SlideShare una empresa de Scribd logo
1 de 23
Data Centers – AHP Model




                Ashok Bhatla and
                Mohammad Mansour
What are Data Centers
“A data center (or data centre or
datacenter or datacenter) is a
facility used to house computer
systems       and       associated
components,         such        as
telecommunications and storage
systems. It generally includes
redundant or backup power
supplies,     redundant       data
communications        connections,
environmental controls (e.g., air
conditioning, fire suppression)
and security devices.”
(Source: WIKI Definition)


      Data Centers are Information Factories
Components of a Data Center
                      Telecom
                      Systems


 Electricity
  Systems
                                         Cooling
                                         Systems




 Humidity
  Control
 Systems                           Security
                                   Systems
               Compute Equipment
Facts about Data Centers
 Server racks now designed for more than 25+ kW

 Typical facility ~ 1MW, can be > 20 MW

 Cost of electricity equaling capital cost of IT equipment

 1.5% of all electricity in the U.S. in 2006 ($4.5 Billion)

 Growing at 12% per year (will double in 5 years)

 Power and cooling constraints in existing facilities
    Source : http://www.doe.gov
Major Issues in Data Centers
Data Center Metrics
   Power Usage Efficiency (PUE)

   Water Usage Effectiveness (WUE)

   Energy Reuse Effectiveness (ERE)

   Data Center Compute Efficiency (DCcE)

   D.C Performance per Watt (DCPpW)

Source:
http://www.thegreengrid.com
http://www.hothardware.com
Data Centers in Remote Locations
Google in Dalles, Oregon
Microsoft and Yahoo in Quincy, Washington.
Facebook in Prineville, Oregon
Amazon in Boardman, Oregon
Intel in Sacramento
Data Center Map – North America




Source : http://www.datacentermap.com/
Purpose of the Study
• Develop a Decision Model for data center site
  selection for companies settings up their own
  dedicated data centers.
• Different Hosting Models like Co location,
  Managed hosting, Outsourcing etc. are also
  out of scope.
Goal of the
         Organization
• Setup a modern energy
  efficient data center with
  minimum cost, high
  computing power, at a
  desired location with low
  chances of natural
  disasters – providing best
  value to the business it
  serves.
Data Center Infrastructure Standard
 ANSI/CSA/EIA/TIA 942
 Provides standards for planning of data
  centers, computer rooms, co-location centers,
  trading floor equipment rooms, technology
  test labs and similar spaces.
 Standard for determining the quality of a data
  center and for comparing data centers with
  each other.
HDM             Define Overall Key
                        Decisions




Methodology        Select Different
                 Criteria and Factors



                  Select Different
                   Alternatives



              Gather Expert Opinion
              for Criteria & Factors



               Measure and Identify
                 Relative weights



               Calculate Impact of
                criteria on overall
                     decisions




               Conclude the best
              possible site for an IT
                   Data Center
Data Center Site Selection – HDM Model




Geographical           Financial               Political         Social

  Factors              Factors                 Factors          Factors

    (C1)                 (C2)                    (C3)             (C4)


    Disaster             Land Cost                  Tax           Safety &
                                                               Security, Crime
   Avoidance               (F21)                Structure,
                                              Incentives and        (F41)
     (F11)                                       Subsidies
   Transport             Building
  Availability/        Construction                (F31)
  Accessibility           Cost
                                                                Laws related
      (F12)                (F22)               Jobs Creation      to Urban
                                                   (F32)          Planning
    Telecom            Variable Costs
                                                                   (F42)
                        – electricity
    Network            cost, property
   Availability              tax
      (F13)                (F23)


     Power
   Availability

      (F14)



     Water
   Availability

      (F15)
Respondents Profile
•   Expert 1: IT Data Center Manager – responsible for operations of Data
    Center.
•
•   Expert 2: Facilities Planner – responsible for design and construction of
    buildings
•
•   Expert 3: IT Manager – responsible for infrastructure which includes all IT
    equipment
•
•   Expert 4: Finance Analyst – responsible for the NPV and ROI Analysis and
    Budgeting etc.
•
•   Expert 5: Electrical Engineer – responsible for Cooling and Power Issues in
    a Data Center
Steps
PCM Calculations
       y    k
Av = ∑∑ Cwi ∗ Fwij ∗ Dij
      i =1 j =1

