Lost bit projectsBAUER
Full displacement pile
(FDP)
April 2008
Piles for new IKEA building
FDP lost bit - Projects
Padova, Italy
Contractor: Dolomiti Rocce
Base carrier: BG 24 H+ lattice mast extension
FDP Tool: 620 mm dia. lost bit
Pile length: L = 24 m
Quantity: >350
800mmdiaboredpileto23,4m
800mmdiaboredpileto23,4m
610mmdiaFDPto18,8m
610mmdiaFDPto16,8m
610mmdiaFDPto18,8m
610mmdiaFDPto16,8m
Soft silty clay
with sand lenses
Silty fine sand
Silty fine sand
Soft silty clay
Soft silty clay
FDP lost bit - Projects
Padova, Italy
CPT test
FDP lost bit - Projects
Padova, Italy
BG 24 H Lattice mast extension
Concrete pump on crawler
FDP lost bit - Projects
Padova, Italy
Excavated pilecaps
FDP lost bit - Projects
Padova, Italy
Tension anchors
BAUER load test equipment
Anchordrilling with same machine
Load test
FDP lost bit - Projects
Padova, Italy
Load [t]
Settlement[mm]
FDP lost bit - Projects
Dolo, Italy
Contractor: Dolomiti Rocce
Base carrier: BG 28 V
+ lattice mast extension
FDP Tool: 620 mm dia. lost bit
Pile length: L = 28 m
Quantity: >500
Tension piles for underpasses
ORIGINAL DESIGN
800 mm dia Jet grout
columns, 14.5 m long
reinforced with Gewi
bars
1200 mm bored pile
28 m long
4 Tie-downs / pile
FDP lost bit - Projects
Dolo, Italy
ALTERNATIVE DESIGN - 610 mm dia. FDP, 24 m long
FDP lost bit - Projects
Dolo, Italy
FDP lost bit - Projects
Dolo, Italy
BG 28 V
BG 28 V with lattice mast extension
max. drilling depth = 30 m
FDP lost bit - Projects
Dolo, Italy
620 mm FDP tool with 1,50 m auger
Cage installation through the stem
Joining 2 pieces of cage, each is 10 m long
FDP lost bit - Projects
Dolo, Italy
Drilling down in automatic mode
Pulling up automatic is monitored by
the quantity of the concrete pump
BTronic operating screen in concreting mode
FDP lost bit - Projects
Nordenham, Germany
Contractor: Akril
Base carrier: RG 20 S
FDP Tool: 440 mm lost bit
Pile length: L = 13 m
Quantity: 377
Foundation piles for a supermarket
FDP lost bit - Projects
Nordenham, Germany
Soil conditions
CPT test
Exploration borehole and dynamic probing
peat c´=2-5 kN/m²
sand
sandy silt
FDP lost bit - Projects
Nordenham, Germany
Peat with c ´= 2 - 5 kN/m² Concreting with mobile truckpump
FDP lost bit - Projects
Durban and Capetown, South Africa
Introduction of FDP in
South Africa
Contractor: FRANKI
Base carrier: MG 48
FDP Tool: 710 mm lost bit
Pile length: up to 18 m
Scope of work: 10 testpiles
FDP lost bit - Projects
Durban and Capetown, South Africa
MG 48 with lattice mast extension 1. Torque converter
2. Gearbox
3. Hopper
1
2
3
FDP lost bit - Projects
Durban and Capetown, South Africa
710 mm FDP tool with 1,50 auger
MG 48

Más contenido relacionado

La actualidad más candente

Baterias cat ultimo.
Baterias  cat    ultimo.Baterias  cat    ultimo.
Baterias cat ultimo.RaulChura3
 
875-AL AHSA DOOR 900-Layout1
875-AL AHSA DOOR 900-Layout1875-AL AHSA DOOR 900-Layout1
875-AL AHSA DOOR 900-Layout1Mark Bagon
 
GLUEJET Powerpoint PDF
GLUEJET Powerpoint PDFGLUEJET Powerpoint PDF
GLUEJET Powerpoint PDFNeil Thayer
 
International Construction Quality Inspector
International Construction Quality InspectorInternational Construction Quality Inspector
International Construction Quality InspectorJOSE CASAS BUEY
 
Career Highlights
Career HighlightsCareer Highlights
Career HighlightsKenny Bruce
 
Past and Present Facilities I have Managed 20160205
Past and Present Facilities I have Managed 20160205Past and Present Facilities I have Managed 20160205
Past and Present Facilities I have Managed 20160205Alexander Mieszkowski
 
Copy of 6-14 ATA Box Cell Kaizen
Copy of 6-14 ATA Box Cell KaizenCopy of 6-14 ATA Box Cell Kaizen
Copy of 6-14 ATA Box Cell KaizenBenjamin Yorkey
 
