Geotechnical Information for FM78 and Lakeview

1 boring made at 15 feet below surface


               Approximate
                                                                                      Consitency
Description       Depth of                    Material Encountered
                                                                                       /Density
               Stratum (feet)
                                    1 1/2 inches of Asphalt over 4 inches of
     -            0 to 1/2                                                                  -
                                       Crushed Limestone Base Material
                                 Fill - LEAN CLAY (CL); dark brown and brown
 Stratum I        1/2 to 1                                                                Stiff
                                                    mottled

Stratum II          1 to 7                    CLAY (CH); dark brown                Stiff to Very Stiff

                                  CLAY (CH); yellowish brown and gray with
Stratum III        7 to 15                                                         Stiff to Very Stiff
                                               gypsum crystals

Approximately 3 feet of clay should be removed and replaced with select fill

These conditions will satisfy a Condition C Foundation

*Note: Sample was taken less than 1000 feet away. This is the reason for the initial layer of asphalt in the boring sample.


 Subsurface Information
                                                  Existing
                                    Lean Clay                   Clay

    Volumetric Changes              moderate                    high


     Plasticity Index (PI)             26%                   35% to 54%


  In-situ moisture content               3%                   1% to 7%

                                 11 blows for 12"        10 to 25 blows for
         SPT "N" Values
                                   penetration            12" penetration
Foundation Considerations
Shallow Strip Footings
                          Item                                             Description
                   Bearing Stratum                                           Select fill
      Minimum embedment below final grade                          24 inches below final grade
                  Bearing pressures                             Net allowable total load - 2,000 psf
            Approximate total settlement                                       1 inch
   Estimated approximate differential settlement                          1/2 to 3/4 inch
            Allowable passive resistance                            1,000 psf per foot of depth
             Coefficient of sliding friction                                    0.4
                   Uplift Resistance                    Foundation Weight (150 pcf) & Soil Weight (120 pcf)




Pavement Design Information

Flexible Pavement System
                                 Material Thickness (inches)
         Component
                                 Parking Area    Driveway
   Asphalt (Type D HMAC)              1.5             2
   Crushed limestone base              9             10
Moisture conditioned subgrade          6              6



           Parameter                Asphalt
          Reliability (%)             70
      Standard Deviation             0.45
  Initial Serviceability Index        4.2
 Terminal Serviceability Index         2



Design life of 10 years
2,000 ESAL per year in driveway areas
1,000 ESAL per year in parking areas
Porous Paver Information

Purchased from Belgard Company, Aqua-Roc Porous Paver will be used.


                          Material
     Component            Thickness
                             (in.)
   Vehicular Paver           3.15
     #8 Aggregate             2
    #57 Aggregate             6
#2 Subbase Aggregate          6

To be used in parking stalls, as well as parking lot walkways for foot trafic.
This material will support the stormwater runoff design.
Stormwater runoff will flow under the parking lot to a system of pipes, which will direct the water to a nearby
sewer easement.
This material will also give benefit to our LEED certification goals, and also meets ADA requirements
Parking Lot Pricing

Asphalt Paving for Roadways, Assembly Costs

On-site roadway, with 10" thick aggregate base, 2" thick asphalt binder course, rubberized
asphalt interlayer, and 2" thick wear course.


                            Craft@Hrs    Unit    Material    Labor     Equipment       Total
Fine grading and compact
    existing subbase     P5@.066        SY            0.01      2.89           2.69       5.59
  Stone aggregate base,
     Class 2, 10" thick    P5@.02       SY            8.35       2.2           2.05       12.6
 Binder course 2" thick (9
       SY per ton)         P5@.039      SY            11.3      1.71           1.59       14.6
   Rubberized asphalt
       interlayer          P5@.005      SY            1.28      0.22            0.2          1.7
Wear course 2" thick (9 SY
       per ton)            P5@.039      SY            11.8      1.71           1.59       15.1
 Tar emulsion protective
         seal coat          P5@.034 SY                 3.51      1.49           1.39      6.39
Total estimated cost for typical 10' wide roadway, 4" paving over 4" aggregate base
  Cost per SY of roadway P5@.203 SY                   31.24        8.9          8.28     55.98

Asphalt Paving for Parking Areas, Assembly Costs


A vehicular porous paver will be purchased from manufacturer Belgard and used in the parking
                         stall areas, as well as foot traffic walkways.
 For our required dimensions, a purchase price estimate including base aggregates and labor
                         was given to be roughly $7 per square foot.


