Primavera PERT Master
–
The Risk Analysis Tool
Presentation Agenda
• What is PERT Master ?
• Project Risk Management Concepts
• Introductory Demonstrations
– Importing from Primavera
– Quick Risk Templates
– Running a Risk Analysis
– Risk Register with schedule
• Advanced Risk Management
– Schedule cost loading techniques
– Probabilistic cash flow and profitability breakeven

11/15/13
What is PERT Master ?

“Minimize
Uncertainty”

11/15/13

Budget //
Budget
Schedule
Schedule
Estimate
Estimate

Total Project Cost

• PERT Master Focus
Maximize Profit
– Specialist in Project Risk Management
– Full Lifecycle risk solution
Management
“Strategic Management
Reserve
Reserve
Decisions”
– Faithful to project scheduling
Mitigation
Mitigation
“Maximize
• PERT Master Vision
Cost/Effort
Cost/Effort
Return”
– “Improved decision making
“Proper
Contingency
Contingency
Allocation”
through project intelligence”
Life Value Proposition
PHASE 1

PHASE 22
PHASE

PHASE 33
PHASE

PHASE 44
PHASE

Opportunity

FEED Front End

A/B/C, own)

Engineering
Design

Execution

(e.g. oil field)

Alternative
selection (rig

Wild Guess
(WAG)

-15% to +30%
Estimate

+/-10%
Estimate

•High estimate uncertainty
•Little Known about risk events
Capital
Schedule based
Market/Invest
Investment risk
cost risk
ment risk
analysis
analysis
analysis
“DOING RIGHT PROJECTS”

11/15/13

PHASE 5
Operations

Detailed Eng. &
Detailed Eng. &
SS
Procurement
Procurement
A
A
N
N
C +/- 3% Estimate No Estimate
C
Uncertainty
TT
II
O •Estimate uncertainty – Low
O
N •Discrete risk events
N
Risk event /
Risk event
register
monitoring
analysis
“DOING PROJECTS RIGHT”
PLAN YOUR WORK
WORK YOUR PLAN
Life Value Proposition
CORPORATE
REVENUE ANALYSIS

PORTFOLIO ANALYSIS

PROJECT ANALYSIS

PHASE 1

PHASE 22
PHASE

PHASE 33
PHASE

PHASE 44
PHASE

Opportunity

Alternative
selection (rig

FEED Front End

A/B/C, own)

Engineering
Design

Execution

-15% to +30%
Estimate

+/-10%
Estimate

(e.g. oil field)

WAG

•High estimate uncertainty
•Little Known about risk events
Capital
Schedule based
Market/Invest
Investment risk
cost risk
ment risk
analysis
analysis
analysis
“DOING RIGHT PROJECTS”

Operations

Detailed Eng. &
Detailed Eng. &
SS
Procurement
Procurement
A
A
N
N
C +/- 3% Estimate No Estimate
C
Uncertainty
TT
II
O •Estimate uncertainty – Low
O
N •Discrete risk events
N
Risk event /
Risk event
register
monitoring
analysis
“DOING PROJECTS RIGHT”
PLAN YOUR WORK

11/15/13

PHASE 5

WORK YOUR PLAN
Risk Vs Schedule
• Realistic /Most Likely
• Aggressive / Optimistic
• Cautious / Pessimistic
• Scale to Fit

11/15/13
Types of Risks
• Uncertainty
– PERT Master handles uncertainty by using three point
estimate distributions minimum, most likely and maximum
• Risk Events
– PERT Master handles risk events by using risk register to
enter possible events along with estimates of each one’s
probability and potential impacts on duration, cost and
project quality
Uncertainty + Risk Events = Total Risk Exposure

11/15/13
Types of Risk - Uncertainty
E.g. How long does it take to do wiring?

Duration/
Duration/
Cost
Cost

11/15/13
Types of Risk
Activity A
Activity B

?
?

