departmental
Works
1 Engineering works for Sohniwala Well # 1 at Tehsil
Ahmedpur Distt. Jhang
Completed Rs: 39.810 M Rs: 14.669 M Rs: 25.141 M
2 Engineering works for Jand well # 1 Distt. Attock Completed Rs: 54.284 M Rs: 19.387 M Rs: 34.897 M
3 Construction of Pre Drilling Engineering Works At
Rajian-8 District Chakwal Punjab
Completed Rs: 60.100 M Rs: 23.889 M Rs: 36.211 M
4 Construction of Foundation for installation of
Weigh Bridge at Nashpa Oil Field
Contract
execution awaited
Rs: 1.147 M Rs: 1.148 M Rs: 0.00 M
5 Engineering works for Qadirpur HRL well # 7 Distt.
Ghotki Sindh
Completed Rs: 47.609 M Rs: 42.377 M Rs: 5.232 M
6 Engineering works for Qadirpur Well # 50 at Distt.
Ghotki Sindh
Completed Rs: 39.422 M Rs: 27.782 M Rs:11.64 M
7 Construction of Pre-Drilling Engineering Works at
QP-51 District Ghotki, Sindh.
Contract execution
awaited
Rs: 127.920 M Rs: 72.378 M Rs: 55.542 M
8 Engineering works for Jakhro West Well # 1 at Distt.
Sanghar Sindh
Completed Rs:47.60 0M Rs: 42.377 M Rs: 5.224 M
9 Construction of Pre Drilling Civil Works at Well
Kunnar Deep # 09 District Hyderabad
Completed Rs: 35.470 M Rs: 22.50 M Rs: 12.974 M
10 Construction of Pre Drilling Civil Works at Well
Chak # 5 Dim # 3.
Rig shifting in
Progress.
Rs: 40.609 M Rs: 28.23 M Rs: 12.379 M
11 Construction of Pre Drilling Engineering Works AT
Chak 25C-1, District Sanghar, Sindh.
Work is in
Progress.
Rs: 28.474 M Rs: 20.067 M Rs: 8.407 M
12 Construction of Pre-Drilling Engineering works at
Manna-1 (Tay X-2), Distt. Hyderabad, Sindh.
Work is in
Progress.
Rs: 27.464 M Rs: 19.834 M Rs: 7.63 M
13 Uch-II – Gathering System for Six Wells Completed Rs.98.240 M Rs.77.200 M Rs.21.040 M
Works carried out after the adoption of Revised
Engineering Works Procedure
15. Completed wells during FY-2012-13
S. No Location Name Marked Start date Completion date Rig Type
16 Kurram # 01 31.12.2012 11.01.2013 24.02.2013 GWDC
17 Tando Qasir 02.01.2013 17.01.2013 17.02.2013 307
18 Soghri X-1 05.03.2013 07.03.2013 17.03.2013 N-1
19 Sohniwala # 01 16.03.2013 17.04.2013 26.04.2013 F-125
20 Jand # 01 04.01.2013 03.05.2013 14.06.2013 GWDC-6
21 Qadirpur HRL-7 19.03.2013 18.05.2013 06.06.2013 GWDC-5
22 Jakhro West # 01 05.04.2013 30.05.2013 26.05.2013 Sinopac
16. Completed Works during FY-2013-14
S. No Location Name Marked Start date Completion date Rig Type
01 Maru East # 01 10.04.2013 20.07.2013
20.09.2013 30.09.2013
F-125
02 Qadirpur # 50 15.05.2013 05.07.2013 25.07.2013 Cracow-1
03 Rajian # 08 25.06.2013 08.09.2013 02.10.2013 N-2
04 Kunnar Deep # 09 03.07.2013 08.09.2013 03.10.2013 N-6
GWDC-8
05 Zin SML-3 05.02.2013 05.02.2013 22.09.2013 N-55
06 UCH-II Gathering
lines for six wells
- 18.04.2013 30.06.2013 -
17. In progress Works during FY-2013-14
S. No Location Name Marked Start date Completion date Rig Type
01 Chak Dim-5 # 02 04.07.2013 23.09.2013 Rig shifting started SIN-149
02 Kup # 01 09.07.2013 Awaited Approach Road
leveling in progress
through OGDCL
machinery
N-2
OGDCL machinery mobilized on 11.07.13
Work started 12.07.13
Work stopped for 55 days w.e.f.19.07.13 to 11.09.13
Work again stopped for 3 days w.e.f.14.9.13 to 16.9.13
Restarted on 17.9.13
03 Chak 25-C-1 07.08.2013 Awaited Leveling through
OGDCL machinery in
progress
N-6
04 Manna # 01 07.08.2013 11.10.2013 LOI issued on
