6. As mandated by ordinances and plan review comments, the original fountain design was reoriented to face the intersection of Waterman Road and Elk Grove Boulevard, and underwent modifications to the overall size, landscaping, bench seating & anterior signage.
17. 2,921 sq. ft. Community Building, Office & Upstairs Manager’s Unit for 103-Unit Multi-Family Apartment Project Elk Grove, CA 2009
18.
19.
20.
21.
22. The following site photos, showing the completed and newly occupied downstairs Community Building and Office, move from the front entrance (adjacent to large main parking lot, see image below) around the exterior in a counter-clockwise manner. Upon reaching the patio adjacent to the pool deck, the photo tour shifts to the building’s interior near the pool-side window wall, and proceeds along the inside details with a clock-wise progression.
48. South-East view of dwelling Buildings P and Q of Copperstone project during construction, taken from US Hwy 99, adjacent to West Stockton Boulevard (beyond freeway onramp and greenbelt, alongside which semi trailer is parked). Reference previous slide’s image.
62. 5,395 sq. ft. Tenant Improvement on Vacant Commercial Shell Project Sacramento, CA 2009
63.
64.
65.
66.
67.
68.
69.
70.
71. Residential Kitchen Remodel Cheney, WA 2009 Preliminary and Final sketches, used to facilitate the design process through Client feedback, revisions & interaction
79. Featured Project, Remodel Spokane magazine (Fall 2009 issue) Roberson Bathroom and Kitchen Remodel winners of contest co-sponsored by KXLY News 4 Extreme Team and the Spokane Home Builders Association Remodeler’s Council