Cost

Driveway                         Parking Lot
  3076 SY                              24937 SF
 55.98 Cost/SY                               7 Cost/SF
172194 Cost                           174559 Cost

          Total
          Cost        346753.5
All black areas will be made up of asphalt pavement as designed in the previous pages. The grey
sections, including the parking stalls and the walkways, will be made up of the aforementioned porous
paver.

Más contenido relacionado

La actualidad más candente

Proctor Compaction Test
Proctor Compaction TestProctor Compaction Test
Proctor Compaction TestAbhinav Kumar
 
Compaction and Drain-ability
Compaction and Drain-abilityCompaction and Drain-ability
Compaction and Drain-abilityMuhammad Faisal
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and SurveysJerome Jaime
 
Ex 6 c field density by clod method
Ex 6 c field density  by clod methodEx 6 c field density  by clod method
Ex 6 c field density by clod methodbhimaji40
 
Field control of compaction and compaction Equipment
Field control of compaction and compaction EquipmentField control of compaction and compaction Equipment
Field control of compaction and compaction Equipmentaishgup
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration TestMuftah Aljoat
 
Bearing ratio capacity of compacted soil
Bearing ratio capacity of compacted soilBearing ratio capacity of compacted soil
Bearing ratio capacity of compacted soilameresmail92
 
Compaction and its effects on soil
Compaction and its effects on soilCompaction and its effects on soil
Compaction and its effects on soilParth Joshi
 
Soil: Strength and compaction
Soil: Strength and compactionSoil: Strength and compaction
Soil: Strength and compactionJack McHugh
 
7 a soil properties determination
7  a soil properties determination7  a soil properties determination
7 a soil properties determinationMarvin Ken
 
Min and Max Density of soil
Min and Max Density of soilMin and Max Density of soil
Min and Max Density of soilAbhinav Kumar
 
FINENESS TEST OF CEMENT (DRY SIEVING)
FINENESS TEST OF CEMENT (DRY SIEVING)FINENESS TEST OF CEMENT (DRY SIEVING)
FINENESS TEST OF CEMENT (DRY SIEVING)Davinderpal Singh
 
Presentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionPresentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionTEJASWI SHARMA
 

La actualidad más candente (17)

Proctor Compaction Test
Proctor Compaction TestProctor Compaction Test
Proctor Compaction Test
 
Compaction and Drain-ability
Compaction and Drain-abilityCompaction and Drain-ability
Compaction and Drain-ability
 
Soil Test and Surveys
Soil Test and SurveysSoil Test and Surveys
Soil Test and Surveys
 
Ex 6 c field density by clod method
Ex 6 c field density  by clod methodEx 6 c field density  by clod method
Ex 6 c field density by clod method
 
Test for sand
Test for sandTest for sand
Test for sand
 
Field control of compaction and compaction Equipment
Field control of compaction and compaction EquipmentField control of compaction and compaction Equipment
Field control of compaction and compaction Equipment
 
Cone Penetration Test
Cone Penetration TestCone Penetration Test
Cone Penetration Test
 
Compaction
Compaction Compaction
Compaction
 
Bearing ratio capacity of compacted soil
Bearing ratio capacity of compacted soilBearing ratio capacity of compacted soil
Bearing ratio capacity of compacted soil
 
Cbr test
Cbr testCbr test
Cbr test
 
Kamal
KamalKamal
Kamal
 
Compaction and its effects on soil
Compaction and its effects on soilCompaction and its effects on soil
Compaction and its effects on soil
 
Soil: Strength and compaction
Soil: Strength and compactionSoil: Strength and compaction
Soil: Strength and compaction
 
7 a soil properties determination
7  a soil properties determination7  a soil properties determination
7 a soil properties determination
 
Min and Max Density of soil
Min and Max Density of soilMin and Max Density of soil
Min and Max Density of soil
 