E.g. Do we need to replace old wiring?
Activity C

11/15/13
Branching – Probabilistic & Conditional
Scenario: Renovate the Premises
– Remove wiring (50% probability)
– Repair wiring (40% probability)
– Install new wiring (10% probability)

11/15/13
Template Quick Risk

11/15/13
Types Of Risks - Risk Events
• Single Impact
• Series of Impact
• Multiple exclusive impacts
• Multiple impacts to multiple activities

11/15/13
Risk Register

11/15/13
Risk Register

11/15/13
Monte Carlo Simulation
• Range forms an envelope
• One segment is selected for each envelope
• Hidden critical paths revealed

7 8
Min

11/15/13

9 10 11 12 13 14 15 16 17
Likely
Max
Monte Carlo Simulation
• Range forms an envelope
• One segment is selected for each envelope
• Hidden critical paths revealed

ITERATION
1
2

10 DAYS
9 DAYS

14 DAYS
3
17 DAYS
4
11 DAYS
5
7
6
DAYS
10 DAYS
7
12 DAYS
8
9 6 DAYS
…

7 8
Min

11/15/13

9 10 11 12 13 14 15 16 17
Likely
Max
PERT Master Risk Analysis Methodology

• Risk Ready State
– Schedule : Sound logic
– Scheduling errors
• Risk Inputs
– Estimate Uncertainty:
“Quick Risk”
– Risk Events: risk register
• Risk Impacts
– Map risks to tasks
• Risk Analysis
– Monte Carlo Simulation
– Risk hot spots
11/15/13
PERT Master Risk Analysis Methodology
• Risk Response
– Determination of Contingency
– Mitigation Scenarios
– Probabilistic cashflow

11/15/13
Plan Validation: Schedule Check

11/15/13
Initial Risk Inputs – Quick Risk Analysis

11/15/13
Accuracy with Ease

11/15/13
Risk Outputs

11/15/13

Más contenido relacionado

La actualidad más candente

Schedule Design AACE
Schedule Design AACESchedule Design AACE
Schedule Design AACEChris Carson
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingChris Carson
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk ManagementHayat Denzi
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk managementejlp12
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overviewMaher Almohamad
 
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo
 
Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3Matiwos Tsegaye
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2Chris Carson
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementKaustubh Gupta
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Agus Suhanto
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan DevelopmentGlen Alleman
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesThe Vertex Companies, LLC
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk ManagementMauro Jasse
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleGlen Alleman
 
Project risk management
Project risk managementProject risk management
Project risk managementEr Swati Nagal
 
Monte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisMonte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisIntaver Insititute
 

La actualidad más candente (20)

Schedule Design AACE
Schedule Design AACESchedule Design AACE
Schedule Design AACE
 
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 MeetingDealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
Dealing With A Schedule That Cannot Be Approved - AACE 2012 Meeting
 
Presentation on Project Risk Management
Presentation on Project Risk ManagementPresentation on Project Risk Management
Presentation on Project Risk Management
 
Project Risk Management
 Project Risk Management Project Risk Management
Project Risk Management
 
PMP Training - 11 project risk management
PMP Training - 11 project risk managementPMP Training - 11 project risk management
PMP Training - 11 project risk management
 
Ms project 2016 overview
Ms project 2016 overviewMs project 2016 overview
Ms project 2016 overview
 
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
Project Controls Expo 09 Nov 2011, London - DELAY AND FORENSIC ANALYSIS By Ro...
 
Primavera p6 18.8 planning and scheduling guide r3
Primavera p6 18.8 planning and  scheduling guide r3Primavera p6 18.8 planning and  scheduling guide r3
Primavera p6 18.8 planning and scheduling guide r3
 
Baseline Schedules 2
Baseline Schedules 2Baseline Schedules 2
Baseline Schedules 2
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Project Risk Management - PMBOK6
Project Risk Management - PMBOK6Project Risk Management - PMBOK6
Project Risk Management - PMBOK6
 
Integrated Master Plan Development
Integrated Master Plan DevelopmentIntegrated Master Plan Development
Integrated Master Plan Development
 
VERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule AnalysesVERTEX Construction Delays and Forensic Schedule Analyses
VERTEX Construction Delays and Forensic Schedule Analyses
 
Project Risk Management
Project Risk ManagementProject Risk Management
Project Risk Management
 
Performance Measurement and Weightage Systems
Performance Measurement and Weightage SystemsPerformance Measurement and Weightage Systems
Performance Measurement and Weightage Systems
 
50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only50 Planning Fundamentals V5.0 - procedures only
50 Planning Fundamentals V5.0 - procedures only
 
The integrated master plan and integrated master schedule
The integrated master plan and integrated master scheduleThe integrated master plan and integrated master schedule
The integrated master plan and integrated master schedule
 
Project risk management
Project risk managementProject risk management
Project risk management
 
Monte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk AnalysisMonte Carlo Schedule Risk Analysis
Monte Carlo Schedule Risk Analysis
 

