SlideShare a Scribd company logo
1 of 5
ANDREW M. BREEN, MBA

10961 PRINCETON VILLAGE DRIVE                                                              CELL: 704.737.6476 / HOME: 704.542.6326
CHARLOTTE, NORTH CAROLINA 28277-3021                                                       EMAIL: MARKMI99@YAHOO.COM

SUMMARY OF CREDENTIALS
A multi-dimensional, focused senior resource with a long track record of tangible success. Comfortable working at the forest or tree
level so that business requirements are optimally supported by chosen technical enablers. Project experience includes diverse business,
technical, industry and cultural elements, including experience with international, offshore and virtual teams.
•   Project Management - 15 years of Practice/Program/Project Management experience covering all phases of the SDLC.
    Extensive experience at all levels of project visibility - (e.g., IBM Board of Directors Compensation, Wachovia and NationsBank
    M&A, world-wide application rollouts, etc,). A business process thought leader possessing exceptionally strong leadership,
    communication, problem-solving, motivational and interpersonal skills. Obtains agreement of definition of success at the outset,
    in terms of deliverables, cost, quality, time and change management with owners/stakeholders. Adheres to client’s vision and can
    add additional substantial value to project deliverables, as appropriate (e.g., Best Practices). Experienced in developing
    accelerators to keep project on track, or to come in and resurrect a project. Customization / work around expert. Knowledgeable
    in PMBOK, AIM, Six Sigma and other waterfall methodologies. Strong, proven competencies vis-à-vis project initiation,
    planning, execution, budget, risk, scope, human resources and change management. Highly results-oriented, but easy to work
    with. Uses positive expectations to motivate team members. Industry experience includes Technology, Telecom. Finance, Mfg.,
    Retail, Automotive, Environmental, Utilities and Health Care.
•   Operational – Over 14 years’ experience in corporate legal, financial & managerial accounting, corporate treasury, cash
    management, banking and retirement product areas.
•   Technical – Former applications programmer (PL/1, SAS), Oracle Applications expert
•   Other – Published technical writer (article on Project Management available upon request)


PROFESSIONAL EXPERIENCE
Independent Consultant, Charlotte, NC 4/2009 – Present
    •    Took training on Oracle R.12. Also have access to contractor R.12 sandbox.

    •    Train clients on resume preparation, business writing and interview techniques
Ingersoll Rand Corp., Davidson, NC / Project Mgr 3/2008 -2/2009
    •    Senior Change Leader for Campbellsville, KY site. Part of Oracle global footprint ($300MM over 4 yrs, including over 50 sites)
         implementation – IR’s first US cutover. Managed communications; Drove first implementation/integration audit readiness review and
         follow up process; Trained plant personnel in Oracle; Built / managed first Change Management work plan (integrated with overall
         divisional / sector / plant plans). Laid groundwork for and trained successors.

    •    Oracle 11i support and analysis - Supported Finance & HR teams (IT sector) relating to upgrades / fixes of production processes and
         reports in Oracle (GL, PA, AR, INV) / Siebel environment. Projects were loaded, maintained and tracked on Sharepoint. Provided analysis,
         testing, issue closure and complete documentation. Introduced Project Management procedures / controls to improve management of
         multiple departmental projects. Provided a plan to better organize and work with vast amount of accumulated documentation. Customers /
         management were very pleased with quality and turn-around of deliverables.
Contract Consultant, Senior Project Manager / Business Process (Best Practices), Charlotte, NC 4/2007 – 2/2008
     •    10/07 – 2/08: Synapse Technologies, LLC / client – Wachovia – Senior Project Manager for Golden West M&A project. Responsibility
          included identifying and transitioning in-scope loan products, simplifying 12,000 line work plan, identifying dependencies, issues and
          risks and integrating with overall plan. Also, meeting facilitation, status reporting, project forecasting and budgeting. All deliverable
          milestones made on time and on budget. Customer was highly satisfied. Trained / handed off project to FTE PM who became available.
     •    4/07 – 6/07: Patriot Consulting, Inc. / client – Office Depot – Cash Management Lead. Responsible for assistance with requirements
          development /integration and construction of test scripts to match standard and custom business scenarios needed for Oracle
          implementation. Added significant value to basic functional requirements selection around best practices. Business analysis and technical
          writing skills were critical for success. Customer was highly satisfied. Project funding issues forced early team roll-off.
Keane, Inc., Charlotte, NC / Project Manager / Principal Consultant 11/2005 – 4/2007
     •    Opted for a local consulting assignment with a large local financial client in lieu of an offer to travel for 50 percent more pay.
                              Sunday, December 20, 2009                           Andrew M Breen                 1 of 5
•    Performed Business Analysis and Project Management roles in first assignment for TIAA-CREF. Risk analysis identified an
         inconsistency in the integrated legacy data model, which had been built to test a new web application that saved the client thousands of
         person–hours and dollars by delaying testing until model was fixed. Delay opened Finance support opportunity.
    •    In second TIAA-CREF assignment, supporting the Accounting and Finance teams, submitted a proposal to save substantial IT costs by
         decommissioning outmoded systems and consolidating under an Oracle / PeopleSoft platform. Proposal was sent to Finance and IT senior
         management for evaluation. Since beginning second position at client, have added value in multiple software releases and provided
         process improvements.

 IBM Corporation (rehire), Charlotte, NC / Senior Consultant 5/2004 – 3/2005
    Responsibilities: Project Management, applications consulting, RFQ assistance, special projects, integrations
    • Major projects: setup of Financial Consolidation Hub / Global Accounting Engine and finance lead for GL and AP – both roles were
         hands-on 11.5.9
    •    Sarbanes-Oxley trained and deployed after selection to IBM / KPMG compliance team. Primarily a risk-mitigation role.
Project Manager / Independent Consultant, Charlotte, NC 9/2003 – 4/2004
    •    Local projects involving technical writing, training, risk mitigation / cost management and process improvement, QA, Troubleshooting,
    •    Retooled skills – Six Sigma, began PMP study in preparation for rejoining consulting opportunities.