FINENESS TEST OF CEMENT (DRY SIEVING)
FINENESS TEST OF CEMENT (DRY SIEVING)FINENESS TEST OF CEMENT (DRY SIEVING)
FINENESS TEST OF CEMENT (DRY SIEVING)
 
Presentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road ConstructionPresentation on Laboratory Tests-Road Construction
Presentation on Laboratory Tests-Road Construction
 

Destacado

Png atelier slides
Png atelier slidesPng atelier slides
Png atelier slidescameronyates
 
Transform Magazine Vol1
Transform Magazine Vol1Transform Magazine Vol1
Transform Magazine Vol1sangdemb
 
Vpectrl3 ram steel - column load summary
Vpectrl3   ram steel - column load summaryVpectrl3   ram steel - column load summary
Vpectrl3 ram steel - column load summarycathexis123
 
Montecore-Highlands Tender grilled beef
Montecore-Highlands Tender grilled beefMontecore-Highlands Tender grilled beef
Montecore-Highlands Tender grilled beefkritsukawat
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collectioncathexis123
 
Apple® i pod
Apple® i podApple® i pod
Apple® i podc5hieldz
 
Kennismaking Flynth Regio Midden
Kennismaking Flynth Regio MiddenKennismaking Flynth Regio Midden
Kennismaking Flynth Regio MiddenKokWilfred
 
Ayurvrda fundamentals-and-basic-principals- by dr jahir
Ayurvrda fundamentals-and-basic-principals- by  dr jahirAyurvrda fundamentals-and-basic-principals- by  dr jahir
Ayurvrda fundamentals-and-basic-principals- by dr jahirJahir Akand
 
Montecore slide cp version (reviewed by pairat) jan 2013
Montecore slide  cp version (reviewed by pairat) jan 2013Montecore slide  cp version (reviewed by pairat) jan 2013
Montecore slide cp version (reviewed by pairat) jan 2013kritsukawat
 
Optimum tilt of solar panels
Optimum tilt of solar panelsOptimum tilt of solar panels
Optimum tilt of solar panelscathexis123
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collectioncathexis123
 
Beam and column list
Beam and column listBeam and column list
Beam and column listcathexis123
 
Montecore slides version 3
Montecore slides version 3Montecore slides version 3
Montecore slides version 3kritsukawat
 
Montecore snacks co., ltd. highlands jerky 2013
Montecore snacks co., ltd. highlands jerky 2013Montecore snacks co., ltd. highlands jerky 2013
Montecore snacks co., ltd. highlands jerky 2013kritsukawat
 
Internet và những con số ấn tượng
Internet và những con số ấn tượngInternet và những con số ấn tượng
Internet và những con số ấn tượngbeautiful_soul_1307
 
Modern Trade Expert -New client introduction .
Modern Trade Expert -New client introduction .Modern Trade Expert -New client introduction .
Modern Trade Expert -New client introduction .kritsukawat
 

Destacado (19)

Png atelier slides
Png atelier slidesPng atelier slides
Png atelier slides
 
Diag syl
Diag sylDiag syl
Diag syl
 
Transform Magazine Vol1
Transform Magazine Vol1Transform Magazine Vol1
Transform Magazine Vol1
 
Vpectrl3 ram steel - column load summary
Vpectrl3   ram steel - column load summaryVpectrl3   ram steel - column load summary
Vpectrl3 ram steel - column load summary
 
Montecore-Highlands Tender grilled beef
Montecore-Highlands Tender grilled beefMontecore-Highlands Tender grilled beef
Montecore-Highlands Tender grilled beef
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collection
 
She said yes
She said yesShe said yes
She said yes
 
Apple® i pod
Apple® i podApple® i pod
Apple® i pod
 
Kennismaking Flynth Regio Midden
Kennismaking Flynth Regio MiddenKennismaking Flynth Regio Midden
Kennismaking Flynth Regio Midden
 
Ayurvrda fundamentals-and-basic-principals- by dr jahir
Ayurvrda fundamentals-and-basic-principals- by  dr jahirAyurvrda fundamentals-and-basic-principals- by  dr jahir
Ayurvrda fundamentals-and-basic-principals- by dr jahir
 