Av = Alternative final value
Cwi = Weight of criterion i (i = 1- y )
Fwij = Weight of factor j in C i ( j = 1-k )
Dij = Alternative ranking for factor j in C i
y = Number of criteria in the model
k = Number of factors under C i
Table 4: Ranking of alternatives against each factor




                Interpretation of the Data
                  Criterion                           Factors                                   Desirability Values (0-100)
                                                                                Alt1: Quincy,         Alt2:            Alt3:       Alt4:
                                                                                Washington        Sacramento, Charlotte,          Dalles,
                                                                                                    California      N. Carolina   Oregon




C1: Geographical Factors
                                 F11: Disaster Avoidance                             83                 66              79          82
                                 F12: Transport Availability/ Accessibility          66                 85              85          71

                                 F13: Telecom Network Availability                   66                 84              86          79

                                 F14: Power Availability                             87                 73              83          83
                                 F15: Water Availability                             77                 65              74          81
C2: Financial Factors
                                 F21: Land Cost                                      85                 65              70          85
                                 F22: Building Construction Cost                     81                 74              72          86

                                 F23: Variable Costs – electricity cost,             87                 68              76          83
                                 property tax
C3: Political Factors
                                 F31: Tax Structure, Incentives and Subsidies        90                 73              74          92

                                 F32: Jobs Creation                                  74                 77              75          67
C4: Social Factors
                                 F41: Safety & Security, Crime                       85                 69              73          85
                                 F42: Laws related to Urban Planning                 84                 62              63          83
Discussion
Conclusion
Questions

Más contenido relacionado

Similar a Dc energy efficiency presentation for psu lecture - ashok bhatla - final

Global Program Management’s Achilles Heel
Global Program Management’s Achilles HeelGlobal Program Management’s Achilles Heel
Global Program Management’s Achilles Heelfrankelly1
 
Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...
Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...
Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...John Hamilton, DAHC,EHC,CFDAI, CPP, PSPO
 
ELECTRONICS INDUSTRY STUDY REPORT
ELECTRONICS INDUSTRY STUDY REPORT ELECTRONICS INDUSTRY STUDY REPORT
ELECTRONICS INDUSTRY STUDY REPORT SVCAVET
 
CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...
CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...
CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...TI Safe
 
Lockheed Martin - Integrated Infrastructure: Cyber Resiliency in Society
Lockheed Martin - Integrated Infrastructure: Cyber Resiliency in SocietyLockheed Martin - Integrated Infrastructure: Cyber Resiliency in Society
Lockheed Martin - Integrated Infrastructure: Cyber Resiliency in SocietyLockheed-Martin
 
Fire Mapping: Building and Maintaining Datasets in ArcGIS
Fire Mapping: Building and Maintaining Datasets in ArcGISFire Mapping: Building and Maintaining Datasets in ArcGIS
Fire Mapping: Building and Maintaining Datasets in ArcGISEsri
 
Graph-enabled network automation solutions with Neo4j
Graph-enabled network automation solutions with Neo4jGraph-enabled network automation solutions with Neo4j
Graph-enabled network automation solutions with Neo4jNeo4j
 
MDPD GIS Application Review and Recommendations for Implementation
MDPD GIS Application Review and Recommendations for ImplementationMDPD GIS Application Review and Recommendations for Implementation
MDPD GIS Application Review and Recommendations for ImplementationJuan Tobar
 
De Mystifying Smart Grid Rankin
De Mystifying Smart Grid RankinDe Mystifying Smart Grid Rankin
De Mystifying Smart Grid Rankinlindarankin
 
Using Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, AnywhereUsing Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, AnywhereSafe Software
 
Y2k presented at Towson University December 1998
Y2k presented at Towson University   December 1998Y2k presented at Towson University   December 1998
Y2k presented at Towson University December 1998Chaim Yudkowsky
 