Wachovia Corporation, Charlotte, NC, Officer Profitability Mgmt Division 12/2002 - 8 /2003
   Responsibilities: Analytical role. Write and test / validate financial rules to more accurately report results across the bank. Tools include
   Oracle OFSA Suite, ESSBASE and PL/SQL
Stripling and Beck, Charlotte, NC Dir., ERP Consulting / Project Manager 11/2001 - 11/2002
    Responsibilities: Anchor projects as lead implementation resource; Plan, build and manage the firm's ERP Consulting Practice including
    Quality Assurance. Report directly to CEO. Note: Also ran my personal consulting practice (main client: IT Convergence).
    •    Designed, built and delivered a Best Practices-based global Oracle Applications Multiorg Implementation plan in two weeks (Dec. 2001)
         for an Engineering client, after client had been unable to get it from their Big 5 firm over an extended period. Senior client Project
         Manager was able to use the plan to do the work internally, resulting in considerable budget savings.
    •    Production System Troubleshooting. Subcontracted with Ingersoll Rand and solved top Oracle Purchasing production issue client had
         been unable to debug internally. R. 11.5.4.
    •    Lead resource for responding to ERP/Oracle RFP's / RFQ's / Train internal resources on Oracle products / methodologies / testing /
         Financials functionality.
Harris/Exigent Solutions Group, Charlotte, NC VP/ Practice Manager 1/2001-11/2001
    Responsibilities: Managed Business Development, Consulting, Deliverable Quality, Vendor Contracts, Personnel, Budgeting, Training and
    Administration. I reported directly to the President of Exigent Solutions Group. (Harris purchased Exigent International, effective May 2001)
    •    Lead functional resource for all sales and consulting teams – specialized in GL, AR, AP, FA, Cash Management and Treasury – solved ad
         hoc customer functionality question / product issues / devised workarounds / integrations / customizations
    •    Provide Oracle Financials expertise to clients on ad hoc basis - e.g., to get them through their first accounting close. Assisted in setup/
         testing and ad hoc problem solving. (GL – including WW Consolidations - A/PA/HRMS/CRM), resolve TAR's, help with workarounds,
         etc. Maintained `hands-on' Oracle experience w/ R., 11i via engagements and sandbox.
    •    Transformed the practice's market niche from staff augmentation into a competitor for project / multi-project work. Led account pursuit
         teams as primary contact for client management. Relied upon to be the `last word' to the client in my role as the major knowledge
         resource on our business development calls. Owned the Methodology leadership role - disseminated information on test processes and full
         SDLC project life cycle to the teams. Developed / upgraded project deliverables utilizing technical writing and business analysis skills.
         Developed standards for project pursuits. Along with division president, was lead in RFP process.
    •    Responsible for deliverable quality standards, risk mitigation, vendor management and assisted with Practice’s budgeting.
Cap Gemini Ernst & Young, Charlotte, NC Consulting Manager 4/1998 - 12/2000
    Responsibilities: Project Management and / or Financial lead roles, including sales pursuits, at Fortune 500 and dot COM companies.
    Industries included in this group are high technology, medical, financial, automotive, environmental and utilities. I served as a Financials Best-
    Practices resource responsible for setting deliverable quality standards, planning, testing and executing. I also played significant role in leading
    risk mitigation measuring impact on budgeted cost through client negotiations.
    •    Harvard Pilgrim Health Care, 9/00 -12/00: Project scope - built an ODW (Operational Data Warehouse) to take updated / reconciled feeds
         from legacy subsystems and upload / integrate to the new Financial Management System (FMS) via ETL tool. Platform was HPUX.


                             Sunday, December 20, 2009                           Andrew M Breen                 2 of 5
Phase I applications were General Ledger, Receivables, FSG, Project Costing; Phase II included Payables, Purchasing, and HRMS. My
         role: the overall Project Lead for the Oracle (FMS) implementation, covering both the functional and technical sides of the applications
    •    Southern Energy Corp, 5/00 – 8/00: Sales and consulting lead for Oracle Treasury and Oracle Financials. Functional go-to person for
         these applications which client subsequently purchased.
    •    Cigna International, 11/99-3/00: Project scope - successful worldwide rollout of Oracle applications for the R. 11.0.3 Oracle Financials
         Worldwide implementation (25 countries with 3 SOB each – total was over 75 sets of books). Included Multiple Reporting Currency,
         Consolidation Workbench, ADI, MassAllocations, Budgeting, Localizations, and FSGs. My role: General Ledger and Financial Reporting
         PM / team lead. Interfaced directly with senior Cigna executives. Trained junior team members and client staff on Accounting Flexfield
         design, R. 11 functionality. Heavy integration customization requirements were documented, tested and implemented.
    •    Eaton Corp., 11/98-7/99: Project scope - Successful implementation of Oracle Financials and Mfg. Applications at Clutch Division HQ -
         Auburn, Indiana, and two Remanufacturing (Reman) sites. This was a complete manufacturing and financials implementation. Oracle
         10.7 SC 16.1, HPUX Platform. My role: Accounts Receivable team lead. Responsibilities included providing a solution for invoice
         processing at the plant while cash was applied at the corporate level in a Shared Services environment. Additionally, A/R was set up to
         handle a customized invoicing/credit bolt-on used at the Remanufacturing sites (known as the Core Bank). Applications I assisted with
         (setup/testing): GL, OM, PO, AP). Custom test scripts had to be developed to test import of data from Order Entry into the Financials.
    •    Michelin, 8/98-10/98: Project scope - Michelin's successful North America Oracle P01 Pilot project. Oracle 10.7 NCA implementation on
         HP platform. My role: Testing coordinator and incident tracking & resolution lead across all applications. Responsibilities spanned
         planning and ensuring successful test cycle execution across GL (including WW Consolidations), FA, PA, PO, AP, AR (VERTEX), INV,
         Custom Cost, Legacy Sales Database, Conversions / Interfaces teams. Acted as point of contact with Michelin Global Core development
         team in France and externally with Oracle.
    •    Other: Conceived, developed and managed an internal Oracle Applications / Technical training program, delivered at no cost to E&Y.
         Students and teachers were consultants who were not deployed. The sessions leveraged interactive, classroom training, the 'sandbox'
         Oracle Instance and the varied skill sets of the consultants. I facilitated these cross- sessions to fill in basic knowledge gaps, promote
         mentoring relationships and help build confidence. Eventually, consultants from other offices began calling in to the sessions and the idea
         was rolled out to other offices. The Partners made attendance at this class mandatory for undeployed resources.
Oracle Corporation, Atlanta, Ga. / Charlotte, NC Principal Consultant 9/1995 - 4/1998
    Responsibilities: Lead / participate in Oracle applications engagements and sales pursuits. Set deliverable quality standards, mitigate risk
    and cost.
    •    Eaton Corp. 1/98-6/98: Financial lead for successful implementation of Oracle (10.6.1) at Fluid Power Division, Fletcher, NC. Selected to
         provide project management and Oracle Financials expertise (GL / WW Consolidations) for corporate divisional team. Also a member of
         the Manufacturing team, Responsible for local full implementation of Oracle Cost Management. Project included extensive setup, testing,
         integration with EDI Gateway to transmit notifications to Shared Services Center and went live ahead of schedule.
    •    KPMG Peat Marwick (1997): Invited to Montvale, NJ headquarters to assist with the definition of the GL Chart of Accounts. Helped
         produce a strawman that went to the partners for review.
    •    Fisher Scientific (1998): Pittsburgh, Pa. Project scope - Implement Financials / Distribution applications, R. 10.6. Role was co-GL lead.
         Successfully planned/defined/setup Chart of Accounts and Financial Reporting. Successfully coordinated unit/integration/User
         Acceptance testing / integration with other financials (AR, AP)
    •    Toshiba (1997): Called in to Tokyo, Japan headquarters to evaluate the functionality / test at a high level a series of different options
         being considered for the GL (including Worldwide Consolidation) Corporate Chart of Accounts / Accounting Flexfield and to assist with
         integrating this into the new Multi-Org. model which had just been introduced by Oracle. Client reported they had learned what they
         needed in order to get to the next step of the implementation.
    •    Unisys - (1997): Blue Bell, Pa. Client had tried to bring up A/R for a year without success. Noticing the large number of unresolved
         Technical Assistance Requests (TARs), I redirected their test efforts along a critical path and brought them up live and through their first
         close (including reconciliation's) within 6 weeks, resulting in considerable budget savings.
    •    Time Warner (WEA Mfg. 1997): - Oliphant, Pa. Successful implementation of manufacturing apps. - Inventory, WIP, BOM, Costing,
         MRP, ENG, Order Entry and Purchasing including Mfg. Customizations and integrated the financial transactions into client's legacy
         system. My role was the Project Manager and Receivables/Financial lead.
    •    Amercord (1996): - Assisted my manager in setting up full set of Oracle Financials (including consolidations)
    •    Unifi (1995/1996): - Brought to Greensboro, NC headquarters and successfully set up their Financial Reporting as the lead FSG
         Consultant. Assignment called for creating full set of Financials in $, Budget and Stat currencies as well as a specialized set of Financials.
         I was later called back and successfully customized invoices and credit memos to provide more sales order detail utilizing a variety of
         fields from the Customer and Inventory Masters