Montecore slide cp version (reviewed by pairat) jan 2013
Montecore slide  cp version (reviewed by pairat) jan 2013Montecore slide  cp version (reviewed by pairat) jan 2013
Montecore slide cp version (reviewed by pairat) jan 2013
 
Optimum tilt of solar panels
Optimum tilt of solar panelsOptimum tilt of solar panels
Optimum tilt of solar panels
 
Foundation data collection
Foundation data collectionFoundation data collection
Foundation data collection
 
Beam and column list
Beam and column listBeam and column list
Beam and column list
 
Montecore slides version 3
Montecore slides version 3Montecore slides version 3
Montecore slides version 3
 
Montecore snacks co., ltd. highlands jerky 2013
Montecore snacks co., ltd. highlands jerky 2013Montecore snacks co., ltd. highlands jerky 2013
Montecore snacks co., ltd. highlands jerky 2013
 
Internet và những con số ấn tượng
Internet và những con số ấn tượngInternet và những con số ấn tượng
Internet và những con số ấn tượng
 
Modern Trade Expert -New client introduction .
Modern Trade Expert -New client introduction .Modern Trade Expert -New client introduction .
Modern Trade Expert -New client introduction .
 
job scheduling
job schedulingjob scheduling
job scheduling
 

Similar a Geotech and pavement design information

Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practiceTADSA1
 
Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practiceTADSA1
 
Air pave submittal march 2015
Air pave submittal march 2015Air pave submittal march 2015
Air pave submittal march 2015Michael Bean
 
gr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnlgr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnlDennis McElroy
 
Grounding and bonding testing
Grounding and bonding testingGrounding and bonding testing
Grounding and bonding testingmichaeljmack
 
Investigation of behaviour of concrete on adding crumb
Investigation of behaviour of concrete on adding crumbInvestigation of behaviour of concrete on adding crumb
Investigation of behaviour of concrete on adding crumbAbhimanyu Saraswat
 
Presentation on standard penertation test
Presentation on standard penertation testPresentation on standard penertation test
Presentation on standard penertation testJoydeep Atta
 
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNITA presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNITRiteshmani Tripathi
 
Compaction and Drainability 01
Compaction and Drainability 01Compaction and Drainability 01
Compaction and Drainability 01Muhammad Faisal
 
Chapter3 road pavement
Chapter3 road pavementChapter3 road pavement
Chapter3 road pavementpokjak80
 
Sand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam constructionSand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam constructionAmardeep Singh
 
TL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptTL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptAshokKumar561399
 
Characterization of Pavement Materials
Characterization of Pavement MaterialsCharacterization of Pavement Materials
Characterization of Pavement MaterialsArnabKarmakar18
 
Influence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavementsInfluence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavementsIAEME Publication
 
Subgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsSubgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsJill Reeves
 

Similar a Geotech and pavement design information (20)

Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practice
 
Hdpe installation practice
Hdpe installation practiceHdpe installation practice
Hdpe installation practice
 
D jav grounding
D jav groundingD jav grounding
D jav grounding
 
Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1Porous Pavement in Cold Climates Part 1
Porous Pavement in Cold Climates Part 1
 
Air pave submittal march 2015
Air pave submittal march 2015Air pave submittal march 2015
Air pave submittal march 2015
 
7873
78737873
7873
 
gr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnlgr_2016_cir-lam-card_fnl
gr_2016_cir-lam-card_fnl
 
Grounding and bonding testing
Grounding and bonding testingGrounding and bonding testing
Grounding and bonding testing
 
Designing with Tile
Designing with TileDesigning with Tile
Designing with Tile
 
Investigation of behaviour of concrete on adding crumb
Investigation of behaviour of concrete on adding crumbInvestigation of behaviour of concrete on adding crumb
Investigation of behaviour of concrete on adding crumb
 
Presentation on standard penertation test
Presentation on standard penertation testPresentation on standard penertation test
Presentation on standard penertation test
 
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNITA presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
A presentation(12 btceng040) ON SUMMER INTERNSHIP from MNNIT
 
Compaction and Drainability 01
Compaction and Drainability 01Compaction and Drainability 01
Compaction and Drainability 01
 
Chapter3 road pavement
Chapter3 road pavementChapter3 road pavement
Chapter3 road pavement
 
