Foundation Data

Foundation Numbers and sizes

             Length      Width        Depth                          Page
 Number        (ft)       (ft)         (ft)       Area (ft^3)
   10         137          3           3.5          1438.5             2
   11         131          3           2.5          982.5              5
   12          88          3           1.5           396               8
   13          87          3           1.5          391.5             10
   14          85          3           1.5          382.5             13
   15          86          3           1.5           387              16
   16          83          3           1.5          373.5             19
   21         125          3           1.5          562.5             22
   26         119          3           1.5          535.5             25
   27         233          3            2            1398             28
   29         175          3            5            2625             31
   30          60          3            5            900              34
   31         176          3            5            2640             36
   32         177          3            5            2655             39


All reinforcements used in the foundations are in the following pages. They are broken into sections by
the foundation number, followed by the top, bottom, and shear reinforcement data.
Foundation 10

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #11

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        12            0       5    1.23    1.32
    2        #4        16            5      35    3.15     3.2
    3        #4        16           35      55    3.15     3.2
    4        #4        16           55      85    3.15     3.2
    5        #4        16           85     101    3.15     3.2
    6        #4        13          101     125    2.55     2.6
    7        #3         8          125     131    0.86    0.88




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #7         5            0      20    2.79      3
    2        #6        10           20      45    4.35     4.4
    3        #7         7           45      70    4.09     4.2
    4        #8         5           70      93    3.91    3.95
    5        #7         6           93     113    3.12     3.6
    6        #6         6          113     131    2.48    2.64
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #4        12          0      2.79    0.36     0.4
   #4        12        8.21      13     0.36     0.4
                        13       19       0       0
                        19       25       0       0
   #4        12         25     32.79    0.36     0.4
   #4        12       38.21    43.07    0.36     0.4
   #4        12       43.07      45     0.36     0.4
   #4        12         45     47.93    0.36     0.4
   #4        12       47.93    52.79    0.36     0.4
   #4        12       58.21      66     0.36     0.4
   #4        12         66       70     0.36     0.4
                        70       75       0       0
   #4        12         75     82.79    0.36     0.4
   #4        12       88.21      93     0.36     0.4
   #4        12         93     98.79    0.36     0.4
   #4        12       104.21    110     0.36     0.4
   #4        12        110      114     0.36     0.4
                       114      118       0       0
   #4        12        118     122.79   0.36     0.4
                      128.21    131       0       0
Foundation #12

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #13

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.32    0.55
    2        #4         7            3      33    1.33     1.4
    3        #4        10           33      53     1.9      2
    4        #4         7           53      83    1.34     1.4
    5        #3         5           83      87     0.3    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4        10            0      17    1.87      2
    2        #5        15           17      43    4.63    4.65
    3        #6        11           43      69    4.65    4.84
    4        #5         6           69      87    1.84    1.86
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     1.78    0.35    0.44
   #3         6       5.22      10    0.35    0.44
                       10       17      0       0
                       17       25      0       0
   #3        3         25     31.78    0.5    0.88
   #3        3        35.22     43    0.65    0.88
   #3        3         43     51.78   0.66    0.88
   #3        3        55.22     62    0.49    0.88
                       62       69      0       0
                       69       77      0       0
   #3        6         77     81.78   0.35    0.44
   #3        6        85.22     87    0.35    0.44
Foundation #14

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.07    0.55
    2        #4         6            2      32    1.13     1.2
    3        #4         7           32      52    1.38     1.4
    4        #4         6           52      82    1.11     1.2
    5        #3         7           82      85     0.7    0.77




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         6            0      16    1.18     1.2
    2        #5        11           16      42    3.31    3.41
    3        #5        11           42      68    3.32    3.41
    4        #4         6           68      85    1.16     1.2
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      4.23       6      0       0
                        6       15      0       0
                       15       25      0       0
   #3        6         25     30.77   0.35    0.44
   #3        6        34.23     37    0.35    0.44
   #3        6         37     39.74   0.35    0.44
                      39.74     42      0       0
                       42     45.26     0       0
   #3        6        45.26     48    0.35    0.44
   #3        6         48     50.77   0.35    0.44
   #3        6        54.23     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     80.77     0       0
Foundation #15

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       3    0.15    0.55
    2        #3        10            3      33    1.07     1.1
    3        #3        13           33      53    1.43    1.43
    4        #3        10           53      83    1.09     1.1
    5        #3         5           83      86    0.15    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         7            0      17    1.39     1.4
    2        #5        11           17      43    3.33    3.41
    3        #6         8           43      69    3.33    3.52
    4        #5         5           69      86    1.37    1.55
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                        0     1.27      0       0
                      4.73       8      0       0
                        8       17      0       0
                       17       26      0       0
   #3        6         26     31.27   0.35    0.44
   #3        6        34.73     38    0.35    0.44
                       38       41      0       0
                       41       45      0       0
   #3        6         45       48    0.35    0.44
   #3        6         48     51.27   0.35    0.44
   #3        6        54.73     60    0.35    0.44
                       60       69      0       0
                       69       78      0       0
                       78     81.27     0       0
                      84.73     86      0       0
Foundation #16