                             Sunday, December 20, 2009                          Andrew M Breen                 3 of 5
•    Other Implementations ('95-'98): Multi-org. analysis. Business process reengineering / analysis including context and flow diagramming;
             Development of desktop procedures, technical writing and training.


NationsBank Charlotte, NC Asst. V.P. Finance Dept Project Manager 12/1993 - 7/1995
        Responsibilities: Planning, analysis / test of financial entities acquired via Merger and Acquisition to create seamless integration of new
        subsystems with NationsBank's General Ledger while ensuring full compliance with integrity/ accuracy / timeliness of statutory Regulatory
        Reporting requirements. The bank's General Ledger ran on IBM 3090's, using COBOLII and was reported across the bank using InfoPak.
        •    Assisted with successful integration of several M&A entities including these systems: loan, DDA, FX, Letters of Credit.
        •    Successful work on General and Corporate Bank Systems service upgrade programs to deliver successful testing. Includes MQ series.
Independent Contractor Pound Ridge, NY 8/1992 - 12/1993
    •       General Electric Credit Corporation – Assisted with miscellaneous accounting projects and reconciliations.
    •       New York Medical College, Cornell Medical Center – Worked on project to help automate internal accounting processes.
IBM Corporation Armonk, NY (Misc. Professional Titles - details upon request) 1/1979 - 7/1992*
   Responsibilities Corporate Balance Sheet / Project Management '91- 92/ Corporate Controller staff, Worldwide Income and Expense
   Consolidations 90-'91 / Corporate Treasury staff, Corporate Cash Management '86-'90 / Corporate Human Resources staff, Applications
   Programming (PL/1 and SAS) '82-'85 / Corporate Legal staff / Litigation Analysis Division, '79-'82


SKILLS: Strongest skills are bolded


 Oracle Applications: (12/ 11i/11.5.10.2) including GL, (FSG’s), ADI, Financial Consolidation Hub, OFA. AR, AP, CE (Cash
 Management), Treasury, PO, FA, Project Accounting, WIP, BOM, Cost, Inv, CRM and HR suites; Oracle Discoverer (formerly ‘Browser’)


PROCESSES / METHODOLOGIES                         SOFTWARE- TOOLS                                           SOFTWARE - LANGUAGES
Oracle AIM                                        Internet Explorer, Mozilla Firefox, Netscape              PL/SQL
Oracle FastForward                                Windows Vista, XP Pro, XP home, ME, NT, 2000              PL/1
Oracle Easipath Migration Methodology             MS Excel, Word, Project, Visio, PowerPoint, Access        SAS
Oracle Business Model                             TOAD and Golden                                           JCL
Oracle Custom Development Methodology             Mercury Test Suite                                        Excel Macros
VelocitEY                                         Sharepoint                                                XML
Six Sigma                                         Infopak / FOCUS                                           Speak, Read, Write French
Waterfall, Agile, Scrum                           Essbase
                                                  Oracle OFSA - Perf. Analyzer/ Balance and Control
                                                  Palm OS



EDUCATION:
    •       Syracuse University Syracuse, NY, BS Psychology, Pre-med, minor in Biology

    •       Pace University White Plains, NY, MBA, Financial Management, GPA 3.5+



ASSOCIATIONS:

    •       Linkedin: www.linkedin.com/in/andrewbreencharlotte




                                 Sunday, December 20, 2009                        Andrew M Breen                4 of 5
COMMUNITY 2005 – Volunteer with V.A. to train injured vets in life mgmt and IT skills; Speaker - Charlotte Oracle Applications User Group -
Best Practices in Oracle Financials – 2001; Selected as Project Manager volunteer representative from E&Y for the Advantage Carolina initiative
(1999) which made tangible contributions in time and skill deployment to help build of Charlotte's IT infrastructure; NationsBank - Volunteer for
Green Circle Program - provides self-esteem to disadvantaged youth (1994); Director of Fundraising - New York State Epilepsy Association
('81-'84); Project Management Institute; Oracle Applications Users Group


Selected Project Management Summary


                                                                       Purpose / Major                                                                         Outcome /
 Project Name / Description         Date             Role                                             Budget          Team Size        Complexity
                                                                         Deliverables                                                                          Comments
                                                                  Perform quality check of plant
                                                                                                                      Extended
                                                                  preparedness, build, maintain                                       Highly complex -      Met all deliverable
                                                                                                    $300MM over       team was
  Ingersoll Rand Oracle Rollout      2008       Sr Change Mgr        project plan, train plant                                             many          targets and prepared Ky.
                                                                                                    4 yrs/50 sites     over 100
                                                                      personnel, implement                                            customizations        Plant for transition
                                                                                                                       persons
                                                                       communication plan
                                                                                                                                                          Integrated my part of
                                                                      Integrate GW Mortgage
                                                                                                                                                           the merger while my
                                                                    products (application and                                           Moderately
Wachovia / Golden West Merger      2007-'08     Project Manager                                     Approx. $3m        12 to 14                              team successfully
                                                                     infrastructure monitoring                                           complex
                                                                                                                                                          mapped loan products
                                                                    software) with Wachovia's
                                                                                                                                                                for transfer
                                                                                                                                                            Successful in all core
                                                                                                                                                           Project Management
                                                                                                                                                           tasks - effectively use
                                                                                                                                                          various methodologies
                                                                                                                         20 to 25                              through project
                                                                      Monitored all ongoing                             including                         management life cycle;
                                                                  projects; stepped in to support                     reporting to                           effectively handle
                                                                                                                                      Projects were of
                                                                   implementations and assure       Parent firm          Division                             planning, testing,
        Harris / Exigent             2001        Practice Mgr                                                                             varying
                                                                     customer satisfaction, as      worth $23m       President and                       training communication,
                                                                                                                                        complexity
                                                                    needed. Marketed project                         marketing to                          change management;
                                                                      services to new clients                             C-level                            effective meeting
                                                                                                                         contacts                             facilitation, issue
                                                                                                                                                                management,
                                                                                                                                                             escalations; strong
                                                                                                                                                             client-facing skills;
                                                                                                                                                            effective mentoring