Ppt
PptPpt
Ppt
 
Sand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam constructionSand chimney and sand blanket in Earthen Dam construction
Sand chimney and sand blanket in Earthen Dam construction
 
TL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.pptTL_Cons_present_Kishanpur_20[1].08.09.ppt
TL_Cons_present_Kishanpur_20[1].08.09.ppt
 
Characterization of Pavement Materials
Characterization of Pavement MaterialsCharacterization of Pavement Materials
Characterization of Pavement Materials
 
Influence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavementsInfluence of subgrade condition on rutting in flexible pavements
Influence of subgrade condition on rutting in flexible pavements
 
Subgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & MethodsSubgrade Stabilization: Materials & Methods
Subgrade Stabilization: Materials & Methods
 

Más de cathexis123

Schott poly 220 240 datasheet
Schott poly 220 240 datasheetSchott poly 220 240 datasheet
Schott poly 220 240 datasheetcathexis123
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrativecathexis123
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design informationcathexis123
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrativecathexis123
 
PV System Cost Analysis
PV System Cost AnalysisPV System Cost Analysis
PV System Cost Analysiscathexis123
 
Final PV System cost analysis
Final PV System cost analysisFinal PV System cost analysis
Final PV System cost analysiscathexis123
 
PV System Sizing
PV System SizingPV System Sizing
PV System Sizingcathexis123
 
Tx dot use of pfc
Tx dot use of pfcTx dot use of pfc
Tx dot use of pfccathexis123
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavementcathexis123
 
Vpectrl3 ram steel - gravity column design summary
Vpectrl3   ram steel - gravity column design summaryVpectrl3   ram steel - gravity column design summary
Vpectrl3 ram steel - gravity column design summarycathexis123
 
Vpectrl3 ram steel - gravity beam design
Vpectrl3   ram steel - gravity beam designVpectrl3   ram steel - gravity beam design
Vpectrl3 ram steel - gravity beam designcathexis123
 
Vpectrl3 ram steel - beam summary
Vpectrl3   ram steel - beam summaryVpectrl3   ram steel - beam summary
Vpectrl3 ram steel - beam summarycathexis123
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation designcathexis123
 
Vpectrl3 ram steel - gravity column design
Vpectrl3   ram steel - gravity column designVpectrl3   ram steel - gravity column design
Vpectrl3 ram steel - gravity column designcathexis123
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrativecathexis123
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrativecathexis123
 
PV Option 4- Canadian Solar Max Power data sheet
PV Option 4- Canadian Solar Max Power data sheetPV Option 4- Canadian Solar Max Power data sheet
PV Option 4- Canadian Solar Max Power data sheetcathexis123
 
PV Option 2- E20 Data Sheet
PV Option 2- E20 Data SheetPV Option 2- E20 Data Sheet
PV Option 2- E20 Data Sheetcathexis123
 
PV Optoion 1-Schott Poly 220 240 datasheet
PV Optoion 1-Schott Poly 220 240 datasheetPV Optoion 1-Schott Poly 220 240 datasheet
PV Optoion 1-Schott Poly 220 240 datasheetcathexis123
 

Más de cathexis123 (19)

Schott poly 220 240 datasheet
Schott poly 220 240 datasheetSchott poly 220 240 datasheet
Schott poly 220 240 datasheet
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
 
Geotech and pavement design information
Geotech and pavement design informationGeotech and pavement design information
Geotech and pavement design information
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
 
PV System Cost Analysis
PV System Cost AnalysisPV System Cost Analysis
PV System Cost Analysis
 
Final PV System cost analysis
Final PV System cost analysisFinal PV System cost analysis
Final PV System cost analysis
 
PV System Sizing
PV System SizingPV System Sizing
PV System Sizing
 
Tx dot use of pfc
Tx dot use of pfcTx dot use of pfc
Tx dot use of pfc
 
White paper permeablepavement
White paper permeablepavementWhite paper permeablepavement
White paper permeablepavement
 
Vpectrl3 ram steel - gravity column design summary
Vpectrl3   ram steel - gravity column design summaryVpectrl3   ram steel - gravity column design summary
Vpectrl3 ram steel - gravity column design summary
 