Empires Idhs Red Cell White Paper
Empires Idhs Red Cell White PaperEmpires Idhs Red Cell White Paper
Empires Idhs Red Cell White Papermartindudziak
 
No logo smart grid in the usa 100409f2
No logo smart grid in the usa 100409f2No logo smart grid in the usa 100409f2
No logo smart grid in the usa 100409f2Hiroshi Yagi
 
Definition of project profiles to streamline MBSE deployment efforts
Definition of project profiles to streamline MBSE deployment effortsDefinition of project profiles to streamline MBSE deployment efforts
Definition of project profiles to streamline MBSE deployment effortsObeo
 
Securing Critical Infrastructures with a cybersecurity digital twin
Securing Critical Infrastructures with a cybersecurity digital twin Securing Critical Infrastructures with a cybersecurity digital twin
Securing Critical Infrastructures with a cybersecurity digital twin Massimiliano Masi
 

Similar a Dc energy efficiency presentation for psu lecture - ashok bhatla - final (20)

Global Program Management’s Achilles Heel
Global Program Management’s Achilles HeelGlobal Program Management’s Achilles Heel
Global Program Management’s Achilles Heel
 
Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...
Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...
Ncma saguaro cyber security 2016 law & regulations asis phoenix dely fina...
 
Tralli
TralliTralli
Tralli
 
Overview and Status of HDF in NPOESS & NPP
Overview and Status of HDF in NPOESS & NPPOverview and Status of HDF in NPOESS & NPP
Overview and Status of HDF in NPOESS & NPP
 
Aero dataworkshop 2d-module-02_v1.0_en
Aero dataworkshop 2d-module-02_v1.0_enAero dataworkshop 2d-module-02_v1.0_en
Aero dataworkshop 2d-module-02_v1.0_en
 
ELECTRONICS INDUSTRY STUDY REPORT
ELECTRONICS INDUSTRY STUDY REPORT ELECTRONICS INDUSTRY STUDY REPORT
ELECTRONICS INDUSTRY STUDY REPORT
 
CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...
CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...
CLASS 2022 - Abilio Franco e Bryan Rivera (Thales) - Privacidade de dados e c...
 
DEVELOPMENT OF THE GLOBAL EARTHQUAKE CONSEQUENCES DATABASE
DEVELOPMENT OF THE GLOBAL EARTHQUAKE CONSEQUENCES DATABASEDEVELOPMENT OF THE GLOBAL EARTHQUAKE CONSEQUENCES DATABASE
DEVELOPMENT OF THE GLOBAL EARTHQUAKE CONSEQUENCES DATABASE
 
Lockheed Martin - Integrated Infrastructure: Cyber Resiliency in Society
Lockheed Martin - Integrated Infrastructure: Cyber Resiliency in SocietyLockheed Martin - Integrated Infrastructure: Cyber Resiliency in Society
Lockheed Martin - Integrated Infrastructure: Cyber Resiliency in Society
 
Smart Grid
Smart GridSmart Grid
Smart Grid
 
Fire Mapping: Building and Maintaining Datasets in ArcGIS
Fire Mapping: Building and Maintaining Datasets in ArcGISFire Mapping: Building and Maintaining Datasets in ArcGIS
Fire Mapping: Building and Maintaining Datasets in ArcGIS
 
Graph-enabled network automation solutions with Neo4j
Graph-enabled network automation solutions with Neo4jGraph-enabled network automation solutions with Neo4j
Graph-enabled network automation solutions with Neo4j
 
MDPD GIS Application Review and Recommendations for Implementation
MDPD GIS Application Review and Recommendations for ImplementationMDPD GIS Application Review and Recommendations for Implementation
MDPD GIS Application Review and Recommendations for Implementation
 
De Mystifying Smart Grid Rankin
De Mystifying Smart Grid RankinDe Mystifying Smart Grid Rankin
De Mystifying Smart Grid Rankin
 
Using Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, AnywhereUsing Data Integration to Deliver Intelligence to Anyone, Anywhere
Using Data Integration to Deliver Intelligence to Anyone, Anywhere
 
