SlideShare una empresa de Scribd logo
1 de 1
Descargar para leer sin conexión
EDUCATION

Project: School Extension with featured timber domed roof
Head Teacher: George Potrykus
Architect: Stewart Maclachlan, LBN

This prestigious project involved the erection of a steel
framed building with a featured timber domed roof. The
building designed by Stewart Maclachlan of London
Borough of Newham (LBN) incorporates an innovative               RONALD OPENSHAW
                                                                 NURSERY
vaulted and domed semi-circular timber roof. The roof was
                                                                 VALUE: £457,000
manufactured on site with traditional craft hand skills. The
finished inside is a beautiful array of circular timber.
Our team ensured the highest standards of quality, as the tightest of tolerances were required for the domed
end to accurately meet the vaulted section. The finished project is a unique quality piece of work not often
seen on construction sites these days. The quality and precision achieved in this project is testament to our
teamwork and co-operation.


                                                               MARYLAND PRIMARY
                                                               SCHOOL
                                                               VALUE: £63, 700




                              ELMHURST PRIMARY
                              SCHOOL
                              VALUE: £350, 000



Project: Refurbishment of School toilets                  Project:   Refurbishment of School toilets
Head Teacher: Shahed Ahmed                                Head Teacher: Lorna Jackson - 020 8534 8135
Site Contact: Maxine Dixon - 020 8472 1062
                                                          The project comprised the complete strip out and
This project involved the complete strip out and          refurbishment of boys, girls and staff toilets. The
refurbishment of 27 toilets. We used the time leading     time leading up to the start was used to develop
up to the project start date to develop the design. We    the design. We engaged the school heads in the
assisted the school in selecting the design, colours      process of working up a design together until they
and appliances they required. Works were carried          were satisfied.
out over a ten month period including school term-
time on a rolling programme without a hitch. This is      The project was completed during the summer
because our tradesmen are specially trained to work       holidays and the school was very pleased with the
in school environments.                                   outcome. The Head teacher is available for
                                                          reference.
The school was very pleased with the outcome. The
Head Teacher is available to give reference.




                             363 Ripple Road, Essex. IG1 19PN Tel: 020 8594 2594 Fax: 020 8591 1213
                                         Email: info@carmelcrest.co.uk Website: www.carmelcrest.co.uk

Más contenido relacionado

Similar a Project summary education

Refurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker RoomRefurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker RoomCarmelcrest
 
London Residential | Case Study
London Residential | Case Study London Residential | Case Study
London Residential | Case Study 33 London Limited
 
Primary School Projects
Primary School ProjectsPrimary School Projects
Primary School ProjectsMark Sidding
 
Healthcare projects 2013
Healthcare projects 2013Healthcare projects 2013
Healthcare projects 2013roger_lawson
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012JerramFalkus
 
Project summary health
Project summary healthProject summary health
Project summary healthCarmelcrest
 
Take a look at some of our recent projects
Take a look at some of our recent projectsTake a look at some of our recent projects
Take a look at some of our recent projectsKatie Hayes
 
16386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.1516386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.15Nicholas Ball
 
Roots CEFPI Design Concept Entry
Roots CEFPI Design Concept EntryRoots CEFPI Design Concept Entry
Roots CEFPI Design Concept EntryClass Of Your Own
 
PRIMARY SCHOOL CASE STUDY.pptx
PRIMARY SCHOOL CASE STUDY.pptxPRIMARY SCHOOL CASE STUDY.pptx
PRIMARY SCHOOL CASE STUDY.pptxPRAPTI MITRA
 

Similar a Project summary education (20)

Ringway at Ruskington
Ringway at RuskingtonRingway at Ruskington
Ringway at Ruskington
 
Project Proposal.pptx
Project Proposal.pptxProject Proposal.pptx
Project Proposal.pptx
 
Refurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker RoomRefurbishment of Welfare Room Toilets and Locker Room
Refurbishment of Welfare Room Toilets and Locker Room
 
639.pdf
639.pdf639.pdf
639.pdf
 
London Residential | Case Study
London Residential | Case Study London Residential | Case Study
London Residential | Case Study
 
Primary School Projects
Primary School ProjectsPrimary School Projects
Primary School Projects
 
South Lanarkshire College
South Lanarkshire College South Lanarkshire College
South Lanarkshire College
 
greenspace brochure 2016
greenspace brochure 2016greenspace brochure 2016
greenspace brochure 2016
 
DB CV 27.07.15
DB CV 27.07.15DB CV 27.07.15
DB CV 27.07.15
 
JG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our ReputationJG Molloy Brochure - Building On Our Reputation
JG Molloy Brochure - Building On Our Reputation
 
Healthcare projects 2013
Healthcare projects 2013Healthcare projects 2013
Healthcare projects 2013
 
09 flagship education projects 2012
09 flagship education projects 201209 flagship education projects 2012
09 flagship education projects 2012
 