Similar a Pert master risk analysis tool

An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14p6academy
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk AnalysisIntaver Insititute
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk AnalysisIntaver Insititute
 
Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...
Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...
Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...Association for Project Management
 
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...Kristy Marshall
 
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Association for Project Management
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo
 
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...Shrikant Kate
 
Thesis Presentation_LocNguyen
Thesis Presentation_LocNguyenThesis Presentation_LocNguyen
Thesis Presentation_LocNguyenLoc Nguyen
 
Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02kongara
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14p6academy
 
Project Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaProject Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaPankaj K Sinha
 
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)Serdar Temiz
 

Similar a Pert master risk analysis tool (20)

Practical project risk assessment, Simon White
Practical project risk assessment, Simon WhitePractical project risk assessment, Simon White
Practical project risk assessment, Simon White
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
 
Simon White - Where is the Risk?
Simon White - Where is the Risk?Simon White - Where is the Risk?
Simon White - Where is the Risk?
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Mg6088 spm unit-3
Mg6088 spm unit-3Mg6088 spm unit-3
Mg6088 spm unit-3
 
Quantitative Project Risk Analysis
Quantitative Project Risk AnalysisQuantitative Project Risk Analysis
Quantitative Project Risk Analysis
 
Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...
Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...
Integrated Cost and Schedule Risk Analysis (ICSRA), Demystified webinar, 14 N...
 
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
8. Nicole Player, MGT - Creating a Mine with Datamine Scenario Planning and S...
 
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
Practical project risk assessment, presented by Simon White, 10th Oct 2016, A...
 
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
Project Controls Expo, 18th Nov 2014 - "Schedule Risk Analysis for Complex Pr...
 
Session 18 -2 PMP 4th edition
Session 18 -2  PMP 4th editionSession 18 -2  PMP 4th edition
Session 18 -2 PMP 4th edition
 
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
Risk Management and Value Engineering _ Unit 4 _ Construction Management _ Fi...
 
Thesis Presentation_LocNguyen
Thesis Presentation_LocNguyenThesis Presentation_LocNguyen
Thesis Presentation_LocNguyen
 
Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02Pert cpm-120421125920-phpapp02
Pert cpm-120421125920-phpapp02
 
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14An introduction to primavera risk analysis  - Oracle Primavera P6 Collaborate 14
An introduction to primavera risk analysis - Oracle Primavera P6 Collaborate 14
 
Project Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K SinhaProject Risk Management-Pankaj K Sinha
Project Risk Management-Pankaj K Sinha
 
William masson 2016-cv_a
William masson 2016-cv_aWilliam masson 2016-cv_a
William masson 2016-cv_a
 
Chapter 2.ppt
Chapter 2.pptChapter 2.ppt
Chapter 2.ppt
 
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
Project Controls Expo 18th Nov 2014 - "Cost Estimate Risk Analysis: For Capit...
 
Project Risk Management (10)
 Project Risk Management (10) Project Risk Management (10)
Project Risk Management (10)
 

Más de CADD Centre Software Solutions Private Limited

Más de CADD Centre Software Solutions Private Limited (20)

Primavera manual
Primavera manual Primavera manual
Primavera manual
 
A b-c-d-(e) of ccsspl corporate presentation
A b-c-d-(e) of ccsspl corporate presentationA b-c-d-(e) of ccsspl corporate presentation
A b-c-d-(e) of ccsspl corporate presentation
 
Login methodology for Primavera V8.3 (EPPM)
Login methodology for Primavera V8.3 (EPPM)Login methodology for Primavera V8.3 (EPPM)
Login methodology for Primavera V8.3 (EPPM)
 
Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3Oracle Primavera Team member 8.3
Oracle Primavera Team member 8.3
 
Oracle Primavera contractor
Oracle Primavera  contractorOracle Primavera  contractor
Oracle Primavera contractor
 
Recurring task IN MS project
Recurring task IN MS project Recurring task IN MS project
Recurring task IN MS project
 
CPCL Case study
CPCL Case studyCPCL Case study
CPCL Case study
 
Oracle Primavera contract management
Oracle Primavera  contract managementOracle Primavera  contract management
Oracle Primavera contract management
 
Uses of Project Status field
Uses of  Project Status field Uses of  Project Status field
Uses of Project Status field
 
Oracle primavera Universal content management
Oracle primavera Universal content management Oracle primavera Universal content management
Oracle primavera Universal content management
 