Ultratech Cement Presentation on Constraints
Ultratech Cement Presentation on ConstraintsUltratech Cement Presentation on Constraints
Ultratech Cement Presentation on ConstraintsSnehal Nemane
 
AnthonyFosterresume.docx
AnthonyFosterresume.docxAnthonyFosterresume.docx
AnthonyFosterresume.docxAnthony Foster
 
Cbecl clay brick project with tunnel kiln-200000 pcs per day
Cbecl clay brick project with tunnel kiln-200000 pcs per dayCbecl clay brick project with tunnel kiln-200000 pcs per day
Cbecl clay brick project with tunnel kiln-200000 pcs per dayAbu Rayhan
 
Material hardware
Material hardwareMaterial hardware
Material hardwarealmarig
 
FPSO Petrojarl Knarr - Fact Sheet
FPSO Petrojarl Knarr - Fact SheetFPSO Petrojarl Knarr - Fact Sheet
FPSO Petrojarl Knarr - Fact SheetTeekay Corporation
 
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project CostAuto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project CostOashim Khan
 
Hb logistic Construction Equipment 2021
Hb logistic Construction Equipment 2021Hb logistic Construction Equipment 2021
Hb logistic Construction Equipment 2021Moshiour Rahman
 

La actualidad más candente (17)

Baterias cat ultimo.
Baterias  cat    ultimo.Baterias  cat    ultimo.
Baterias cat ultimo.
 
875-AL AHSA DOOR 900-Layout1
875-AL AHSA DOOR 900-Layout1875-AL AHSA DOOR 900-Layout1
875-AL AHSA DOOR 900-Layout1
 
GLUEJET Powerpoint PDF
GLUEJET Powerpoint PDFGLUEJET Powerpoint PDF
GLUEJET Powerpoint PDF
 
Cube house
Cube houseCube house
Cube house
 
International Construction Quality Inspector
International Construction Quality InspectorInternational Construction Quality Inspector
International Construction Quality Inspector
 
Career Highlights
Career HighlightsCareer Highlights
Career Highlights
 
Past and Present Facilities I have Managed 20160205
Past and Present Facilities I have Managed 20160205Past and Present Facilities I have Managed 20160205
Past and Present Facilities I have Managed 20160205
 
Copy of 6-14 ATA Box Cell Kaizen
Copy of 6-14 ATA Box Cell KaizenCopy of 6-14 ATA Box Cell Kaizen
Copy of 6-14 ATA Box Cell Kaizen
 
Residential Roof Report
Residential Roof ReportResidential Roof Report
Residential Roof Report
 
Petrojarl Knarr Factsheet
Petrojarl Knarr FactsheetPetrojarl Knarr Factsheet
Petrojarl Knarr Factsheet
 
Ultratech Cement Presentation on Constraints
Ultratech Cement Presentation on ConstraintsUltratech Cement Presentation on Constraints
Ultratech Cement Presentation on Constraints
 
AnthonyFosterresume.docx
AnthonyFosterresume.docxAnthonyFosterresume.docx
AnthonyFosterresume.docx
 
Cbecl clay brick project with tunnel kiln-200000 pcs per day
Cbecl clay brick project with tunnel kiln-200000 pcs per dayCbecl clay brick project with tunnel kiln-200000 pcs per day
Cbecl clay brick project with tunnel kiln-200000 pcs per day
 
Material hardware
Material hardwareMaterial hardware
Material hardware
 
FPSO Petrojarl Knarr - Fact Sheet
FPSO Petrojarl Knarr - Fact SheetFPSO Petrojarl Knarr - Fact Sheet
FPSO Petrojarl Knarr - Fact Sheet
 
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project CostAuto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
Auto Bricks - Tunnel Kiln and Hoffman Kiln Project Cost
 
Hb logistic Construction Equipment 2021
Hb logistic Construction Equipment 2021Hb logistic Construction Equipment 2021
Hb logistic Construction Equipment 2021
 

Destacado

Bauer csm bolivia 2013-04-24
Bauer   csm bolivia 2013-04-24Bauer   csm bolivia 2013-04-24
Bauer csm bolivia 2013-04-24cfpbolivia
 
Bullock bidirectional testing
Bullock bidirectional testingBullock bidirectional testing
Bullock bidirectional testingcfpbolivia
 
Las fundaciones profundas en bolivia en los últimos 50 años mario terceros h.
Las fundaciones profundas en bolivia en los últimos 50 años   mario terceros h.Las fundaciones profundas en bolivia en los últimos 50 años   mario terceros h.
Las fundaciones profundas en bolivia en los últimos 50 años mario terceros h.cfpbolivia
 