Vpectrl3 ram steel - gravity beam design
Vpectrl3   ram steel - gravity beam designVpectrl3   ram steel - gravity beam design
Vpectrl3 ram steel - gravity beam design
 
Vpectrl3 ram steel - beam summary
Vpectrl3   ram steel - beam summaryVpectrl3   ram steel - beam summary
Vpectrl3 ram steel - beam summary
 
Vpectrl3 ram foundation - continuous foundation design
Vpectrl3   ram foundation - continuous foundation designVpectrl3   ram foundation - continuous foundation design
Vpectrl3 ram foundation - continuous foundation design
 
Vpectrl3 ram steel - gravity column design
Vpectrl3   ram steel - gravity column designVpectrl3   ram steel - gravity column design
Vpectrl3 ram steel - gravity column design
 
Foundation narrative
Foundation narrativeFoundation narrative
Foundation narrative
 
Pavement design narrative
Pavement design narrativePavement design narrative
Pavement design narrative
 
PV Option 4- Canadian Solar Max Power data sheet
PV Option 4- Canadian Solar Max Power data sheetPV Option 4- Canadian Solar Max Power data sheet
PV Option 4- Canadian Solar Max Power data sheet
 
PV Option 2- E20 Data Sheet
PV Option 2- E20 Data SheetPV Option 2- E20 Data Sheet
PV Option 2- E20 Data Sheet
 
PV Optoion 1-Schott Poly 220 240 datasheet
PV Optoion 1-Schott Poly 220 240 datasheetPV Optoion 1-Schott Poly 220 240 datasheet
PV Optoion 1-Schott Poly 220 240 datasheet
 

Último

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607dollysharma2066
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfJos Voskuil
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxMarkAnthonyAurellano
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy Verified Accounts
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMVoces Mineras
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailAriel592675
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?Olivia Kresic
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesKeppelCorporation
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis UsageNeil Kimberley
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfpollardmorgan
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...ShrutiBose4
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024Matteo Carbone
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...ssuserf63bd7
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 

Último (20)

FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607FULL ENJOY Call girls in Paharganj Delhi | 8377087607
FULL ENJOY Call girls in Paharganj Delhi | 8377087607
 
Digital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdfDigital Transformation in the PLM domain - distrib.pdf
Digital Transformation in the PLM domain - distrib.pdf
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptxContemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
Contemporary Economic Issues Facing the Filipino Entrepreneur (1).pptx
 
Buy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail AccountsBuy gmail accounts.pdf Buy Old Gmail Accounts
Buy gmail accounts.pdf Buy Old Gmail Accounts
 
Memorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQMMemorándum de Entendimiento (MoU) entre Codelco y SQM
Memorándum de Entendimiento (MoU) entre Codelco y SQM
 
Case study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detailCase study on tata clothing brand zudio in detail
Case study on tata clothing brand zudio in detail
 
MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?MAHA Global and IPR: Do Actions Speak Louder Than Words?
MAHA Global and IPR: Do Actions Speak Louder Than Words?
 
Annual General Meeting Presentation Slides
Annual General Meeting Presentation SlidesAnnual General Meeting Presentation Slides
Annual General Meeting Presentation Slides
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCREnjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
Enjoy ➥8448380779▻ Call Girls In Sector 18 Noida Escorts Delhi NCR
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage2024 Numerator Consumer Study of Cannabis Usage
2024 Numerator Consumer Study of Cannabis Usage
 
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdfIntro to BCG's Carbon Emissions Benchmark_vF.pdf
Intro to BCG's Carbon Emissions Benchmark_vF.pdf
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
Ms Motilal Padampat Sugar Mills vs. State of Uttar Pradesh & Ors. - A Milesto...
 