09.10.13, Concerting
in Progress
N-5
05 Rajian # 02 Work over 13.08.2013 Awaited LOI issued on
04.10.13, Concerting
in Progress
307
18. In Tender Process wells during FY-2013-14
S. No Location Name Marked Status Rig Type
01 Qadirpur # 52 21.08.2013 In award approval
process
Cracow-1
02 HRL # 08 21.08.2013 // Cracow-1
03 Nashpa # 05 05.07.2013 NOC awaited N-3
04 Dachra Pur –
Gathering Lines
- LOI Issued
07.10.2013
-
05 UCH-II Gathering
System for 09 Wells
- BOD Approval
Awaited
-
19. Permanent Structure Works
19
S. No Name of Project Cost in millions Remarks
01 Construction of Sport Shed at Uch 5.703
EFP-I involving an
amount of
Rs.104.934 millions
other than PDCWs
02 06 numbers Police Pickets in Uch area 21.511
03 15 numbers Security Rooms at each well in Uch area 7.028
04 Maintenance of ROW & Approach Road at Uch Gas Field 2.126
05 Boundary wall, watch tower & Security Uch 48.096
06 Construction of Store Shed at Uch 20.470
07 Changes in Works for Rig Kremco at Bahu # 05 26.584
EFP-II involving an
amount of Rs.46.847
millions other than
PDCWs
08 Water Supply to Dhodak Plant -
09 Construction of Executive Annexe at Regional Office Multan 10.074
10 Surface facilities at Bahu Well # 1, 2 & 3 7.268
11 Construction of Engine Operator Room, Hard Standing at Kot
Adu
2.921
12 Water Supply to Dhodak Field -
13 Construction of additional new Room (08 Nos) in Officer’s
Residential Camp at Dakhni
5.522
EFP-III involving an
amount of
Rs.540.274 millions
other than PDCWs
14 Construction of New Production Office at Dakhni 3.274
15 Fencing of Store Boundary/Chemical shed at Dakhni Store
Shed
2.483
20. Permanent Structure Works
20
S. No Name of Project Cost in millions Remarks
16 Preparation of Effluent water pit at Dakhni (04 numbers) 13.558
17 Construction of new security check post at Dakhni Plant 0.153
18 Sheikhan Plant EWT works 43.367
19 Civil works for reinstallation of TOC Mud Plant at Sheikhan
Production Field
2.227
20 Construction of Boundary wall & provision of Steel Stairs for
watch towers at Sheikhan Field
8.284
21 Construction of Officer’s Colony at Chanda 35.00
22 Security of Security Posts for Platoon # 4 at Chanda/Mela
Plant
5.941
23 Infrastructure Work at Chanda Oil Field 22.874
24 Up-gradation of Road from Shakardara to Kharrapa More 262.04
25 Concrete Flooring at Chanda Plant area 6.743
26 Fencing & Gate at Mela # 03 1.938
27 Construction of Crude Recovery pit at Mela Plant 1.88
28 Construction of Building at Mela Dehydration Plant 1.891
29 Installation of Weigh Bridges at Mela # 03 0.931
21. Permanent Structure Works
21
S. No Name of Project Cost in millions Remarks
30 Construction of HSEQ Office with Bath & Mini Store at Mela
Field
0.383
31 Nashpa Plant EWT Civil Works 68.572
32 Construction of 3 Km mettaled Road at Nashpa Banda under
Social Welfare
11.948
33 Construction of Recreation Hall for Worker Mess at Nashpa
Plant
0.955
34 Construction of Control Room for Marketing Section at
Nashpa
1.500
35 Construction of two numbers production storage shed &
hard standing at Nashpa Plant
0.133
36 Construction of Security Check Posts at Nashpa # 1,2 & 3 1.89
37 Construction of Security Check Posts out site the Plant 05
numbers
3.598
38 Pre Casted RCC Wall for extension of LPG Plant at Nashpa 13.003
39 Construction of Permanent Woven Wire Mesh Fencing at