                                                                                                                                                            Successful in all core
                                                                                                                                                           Project Management
                                                                                                                                                           tasks - effectively use
                                                                                                                                                          various methodologies
                                                                                                                        Smallest
                                                                                                                                                               through project
                                                                                                                     project about
                                                                                                                                                          management life cycle;
  Cap Gemini Ernst & Young -                                                                                          10 people,
                                                 Project Mgr,                                                                                                effectively handle
      Projects included:                                          Implement Oracle via ETL tool,    Estimate they        largest      Simple (Harvard
                                                  Team lead,                                                                                                  planning, testing,
  Harvard Pilgrim Health Care     1998 - 2000                       international application        ranged from         several         Pilgrim) to
                                                    Testing                                                                                              training communication,
             Cigna                                                           rollouts               $.5M to $10M       hundred -          complex
                                                 Coordinator                                                                                               change management;
           Michelin                                                                                                   interfaced
                                                                                                                                                             effective meeting
                                                                                                                      with senior
                                                                                                                                                              facilitation, issue
                                                                                                                     management
                                                                                                                                                                management,
                                                                                                                                                             escalations; strong
                                                                                                                                                             client-facing skills;
                                                                                                                                                            effective mentoring

                                                                                                                                                          Planned, implemented,
                                                                   Transitioned manual record
                                                                                                                      6 people,                          tested and installed new
IBM Corporation - Automation of                                   keeping and compensation to
                                                                                                                      including                            system. It formed the
Board of Directors Compensation      1992       Project Manager   an automated basis to reduce      Approx. $100k                          Simple
                                                                                                                      BOD level                             basis for automating
         and Reporting                                             time and cost and improve
                                                                                                                        liaison                                   executive
                                                                             accuracy
                                                                                                                                                              compensation.




                                   Sunday, December 20, 2009                                 Andrew M Breen                       5 of 5

More Related Content

What's hot

Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27Jason Hyatt, PMP
 
John marquart enterprise project manager
John marquart   enterprise project managerJohn marquart   enterprise project manager
John marquart enterprise project managerJohn Marquart
 
IT Project Manager - Charlotte NC
IT Project Manager - Charlotte NCIT Project Manager - Charlotte NC
IT Project Manager - Charlotte NCJeffWitzer
 
Donna modified 090716
Donna modified 090716Donna modified 090716
Donna modified 090716Donna White
 
Rita Duncan Resume
Rita Duncan ResumeRita Duncan Resume
Rita Duncan ResumeRita Duncan
 
Resume ken turano_june 2016
Resume ken turano_june 2016Resume ken turano_june 2016
Resume ken turano_june 2016Ken Turano
 
HiteshArora_April 16
HiteshArora_April 16HiteshArora_April 16
HiteshArora_April 16Hitesh Arora
 
CV for Neil Fulton as of 10_2013
CV for Neil Fulton as of 10_2013CV for Neil Fulton as of 10_2013
CV for Neil Fulton as of 10_2013Neil Fulton
 
Thomas Pfeiffer Resume 2017
Thomas Pfeiffer Resume 2017Thomas Pfeiffer Resume 2017
Thomas Pfeiffer Resume 2017Thomas Pfeiffer
 
Resume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PMResume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PMPrabhu Kannan
 
Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)Michael A. Myrick
 
J Karl Kook Resume 2009
J Karl Kook Resume 2009J Karl Kook Resume 2009
J Karl Kook Resume 2009jkarlkook
 
Shaheen_Salaria-2016
Shaheen_Salaria-2016Shaheen_Salaria-2016
Shaheen_Salaria-2016Shani Salaria
 
Project Manager - PMP [Resume]
Project Manager - PMP [Resume]Project Manager - PMP [Resume]
Project Manager - PMP [Resume]jkern1993
 
Resume David Barker
Resume David BarkerResume David Barker
Resume David BarkerDavid Barker
 

What's hot (20)

SHIPRA KAUSHAL_022017
SHIPRA  KAUSHAL_022017SHIPRA  KAUSHAL_022017
SHIPRA KAUSHAL_022017
 
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
Jason Hyatt, PMP - Resume - Project Manager - 2014-11-27
 
Scott Callan 2017
Scott Callan 2017Scott Callan 2017
Scott Callan 2017
 
John marquart enterprise project manager
John marquart   enterprise project managerJohn marquart   enterprise project manager
John marquart enterprise project manager
 
IT Project Manager - Charlotte NC
IT Project Manager - Charlotte NCIT Project Manager - Charlotte NC
IT Project Manager - Charlotte NC
 
Randall J Chianell (5)
Randall J  Chianell (5)Randall J  Chianell (5)
Randall J Chianell (5)
 
Donna modified 090716
Donna modified 090716Donna modified 090716
Donna modified 090716
 
Rita Duncan Resume
Rita Duncan ResumeRita Duncan Resume
Rita Duncan Resume
 
Resume ken turano_june 2016
Resume ken turano_june 2016Resume ken turano_june 2016
Resume ken turano_june 2016
 
Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV Jamil Faraj Hassan, PMP CV
Jamil Faraj Hassan, PMP CV
 
HiteshArora_April 16
HiteshArora_April 16HiteshArora_April 16
HiteshArora_April 16
 
CV for Neil Fulton as of 10_2013
CV for Neil Fulton as of 10_2013CV for Neil Fulton as of 10_2013
CV for Neil Fulton as of 10_2013
 
Thomas Pfeiffer Resume 2017
Thomas Pfeiffer Resume 2017Thomas Pfeiffer Resume 2017
Thomas Pfeiffer Resume 2017
 
Resume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PMResume_ Prabhu Kannan_PM
Resume_ Prabhu Kannan_PM
 
Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)Infrastructure Architect v3 (COVER)
Infrastructure Architect v3 (COVER)
 
J Karl Kook Resume 2009
J Karl Kook Resume 2009J Karl Kook Resume 2009
J Karl Kook Resume 2009
 
Shaheen_Salaria-2016
Shaheen_Salaria-2016Shaheen_Salaria-2016
Shaheen_Salaria-2016
 
RESUME
RESUMERESUME
RESUME
 
Project Manager - PMP [Resume]
Project Manager - PMP [Resume]Project Manager - PMP [Resume]
Project Manager - PMP [Resume]
 
Resume David Barker
Resume David BarkerResume David Barker
Resume David Barker
 

Viewers also liked

Quantitative, Qualitative, and Intuitive Feature Prioritization
Quantitative, Qualitative, and Intuitive Feature PrioritizationQuantitative, Qualitative, and Intuitive Feature Prioritization
Quantitative, Qualitative, and Intuitive Feature PrioritizationJeremy Horn
 
The Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American ExpressThe Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American ExpressLean Startup Co.
 