IoT Insurance Observatory: summary 2024
IoT Insurance Observatory:  summary 2024IoT Insurance Observatory:  summary 2024
IoT Insurance Observatory: summary 2024
 
International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...International Business Environments and Operations 16th Global Edition test b...
International Business Environments and Operations 16th Global Edition test b...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 

Geotech and pavement design information

  • 1. Geotechnical Information for FM78 and Lakeview 1 boring made at 15 feet below surface Approximate Consitency Description Depth of Material Encountered /Density Stratum (feet) 1 1/2 inches of Asphalt over 4 inches of - 0 to 1/2 - Crushed Limestone Base Material Fill - LEAN CLAY (CL); dark brown and brown Stratum I 1/2 to 1 Stiff mottled Stratum II 1 to 7 CLAY (CH); dark brown Stiff to Very Stiff CLAY (CH); yellowish brown and gray with Stratum III 7 to 15 Stiff to Very Stiff gypsum crystals Approximately 3 feet of clay should be removed and replaced with select fill These conditions will satisfy a Condition C Foundation *Note: Sample was taken less than 1000 feet away. This is the reason for the initial layer of asphalt in the boring sample. Subsurface Information Existing Lean Clay Clay Volumetric Changes moderate high Plasticity Index (PI) 26% 35% to 54% In-situ moisture content 3% 1% to 7% 11 blows for 12" 10 to 25 blows for SPT "N" Values penetration 12" penetration
  • 2. Foundation Considerations Shallow Strip Footings Item Description Bearing Stratum Select fill Minimum embedment below final grade 24 inches below final grade Bearing pressures Net allowable total load - 2,000 psf Approximate total settlement 1 inch Estimated approximate differential settlement 1/2 to 3/4 inch Allowable passive resistance 1,000 psf per foot of depth Coefficient of sliding friction 0.4 Uplift Resistance Foundation Weight (150 pcf) & Soil Weight (120 pcf) Pavement Design Information Flexible Pavement System Material Thickness (inches) Component Parking Area Driveway Asphalt (Type D HMAC) 1.5 2 Crushed limestone base 9 10 Moisture conditioned subgrade 6 6 Parameter Asphalt Reliability (%) 70 Standard Deviation 0.45 Initial Serviceability Index 4.2 Terminal Serviceability Index 2 Design life of 10 years 2,000 ESAL per year in driveway areas 1,000 ESAL per year in parking areas
  • 3. Porous Paver Information Purchased from Belgard Company, Aqua-Roc Porous Paver will be used. Material Component Thickness (in.) Vehicular Paver 3.15 #8 Aggregate 2 #57 Aggregate 6 #2 Subbase Aggregate 6 To be used in parking stalls, as well as parking lot walkways for foot trafic. This material will support the stormwater runoff design. Stormwater runoff will flow under the parking lot to a system of pipes, which will direct the water to a nearby sewer easement. This material will also give benefit to our LEED certification goals, and also meets ADA requirements
  • 4. Parking Lot Pricing Asphalt Paving for Roadways, Assembly Costs On-site roadway, with 10" thick aggregate base, 2" thick asphalt binder course, rubberized asphalt interlayer, and 2" thick wear course. Craft@Hrs Unit Material Labor Equipment Total Fine grading and compact existing subbase P5@.066 SY 0.01 2.89 2.69 5.59 Stone aggregate base, Class 2, 10" thick P5@.02 SY 8.35 2.2 2.05 12.6 Binder course 2" thick (9 SY per ton) P5@.039 SY 11.3 1.71 1.59 14.6 Rubberized asphalt interlayer P5@.005 SY 1.28 0.22 0.2 1.7 Wear course 2" thick (9 SY per ton) P5@.039 SY 11.8 1.71 1.59 15.1 Tar emulsion protective seal coat P5@.034 SY 3.51 1.49 1.39 6.39 Total estimated cost for typical 10' wide roadway, 4" paving over 4" aggregate base Cost per SY of roadway P5@.203 SY 31.24 8.9 8.28 55.98 Asphalt Paving for Parking Areas, Assembly Costs A vehicular porous paver will be purchased from manufacturer Belgard and used in the parking stall areas, as well as foot traffic walkways. For our required dimensions, a purchase price estimate including base aggregates and labor was given to be roughly $7 per square foot. Cost Driveway Parking Lot 3076 SY 24937 SF 55.98 Cost/SY 7 Cost/SF 172194 Cost 174559 Cost Total Cost 346753.5
  • 5. All black areas will be made up of asphalt pavement as designed in the previous pages. The grey sections, including the parking stalls and the walkways, will be made up of the aforementioned porous paver.