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       1    0.01    0.55
    2        #4         8            1      31    1.44     1.6
    3        #3        10           31      51    1.03     1.1
    4        #4         7           51      81    1.37     1.4
    5        #3        10           81      83    1.02     1.1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3        10            0      20    1.05     1.1
    2        #4        13           20      43    2.46     2.6
    3        #4        13           43      64    2.49     2.6
    4        #3        10           64      83    1.02     1.1
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
                      3.24       5      0       0
                        5       15      0       0
                       15       25      0       0
                       25     29.76     0       0
   #3        6        33.24     36    0.35    0.44
                       36       39      0       0
                       39       44      0       0
                       44       47      0       0
   #3        6         47     49.76   0.35    0.44
                      53.24     58      0       0
                       58       68      0       0
                       68       78      0       0
                       78     79.76     0       0
Foundation #21

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.13    0.55
    2        #4         7            2      32    1.39     1.4
    3        #5         5           32      52    1.43    1.55
    4        #4         7           52      82    1.38     1.4
    5        #4         5           82      98    0.98      1
    6        #5         5           98     122    1.48    1.55
    7        #4         5          122     125    0.97      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         6            0      21     1.8    1.86
    2        #6        10           21      42    4.14     4.4
    3        #5        12           42      68    3.68    3.72
    4        #4        16           68      90    3.17     3.2
    5        #5        11           90     108    3.24    3.41
    6        #5         5          108     125    1.53    1.55
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                       4.23       7       0       0
                         7       15       0       0
                        15       24       0       0
   #3        6          24     30.77    0.35    0.44
   #3        6        34.23      37     0.36    0.44
   #3        6          37     39.74    0.35    0.44
                      39.74      42       0       0
                        42     45.26      0       0
   #3        6        45.26      48     0.35    0.44
   #3        6          48     50.77    0.35    0.44
   #3        6        54.23      60     0.35    0.44
                        60       67       0       0
                        67       75       0       0
   #3        6          75     80.77    0.35    0.44
   #3        6        84.23      90     0.35    0.44
   #3        6          90     96.77    0.35    0.44
   #3        6        100.23    106     0.35    0.44
                       106      112       0       0
                       112      118       0       0
                       118     120.77     0       0
Foundation #26

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       2    0.09    0.55
    2        #4         8            2      20    1.55     1.6
    3        #4         8           20      47    1.49     1.6
    4        #4         8           47      82    1.54     1.6
    5        #3        10           82     117    1.05     1.1
    6        #3         5          117     119     0.1    0.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         7            0      12    0.67    0.77
    2        #3        15           12      34    1.61    1.65
    3        #4        17           34      63    3.28     3.4
    4        #3         8           63     100    0.79    0.88
    5        #3         6          100     119    0.65    0.66
Shear Reinforcement

  Size      Spc       Start    End     Req.    Prov.
            (in)       (ft)     (ft)   (in2)   (in2)
                      3.74       5       0       0
                        5        9       0       0
                        9       14       0       0
                       14     18.26      0       0
                      21.74     23       0       0
                       23       31       0       0
                       31       40       0       0
   #3        6         40     45.26    0.35    0.44
   #3        6        48.74     54     0.35    0.44
                       54       67       0       0
                       67     80.26      0       0
                      83.74     99       0       0
                       99      114       0       0
                       114    115.26     0       0
Foundation #27

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #5         5            0       8    1.38    1.55
    2        #6         6            8      38    2.51    2.64
    3        #5         6           38      58    1.82    1.86
    4        #6        10           58      88    4.21     4.4
    5        #6         9           88     104    3.88    3.96
    6        #6         5          104     128    1.88     2.2
    7        #5         5          128     137    0.25    1.55




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6        10            0      24    4.33     4.4
    2        #6         9           24      48    3.73    3.96
    3        #6         8           48      72    3.39    3.52
    4        #6        14           72      96    5.76    6.16
    5        #5         5           96     115    0.69    1.55
    6        #4         7          115     137    1.36     1.4
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
   #5        18          0      4.79    0.38    0.41
   #5        18       12.21      18     0.38    0.41
   #5        18         18       23     0.38    0.41
                        23       29       0       0
   #5        18         29     34.79    0.38    0.41
   #5        18       42.21      45     0.38    0.41
   #5        18         45       48     0.38    0.41
   #5        18         48       52     0.38    0.41
   #5        18         52     54.79    0.38    0.41
   #5        18       62.21      67     0.38    0.41
   #5        18         67       71     0.38    0.41
                        71       76       0       0
   #5        18         76       80     0.38    0.41
   #5        18         80     84.79    0.38    0.41
   #5        18       92.21      96     0.38    0.41
   #5        18         96       99     0.38    0.41
   #5        18         99     100.79   0.38    0.41
                      108.21    116       0       0
                       116     124.79     0       0
                      132.21    137       0       0
Foundation #29

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0       4    0.42      1
    2        #5         5            4      34    1.48    1.55
    3        #6         5           34      54    2.13     2.2
    4        #5         5           54      84    1.49    1.55
    5        #4         5           84      88    0.46      1




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #6         6            0      17    2.42    2.64
    2        #7         9           17      44    5.11     5.4
    3        #7         9           44      73    5.12     5.4
    4        #6         6           73      88    2.51    2.64
Shear Reinforcement