Y2k presented at Towson University December 1998
Y2k presented at Towson University   December 1998Y2k presented at Towson University   December 1998
Y2k presented at Towson University December 1998
 
Empires Idhs Red Cell White Paper
Empires Idhs Red Cell White PaperEmpires Idhs Red Cell White Paper
Empires Idhs Red Cell White Paper
 
No logo smart grid in the usa 100409f2
No logo smart grid in the usa 100409f2No logo smart grid in the usa 100409f2
No logo smart grid in the usa 100409f2
 
Definition of project profiles to streamline MBSE deployment efforts
Definition of project profiles to streamline MBSE deployment effortsDefinition of project profiles to streamline MBSE deployment efforts
Definition of project profiles to streamline MBSE deployment efforts
 
Securing Critical Infrastructures with a cybersecurity digital twin
Securing Critical Infrastructures with a cybersecurity digital twin Securing Critical Infrastructures with a cybersecurity digital twin
Securing Critical Infrastructures with a cybersecurity digital twin
 

Más de ASHOK BHATLA

Capacity management for ETL System
Capacity management for ETL SystemCapacity management for ETL System
Capacity management for ETL SystemASHOK BHATLA
 
Capacity Management of an ETL System
Capacity Management of an ETL SystemCapacity Management of an ETL System
Capacity Management of an ETL SystemASHOK BHATLA
 
Smart Electric Meters - Role of Govt. in Technology Management
Smart Electric Meters - Role of Govt. in Technology ManagementSmart Electric Meters - Role of Govt. in Technology Management
Smart Electric Meters - Role of Govt. in Technology ManagementASHOK BHATLA
 
World innovation - Knowledge Competitiveness Index
World innovation - Knowledge Competitiveness IndexWorld innovation - Knowledge Competitiveness Index
World innovation - Knowledge Competitiveness IndexASHOK BHATLA
 
R&d management trending between india, china and us
R&d management   trending between india, china and usR&d management   trending between india, china and us
R&d management trending between india, china and usASHOK BHATLA
 
Solar lantern technology adoption model for indian villages - final
Solar lantern   technology adoption model for indian villages - finalSolar lantern   technology adoption model for indian villages - final
Solar lantern technology adoption model for indian villages - finalASHOK BHATLA
 
Emerging Technology Products for Indian Villages
Emerging Technology Products for Indian VillagesEmerging Technology Products for Indian Villages
Emerging Technology Products for Indian VillagesASHOK BHATLA
 

Más de ASHOK BHATLA (8)

Capacity management for ETL System
Capacity management for ETL SystemCapacity management for ETL System
Capacity management for ETL System
 
Capacity Management of an ETL System
Capacity Management of an ETL SystemCapacity Management of an ETL System
Capacity Management of an ETL System
 
Smart Electric Meters - Role of Govt. in Technology Management
Smart Electric Meters - Role of Govt. in Technology ManagementSmart Electric Meters - Role of Govt. in Technology Management
Smart Electric Meters - Role of Govt. in Technology Management
 
World innovation - Knowledge Competitiveness Index
World innovation - Knowledge Competitiveness IndexWorld innovation - Knowledge Competitiveness Index
World innovation - Knowledge Competitiveness Index
 
R&d management trending between india, china and us
R&d management   trending between india, china and usR&d management   trending between india, china and us
R&d management trending between india, china and us
 
Ashok career map
Ashok career mapAshok career map
Ashok career map
 
Solar lantern technology adoption model for indian villages - final
Solar lantern   technology adoption model for indian villages - finalSolar lantern   technology adoption model for indian villages - final
Solar lantern technology adoption model for indian villages - final
 
Emerging Technology Products for Indian Villages
Emerging Technology Products for Indian VillagesEmerging Technology Products for Indian Villages
Emerging Technology Products for Indian Villages
 

Último

Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Strongerpanagenda
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.Curtis Poe
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsNathaniel Shimoni
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsSergiu Bodiu
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch TuesdayIvanti
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...panagenda
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxLoriGlavin3
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesThousandEyes
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfLoriGlavin3
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rick Flair
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersRaghuram Pandurangan
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterMydbops
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality AssuranceInflectra
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfNeo4j
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxLoriGlavin3
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxLoriGlavin3
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI AgeCprime
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsPixlogix Infotech
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxLoriGlavin3
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsRavi Sanghani
 

Último (20)

Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better StrongerModern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
Modern Roaming for Notes and Nomad – Cheaper Faster Better Stronger
 
How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.How AI, OpenAI, and ChatGPT impact business and software.
How AI, OpenAI, and ChatGPT impact business and software.
 
