The document proposes a network solution for a healthcare organization with 5 offices. It includes network designs, hardware selections, and costs. Key aspects include:
- Cabling and network designs for each office following industry standards
- Firewall, server, and desktop selections to meet current and future needs
- Virtualization, backups, and disaster recovery plans for data protection and business continuity
- Estimated total cost of $329,182 including hardware, labor, and optional service agreements
Building Efficient Edge Nodes for Content Delivery Networks
Completed+Presentation+Capstone
1. “ Establishing better technology today, for a better tomorrow” CNS-Capstone-Project Team Members Daniel Gonzalez, Mike Oilvieri, Chuck Wright, Carl Dopart, Fatih Bahsi, Nick Solano, Nick Szmyd, Byran D’Amario, John Savage
12. Cisco 2811 Integrated Services Router Cisco Catalyst 2960 24PC-L Switch The 2960 Series with LAN based software are a family fixed-configuration standalone intelligent Ethernet devices with Power-Over-Ethernet (POE) or non POE configurations that provide Fast Ethernet and Gigabit Ethernet connectivity, enabling enhanced LAN services for entry-level enterprise, midmarket, and branch office networks. The 2960 offers integrated security, including Network Administration Control (NAC),advanced quality of service (QoS),and resiliency to deliver service to the network edge. The Cisco 2811 provides the ability to deliver multiple high-quality simultaneous services at wire speed up to multiple T1/E1/xDSL connections. With the Cisco IOS Software Advanced Security feature set, the 2811 provides a robust array of security features such as Cisco IOS software firewall, intrusion prevention,IPSec VPN, Secure Shell (SSH) Protocol Version 2.0, and Simple Network Management Protocol (SNMPv3) in one secure solution set. Cisco Call Manager Express (CME) is an optional solution embedded in the Cisco IOS software that provides call processing for Cisco IP phones.
38. Disaster Recovery Action Plans Part I: Action Plan Action Item: Total loss of data single or multi-system Expected Outcome: Total restore Key Steps Timeframe Party Responsible Administrator on duty makes determination that system/systems or Data are not recoverable without DR tape. Call is made to DR team lead to assemble team. 1.5 hours On call administrator Place call to media storage vendor to recall tapes needed and have them delivered to local site. 4 hours On Call Administrator DR team arrives on site and continues assessment of issue. 2.5 hours DR team Restore of data begins Contingent on total scope of loss. DR team
39. Disaster Recovery Action Plans con’t Part II: Action Plan Action Item: Total loss Site Expected Outcome: Total restore Additional Comments: Total timeline will be set after testing. Key Steps Timeframe Party Responsible Administrator on duty makes determination that site is no longer able to sustain proper function. .5 hours On call administrator Place call to media storage vendor to recall tapes needed and have them delivered to DR site. 4 hours On Call Administrator DR team arrives at DR site and continues assessment of issue and preparation for arrival of media. 2.5 hours DR team Restore of data begins ??? DR team