  Size      Spc       Start    End    Req.    Prov.
            (in)       (ft)    (ft)   (in2)   (in2)
   #3         6         0     2.28    0.35    0.44
   #3         6       5.72      11    0.35    0.44
                       11       18      0       0
                       18       25      0       0
   #3        3         25     32.28   0.66    0.88
   #3        3        35.72     44    0.82    0.88
   #3        3         44     52.28   0.82    0.88
   #3        3        55.72     63    0.65    0.88
                       63       70      0       0
                       70       77      0       0
   #3        6         77     82.28   0.35    0.44
   #3        6        85.72     88    0.35    0.44
Foundation #30

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       7    0.03    0.55
    2        #3         5            7      25    0.32    0.55
    3        #4         8           25      52    1.59     1.6
    4        #3        13           52      60    1.42    1.43




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0      18    0.26    0.55
    2        #3         5           18      38    0.15    0.55
    3        #4        12           38      60    2.21     2.4
Shear Reinforcement

  Seg.      Size      Spc    Start    End    Req.    Prov.
                      (in)    (ft)    (ft)   (in2)   (in2)
    1                          0     2.23      0             0
    2                        12.77     16      0             0
    3                         16     20.23     0             0
    4                        30.77     39      0             0
    5                         39     47.23     0             0
    6                        57.77     60      0             0
Foundation #31

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.26    0.55
    2        #3         8            8      33    0.87    0.88
    3        #3         6           33      43    0.63    0.66
    4        #4         6           43      68    1.18     1.2
    5        #4         5           68      93    0.92      1
    6        #4         9           93     123    1.76     1.8
    7        #4         9          123     148    1.78     1.8
    8        #3        17          148     168    1.82    1.87
    9        #3        17          168     176    1.84    1.87




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      21    0.98      1
    2        #5         7           21      38    2.16    2.17
    3        #4        10           38      56      2       2
    4        #5         6           56      81    1.72    1.86
    5        #4        11           81     105     2.2     2.2
    6        #5        11          105     136    3.41    3.41
    7        #4         5          136     158      0       1
    8        #5        10          158     176    2.87     3.1
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      2.79      0       0
                      13.21      20       0       0
                        20     27.79      0       0
                      48.21      55       0       0
                        55     62.79      0       0
                      73.21      80       0       0
                        80     87.79      0       0
                      98.21     107       0       0
                       107     116.79     0       0
   #5        18       116.79   117.79   0.35    0.41
   #5        18       128.21   129.21   0.35    0.41
   #5        18       129.21    136     0.35    0.41
                       136     142.79     0       0
                      153.21    157       0       0
                       157     161.79     0       0
   #5        18       161.79   162.79   0.35    0.41
                      173.21    176       0       0
Foundation #32

Longitudinal Reinforcement – Top

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #3         5            0       8    0.22    0.55
    2        #4         5            8      33    0.97      1
    3        #3         6           33      43    0.61    0.66
    4        #4         6           43      68    1.16     1.2
    5        #4         5           68      93    0.89      1
    6        #5         6           93     123    1.78    1.86
    7        #5         6          123     148    1.76    1.86
    8        #4        10          148     168    1.99      2
    9        #5         7          168     177    2.01    2.17




Longitudinal Reinforcement – Bottom

  Seg.       Size      No.         Start   End    Req.    Prov.
                                    (ft)   (ft)   (in2)   (in2)
    1        #4         5            0      22    0.91      1
    2        #5         7           22      38    2.12    2.17
    3        #4        10           38      57    1.98      2
    4        #5         6           57      82    1.72    1.86
    5        #4        11           82     107    2.19     2.2
    6        #5        12          107     137    3.42    3.72
    7        #4         5          137     158      0       1
    8        #4        16          158     177    3.15     3.2
Shear Reinforcement

  Size      Spc        Start    End     Req.    Prov.
            (in)        (ft)     (ft)   (in2)   (in2)
                         0      3.29      0       0
                      13.71      21       0       0
                        21     28.29      0       0
                      48.71      56       0       0
                        56     63.29      0       0
                      73.71      81       0       0
                        81     88.29      0       0
                      98.71     108       0       0
                       108     117.29     0       0
   #5        18       117.29   118.29   0.35    0.41
   #5        18       128.71    130     0.35    0.41
                       130      137       0       0
                       137     143.29     0       0
                      153.71    158       0       0
                       158     162.29     0       0
   #5        18       162.29   163.29   0.35    0.41
                      173.71    177       0       0
Foundation data collection

Más contenido relacionado

La actualidad más candente

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manual
fjsjjekdkme
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheet
Electromate
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
fhsjejfsekkkm
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
fjsjjekdkme
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006
Petrobras
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
fjsjjekdkme
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmg
Mx Sanook
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
fjskemdme
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
fjsjjekdkme
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manual
fjskemdme
 

La actualidad más candente (17)

Massey ferguson mf 398 tractor, b18008 parts catalogue manual
Massey ferguson mf 398 tractor,   b18008 parts catalogue manualMassey ferguson mf 398 tractor,   b18008 parts catalogue manual
Massey ferguson mf 398 tractor, b18008 parts catalogue manual
 
Lintech ball screw_option_specsheet
Lintech ball screw_option_specsheetLintech ball screw_option_specsheet
Lintech ball screw_option_specsheet
 
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...Massey ferguson mf 387 tractor service parts catalogue manual (part number  3...
Massey ferguson mf 387 tractor service parts catalogue manual (part number 3...
 