Designing Behavior Change for Health, Kelvin Kwong, Jawbone
Designing Behavior Change for Health, Kelvin Kwong, JawboneDesigning Behavior Change for Health, Kelvin Kwong, Jawbone
Designing Behavior Change for Health, Kelvin Kwong, JawboneLean Startup Co.
 
Platforms for the Future of Work, Roger Dickey, Gigster
Platforms for the Future of Work, Roger Dickey, GigsterPlatforms for the Future of Work, Roger Dickey, Gigster
Platforms for the Future of Work, Roger Dickey, GigsterLean Startup Co.
 
Design and the Self, Irene Au, Khosla Ventures
Design and the Self, Irene Au, Khosla VenturesDesign and the Self, Irene Au, Khosla Ventures
Design and the Self, Irene Au, Khosla VenturesLean Startup Co.
 
How Can I Build a Culture That Serves Existing Customers While Unlocking New ...
How Can I Build a Culture That Serves Existing Customers While Unlocking New ...How Can I Build a Culture That Serves Existing Customers While Unlocking New ...
How Can I Build a Culture That Serves Existing Customers While Unlocking New ...Lean Startup Co.
 
Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...
Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...
Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...Lean Startup Co.
 
Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...
Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...
Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...Lean Startup Co.
 
How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...
How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...
How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...Lean Startup Co.
 
How Staying Lean Made Us Big, Michael Perry, Shopify
How Staying Lean Made Us Big, Michael Perry, ShopifyHow Staying Lean Made Us Big, Michael Perry, Shopify
How Staying Lean Made Us Big, Michael Perry, ShopifyLean Startup Co.
 

Viewers also liked (10)

Quantitative, Qualitative, and Intuitive Feature Prioritization
Quantitative, Qualitative, and Intuitive Feature PrioritizationQuantitative, Qualitative, and Intuitive Feature Prioritization
Quantitative, Qualitative, and Intuitive Feature Prioritization
 
The Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American ExpressThe Innovation Engine, Andrew Breen, American Express
The Innovation Engine, Andrew Breen, American Express
 
Designing Behavior Change for Health, Kelvin Kwong, Jawbone
Designing Behavior Change for Health, Kelvin Kwong, JawboneDesigning Behavior Change for Health, Kelvin Kwong, Jawbone
Designing Behavior Change for Health, Kelvin Kwong, Jawbone
 
Platforms for the Future of Work, Roger Dickey, Gigster
Platforms for the Future of Work, Roger Dickey, GigsterPlatforms for the Future of Work, Roger Dickey, Gigster
Platforms for the Future of Work, Roger Dickey, Gigster
 
Design and the Self, Irene Au, Khosla Ventures
Design and the Self, Irene Au, Khosla VenturesDesign and the Self, Irene Au, Khosla Ventures
Design and the Self, Irene Au, Khosla Ventures
 
How Can I Build a Culture That Serves Existing Customers While Unlocking New ...
How Can I Build a Culture That Serves Existing Customers While Unlocking New ...How Can I Build a Culture That Serves Existing Customers While Unlocking New ...
How Can I Build a Culture That Serves Existing Customers While Unlocking New ...
 
Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...
Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...
Tips for Applying Lean Startup in a Large Organization: A Case Study with Tel...
 
Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...
Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...
Lean Startup Inside a Big Company (with a Shark Tank Twist), Stephen Liguori,...
 
How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...
How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...
How to Grow New: Reframing GE FastWorks & How to Engage 250k people, Viv Gold...
 
How Staying Lean Made Us Big, Michael Perry, Shopify
How Staying Lean Made Us Big, Michael Perry, ShopifyHow Staying Lean Made Us Big, Michael Perry, Shopify
How Staying Lean Made Us Big, Michael Perry, Shopify
 

Similar to Abreen Pm 1209

1 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver20071 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver2007Topsy2000
 
Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016Robert Duffy
 
Christopher Salerno Resume
Christopher Salerno ResumeChristopher Salerno Resume
Christopher Salerno ResumeChris Salerno
 
Christopher Salerno April16
Christopher Salerno April16Christopher Salerno April16
Christopher Salerno April16Chris Salerno
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul ResumeRajib Paul
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resumeRajib Paul
 
Renee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee_Foland
 
James Blance Resume_2016
James Blance Resume_2016James Blance Resume_2016
James Blance Resume_2016James Blance
 
Resume_Bishnu Sethy
Resume_Bishnu SethyResume_Bishnu Sethy
Resume_Bishnu SethyBishnu Sethy
 
Resume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10YrsResume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10YrsShameena Nayeem
 
Debra quintyne resume 2015
Debra quintyne resume 2015Debra quintyne resume 2015
Debra quintyne resume 2015Debra Quintyne
 
Sankar Gopal_Business Intelligence_Reporting_Analyst
Sankar Gopal_Business Intelligence_Reporting_AnalystSankar Gopal_Business Intelligence_Reporting_Analyst
Sankar Gopal_Business Intelligence_Reporting_AnalystSankar Narayanan
 

Similar to Abreen Pm 1209 (20)

1 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver20071 Linda Rodriguez Project 2010 1116 Ver2007
1 Linda Rodriguez Project 2010 1116 Ver2007
 
DElliott Resume
DElliott ResumeDElliott Resume
DElliott Resume
 
Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016Duffy_Robert_Resume 2016
Duffy_Robert_Resume 2016
 
Christopher Salerno Resume
Christopher Salerno ResumeChristopher Salerno Resume
Christopher Salerno Resume
 
Christopher Salerno April16
Christopher Salerno April16Christopher Salerno April16
Christopher Salerno April16
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Rajib paul Resume
Rajib paul   ResumeRajib paul   Resume
Rajib paul Resume
 
Rajib paul resume
Rajib paul   resumeRajib paul   resume
Rajib paul resume
 
Renee w foland_resume_09_2012b
Renee w foland_resume_09_2012bRenee w foland_resume_09_2012b
Renee w foland_resume_09_2012b
 
C C Resume
C C ResumeC C Resume
C C Resume
 
James Blance Resume_2016
James Blance Resume_2016James Blance Resume_2016
James Blance Resume_2016
 
GO_Fusion_HCM1
GO_Fusion_HCM1GO_Fusion_HCM1
GO_Fusion_HCM1
 
Resume_Bishnu Sethy
Resume_Bishnu SethyResume_Bishnu Sethy
Resume_Bishnu Sethy
 
Kerry_Sheehan_15
Kerry_Sheehan_15Kerry_Sheehan_15
Kerry_Sheehan_15
 
Resume
ResumeResume
Resume
 
Cosgrave 062016
Cosgrave 062016Cosgrave 062016
Cosgrave 062016
 
Resume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10YrsResume_Shameena_Technical Lead_10Yrs
Resume_Shameena_Technical Lead_10Yrs
 