Spt spt t procedures and practical applications -luciano decourt
Spt  spt t procedures and practical applications -luciano decourtSpt  spt t procedures and practical applications -luciano decourt
Spt spt t procedures and practical applications -luciano decourtcfpbolivia
 
Prospección geofísica aplicada en las investigaciones geotécnicas noel perez
Prospección geofísica aplicada en las investigaciones geotécnicas  noel perezProspección geofísica aplicada en las investigaciones geotécnicas  noel perez
Prospección geofísica aplicada en las investigaciones geotécnicas noel perezcfpbolivia
 
The static loading test bengt h. fellenius
The  static loading test   bengt h. felleniusThe  static loading test   bengt h. fellenius
The static loading test bengt h. felleniuscfpbolivia
 
Bolivia driven vibrated piles k. rainer masssarsch
Bolivia driven vibrated piles   k. rainer masssarschBolivia driven vibrated piles   k. rainer masssarsch
Bolivia driven vibrated piles k. rainer masssarschcfpbolivia
 
HPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATIONHPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATIONJohn Miranda
 
SIEL PRECAST BUILDING SYSTEM
SIEL PRECAST  BUILDING SYSTEMSIEL PRECAST  BUILDING SYSTEM
SIEL PRECAST BUILDING SYSTEMsegun ilori
 
MASSARSCH - geofisico1
MASSARSCH - geofisico1MASSARSCH - geofisico1
MASSARSCH - geofisico1cfpbolivia
 
Massarsch geofisico2
Massarsch   geofisico2Massarsch   geofisico2
Massarsch geofisico2cfpbolivia
 
Auvinet exc foundations and geotechnical hazards
Auvinet  exc foundations and geotechnical hazards Auvinet  exc foundations and geotechnical hazards
Auvinet exc foundations and geotechnical hazards cfpbolivia
 
Massarsch uevos desarrollos en pilotes de fundación
Massarsch    uevos desarrollos en pilotes de fundaciónMassarsch    uevos desarrollos en pilotes de fundación
Massarsch uevos desarrollos en pilotes de fundacióncfpbolivia
 
Sellountou evalaución integridad de pilotes
Sellountou   evalaución integridad de pilotesSellountou   evalaución integridad de pilotes
Sellountou evalaución integridad de pilotescfpbolivia
 
Oscar barde pilotres gran diámetro en arcillas duras
Oscar barde  pilotres gran diámetro en arcillas durasOscar barde  pilotres gran diámetro en arcillas duras
Oscar barde pilotres gran diámetro en arcillas durascfpbolivia
 
Decourt provas de carga podem
Decourt    provas de carga podemDecourt    provas de carga podem
Decourt provas de carga podemcfpbolivia
 
Fellenius prediction presentation
Fellenius  prediction presentationFellenius  prediction presentation
Fellenius prediction presentationcfpbolivia
 
Carolos prato ensayos de-carga_dinámicos-rev_a3
Carolos prato   ensayos de-carga_dinámicos-rev_a3Carolos prato   ensayos de-carga_dinámicos-rev_a3
Carolos prato ensayos de-carga_dinámicos-rev_a3cfpbolivia
 
Albuquerque monitoreo pilotes
Albuquerque   monitoreo pilotesAlbuquerque   monitoreo pilotes
Albuquerque monitoreo pilotescfpbolivia
 

Destacado (20)

Bauer csm bolivia 2013-04-24
Bauer   csm bolivia 2013-04-24Bauer   csm bolivia 2013-04-24
Bauer csm bolivia 2013-04-24
 
Bullock bidirectional testing
Bullock bidirectional testingBullock bidirectional testing
Bullock bidirectional testing
 
Las fundaciones profundas en bolivia en los últimos 50 años mario terceros h.
Las fundaciones profundas en bolivia en los últimos 50 años   mario terceros h.Las fundaciones profundas en bolivia en los últimos 50 años   mario terceros h.
Las fundaciones profundas en bolivia en los últimos 50 años mario terceros h.
 
Spt spt t procedures and practical applications -luciano decourt
Spt  spt t procedures and practical applications -luciano decourtSpt  spt t procedures and practical applications -luciano decourt
Spt spt t procedures and practical applications -luciano decourt
 
Prospección geofísica aplicada en las investigaciones geotécnicas noel perez
Prospección geofísica aplicada en las investigaciones geotécnicas  noel perezProspección geofísica aplicada en las investigaciones geotécnicas  noel perez
Prospección geofísica aplicada en las investigaciones geotécnicas noel perez
 
The static loading test bengt h. fellenius
The  static loading test   bengt h. felleniusThe  static loading test   bengt h. fellenius
The static loading test bengt h. fellenius
 
Bolivia driven vibrated piles k. rainer masssarsch
Bolivia driven vibrated piles   k. rainer masssarschBolivia driven vibrated piles   k. rainer masssarsch
Bolivia driven vibrated piles k. rainer masssarsch
 