FM 753
FM 753FM 753
FM 753
 
Massey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manualMassey ferguson mf 20 combine parts catalogue manual
Massey ferguson mf 20 combine parts catalogue manual
 
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manualMassey ferguson mf 362 n tractor (japan only) parts catalogue manual
Massey ferguson mf 362 n tractor (japan only) parts catalogue manual
 
Webcast: 4th quarter 2006
Webcast: 4th quarter 2006Webcast: 4th quarter 2006
Webcast: 4th quarter 2006
 
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manualMassey ferguson mf 24 combine engines (perkins) parts catalogue manual
Massey ferguson mf 24 combine engines (perkins) parts catalogue manual
 
Hyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manualHyundai hdf35 3 forklift truck service repair manual
Hyundai hdf35 3 forklift truck service repair manual
 
Dijet draaibeitels-cnmg
Dijet draaibeitels-cnmgDijet draaibeitels-cnmg
Dijet draaibeitels-cnmg
 
1 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 731 d%20engine%20mechanical%2045 73
1 d%20engine%20mechanical%2045 73
 
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manualMassey ferguson mf 690 tractor   1984 (fr) tractor parts catalogue manual
Massey ferguson mf 690 tractor 1984 (fr) tractor parts catalogue manual
 
Assignment model problems
Assignment model problemsAssignment model problems
Assignment model problems
 
Nuts bolts-screws-washers
Nuts bolts-screws-washersNuts bolts-screws-washers
Nuts bolts-screws-washers
 
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor,   193552 (gb) parts catalogue manualMassey ferguson mf 265 tractor,   193552 (gb) parts catalogue manual
Massey ferguson mf 265 tractor, 193552 (gb) parts catalogue manual
 
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor (  387021 (gb)) parts catalogue manualMassey ferguson mf290 tractor (  387021 (gb)) parts catalogue manual
Massey ferguson mf290 tractor ( 387021 (gb)) parts catalogue manual
 
Hyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manualHyundai hlf202530(c) 5 forklift truck service repair manual
Hyundai hlf202530(c) 5 forklift truck service repair manual
 

Similar a Foundation data collection

Foundation data
Foundation dataFoundation data
Foundation data
J C
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
cathexis123
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Purple Vision
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Purple Vision
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
Chattichai
 
Stocks price
Stocks priceStocks price
Stocks price
iipmff2
 
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
Aj Yawwalak
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Nesma
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319
Nestor Neto
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5
Aj Yawwalak
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
Josue Campos
 

Similar a Foundation data collection (20)

Foundation data
Foundation dataFoundation data
Foundation data
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12Saint Francis & Purple Vision NAHF Presentation 24/3/12
Saint Francis & Purple Vision NAHF Presentation 24/3/12
 
Triangulation Sample
Triangulation  SampleTriangulation  Sample
Triangulation Sample
 
Stocks price
Stocks priceStocks price
Stocks price
 
10
1010
10
 
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
คะแนนสอบคณิตศาสตร์ม.3 5 ปี53
 
Dynaboltinstall
DynaboltinstallDynaboltinstall
Dynaboltinstall
 
The Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic InteractionThe Science and Practice of Cartographic Interaction
The Science and Practice of Cartographic Interaction
 
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...Iwsm2014   extracting dependencies from software changes (thomas wetzlmaier -...
Iwsm2014 extracting dependencies from software changes (thomas wetzlmaier -...
 
Portaria sit 319
Portaria sit 319Portaria sit 319
Portaria sit 319
 
Writing Readable Code with Pipes
Writing Readable Code with PipesWriting Readable Code with Pipes
Writing Readable Code with Pipes
 
Bolt details
Bolt detailsBolt details
Bolt details
 
คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5คะแนนม.3 ปี53 3 5
คะแนนม.3 ปี53 3 5
 
mansoane
mansoanemansoane
mansoane
 
Statistics.docx
Statistics.docxStatistics.docx
Statistics.docx
 
Production forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdfProduction forecast and fuel 2020 rev00.pdf
Production forecast and fuel 2020 rev00.pdf
 
Structural Concrete Presentation
Structural Concrete PresentationStructural Concrete Presentation
Structural Concrete Presentation
 
508202
508202508202
508202
 

Más de cathexis123

Schott poly 220 240 datasheet
Schott poly 220 240 datasheetSchott poly 220 240 datasheet
Schott poly 220 240 datasheet
cathexis123
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
cathexis123
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
cathexis123
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collection
cathexis123
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
cathexis123
 
PV System Cost Analysis
PV System Cost AnalysisPV System Cost Analysis
PV System Cost Analysis
cathexis123
 
Final PV System cost analysis
Final PV System cost analysisFinal PV System cost analysis
Final PV System cost analysis
cathexis123
 
PV System Sizing
PV System SizingPV System Sizing
PV System Sizing
cathexis123
 
Tx dot use of pfc
Tx dot use of pfcTx dot use of pfc
Tx dot use of pfc
cathexis123
 
Optimum tilt of solar panels
Optimum tilt of solar panelsOptimum tilt of solar panels
Optimum tilt of solar panels
cathexis123
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
cathexis123
 