Resume pmp product lead
Resume pmp product leadResume pmp product lead
Resume pmp product lead
 
Debra quintyne resume 2015
Debra quintyne resume 2015Debra quintyne resume 2015
Debra quintyne resume 2015
 
Sankar Gopal_Business Intelligence_Reporting_Analyst
Sankar Gopal_Business Intelligence_Reporting_AnalystSankar Gopal_Business Intelligence_Reporting_Analyst
Sankar Gopal_Business Intelligence_Reporting_Analyst
 

Abreen Pm 1209

  • 1. ANDREW M. BREEN, MBA 10961 PRINCETON VILLAGE DRIVE CELL: 704.737.6476 / HOME: 704.542.6326 CHARLOTTE, NORTH CAROLINA 28277-3021 EMAIL: MARKMI99@YAHOO.COM SUMMARY OF CREDENTIALS A multi-dimensional, focused senior resource with a long track record of tangible success. Comfortable working at the forest or tree level so that business requirements are optimally supported by chosen technical enablers. Project experience includes diverse business, technical, industry and cultural elements, including experience with international, offshore and virtual teams. • Project Management - 15 years of Practice/Program/Project Management experience covering all phases of the SDLC. Extensive experience at all levels of project visibility - (e.g., IBM Board of Directors Compensation, Wachovia and NationsBank M&A, world-wide application rollouts, etc,). A business process thought leader possessing exceptionally strong leadership, communication, problem-solving, motivational and interpersonal skills. Obtains agreement of definition of success at the outset, in terms of deliverables, cost, quality, time and change management with owners/stakeholders. Adheres to client’s vision and can add additional substantial value to project deliverables, as appropriate (e.g., Best Practices). Experienced in developing accelerators to keep project on track, or to come in and resurrect a project. Customization / work around expert. Knowledgeable in PMBOK, AIM, Six Sigma and other waterfall methodologies. Strong, proven competencies vis-à-vis project initiation, planning, execution, budget, risk, scope, human resources and change management. Highly results-oriented, but easy to work with. Uses positive expectations to motivate team members. Industry experience includes Technology, Telecom. Finance, Mfg., Retail, Automotive, Environmental, Utilities and Health Care. • Operational – Over 14 years’ experience in corporate legal, financial & managerial accounting, corporate treasury, cash management, banking and retirement product areas. • Technical – Former applications programmer (PL/1, SAS), Oracle Applications expert • Other – Published technical writer (article on Project Management available upon request) PROFESSIONAL EXPERIENCE Independent Consultant, Charlotte, NC 4/2009 – Present • Took training on Oracle R.12. Also have access to contractor R.12 sandbox. • Train clients on resume preparation, business writing and interview techniques Ingersoll Rand Corp., Davidson, NC / Project Mgr 3/2008 -2/2009 • Senior Change Leader for Campbellsville, KY site. Part of Oracle global footprint ($300MM over 4 yrs, including over 50 sites) implementation – IR’s first US cutover. Managed communications; Drove first implementation/integration audit readiness review and follow up process; Trained plant personnel in Oracle; Built / managed first Change Management work plan (integrated with overall divisional / sector / plant plans). Laid groundwork for and trained successors. • Oracle 11i support and analysis - Supported Finance & HR teams (IT sector) relating to upgrades / fixes of production processes and reports in Oracle (GL, PA, AR, INV) / Siebel environment. Projects were loaded, maintained and tracked on Sharepoint. Provided analysis, testing, issue closure and complete documentation. Introduced Project Management procedures / controls to improve management of multiple departmental projects. Provided a plan to better organize and work with vast amount of accumulated documentation. Customers / management were very pleased with quality and turn-around of deliverables. Contract Consultant, Senior Project Manager / Business Process (Best Practices), Charlotte, NC 4/2007 – 2/2008 • 10/07 – 2/08: Synapse Technologies, LLC / client – Wachovia – Senior Project Manager for Golden West M&A project. Responsibility included identifying and transitioning in-scope loan products, simplifying 12,000 line work plan, identifying dependencies, issues and risks and integrating with overall plan. Also, meeting facilitation, status reporting, project forecasting and budgeting. All deliverable milestones made on time and on budget. Customer was highly satisfied. Trained / handed off project to FTE PM who became available. • 4/07 – 6/07: Patriot Consulting, Inc. / client – Office Depot – Cash Management Lead. Responsible for assistance with requirements development /integration and construction of test scripts to match standard and custom business scenarios needed for Oracle implementation. Added significant value to basic functional requirements selection around best practices. Business analysis and technical writing skills were critical for success. Customer was highly satisfied. Project funding issues forced early team roll-off. Keane, Inc., Charlotte, NC / Project Manager / Principal Consultant 11/2005 – 4/2007 • Opted for a local consulting assignment with a large local financial client in lieu of an offer to travel for 50 percent more pay. Sunday, December 20, 2009 Andrew M Breen 1 of 5
  • 2. Performed Business Analysis and Project Management roles in first assignment for TIAA-CREF. Risk analysis identified an inconsistency in the integrated legacy data model, which had been built to test a new web application that saved the client thousands of person–hours and dollars by delaying testing until model was fixed. Delay opened Finance support opportunity. • In second TIAA-CREF assignment, supporting the Accounting and Finance teams, submitted a proposal to save substantial IT costs by decommissioning outmoded systems and consolidating under an Oracle / PeopleSoft platform. Proposal was sent to Finance and IT senior management for evaluation. Since beginning second position at client, have added value in multiple software releases and provided process improvements. IBM Corporation (rehire), Charlotte, NC / Senior Consultant 5/2004 – 3/2005 Responsibilities: Project Management, applications consulting, RFQ assistance, special projects, integrations • Major projects: setup of Financial Consolidation Hub / Global Accounting Engine and finance lead for GL and AP – both roles were hands-on 11.5.9 • Sarbanes-Oxley trained and deployed after selection to IBM / KPMG compliance team. Primarily a risk-mitigation role. Project Manager / Independent Consultant, Charlotte, NC 9/2003 – 4/2004 • Local projects involving technical writing, training, risk mitigation / cost management and process improvement, QA, Troubleshooting, • Retooled skills – Six Sigma, began PMP study in preparation for rejoining consulting opportunities. Wachovia Corporation, Charlotte, NC, Officer Profitability Mgmt Division 12/2002 - 8 /2003 Responsibilities: Analytical role. Write and test / validate financial rules to more accurately report results across the bank. Tools include Oracle OFSA Suite, ESSBASE and PL/SQL Stripling and Beck, Charlotte, NC Dir., ERP Consulting / Project Manager 11/2001 - 11/2002 Responsibilities: Anchor projects as lead implementation resource; Plan, build and manage the firm's ERP Consulting Practice including Quality Assurance. Report directly to CEO. Note: Also ran my personal consulting practice (main client: IT Convergence). • Designed, built and delivered a Best Practices-based global Oracle Applications Multiorg