Time Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directionsTime Series Foundation Models - current state and future directions
Time Series Foundation Models - current state and future directions
 
DevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platformsDevEX - reference for building teams, processes, and platforms
DevEX - reference for building teams, processes, and platforms
 
2024 April Patch Tuesday
2024 April Patch Tuesday2024 April Patch Tuesday
2024 April Patch Tuesday
 
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
Why device, WIFI, and ISP insights are crucial to supporting remote Microsoft...
 
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptxUse of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
Use of FIDO in the Payments and Identity Landscape: FIDO Paris Seminar.pptx
 
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyesHow to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
How to Effectively Monitor SD-WAN and SASE Environments with ThousandEyes
 
Moving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdfMoving Beyond Passwords: FIDO Paris Seminar.pdf
Moving Beyond Passwords: FIDO Paris Seminar.pdf
 
Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...Rise of the Machines: Known As Drones...
Rise of the Machines: Known As Drones...
 
Generative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information DevelopersGenerative AI for Technical Writer or Information Developers
Generative AI for Technical Writer or Information Developers
 
Scale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL RouterScale your database traffic with Read & Write split using MySQL Router
Scale your database traffic with Read & Write split using MySQL Router
 
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance[Webinar] SpiraTest - Setting New Standards in Quality Assurance
[Webinar] SpiraTest - Setting New Standards in Quality Assurance
 
Connecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdfConnecting the Dots for Information Discovery.pdf
Connecting the Dots for Information Discovery.pdf
 
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptxA Deep Dive on Passkeys: FIDO Paris Seminar.pptx
A Deep Dive on Passkeys: FIDO Paris Seminar.pptx
 
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptxDigital Identity is Under Attack: FIDO Paris Seminar.pptx
Digital Identity is Under Attack: FIDO Paris Seminar.pptx
 
A Framework for Development in the AI Age
A Framework for Development in the AI AgeA Framework for Development in the AI Age
A Framework for Development in the AI Age
 
The Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and ConsThe Ultimate Guide to Choosing WordPress Pros and Cons
The Ultimate Guide to Choosing WordPress Pros and Cons
 
The State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptxThe State of Passkeys with FIDO Alliance.pptx
The State of Passkeys with FIDO Alliance.pptx
 
Potential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and InsightsPotential of AI (Generative AI) in Business: Learnings and Insights
Potential of AI (Generative AI) in Business: Learnings and Insights
 

