Project sample
1. 1. Executive summary
Education is the most valuable treasure any nation can give to its citizens Ethiopia
has been making tremendous efforts to Restructure the educational system of the
country, a new education and training policy has been launched and implanted all
over the country.
The establishment of the TVET institutions has so far contributed a lot in the
country in general and in the regional in particular. In the one of the moderately
big towns in the country, a new TVET college is planned to established and start
operating next academic years. The premise is already completed, what Remains
the necessary facilities for the various work shops. We are now proposing
procuring facilities for the following various workshops. This newly establishes
TVET College has 5 fields of training namely information technology, masonry,
concrete, plumbing, plastering,
The capacity of each workshop well be 25 students the total budget required is as
follows:
•
Machines, equipment and hand tools birr _______________
•
Furniture’s Birr________________
•
Installation of machines, equipment birr_____________
•
Total project cost Birr __________________
The project will take 6 moths to complete and make it ready for training
The TVET commission management board will implement the project by assigned
the committee and monitoring supervising the project
the committee has 6
member and they are experienced and qualified project manager, marketing
manager, technical manager and department heads that can implement monitor
and evaluate the project effectively. After the completion of the project the
committee hands over the whole TVET workshops for TVET commission
management board and the town education office.
2. 1. Back ground of the project
The establishment of technical and vocational education and training institution is
very crucial of every nation particularly
those that are still “developing” such as
Ethiopia. Vocational education is a capital-intensive fields of study because it is
based on skills and practical a lot of tools, equipment, machinery, are the
necessary facilities for various work shops as a result a lot of money is needed to
build and equip laboratories, demonstration farms , workshop, personnel,
recruitment when the TVET college has been adequately invested up on,
intelligently articulated, and properly executive it should be able to meet the
economic needs and expectations of the nations , and it’s citizen. The new TVET
institution equip with necessary tools, equipment and machinery the college be
comes a center of excellence in the area as competent and qualified training
institutions.
2. Project purpose and description
The project envisaged procuring facilities for the various workshops with standard
tools, equipment, and machinery.
Objective the overall objective of this project is to equip and furnish the various
workshops.
•
To establish standard equipment, tools, machinery for each workshops
•
To facilitate standard work shops and
•
Install the machines, the tools the equipment in properly.
4. Significance and value of the project
3. •
The implementation of the project shall assist the trainees acquired
necessary skills that make them competent on the labor force market and
this shall be employed and be a responsible citizens.
•
The project enhances trainees with Wright attitude, skills and aptitudes
to wards work.
•
The TVET college becomes center of excellence in the area as competent
and qualities training institution
•
The implementation of this project enabling the individuals to choose and
perfect knowledge, and skills in those they have interests and a aptitudes
5. Project beneficiaries
The primary beneficiaries of the propose project trainees those are read to join the
TVET college. Their families, the town were the TVET College established the
nations as a whole and the private sector, will benefit form this project by getting
competent and reliable technical manpower capable with right attitudes, skills and
aptitude towards work.
The end of the project implementation will provide. Well organized, equipped and
standard workshops
6. Project implementation and monitoring
The projects are managed by the TVET management board headed by the director
the board. Assigned six member committee with there experienced and educational
qualification.
TVET management
director
Project manager
Technical
Marketing &
Manager
Finical Manager
Department
Head
Department
Head
Department
Head
4. The project managers carry out all functions and manager with the clear and
transparent participation of all the committee members
- The TVET management board headed shall monitor and evaluated the project
and support (shall also play supervisory role).
7. Project sustainability
The project is being implemented the financing of education is a joint responsibility
of the Federal state and local Government and the private sector. The government
has established strong organizational structure to mange and administers the
various aspects of the project.
8. Project duration
Implementation of the project in most cases might be contingent to the availability
of funds the project shall be accomplished with 6 months this will be form June
5/2012 to November 5/2012.
9. Budget summary ______________________
•
Machineries equipment and materials _______________
•
Installation ___________________________
Please see the detailed budget breakdown in the attached annexes
10. Risk management Plan
Risk contingency planning is the act of preparing a plan, or as series of activities,
should an adverse risk occur. A contingency pan in place forces the project team to
think in advance as to a course of action if a risk event takes place.
The project teams in advance expect the following risks in this project
5. •
Cost of materials this impact is usually estimate as dollar amount that has a
direct impact to the project
•
Schedule delays frequently results may affect the final end date
•
Quality of the delivery materials is frequently over looked as an impact
category if makes disappointment by the stakeholders Contingency may also
be reflected in the project budget as a line item to cover unexpected expenses
and the above risks. The amount of budget for contingency may be limited to
just the high probability risk.
6. Work plane schedule
Activity
June
July
August
September
October
November
Weeks
Weeks
Weeks
Weeks
Weeks
Weeks
1 2
3
4
Tender
announcement and
selecting the best
supplier make un
agreement
Sample taking from
the supplier
evaluating the
equipment based on
specification
Setup the basic
infrastructure for
each of workshop
Delivery time the
awarded supplier
based on the
specification and
agreement they
delivery the machine
tools, and
equipment
After complication of
delivery the
materials the time
for installation
Final end date of
project
1
2
3
4
1
2
3
4
1
2
3
4
1 2
3
4
1
2
3
Remark
4
7. Annexes
Detailed cost and list of equipment and materials
1. Information technology
N Item
U
Qu
Unit
Tota Rem
o
ni
ant
pric
l
e
prin
25
7,00
ce
175,
5
0
450
000
225
2
0
800
00
160
t
1
2
3
Computer
pc
Printer HP leaser jet 1320
s
Pc
Scan jet color
s
Pc
s
4
Network connection
• HUBS
•
•
•
5
6
7
8
9
1
0
Pc
10
RJ
s
pc
5.00
720 1.15
50
828
Cable
s
Pc
.00
470 2.07
972
Crimping tools
s
Pc
0
6
.00
345.
7
207
50
00
217
0
108
650
5
3.00
100
1
0
450
500
1
0
200
0
200
00
560
APC smart UPS
s
Pc
143
Printer tanner
s
Pc
Photocopy machine
s
Pc
Beamer LCD projector Dell 2400
s
Pc
Blower
s
Pc
2
00
280
Fire
s
Pc
1
143
300
0
s
Extinguishers
300
ark
8. 1
Tool kit with all accessory
Pc
1
s
1
200
0
200
0
2. Masonry
A. Machinery and equipments specification
S.N
1
2
3
4
5
6
7
Item
Bench grinder
Block molding
Computer
Concrete mixer
Electrical bar cutler
Electrical brick
Leveling with all
Unit
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Pcs
Quant
5
2
2
1
1
1
1
U. price
685.27
38,927.90
7,821.19
30,000
24,365,16
12,119.21
20000
T.prince
Remark
3,426.35
77,855.8
15,642.38
30,000
24,365.10
12,119.21
8
9
accessory
Portable disk
Reinforcing shear
Pcs
Pcs
2
1
675.21
2000
1350.42
2000
10
11
culture
thedoelite
Vibrator
pcs
pcs
2
2
35,000
12,116.27
70,000
24232.54
Subtotal= 259,061.42
10. 259061.42+113450=372511.42
10% contingency
Total cost Estimate, masonry= 409762.60
4.Concert
A/ Machinery and equipments specification
SN Item
1
2
Block molding
Compaction test
Unit
pces
Pcs
Quant Unit
1
1
price
31,998.16
48,921.16
Total
prince
31,998.16
48,921.16
Remark