Implementation plan in two weeks (Dec. 2001) for an Engineering client, after client had been unable to get it from their Big 5 firm over an extended period. Senior client Project Manager was able to use the plan to do the work internally, resulting in considerable budget savings. • Production System Troubleshooting. Subcontracted with Ingersoll Rand and solved top Oracle Purchasing production issue client had been unable to debug internally. R. 11.5.4. • Lead resource for responding to ERP/Oracle RFP's / RFQ's / Train internal resources on Oracle products / methodologies / testing / Financials functionality. Harris/Exigent Solutions Group, Charlotte, NC VP/ Practice Manager 1/2001-11/2001 Responsibilities: Managed Business Development, Consulting, Deliverable Quality, Vendor Contracts, Personnel, Budgeting, Training and Administration. I reported directly to the President of Exigent Solutions Group. (Harris purchased Exigent International, effective May 2001) • Lead functional resource for all sales and consulting teams – specialized in GL, AR, AP, FA, Cash Management and Treasury – solved ad hoc customer functionality question / product issues / devised workarounds / integrations / customizations • Provide Oracle Financials expertise to clients on ad hoc basis - e.g., to get them through their first accounting close. Assisted in setup/ testing and ad hoc problem solving. (GL – including WW Consolidations - A/PA/HRMS/CRM), resolve TAR's, help with workarounds, etc. Maintained `hands-on' Oracle experience w/ R., 11i via engagements and sandbox. • Transformed the practice's market niche from staff augmentation into a competitor for project / multi-project work. Led account pursuit teams as primary contact for client management. Relied upon to be the `last word' to the client in my role as the major knowledge resource on our business development calls. Owned the Methodology leadership role - disseminated information on test processes and full SDLC project life cycle to the teams. Developed / upgraded project deliverables utilizing technical writing and business analysis skills. Developed standards for project pursuits. Along with division president, was lead in RFP process. • Responsible for deliverable quality standards, risk mitigation, vendor management and assisted with Practice’s budgeting. Cap Gemini Ernst & Young, Charlotte, NC Consulting Manager 4/1998 - 12/2000 Responsibilities: Project Management and / or Financial lead roles, including sales pursuits, at Fortune 500 and dot COM companies. Industries included in this group are high technology, medical, financial, automotive, environmental and utilities. I served as a Financials Best- Practices resource responsible for setting deliverable quality standards, planning, testing and executing. I also played significant role in leading risk mitigation measuring impact on budgeted cost through client negotiations. • Harvard Pilgrim Health Care, 9/00 -12/00: Project scope - built an ODW (Operational Data Warehouse) to take updated / reconciled feeds from legacy subsystems and upload / integrate to the new Financial Management System (FMS) via ETL tool. Platform was HPUX. Sunday, December 20, 2009 Andrew M Breen 2 of 5
  • 3. Phase I applications were General Ledger, Receivables, FSG, Project Costing; Phase II included Payables, Purchasing, and HRMS. My role: the overall Project Lead for the Oracle (FMS) implementation, covering both the functional and technical sides of the applications • Southern Energy Corp, 5/00 – 8/00: Sales and consulting lead for Oracle Treasury and Oracle Financials. Functional go-to person for these applications which client subsequently purchased. • Cigna International, 11/99-3/00: Project scope - successful worldwide rollout of Oracle applications for the R. 11.0.3 Oracle Financials Worldwide implementation (25 countries with 3 SOB each – total was over 75 sets of books). Included Multiple Reporting Currency, Consolidation Workbench, ADI, MassAllocations, Budgeting, Localizations, and FSGs. My role: General Ledger and Financial Reporting PM / team lead. Interfaced directly with senior Cigna executives. Trained junior team members and client staff on Accounting Flexfield design, R. 11 functionality. Heavy integration customization requirements were documented, tested and implemented. • Eaton Corp., 11/98-7/99: Project scope - Successful implementation of Oracle Financials and Mfg. Applications at Clutch Division HQ - Auburn, Indiana, and two Remanufacturing (Reman) sites. This was a complete manufacturing and financials implementation. Oracle 10.7 SC 16.1, HPUX Platform. My role: Accounts Receivable team lead. Responsibilities included providing a solution for invoice processing at the plant while cash was applied at the corporate level in a Shared Services environment. Additionally, A/R was set up to handle a customized invoicing/credit bolt-on used at the Remanufacturing sites (known as the Core Bank). Applications I assisted with (setup/testing): GL, OM, PO, AP). Custom test scripts had to be developed to test import of data from Order Entry into the Financials. • Michelin, 8/98-10/98: Project scope - Michelin's successful North America Oracle P01 Pilot project. Oracle 10.7 NCA implementation on HP platform. My role: Testing coordinator and incident tracking & resolution lead across all applications. Responsibilities spanned planning and ensuring successful test cycle execution across GL (including WW Consolidations), FA, PA, PO, AP, AR (VERTEX), INV, Custom Cost, Legacy Sales Database, Conversions / Interfaces teams. Acted as point of contact with Michelin Global Core development team in France and externally with Oracle. • Other: Conceived, developed and managed an internal Oracle Applications / Technical training program, delivered at no cost to E&Y. Students and teachers were consultants who were not deployed. The sessions leveraged interactive, classroom training, the 'sandbox' Oracle Instance and the varied skill sets of the consultants. I facilitated these cross- sessions to fill in basic knowledge gaps, promote mentoring relationships and help build confidence. Eventually, consultants from other offices began calling in to the sessions and the idea was rolled out to other offices. The Partners made attendance at this class mandatory for undeployed resources. Oracle Corporation, Atlanta, Ga. / Charlotte, NC Principal Consultant 9/1995 - 4/1998 Responsibilities: Lead / participate in Oracle applications engagements and sales pursuits. Set deliverable quality standards, mitigate risk and cost. • Eaton Corp. 1/98-6/98: Financial lead for successful implementation of Oracle (10.6.1) at Fluid Power Division, Fletcher, NC. Selected to provide project management and Oracle Financials expertise (GL / WW Consolidations) for corporate divisional team. Also a member of the Manufacturing team, Responsible for local full implementation of Oracle Cost Management. Project included extensive setup, testing, integration with EDI Gateway to transmit notifications to Shared Services Center and went live ahead of schedule. • KPMG Peat Marwick (1997): Invited to Montvale, NJ headquarters to assist with the definition of the GL Chart of Accounts. Helped produce a strawman that went to the partners for review. • Fisher Scientific (1998): Pittsburgh, Pa. Project scope - Implement Financials / Distribution applications, R. 10.6. Role was co-GL lead. Successfully planned/defined/setup Chart of Accounts and Financial Reporting. Successfully coordinated unit/integration/User Acceptance testing / integration with other financials (AR, AP) • Toshiba (1997): Called in to Tokyo, Japan headquarters to evaluate the functionality / test