Nashpa Well # 03
1.532
22. Permanent Structure Works
22
S. No Name of Project Cost in millions Remarks
40 Construction of Remaining Portion of Boundary wall at
Rajian # 01
3.741
41 Construction of Hard Standing in Auction Yard Chak Naurang 6.471
42 Construction of Two Rooms for Office at Chak Naurang 1.325
43 Construction of Approach Road at Auction Yard Chak
Naurang
0.470
44 Construction of Semi Covered Shed at I-9 2.247
45 Repair of OGTI Hostel 4.400
46 Relocation of Pirkoh Compressor at Qadirpur 40.00
EFP-IV involving
Rs.156.426 millions
other than PDCWs
47 Work over job at Qadirpur # 11 19.061
48 Construction of Raised Platform # 41 14.551
49 Construction of Raised Platform Qadirpur Deep # 01 15.054
50 Construction of Hard Standing, Parking Shed in from of
Admin Block
6.800
51 Raising of Qadirpur Plant Boundary wall 30.837
52 Foundation & Cable Trenches at Qadirpur Plant 8.494
53 Repair/Fencing including Gate at Qadirpur Well 6.081
54 Raised Platform at Qadirpur # 17 15.548
23. Permanent Structure Works
23
S. No Name of Project Cost in millions Remarks
55 Construction of Sinjhoro Plant Boundary wall 25.293
EFP-V involving an
amount of
Rs.707.495 million
other than PDCWs
56 Equipment Foundation Civil Works at Sinjhoro Plant
(Phase-I & II) 391.00
57 Building Civil Works of Relocation of Dhodak Plant
58 Earth Filling Works at Sinjhoro Plant 32.157
59 Development of water supply system at Sinjhoro Plant 23.028
60 Internal Electrification for Sinjhoro Plant Building 10.219
61 Sinjhoro Plant Lightning/External Electrification works 42.468
62 Construction of Boundary wall at Bobi Colony 9.836
63 Development of Noor/Bagla Fields 66.005
64 Additional Water Storage Reservoir of 5.6 million Liters
capacity at Bobi Plant
15.232
65 Construction of Foundation for installation of weighing
bridge at Tando Alam Oil Complex
0.931
66 Construction of boundary wall & watch tower at KPD Project 23.968
67 Construction of 10 Nos. Officers Room, 02 Nos. Guest
Room, Dinning Hall, Kitchen & Pantry etc at Kunnar Plant
7.526
68 KPD Phase-II Plant Units 22.421
24. 24
S. No Name of Project Cost in millions Remarks
69 Security Measures at KDS Base Boundary wall extension of
Tubular Yard at Karachi
4.462
70 Construction of FGCP-II New Base Camp at New location 15.760
71 Construction of Room Size 10x10 near Weigh Bridge at TOC 0.275
72 External Electrification at KBS Boundary wall 2.670
73 Compressor Foundation MS Steel Shed & Related other
works at Daru Plant
2.366
74 Installation of water supply system at KDS 5.964
75 Repair of Mesh Fencing/Gates at TOC wells 2.014
76 Renovation work of proposed regional coordinator Karachi
office at 7th
floor Dawood Center
2.000
77 Missan # 01 work over job 1.900
Permanent Structure Works
25. 25
Work Carried out through Field Gathering Sections
S.N FGCP - I Approved Cost REMARKS
01 16” Header of ERW : 4.5KM : QP 18.590M completed
02 8” F/L & WHA HRL#6 : 0.65KM : QP 02.048M completed
03 Emergency repair F/L Well # 36 : QP 00.433M completed
04 Emergency repair 26” Trunk Line : UG - completed
05 Repair 500BBL tanks : 04No. : KAL 01.732M completed
06 Production hook up connection Well#30 : QP 01.827M completed
07 Container Caravan Dining/kitchen cementation :01No : KS 00.806M completed