Oracle Primavera P6 PRO R8 Tips & tricks
Oracle Primavera P6 PRO R8 Tips & tricksOracle Primavera P6 PRO R8 Tips & tricks
Oracle Primavera P6 PRO R8 Tips & tricks
 
User preference Option in Oracle Primavera EPPM P6
User preference Option in Oracle Primavera EPPM P6User preference Option in Oracle Primavera EPPM P6
User preference Option in Oracle Primavera EPPM P6
 
Team member in iphones and android
Team member in iphones and androidTeam member in iphones and android
Team member in iphones and android
 
Activity Duration Types Explained with example in Primavera
Activity Duration Types Explained with example in PrimaveraActivity Duration Types Explained with example in Primavera
Activity Duration Types Explained with example in Primavera
 
S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6S Curves Made Easy With Primavera P6
S Curves Made Easy With Primavera P6
 
Primavera portlets
Primavera portletsPrimavera portlets
Primavera portlets
 
Tested configuration for different Primavera versions
Tested configuration for different Primavera versionsTested configuration for different Primavera versions
Tested configuration for different Primavera versions
 
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
Difference between versions of primavera 6,7,R8.1,R8.2,R8.3
 
Features comparison between Primavera and Microsoft Project
Features comparison between Primavera and Microsoft ProjectFeatures comparison between Primavera and Microsoft Project
Features comparison between Primavera and Microsoft Project
 
Project management software consulting
Project management software consultingProject management software consulting
Project management software consulting
 

Último

APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAssociation for Project Management
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfsanyamsingh5019
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeThiyagu K
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphThiyagu K
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...Pooja Nehwal
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationnomboosow
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room servicediscovermytutordmt
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxShobhayan Kirtania
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfchloefrazer622
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxSayali Powar
 

Último (20)

Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
APM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across SectorsAPM Welcome, APM North West Network Conference, Synergies Across Sectors
APM Welcome, APM North West Network Conference, Synergies Across Sectors
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
Sanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdfSanyam Choudhary Chemistry practical.pdf
Sanyam Choudhary Chemistry practical.pdf
 
Measures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and ModeMeasures of Central Tendency: Mean, Median and Mode
Measures of Central Tendency: Mean, Median and Mode
 
Z Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot GraphZ Score,T Score, Percential Rank and Box Plot Graph
Z Score,T Score, Percential Rank and Box Plot Graph
 
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptxINDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
INDIA QUIZ 2024 RLAC DELHI UNIVERSITY.pptx
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...Russian Call Girls in Andheri Airport Mumbai WhatsApp  9167673311 💞 Full Nigh...
Russian Call Girls in Andheri Airport Mumbai WhatsApp 9167673311 💞 Full Nigh...
 
Interactive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communicationInteractive Powerpoint_How to Master effective communication
Interactive Powerpoint_How to Master effective communication
 
9548086042 for call girls in Indira Nagar with room service
9548086042  for call girls in Indira Nagar  with room service9548086042  for call girls in Indira Nagar  with room service
9548086042 for call girls in Indira Nagar with room service
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
The byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptxThe byproduct of sericulture in different industries.pptx
The byproduct of sericulture in different industries.pptx
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Arihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdfArihant handbook biology for class 11 .pdf
Arihant handbook biology for class 11 .pdf
 
Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1Código Creativo y Arte de Software | Unidad 1
Código Creativo y Arte de Software | Unidad 1
 
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptxPOINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
POINT- BIOCHEMISTRY SEM 2 ENZYMES UNIT 5.pptx
 