Dc energy efficiency presentation for psu lecture - ashok bhatla - final

  • 1. Data Centers – AHP Model Ashok Bhatla and Mohammad Mansour
  • 2. What are Data Centers “A data center (or data centre or datacenter or datacenter) is a facility used to house computer systems and associated components, such as telecommunications and storage systems. It generally includes redundant or backup power supplies, redundant data communications connections, environmental controls (e.g., air conditioning, fire suppression) and security devices.” (Source: WIKI Definition) Data Centers are Information Factories
  • 3. Components of a Data Center Telecom Systems Electricity Systems Cooling Systems Humidity Control Systems Security Systems Compute Equipment
  • 4. Facts about Data Centers  Server racks now designed for more than 25+ kW  Typical facility ~ 1MW, can be > 20 MW  Cost of electricity equaling capital cost of IT equipment  1.5% of all electricity in the U.S. in 2006 ($4.5 Billion)  Growing at 12% per year (will double in 5 years)  Power and cooling constraints in existing facilities Source : http://www.doe.gov
  • 5. Major Issues in Data Centers
  • 6. Data Center Metrics  Power Usage Efficiency (PUE)  Water Usage Effectiveness (WUE)  Energy Reuse Effectiveness (ERE)  Data Center Compute Efficiency (DCcE)  D.C Performance per Watt (DCPpW) Source: http://www.thegreengrid.com http://www.hothardware.com
  • 7. Data Centers in Remote Locations Google in Dalles, Oregon Microsoft and Yahoo in Quincy, Washington. Facebook in Prineville, Oregon Amazon in Boardman, Oregon Intel in Sacramento
  • 8. Data Center Map – North America Source : http://www.datacentermap.com/
  • 9. Purpose of the Study • Develop a Decision Model for data center site selection for companies settings up their own dedicated data centers. • Different Hosting Models like Co location, Managed hosting, Outsourcing etc. are also out of scope.
  • 10. Goal of the Organization • Setup a modern energy efficient data center with minimum cost, high computing power, at a desired location with low chances of natural disasters – providing best value to the business it serves.
  • 11. Data Center Infrastructure Standard  ANSI/CSA/EIA/TIA 942  Provides standards for planning of data centers, computer rooms, co-location centers, trading floor equipment rooms, technology test labs and similar spaces.  Standard for determining the quality of a data center and for comparing data centers with each other.
  • 12. HDM Define Overall Key Decisions Methodology Select Different Criteria and Factors Select Different Alternatives Gather Expert Opinion for Criteria & Factors Measure and Identify Relative weights Calculate Impact of criteria on overall decisions Conclude the best possible site for an IT Data Center
  • 13. Data Center Site Selection – HDM Model Geographical Financial Political Social Factors Factors Factors Factors (C1) (C2) (C3) (C4) Disaster Land Cost Tax Safety & Security, Crime Avoidance (F21) Structure, Incentives and (F41) (F11) Subsidies Transport Building Availability/ Construction (F31) Accessibility Cost Laws related (F12) (F22) Jobs Creation to Urban (F32) Planning Telecom Variable Costs (F42) – electricity Network cost, property Availability tax (F13) (F23) Power Availability (F14) Water Availability (F15)
  • 14. Respondents Profile • Expert 1: IT Data Center Manager – responsible for operations of Data Center. • • Expert 2: Facilities Planner – responsible for design and construction of buildings • • Expert 3: IT Manager – responsible for infrastructure which includes all IT equipment • • Expert 4: Finance Analyst – responsible for the NPV and ROI Analysis and Budgeting etc. • • Expert 5: Electrical Engineer – responsible for Cooling and Power Issues in a Data Center
  • 15. Steps
  • 16. PCM Calculations y k Av = ∑∑ Cwi ∗ Fwij ∗ Dij i =1 j =1 Av = Alternative final value Cwi = Weight of criterion i (i = 1- y ) Fwij = Weight of factor j in C i ( j = 1-k ) Dij = Alternative ranking for factor j in C i y = Number of criteria in the model k = Number of factors under C i
  • 17.
  • 18.
  • 19.
  • 20. Table 4: Ranking of alternatives against each factor Interpretation of the Data Criterion Factors Desirability Values (0-100) Alt1: Quincy, Alt2: Alt3: Alt4: Washington Sacramento, Charlotte, Dalles, California N. Carolina Oregon C1: Geographical Factors F11: Disaster Avoidance 83 66 79 82 F12: Transport Availability/ Accessibility 66 85 85 71 F13: Telecom Network Availability 66 84 86 79 F14: Power Availability 87 73 83 83 F15: Water Availability 77 65 74 81 C2: Financial Factors F21: Land Cost 85 65 70 85 F22: Building Construction Cost 81 74 72 86 F23: Variable Costs – electricity cost, 87 68 76 83 property tax C3: Political Factors F31: Tax Structure, Incentives and Subsidies 90 73 74 92 F32: Jobs Creation 74 77 75 67 C4: Social Factors F41: Safety & Security, Crime 85 69 73 85 F42: Laws related to Urban Planning 84 62 63 83