08 Insu/Cladd F/L Well # 1, 3, 4 & deep-1 : 9KM : DNI 15.554M completed
09 Emergency repair F/L Well # 24 : QP - completed
10 Misc. Jobs ATA-2012 (25.08.12 to 31.08.12) : DNI 0.537 completed
11 Rectification WHA Well# 13 : QP 0.433M completed
12 Emergency repair F/L Well # 07 : QP 0.964M completed
13 Additional 6” Crude transfer line well # 3 : NSH 0.327M completed
14 Fab/Install of Generator Shed : FGCP-I 0.082M completed
15 Emergency repair F/L Well # 36 : QP - completed
16 Emergency repair F/L Well # 36 : QP 0.303M completed
17 Emergency repair F/L Well # 24/41 : QP - completed
18 Emergency repair 26” Trunk Line : UG - completed
19 F/Gathering Sys. (L/Over + ATA Jobs) : BHU 24.00M completed
20 Emergency repair F/L Well # 09 : QP - completed
21 Fab/Install Perm WHA Well#36 :QP 03.052M completed
22 Fab/Install 30” Pub Piece & Valve at Plant : QP 0.595M completed
23 Separator point Well#35,36,38,39,42,17,41,D-1,HRL-2 : QP 1.109M completed
24 Repair Work at 11 Wells & Repair of Sale Gas line – ATA : UG 16.110M completed
25 Emergency Repair F/L Well#43 : QP - completed
26 Emergency Repair F/L Well#07 & 28 : QP - completed
27 8” F/L & WHA Well#46 : 2.5KM : QP 4.507M completed
28 F/L, WHA & Tie-in QP#43 : 100M :QP - completed
29 F/L, WHA & Tie-in QP#42 : 400M :QP - completed
30 Extension 8” Dia F/L QP#36 : 360M : QP 1.900M completed
26. 26
S.N FGCP - I Approved Cost REMARKS
31 Emergency repair F/L QP#33 : QP 0.10M completed
32 Emergency repair F/L QP#09 : QP 0.10M completed
33 Emergency repair F/L HRL#02 : QP 0.10M completed
34 Emergency repair F/L QP#33 0.10M completed
35 Emergency Repair Bahu/PP Header near SS#1 : Bahu 0.518M completed
36 Welding of 14No Joints for production hook Up well Raja-1 : QP 0.10M completed
37 Provision of future tie in at ERW plateform : QP 0.10M completed
38 Renovation of Mess Caravans : FGCP – 1 0.902M completed
39 Extension of 8”dia flow line QP # 37,36 :700 M+360 M : QP 1..90M completed
40 Fab/inst. Of 4” dia FCV spool QP # 01 : QP
0.520M
completed
41 Fab. of 8” dia spool for WHA (20 jts ) QP#29 : QP completed
42 Fab. of 8” dia spool for WHA QP#23 : QP completed
43 Emergency repair Flow Line Well # 33 : QP 0.10M completed
44 Emergency repair 0f 20000 bbl’s tank : NSH 0.10M completed
45 8” Flow Line/WHA& Separation Battery Well # 3 : 4 KM : NSH 15.171M completed
46 Fabrication/installation of WHA : QP#36 3.052M completed
47 Repair caravan fabrication shed : FGCP-I 0.292M completed
48 Laing of 12”dia flow line ERW to QP # 17(1.5KM), Ext WHA,s &
8”dia line QP# 42,43 (300 M) , : QP
2.51 M completed
49 Emergency repair Flow Line Well # deep-1 : QP 0.100M completed
50 Headers 26” dia & 30” dia replacement :1.5KM : QP 15.675M completed
51 Emergency repair Flow Line Well # 07 : QP 0.10 M completed
52 Fabrication/installation of WHA & F/L( 700M) for QP#48 : QP 1.00M completed
53 Emergency repair Flow Line Well # 07 : QP 0.10 M completed
54 Fabrication of K.O V for 10 wells : QP 0.45M completed
55 8” Flow Line/WHA& Separation Battery Well # 4 : 2.9 KM : NSH 17.71M completed
56 Fabrication/Installation of 16” dia by pass header at eastern pig
launching station with 05 tie-in points 0f 8’dia
0.364M Completed
57 Fabrication/installation of WHA well DKN#8 : Dakhni 3.052M completed
58 Repair/Rectification of Pin hole on the Flow line of QP#36 - completed