Vpectrl3 ram steel - gravity column design summary
Vpectrl3   ram steel - gravity column design summaryVpectrl3   ram steel - gravity column design summary
Vpectrl3 ram steel - gravity column design summary
cathexis123
 
Vpectrl3 ram steel - gravity beam design
Vpectrl3   ram steel - gravity beam designVpectrl3   ram steel - gravity beam design
Vpectrl3 ram steel - gravity beam design
cathexis123
 
Vpectrl3 ram steel - column load summary
Vpectrl3   ram steel - column load summaryVpectrl3   ram steel - column load summary
Vpectrl3 ram steel - column load summary
cathexis123
 
Vpectrl3 ram steel - beam summary
Vpectrl3   ram steel - beam summaryVpectrl3   ram steel - beam summary
Vpectrl3 ram steel - beam summary
cathexis123
 
Beam and column list
Beam and column listBeam and column list
Beam and column list
cathexis123
 
Vpectrl3 ram steel - gravity column design
Vpectrl3   ram steel - gravity column designVpectrl3   ram steel - gravity column design
Vpectrl3 ram steel - gravity column design
cathexis123
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
cathexis123
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
cathexis123
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
cathexis123
 

Más de cathexis123 (20)

Schott poly 220 240 datasheet
Schott poly 220 240 datasheetSchott poly 220 240 datasheet
Schott poly 220 240 datasheet
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collection
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
 
PV System Cost Analysis
PV System Cost AnalysisPV System Cost Analysis
PV System Cost Analysis
 
Final PV System cost analysis
Final PV System cost analysisFinal PV System cost analysis
Final PV System cost analysis
 
PV System Sizing
PV System SizingPV System Sizing
PV System Sizing
 
Tx dot use of pfc
Tx dot use of pfcTx dot use of pfc
Tx dot use of pfc
 
Optimum tilt of solar panels
Optimum tilt of solar panelsOptimum tilt of solar panels
Optimum tilt of solar panels
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
 
Vpectrl3 ram steel - gravity column design summary
Vpectrl3   ram steel - gravity column design summaryVpectrl3   ram steel - gravity column design summary
Vpectrl3 ram steel - gravity column design summary
 
Vpectrl3 ram steel - gravity beam design
Vpectrl3   ram steel - gravity beam designVpectrl3   ram steel - gravity beam design
Vpectrl3 ram steel - gravity beam design
 
Vpectrl3 ram steel - column load summary
Vpectrl3   ram steel - column load summaryVpectrl3   ram steel - column load summary
Vpectrl3 ram steel - column load summary
 
Vpectrl3 ram steel - beam summary
Vpectrl3   ram steel - beam summaryVpectrl3   ram steel - beam summary
Vpectrl3 ram steel - beam summary
 
Beam and column list
Beam and column listBeam and column list
Beam and column list
 
Vpectrl3 ram steel - gravity column design
Vpectrl3   ram steel - gravity column designVpectrl3   ram steel - gravity column design
Vpectrl3 ram steel - gravity column design
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
 

Último

CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
9953056974 Low Rate Call Girls In Saket, Delhi NCR
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
rajveermohali2022
 

Último (20)

Hotel And Home Service Available Kolkata Call Girls Sonagachi ✔ 6297143586 ✔C...
Hotel And Home Service Available Kolkata Call Girls Sonagachi ✔ 6297143586 ✔C...Hotel And Home Service Available Kolkata Call Girls Sonagachi ✔ 6297143586 ✔C...
Hotel And Home Service Available Kolkata Call Girls Sonagachi ✔ 6297143586 ✔C...
 
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
Behala ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi Ready ...
 
VIP Model Call Girls Budhwar Peth ( Pune ) Call ON 8005736733 Starting From 5...
VIP Model Call Girls Budhwar Peth ( Pune ) Call ON 8005736733 Starting From 5...VIP Model Call Girls Budhwar Peth ( Pune ) Call ON 8005736733 Starting From 5...
VIP Model Call Girls Budhwar Peth ( Pune ) Call ON 8005736733 Starting From 5...
 
𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...
𓀤Call On 6297143586 𓀤 Ultadanga Call Girls In All Kolkata 24/7 Provide Call W...
 
Almora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment BookingAlmora call girls 📞 8617697112 At Low Cost Cash Payment Booking
Almora call girls 📞 8617697112 At Low Cost Cash Payment Booking
 
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls ServiceCollege Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
College Call Girls Pune 8617697112 Short 1500 Night 6000 Best call girls Service
 
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034  Independent Chenna...
Verified Trusted Call Girls Tambaram Chennai ✔✔7427069034 Independent Chenna...
 
Thane West \ Escort Service in Mumbai - 450+ Call Girl Cash Payment 983332523...
Thane West \ Escort Service in Mumbai - 450+ Call Girl Cash Payment 983332523...Thane West \ Escort Service in Mumbai - 450+ Call Girl Cash Payment 983332523...
Thane West \ Escort Service in Mumbai - 450+ Call Girl Cash Payment 983332523...
 
Verified Trusted Call Girls Singaperumal Koil Chennai ✔✔7427069034 Independe...
Verified Trusted Call Girls Singaperumal Koil Chennai ✔✔7427069034  Independe...Verified Trusted Call Girls Singaperumal Koil Chennai ✔✔7427069034  Independe...
Verified Trusted Call Girls Singaperumal Koil Chennai ✔✔7427069034 Independe...
 