Project summary health
Project summary healthProject summary health
Project summary health
 
1. Main CV pics
1. Main CV pics1. Main CV pics
1. Main CV pics
 
Take a look at some of our recent projects
Take a look at some of our recent projectsTake a look at some of our recent projects
Take a look at some of our recent projects
 
RH+CV+2016
RH+CV+2016RH+CV+2016
RH+CV+2016
 
Get modern
Get modernGet modern
Get modern
 
16386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.1516386 DEESIDE NEWSLETTER 24.11.15
16386 DEESIDE NEWSLETTER 24.11.15
 
Roots CEFPI Design Concept Entry
Roots CEFPI Design Concept EntryRoots CEFPI Design Concept Entry
Roots CEFPI Design Concept Entry
 
PRIMARY SCHOOL CASE STUDY.pptx
PRIMARY SCHOOL CASE STUDY.pptxPRIMARY SCHOOL CASE STUDY.pptx
PRIMARY SCHOOL CASE STUDY.pptx
 

Más de Carmelcrest

Carmelcrest: the first thing we build is trust
Carmelcrest: the first thing we build is trustCarmelcrest: the first thing we build is trust
Carmelcrest: the first thing we build is trustCarmelcrest
 
Sector summary social
Sector summary socialSector summary social
Sector summary socialCarmelcrest
 
Sector summary health
Sector summary healthSector summary health
Sector summary healthCarmelcrest
 
Sector summary education
Sector summary educationSector summary education
Sector summary educationCarmelcrest
 
Sector summary commercial
Sector summary commercialSector summary commercial
Sector summary commercialCarmelcrest
 
Carmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board RoomCarmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board RoomCarmelcrest
 
Case study orpington hospital
Case study orpington hospitalCase study orpington hospital
Case study orpington hospitalCarmelcrest
 
Case Study Orpington Hospital
Case Study Orpington HospitalCase Study Orpington Hospital
Case Study Orpington HospitalCarmelcrest
 

Más de Carmelcrest (8)

Carmelcrest: the first thing we build is trust
Carmelcrest: the first thing we build is trustCarmelcrest: the first thing we build is trust
Carmelcrest: the first thing we build is trust
 
Sector summary social
Sector summary socialSector summary social
Sector summary social
 
Sector summary health
Sector summary healthSector summary health
Sector summary health
 
Sector summary education
Sector summary educationSector summary education
Sector summary education
 
Sector summary commercial
Sector summary commercialSector summary commercial
Sector summary commercial
 
Carmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board RoomCarmelcrest Case study: Homerton Board Room
Carmelcrest Case study: Homerton Board Room
 
Case study orpington hospital
Case study orpington hospitalCase study orpington hospital
Case study orpington hospital
 
Case Study Orpington Hospital
Case Study Orpington HospitalCase Study Orpington Hospital
Case Study Orpington Hospital
 

Project summary education

  • 1. EDUCATION Project: School Extension with featured timber domed roof Head Teacher: George Potrykus Architect: Stewart Maclachlan, LBN This prestigious project involved the erection of a steel framed building with a featured timber domed roof. The building designed by Stewart Maclachlan of London Borough of Newham (LBN) incorporates an innovative RONALD OPENSHAW NURSERY vaulted and domed semi-circular timber roof. The roof was VALUE: £457,000 manufactured on site with traditional craft hand skills. The finished inside is a beautiful array of circular timber. Our team ensured the highest standards of quality, as the tightest of tolerances were required for the domed end to accurately meet the vaulted section. The finished project is a unique quality piece of work not often seen on construction sites these days. The quality and precision achieved in this project is testament to our teamwork and co-operation. MARYLAND PRIMARY SCHOOL VALUE: £63, 700 ELMHURST PRIMARY SCHOOL VALUE: £350, 000 Project: Refurbishment of School toilets Project: Refurbishment of School toilets Head Teacher: Shahed Ahmed Head Teacher: Lorna Jackson - 020 8534 8135 Site Contact: Maxine Dixon - 020 8472 1062 The project comprised the complete strip out and This project involved the complete strip out and refurbishment of boys, girls and staff toilets. The refurbishment of 27 toilets. We used the time leading time leading up to the start was used to develop up to the project start date to develop the design. We the design. We engaged the school heads in the assisted the school in selecting the design, colours process of working up a design together until they and appliances they required. Works were carried were satisfied. out over a ten month period including school term- time on a rolling programme without a hitch. This is The project was completed during the summer because our tradesmen are specially trained to work holidays and the school was very pleased with the in school environments. outcome. The Head teacher is available for reference. The school was very pleased with the outcome. The Head Teacher is available to give reference. 363 Ripple Road, Essex. IG1 19PN Tel: 020 8594 2594 Fax: 020 8591 1213 Email: info@carmelcrest.co.uk Website: www.carmelcrest.co.uk