59 Installation of test separators at QP #36& 37 N/A Completed
Work Carried out through Field Gathering Sections
27. 27
S.N FGCP - I Approved Cost REMARKS
60 Laying of 8” dia flow line QP#29 to eastern header N/A Completed
61 Fab/Installation of WHA & Flowline 1.25KM QP, HRL#7 1.0M Completed
62 Repair/ Rectification of pin hole QP#23 - Completed
63 Repair/ Rectification of pin hole QP#24 - Completed
64 Sale Gas pipeline & Fab. of Meter Run Assembly 3.5KM : Nashpa 4.50M completed
65 Repair/ Rectification of pin hole on F/L of QP# 35, 38, 39 - Completed
66 Repair/ Rectification of pin hole QP#07 - completed
67 Repair/ Rectification of pin hole QP#24 - Completed
Sub Total 163.624M
Work Carried out through Field Gathering Sections
S.N FGCP - II Approved Cost REMARKS
01 Rectification/Maintenance Jobs at Plant/wells : KPD 02.648M completed
02 Repair 12000BBL Tank #5 : KUN 3.066M completed
03 Repair/Modification 12000 BBL Tank#4 as Gun Barrel : TOC 3.265M completed
04 6” F/L & WHA JV Well Shah -1 : 1.5KM : KPD 08.796M Completed
05 OGRA requirement jobs at Bobi LPG Plant 11.961M completed
06 Installation connections of K/O Vessel : BOC 0.730M completed
07 Repair of Mithrao/ Chack Din # 5 F/L 38Km : BOC 2.184M completed
08 Installation of Tie-in point of Compressor at DARU 1.722M Completed
09 Repair of 6000 BBL Tanks #02 : KUN 07.00M Completed
10 6” F/L & WHA Baloch -1 to plant : 19.5KM : SNJ - Completed
11 Repair of 6000 BBL Tank : 01No. : TOC 6.620M Completed
12 6” F/L & WHA well KUN West -1A : 5Km : KPD 8.40M Completed
13 Repair furnace heater : TOC 1.922M Completed
14 6” F/L & WHA Chak-2 (1) to plant : 4.5Km : SNJ 8.255M Completed
15 4” Flow Line &WHA Jhakro Well : 30 KM : JKH 41.377M completed
Sub Total 107.945M
28. 28
S.N FGCP - I
Approved
Cost
Start Progress REMARKS
01 Retrieval of Meyal Line : 30 KM : DNI 07.250M 07.04.12 90%
02 Dismantling of Meyal terminal 04.93M 03.09.13 80%
03 Interconnection piping of 20,000 BBL tanks at NASHPA - - -
04 Fab/Installation of WHA’s : 04Nos : MAR/RET 09.336 06.06.11 99% After installation of sale
gas line
05 Installation of 8” dia F/L Dakhni # 12 - 13.02.13 60%
06 Fab/Installation of WHA & F/L 8 “ dia 2.9Km Nashpa#4 17.71M 28.02.13 97%
07 Repair/Renovation of Caravans : 03Nos for FGCP-II 1.90M 30.08.12 92%
08 Dismantling/ Re-Install WHA QP#11 0.552M 15.08.12 30% Waiting for work over
Sub-TOTAL 41.668M
S.N FGCP - II Approved
Cost
Start Progress REMARKS
01 4” F/L & WHA Chak-63#3 to plant : 12.5KM : SNJ 10.588M 28.07.11 50%
02 8” F/L & WHA PSK D-3, KUN-Deep-6&KM : KPD 22.114M 19.04.12 94%
03 6” dia line Resham well#01 to Sinjhoro plant(15km) 18.5M 18%
04 4” Flow Line/WHA Chak - 63 SE(1) to Plant : 9 KM : SNJ 07.805M 01.10.12 9%
05 6” Flow Line/WHA Chak - 2 (1) to Plant : 15.5 KM : SNJ 28.435 M 14.07.11 95%
06 6” Flow Line/WHA Chak - 2 (3) to Plant : 19.5 KM : SNJ 15.513 M 23.01.11 02%
07 6” Flow Line/WHA Chak - 66 to Plant : 11 KM : SNJ 07.831 M - 02%
08 4” Flow Line /WHA Chak - 63 (1) to Plant : 11 KM : SNJ 08.782 M - -
09 Interim Arrangements/Gathering Area - 6 : SNJ 09.784 M 05.06.12 80%
Sub-TOTAL 129.353M
FGCP’s DEPARTMENTLY ONGOING PROJECT REPORT FOR THE YEAR
July, 2012 - Till October, 2013
Sub Total (I + II) = 171.021 M
29. 29
A. CONSULTANCY WORKS COMPLETED
SR.