Science City Kolkata ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sex...
Science City Kolkata ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sex...Science City Kolkata ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sex...
Science City Kolkata ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sex...
 
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
𓀤Call On 6297143586 𓀤 Park Street Call Girls In All Kolkata 24/7 Provide Call...
 
📞 Contact Number 8617697112 VIP East Sikkim Call Girls
📞 Contact Number 8617697112 VIP East Sikkim Call Girls📞 Contact Number 8617697112 VIP East Sikkim Call Girls
📞 Contact Number 8617697112 VIP East Sikkim Call Girls
 
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICECHEAP Call Girls in  Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
CHEAP Call Girls in Malviya Nagar, (-DELHI )🔝 9953056974🔝(=)/CALL GIRLS SERVICE
 
Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...
Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...
Model Call Girls In Ariyalur WhatsApp Booking 7427069034 call girl service 24...
 
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
Jodhpur Park ( Call Girls ) Kolkata ✔ 6297143586 ✔ Hot Model With Sexy Bhabi ...
 
📞 Contact Number 8617697112 VIP Ganderbal Call Girls
📞 Contact Number 8617697112 VIP Ganderbal Call Girls📞 Contact Number 8617697112 VIP Ganderbal Call Girls
📞 Contact Number 8617697112 VIP Ganderbal Call Girls
 
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
Zirakpur Call Girls👧 Book Now📱8146719683 📞👉Mohali Call Girl Service No Advanc...
 
Top Rated Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated  Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...Top Rated  Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...
Top Rated Pune Call Girls Pimpri Chinchwad ⟟ 6297143586 ⟟ Call Me For Genuin...
 
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
Model Call Girls In Pazhavanthangal WhatsApp Booking 7427069034 call girl ser...
 
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service AvailableCall Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
Call Girls Bhandara Just Call 8617697112 Top Class Call Girl Service Available
 