at a high level a series of different options being considered for the GL (including Worldwide Consolidation) Corporate Chart of Accounts / Accounting Flexfield and to assist with integrating this into the new Multi-Org. model which had just been introduced by Oracle. Client reported they had learned what they needed in order to get to the next step of the implementation. • Unisys - (1997): Blue Bell, Pa. Client had tried to bring up A/R for a year without success. Noticing the large number of unresolved Technical Assistance Requests (TARs), I redirected their test efforts along a critical path and brought them up live and through their first close (including reconciliation's) within 6 weeks, resulting in considerable budget savings. • Time Warner (WEA Mfg. 1997): - Oliphant, Pa. Successful implementation of manufacturing apps. - Inventory, WIP, BOM, Costing, MRP, ENG, Order Entry and Purchasing including Mfg. Customizations and integrated the financial transactions into client's legacy system. My role was the Project Manager and Receivables/Financial lead. • Amercord (1996): - Assisted my manager in setting up full set of Oracle Financials (including consolidations) • Unifi (1995/1996): - Brought to Greensboro, NC headquarters and successfully set up their Financial Reporting as the lead FSG Consultant. Assignment called for creating full set of Financials in $, Budget and Stat currencies as well as a specialized set of Financials. I was later called back and successfully customized invoices and credit memos to provide more sales order detail utilizing a variety of fields from the Customer and Inventory Masters Sunday, December 20, 2009 Andrew M Breen 3 of 5
  • 4. Other Implementations ('95-'98): Multi-org. analysis. Business process reengineering / analysis including context and flow diagramming; Development of desktop procedures, technical writing and training. NationsBank Charlotte, NC Asst. V.P. Finance Dept Project Manager 12/1993 - 7/1995 Responsibilities: Planning, analysis / test of financial entities acquired via Merger and Acquisition to create seamless integration of new subsystems with NationsBank's General Ledger while ensuring full compliance with integrity/ accuracy / timeliness of statutory Regulatory Reporting requirements. The bank's General Ledger ran on IBM 3090's, using COBOLII and was reported across the bank using InfoPak. • Assisted with successful integration of several M&A entities including these systems: loan, DDA, FX, Letters of Credit. • Successful work on General and Corporate Bank Systems service upgrade programs to deliver successful testing. Includes MQ series. Independent Contractor Pound Ridge, NY 8/1992 - 12/1993 • General Electric Credit Corporation – Assisted with miscellaneous accounting projects and reconciliations. • New York Medical College, Cornell Medical Center – Worked on project to help automate internal accounting processes. IBM Corporation Armonk, NY (Misc. Professional Titles - details upon request) 1/1979 - 7/1992* Responsibilities Corporate Balance Sheet / Project Management '91- 92/ Corporate Controller staff, Worldwide Income and Expense Consolidations 90-'91 / Corporate Treasury staff, Corporate Cash Management '86-'90 / Corporate Human Resources staff, Applications Programming (PL/1 and SAS) '82-'85 / Corporate Legal staff / Litigation Analysis Division, '79-'82 SKILLS: Strongest skills are bolded Oracle Applications: (12/ 11i/11.5.10.2) including GL, (FSG’s), ADI, Financial Consolidation Hub, OFA. AR, AP, CE (Cash Management), Treasury, PO, FA, Project Accounting, WIP, BOM, Cost, Inv, CRM and HR suites; Oracle Discoverer (formerly ‘Browser’) PROCESSES / METHODOLOGIES SOFTWARE- TOOLS SOFTWARE - LANGUAGES Oracle AIM Internet Explorer, Mozilla Firefox, Netscape PL/SQL Oracle FastForward Windows Vista, XP Pro, XP home, ME, NT, 2000 PL/1 Oracle Easipath Migration Methodology MS Excel, Word, Project, Visio, PowerPoint, Access SAS Oracle Business Model TOAD and Golden JCL Oracle Custom Development Methodology Mercury Test Suite Excel Macros VelocitEY Sharepoint XML Six Sigma Infopak / FOCUS Speak, Read, Write French Waterfall, Agile, Scrum Essbase Oracle OFSA - Perf. Analyzer/ Balance and Control Palm OS EDUCATION: • Syracuse University Syracuse, NY, BS Psychology, Pre-med, minor in Biology • Pace University White Plains, NY, MBA, Financial Management, GPA 3.5+ ASSOCIATIONS: • Linkedin: www.linkedin.com/in/andrewbreencharlotte Sunday, December 20, 2009 Andrew M Breen 4 of 5
  • 5. COMMUNITY 2005 – Volunteer with V.A. to train injured vets in life mgmt and IT skills; Speaker - Charlotte Oracle Applications User Group - Best Practices in Oracle Financials – 2001; Selected as Project Manager volunteer representative from E&Y for the Advantage Carolina initiative (1999) which made tangible contributions in time and skill deployment to help build of Charlotte's IT infrastructure; NationsBank - Volunteer for Green Circle Program - provides self-esteem to disadvantaged youth (1994); Director of Fundraising - New York State Epilepsy Association ('81-'84); Project Management Institute; Oracle Applications Users Group Selected Project Management Summary Purpose / Major Outcome / Project Name / Description Date Role Budget Team Size Complexity Deliverables Comments Perform quality check of plant Extended preparedness, build, maintain Highly complex - Met all deliverable $300MM over team was Ingersoll Rand Oracle Rollout 2008 Sr Change Mgr project plan, train plant many targets and prepared Ky. 4 yrs/50 sites over 100 personnel, implement customizations Plant for transition persons communication plan Integrated my part of Integrate GW Mortgage the merger while my products (application and Moderately Wachovia / Golden West Merger 2007-'08 Project Manager Approx. $3m 12 to 14 team successfully infrastructure monitoring complex mapped loan products software) with Wachovia's for transfer Successful in all core Project Management tasks - effectively use various methodologies 20 to 25 through project Monitored all ongoing including management life cycle; projects; stepped in to support reporting to effectively handle Projects were of implementations and assure Parent firm Division planning, testing, Harris / Exigent 2001 Practice Mgr varying customer satisfaction, as worth $23m President and training communication, complexity needed. Marketed project marketing to change management; services to new clients C-level effective meeting contacts facilitation, issue management, escalations; strong client-facing skills; effective mentoring Successful in all core Project Management tasks - effectively use various methodologies Smallest through project project about management life cycle; Cap Gemini Ernst & Young - 10 people, Project Mgr, effectively handle Projects included: Implement Oracle via ETL tool, Estimate they largest Simple (Harvard Team lead, planning, testing, Harvard Pilgrim Health Care 1998 - 2000 international application ranged from several Pilgrim) to Testing training communication, Cigna rollouts $.5M to $10M hundred - complex Coordinator change management; Michelin interfaced effective meeting with senior facilitation, issue management management, escalations; strong client-facing skills; effective mentoring Planned, implemented, Transitioned manual record 6 people, tested and installed new IBM Corporation - Automation of keeping and compensation to including system. It formed the Board of Directors Compensation 1992 Project Manager an automated basis to reduce Approx. $100k Simple BOD level basis for automating and Reporting time and cost and improve liaison executive accuracy compensation. Sunday, December 20, 2009 Andrew M Breen 5 of 5