NO.
NAME OF WORK REMARKS / STATUS
1 Design / Consultancy Services for Construction / retrofitting/strengthening
works for installation of new seismic data processing system at OGDCL
House, 12th
Floor, Tower-C, Iba.
Completed.
2 Residential Staff Houses, (Officers, Assistants, Workers) at Sinjhoro Oil
Field. Completed.
3 Design/Consultancy services for Construction of Uch-II camps at Uch Gas
Field. Completed.
B. CONSULTANCY WORKS UNDER PROGRESS.
1 Construction of heavy traffic metalled road from Uch Plant to UPL Dera
Murad Jamali (47 KMs) at Uch Gas Field.
Work delayed due to law and order
situation. Final Tender Documents
awaited.
2 Gas Field Protective Bund (Physical Model Study of Qairpur bund and
ERWs)
Final Design Report submitted. Final
Tender Documents awaited.
3 Feasibility study of existing tarally steel structure bridge for the use of
heavy loaded vehicles and if required design/consultancy services for
improvement of bridge for heavy traffic situated at road from Karrapa More
to Chanda Oil Field.
Final Design and Drawing submitted and
Final Tender Documents awaited.
C. CONSTRUCTION COMPLETED.
1 Bridge over for Kunner LPG Plant. Completed.
2 Supporting Structural System & Electrical works at Bahu Gas Field.
Completed.
3 Repair / Up-gradation of Road from Karrapa More to Chanda Plant () at
Chanda. Completed.
4 Construction / retrofitting/ strengthening works for installation of new
seismic data processing system at OGDCL House, 12th
Floor, Tower-C,
Islamabad.
Completed.
STATUS OF CIVIL WORKS WITH CONTRACT SECTION
BEFORE NEWLY APPROVED ENGG. WORK PROCEDURE AS ON 10.10.2013.
30. 30
A. HEAD OFFICE TENDERS
S.NO NAME OF WORK NUMBERS
1 Bid Document Stage 04
2 Press Advertisement Stage 09
3 Technical Evaluation Stage 07
4 Financial Evaluation Stage 09
5 Management approval for award 07
6 Under Construction 00
7 Completed 00
TOTAL 36
B. PRE-DRILLING ENGINEERING WORKS
1 Bid Document Stage 00
2 Press Advertisement Stage 02
3 Management approval for award 04
4 Works Under Construction 04
5 Works Completed 08
TOTAL 18
C. OTHER ENGINEERING WORKS
1 Bid Document Stage 01
2 Press Advertisement Stage 01
3 Management approval for award 02
4 Works Under Construction 04
5 Works Completed 01
TOTAL 09
STATUS OF CIVIL WORKS WITH CONTRACT SECTION
AFTER NEWLY APPROVED ENGG. WORK PROCEDURE AS ON 10.10.2013.
31. Supply of water to Production sites = 08.93 million gallons monthly
Supply of water to Process & Plants = 76.11 million gallons monthly
Supply of water to Drilling sites = 19.22 million gallons monthly
Total water supplied during the month of Sept, 2013 =104.26 million gallons
Water Supply SectionWater Supply Section
31
32. 32
Vehicle Repaired at I-9 Base WorkshopVehicle Repaired at I-9 Base Workshop
Serviced Minor
Repair
Major
Repair
Engine
Overhauling
Expenditure
1204 1071 128 05 Rs.11,168,461/-
The workshop is maintaining 433 light & heavy vehicles including 406 Petrol & 27The workshop is maintaining 433 light & heavy vehicles including 406 Petrol & 27