Foundation data collection

  • 1. Foundation Data Foundation Numbers and sizes Length Width Depth Page Number (ft) (ft) (ft) Area (ft^3) 10 137 3 3.5 1438.5 2 11 131 3 2.5 982.5 5 12 88 3 1.5 396 8 13 87 3 1.5 391.5 10 14 85 3 1.5 382.5 13 15 86 3 1.5 387 16 16 83 3 1.5 373.5 19 21 125 3 1.5 562.5 22 26 119 3 1.5 535.5 25 27 233 3 2 1398 28 29 175 3 5 2625 31 30 60 3 5 900 34 31 176 3 5 2640 36 32 177 3 5 2655 39 All reinforcements used in the foundations are in the following pages. They are broken into sections by the foundation number, followed by the top, bottom, and shear reinforcement data.
  • 2. Foundation 10 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 3. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 4.
  • 5. Foundation #11 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 12 0 5 1.23 1.32 2 #4 16 5 35 3.15 3.2 3 #4 16 35 55 3.15 3.2 4 #4 16 55 85 3.15 3.2 5 #4 16 85 101 3.15 3.2 6 #4 13 101 125 2.55 2.6 7 #3 8 125 131 0.86 0.88 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #7 5 0 20 2.79 3 2 #6 10 20 45 4.35 4.4 3 #7 7 45 70 4.09 4.2 4 #8 5 70 93 3.91 3.95 5 #7 6 93 113 3.12 3.6 6 #6 6 113 131 2.48 2.64
  • 6. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #4 12 0 2.79 0.36 0.4 #4 12 8.21 13 0.36 0.4 13 19 0 0 19 25 0 0 #4 12 25 32.79 0.36 0.4 #4 12 38.21 43.07 0.36 0.4 #4 12 43.07 45 0.36 0.4 #4 12 45 47.93 0.36 0.4 #4 12 47.93 52.79 0.36 0.4 #4 12 58.21 66 0.36 0.4 #4 12 66 70 0.36 0.4 70 75 0 0 #4 12 75 82.79 0.36 0.4 #4 12 88.21 93 0.36 0.4 #4 12 93 98.79 0.36 0.4 #4 12 104.21 110 0.36 0.4 #4 12 110 114 0.36 0.4 114 118 0 0 #4 12 118 122.79 0.36 0.4 128.21 131 0 0
  • 7.
  • 8. Foundation #12 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 9. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 10. Foundation #13 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.32 0.55 2 #4 7 3 33 1.33 1.4 3 #4 10 33 53 1.9 2 4 #4 7 53 83 1.34 1.4 5 #3 5 83 87 0.3 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 10 0 17 1.87 2 2 #5 15 17 43 4.63 4.65 3 #6 11 43 69 4.65 4.84 4 #5 6 69 87 1.84 1.86
  • 11. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 1.78 0.35 0.44 #3 6 5.22 10 0.35 0.44 10 17 0 0 17 25 0 0 #3 3 25 31.78 0.5 0.88 #3 3 35.22 43 0.65 0.88 #3 3 43 51.78 0.66 0.88 #3 3 55.22 62 0.49 0.88 62 69 0 0 69 77 0 0 #3 6 77 81.78 0.35 0.44 #3 6 85.22 87 0.35 0.44
  • 12.
  • 13. Foundation #14 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.07 0.55 2 #4 6 2 32 1.13 1.2 3 #4 7 32 52 1.38 1.4 4 #4 6 52 82 1.11 1.2 5 #3 7 82 85 0.7 0.77 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 6 0 16 1.18 1.2 2 #5 11 16 42 3.31 3.41 3 #5 11 42 68 3.32 3.41 4 #4 6 68 85 1.16 1.2
  • 14. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 6 0 0 6 15 0 0 15 25 0 0 #3 6 25 30.77 0.35 0.44 #3 6 34.23 37 0.35 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 69 0 0 69 78 0 0 78 80.77 0 0
  • 15.
  • 16. Foundation #15 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 3 0.15 0.55 2 #3 10 3 33 1.07 1.1 3 #3 13 33 53 1.43 1.43 4 #3 10 53 83 1.09 1.1 5 #3 5 83 86 0.15 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 7 0 17 1.39 1.4 2 #5 11 17 43 3.33 3.41 3 #6 8 43 69 3.33 3.52 4 #5 5 69 86 1.37 1.55
  • 17. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 1.27 0 0 4.73 8 0 0 8 17 0 0 17 26 0 0 #3 6 26 31.27 0.35 0.44 #3 6 34.73 38 0.35 0.44 38 41 0 0 41 45 0 0 #3 6 45 48 0.35 0.44 #3 6 48 51.27 0.35 0.44 #3 6 54.73 60 0.35 0.44 60 69 0 0 69 78 0 0 78 81.27 0 0 84.73 86 0 0
  • 18.
  • 19. Foundation #16 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 1 0.01 0.55 2 #4 8 1 31 1.44 1.6 3 #3 10 31 51 1.03 1.1 4 #4 7 51 81 1.37 1.4 5 #3 10 81 83 1.02 1.1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 10 0 20 1.05 1.1 2 #4 13 20 43 2.46 2.6 3 #4 13 43 64 2.49 2.6 4 #3 10 64 83 1.02 1.1
  • 20. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.24 5 0 0 5 15 0 0 15 25 0 0 25 29.76 0 0 #3 6 33.24 36 0.35 0.44 36 39 0 0 39 44 0 0 44 47 0 0 #3 6 47 49.76 0.35 0.44 53.24 58 0 0 58 68 0 0 68 78 0 0 78 79.76 0 0
  • 21.
  • 22. Foundation #21 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.13 0.55 2 #4 7 2 32 1.39 1.4 3 #5 5 32 52 1.43 1.55 4 #4 7 52 82 1.38 1.4 5 #4 5 82 98 0.98 1 6 #5 5 98 122 1.48 1.55 7 #4 5 122 125 0.97 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 6 0 21 1.8 1.86 2 #6 10 21 42 4.14 4.4 3 #5 12 42 68 3.68 3.72 4 #4 16 68 90 3.17 3.2 5 #5 11 90 108 3.24 3.41 6 #5 5 108 125 1.53 1.55