Pert master risk analysis tool

  • 1. Primavera PERT Master – The Risk Analysis Tool
  • 2. Presentation Agenda • What is PERT Master ? • Project Risk Management Concepts • Introductory Demonstrations – Importing from Primavera – Quick Risk Templates – Running a Risk Analysis – Risk Register with schedule • Advanced Risk Management – Schedule cost loading techniques – Probabilistic cash flow and profitability breakeven 11/15/13
  • 3. What is PERT Master ? “Minimize Uncertainty” 11/15/13 Budget // Budget Schedule Schedule Estimate Estimate Total Project Cost • PERT Master Focus Maximize Profit – Specialist in Project Risk Management – Full Lifecycle risk solution Management “Strategic Management Reserve Reserve Decisions” – Faithful to project scheduling Mitigation Mitigation “Maximize • PERT Master Vision Cost/Effort Cost/Effort Return” – “Improved decision making “Proper Contingency Contingency Allocation” through project intelligence”
  • 4. Life Value Proposition PHASE 1 PHASE 22 PHASE PHASE 33 PHASE PHASE 44 PHASE Opportunity FEED Front End A/B/C, own) Engineering Design Execution (e.g. oil field) Alternative selection (rig Wild Guess (WAG) -15% to +30% Estimate +/-10% Estimate •High estimate uncertainty •Little Known about risk events Capital Schedule based Market/Invest Investment risk cost risk ment risk analysis analysis analysis “DOING RIGHT PROJECTS” 11/15/13 PHASE 5 Operations Detailed Eng. & Detailed Eng. & SS Procurement Procurement A A N N C +/- 3% Estimate No Estimate C Uncertainty TT II O •Estimate uncertainty – Low O N •Discrete risk events N Risk event / Risk event register monitoring analysis “DOING PROJECTS RIGHT” PLAN YOUR WORK WORK YOUR PLAN
  • 5. Life Value Proposition CORPORATE REVENUE ANALYSIS PORTFOLIO ANALYSIS PROJECT ANALYSIS PHASE 1 PHASE 22 PHASE PHASE 33 PHASE PHASE 44 PHASE Opportunity Alternative selection (rig FEED Front End A/B/C, own) Engineering Design Execution -15% to +30% Estimate +/-10% Estimate (e.g. oil field) WAG •High estimate uncertainty •Little Known about risk events Capital Schedule based Market/Invest Investment risk cost risk ment risk analysis analysis analysis “DOING RIGHT PROJECTS” Operations Detailed Eng. & Detailed Eng. & SS Procurement Procurement A A N N C +/- 3% Estimate No Estimate C Uncertainty TT II O •Estimate uncertainty – Low O N •Discrete risk events N Risk event / Risk event register monitoring analysis “DOING PROJECTS RIGHT” PLAN YOUR WORK 11/15/13 PHASE 5 WORK YOUR PLAN
  • 6. Risk Vs Schedule • Realistic /Most Likely • Aggressive / Optimistic • Cautious / Pessimistic • Scale to Fit 11/15/13
  • 7. Types of Risks • Uncertainty – PERT Master handles uncertainty by using three point estimate distributions minimum, most likely and maximum • Risk Events – PERT Master handles risk events by using risk register to enter possible events along with estimates of each one’s probability and potential impacts on duration, cost and project quality Uncertainty + Risk Events = Total Risk Exposure 11/15/13
  • 8. Types of Risk - Uncertainty E.g. How long does it take to do wiring? Duration/ Duration/ Cost Cost 11/15/13
  • 9. Types of Risk Activity A Activity B ? ? E.g. Do we need to replace old wiring? Activity C 11/15/13
  • 10. Branching – Probabilistic & Conditional Scenario: Renovate the Premises – Remove wiring (50% probability) – Repair wiring (40% probability) – Install new wiring (10% probability) 11/15/13
  • 12. Types Of Risks - Risk Events • Single Impact • Series of Impact • Multiple exclusive impacts • Multiple impacts to multiple activities 11/15/13
  • 15. Monte Carlo Simulation • Range forms an envelope • One segment is selected for each envelope • Hidden critical paths revealed 7 8 Min 11/15/13 9 10 11 12 13 14 15 16 17 Likely Max
  • 16. Monte Carlo Simulation • Range forms an envelope • One segment is selected for each envelope • Hidden critical paths revealed ITERATION 1 2 10 DAYS 9 DAYS 14 DAYS 3 17 DAYS 4 11 DAYS 5 7 6 DAYS 10 DAYS 7 12 DAYS 8 9 6 DAYS … 7 8 Min 11/15/13 9 10 11 12 13 14 15 16 17 Likely Max
  • 17. PERT Master Risk Analysis Methodology • Risk Ready State – Schedule : Sound logic – Scheduling errors • Risk Inputs – Estimate Uncertainty: “Quick Risk” – Risk Events: risk register • Risk Impacts – Map risks to tasks • Risk Analysis – Monte Carlo Simulation – Risk hot spots 11/15/13
  • 18. PERT Master Risk Analysis Methodology • Risk Response – Determination of Contingency – Mitigation Scenarios – Probabilistic cashflow 11/15/13
  • 19. Plan Validation: Schedule Check 11/15/13
  • 20. Initial Risk Inputs – Quick Risk Analysis 11/15/13