  • 23. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 4.23 7 0 0 7 15 0 0 15 24 0 0 #3 6 24 30.77 0.35 0.44 #3 6 34.23 37 0.36 0.44 #3 6 37 39.74 0.35 0.44 39.74 42 0 0 42 45.26 0 0 #3 6 45.26 48 0.35 0.44 #3 6 48 50.77 0.35 0.44 #3 6 54.23 60 0.35 0.44 60 67 0 0 67 75 0 0 #3 6 75 80.77 0.35 0.44 #3 6 84.23 90 0.35 0.44 #3 6 90 96.77 0.35 0.44 #3 6 100.23 106 0.35 0.44 106 112 0 0 112 118 0 0 118 120.77 0 0
  • 24.
  • 25. Foundation #26 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 2 0.09 0.55 2 #4 8 2 20 1.55 1.6 3 #4 8 20 47 1.49 1.6 4 #4 8 47 82 1.54 1.6 5 #3 10 82 117 1.05 1.1 6 #3 5 117 119 0.1 0.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 7 0 12 0.67 0.77 2 #3 15 12 34 1.61 1.65 3 #4 17 34 63 3.28 3.4 4 #3 8 63 100 0.79 0.88 5 #3 6 100 119 0.65 0.66
  • 26. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 3.74 5 0 0 5 9 0 0 9 14 0 0 14 18.26 0 0 21.74 23 0 0 23 31 0 0 31 40 0 0 #3 6 40 45.26 0.35 0.44 #3 6 48.74 54 0.35 0.44 54 67 0 0 67 80.26 0 0 83.74 99 0 0 99 114 0 0 114 115.26 0 0
  • 27.
  • 28. Foundation #27 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #5 5 0 8 1.38 1.55 2 #6 6 8 38 2.51 2.64 3 #5 6 38 58 1.82 1.86 4 #6 10 58 88 4.21 4.4 5 #6 9 88 104 3.88 3.96 6 #6 5 104 128 1.88 2.2 7 #5 5 128 137 0.25 1.55 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 10 0 24 4.33 4.4 2 #6 9 24 48 3.73 3.96 3 #6 8 48 72 3.39 3.52 4 #6 14 72 96 5.76 6.16 5 #5 5 96 115 0.69 1.55 6 #4 7 115 137 1.36 1.4
  • 29. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #5 18 0 4.79 0.38 0.41 #5 18 12.21 18 0.38 0.41 #5 18 18 23 0.38 0.41 23 29 0 0 #5 18 29 34.79 0.38 0.41 #5 18 42.21 45 0.38 0.41 #5 18 45 48 0.38 0.41 #5 18 48 52 0.38 0.41 #5 18 52 54.79 0.38 0.41 #5 18 62.21 67 0.38 0.41 #5 18 67 71 0.38 0.41 71 76 0 0 #5 18 76 80 0.38 0.41 #5 18 80 84.79 0.38 0.41 #5 18 92.21 96 0.38 0.41 #5 18 96 99 0.38 0.41 #5 18 99 100.79 0.38 0.41 108.21 116 0 0 116 124.79 0 0 132.21 137 0 0
  • 30.
  • 31. Foundation #29 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 4 0.42 1 2 #5 5 4 34 1.48 1.55 3 #6 5 34 54 2.13 2.2 4 #5 5 54 84 1.49 1.55 5 #4 5 84 88 0.46 1 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #6 6 0 17 2.42 2.64 2 #7 9 17 44 5.11 5.4 3 #7 9 44 73 5.12 5.4 4 #6 6 73 88 2.51 2.64
  • 32. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) #3 6 0 2.28 0.35 0.44 #3 6 5.72 11 0.35 0.44 11 18 0 0 18 25 0 0 #3 3 25 32.28 0.66 0.88 #3 3 35.72 44 0.82 0.88 #3 3 44 52.28 0.82 0.88 #3 3 55.72 63 0.65 0.88 63 70 0 0 70 77 0 0 #3 6 77 82.28 0.35 0.44 #3 6 85.72 88 0.35 0.44
  • 33.
  • 34. Foundation #30 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 7 0.03 0.55 2 #3 5 7 25 0.32 0.55 3 #4 8 25 52 1.59 1.6 4 #3 13 52 60 1.42 1.43 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 18 0.26 0.55 2 #3 5 18 38 0.15 0.55 3 #4 12 38 60 2.21 2.4
  • 35. Shear Reinforcement Seg. Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 1 0 2.23 0 0 2 12.77 16 0 0 3 16 20.23 0 0 4 30.77 39 0 0 5 39 47.23 0 0 6 57.77 60 0 0
  • 36. Foundation #31 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.26 0.55 2 #3 8 8 33 0.87 0.88 3 #3 6 33 43 0.63 0.66 4 #4 6 43 68 1.18 1.2 5 #4 5 68 93 0.92 1 6 #4 9 93 123 1.76 1.8 7 #4 9 123 148 1.78 1.8 8 #3 17 148 168 1.82 1.87 9 #3 17 168 176 1.84 1.87 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 21 0.98 1 2 #5 7 21 38 2.16 2.17 3 #4 10 38 56 2 2 4 #5 6 56 81 1.72 1.86 5 #4 11 81 105 2.2 2.2 6 #5 11 105 136 3.41 3.41 7 #4 5 136 158 0 1 8 #5 10 158 176 2.87 3.1
  • 37. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 2.79 0 0 13.21 20 0 0 20 27.79 0 0 48.21 55 0 0 55 62.79 0 0 73.21 80 0 0 80 87.79 0 0 98.21 107 0 0 107 116.79 0 0 #5 18 116.79 117.79 0.35 0.41 #5 18 128.21 129.21 0.35 0.41 #5 18 129.21 136 0.35 0.41 136 142.79 0 0 153.21 157 0 0 157 161.79 0 0 #5 18 161.79 162.79 0.35 0.41 173.21 176 0 0
  • 38.
  • 39. Foundation #32 Longitudinal Reinforcement – Top Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #3 5 0 8 0.22 0.55 2 #4 5 8 33 0.97 1 3 #3 6 33 43 0.61 0.66 4 #4 6 43 68 1.16 1.2 5 #4 5 68 93 0.89 1 6 #5 6 93 123 1.78 1.86 7 #5 6 123 148 1.76 1.86 8 #4 10 148 168 1.99 2 9 #5 7 168 177 2.01 2.17 Longitudinal Reinforcement – Bottom Seg. Size No. Start End Req. Prov. (ft) (ft) (in2) (in2) 1 #4 5 0 22 0.91 1 2 #5 7 22 38 2.12 2.17 3 #4 10 38 57 1.98 2 4 #5 6 57 82 1.72 1.86 5 #4 11 82 107 2.19 2.2 6 #5 12 107 137 3.42 3.72 7 #4 5 137 158 0 1 8 #4 16 158 177 3.15 3.2
  • 40. Shear Reinforcement Size Spc Start End Req. Prov. (in) (ft) (ft) (in2) (in2) 0 3.29 0 0 13.71 21 0 0 21 28.29 0 0 48.71 56 0 0 56 63.29 0 0 73.71 81 0 0 81 88.29 0 0 98.71 108 0 0 108 117.29 0 0 #5 18 117.29 118.29 0.35 0.41 #5 18 128.71 130 0.35 0.41 130 137 0 0 137 143.29 0 0 153.71 158 0 0 158 162.29 0 0 #5 18 162.29 163.29 0.35 0.41 173.71 177 0 0