The Stone Strong System
The Stone Strong SystemThe Stone Strong System
The Stone Strong System
 
HPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATIONHPBS INDUCTION PRESENTATION
HPBS INDUCTION PRESENTATION
 
SIEL PRECAST BUILDING SYSTEM
SIEL PRECAST  BUILDING SYSTEMSIEL PRECAST  BUILDING SYSTEM
SIEL PRECAST BUILDING SYSTEM
 
MASSARSCH - geofisico1
MASSARSCH - geofisico1MASSARSCH - geofisico1
MASSARSCH - geofisico1
 
Massarsch geofisico2
Massarsch   geofisico2Massarsch   geofisico2
Massarsch geofisico2
 
Auvinet exc foundations and geotechnical hazards
Auvinet  exc foundations and geotechnical hazards Auvinet  exc foundations and geotechnical hazards
Auvinet exc foundations and geotechnical hazards
 
Massarsch uevos desarrollos en pilotes de fundación
Massarsch    uevos desarrollos en pilotes de fundaciónMassarsch    uevos desarrollos en pilotes de fundación
Massarsch uevos desarrollos en pilotes de fundación
 
Sellountou evalaución integridad de pilotes
Sellountou   evalaución integridad de pilotesSellountou   evalaución integridad de pilotes
Sellountou evalaución integridad de pilotes
 
Oscar barde pilotres gran diámetro en arcillas duras
Oscar barde  pilotres gran diámetro en arcillas durasOscar barde  pilotres gran diámetro en arcillas duras
Oscar barde pilotres gran diámetro en arcillas duras
 
Decourt provas de carga podem
Decourt    provas de carga podemDecourt    provas de carga podem
Decourt provas de carga podem
 
Fellenius prediction presentation
Fellenius  prediction presentationFellenius  prediction presentation
Fellenius prediction presentation
 
Carolos prato ensayos de-carga_dinámicos-rev_a3
Carolos prato   ensayos de-carga_dinámicos-rev_a3Carolos prato   ensayos de-carga_dinámicos-rev_a3
Carolos prato ensayos de-carga_dinámicos-rev_a3
 
Albuquerque monitoreo pilotes
Albuquerque   monitoreo pilotesAlbuquerque   monitoreo pilotes
Albuquerque monitoreo pilotes
 

Similar a Bauer fdp lost bit projects english

Blastman Foundry References
Blastman Foundry ReferencesBlastman Foundry References
Blastman Foundry ReferencesJoe Craig
 
Blastman General References
Blastman General ReferencesBlastman General References
Blastman General ReferencesJoe Craig
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoJorge Cabaco
 
Stream D_David Riley
Stream D_David RileyStream D_David Riley
Stream D_David RileyBecarAsset
 
Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016
Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016
Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016SECO/WARWICK
 
Bauer panama presentacion completa julio 2010
Bauer panama presentacion completa julio 2010Bauer panama presentacion completa julio 2010
Bauer panama presentacion completa julio 2010grosario_bauer
 
paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...
paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...
paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...Antonio Cañas Rojas
 
ICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyLorella Angelini
 
Hpm solutions for industry, transportation and marine
Hpm solutions for industry, transportation and marineHpm solutions for industry, transportation and marine
Hpm solutions for industry, transportation and marineHPM Engineering srl
 
Sandfits Business Presentation #2 - Creative Works | Every Media Works
Sandfits Business Presentation #2 - Creative Works | Every Media Works Sandfits Business Presentation #2 - Creative Works | Every Media Works
Sandfits Business Presentation #2 - Creative Works | Every Media Works Every Media Works | Everentures
 
Beta solutions succes stories helium recovery system n²/he mixture
Beta solutions succes stories helium recovery system n²/he mixtureBeta solutions succes stories helium recovery system n²/he mixture
Beta solutions succes stories helium recovery system n²/he mixtureTim Van den Bosschelle
 
Beta solutions succes stories n² he mixture
Beta solutions succes stories n² he mixtureBeta solutions succes stories n² he mixture
Beta solutions succes stories n² he mixtureTim Van den Bosschelle
 
Technometal_ Desc research report_ VF2 (3) (4).pptx
Technometal_ Desc research report_ VF2 (3) (4).pptxTechnometal_ Desc research report_ VF2 (3) (4).pptx
Technometal_ Desc research report_ VF2 (3) (4).pptxIbrahimRaafat5
 
Technometal_ Desc research report_ VF2 (3) (3).pptx
Technometal_ Desc research report_ VF2 (3) (3).pptxTechnometal_ Desc research report_ VF2 (3) (3).pptx
Technometal_ Desc research report_ VF2 (3) (3).pptxIbrahimRaafat5
 
M. LABBE : Stainless Steel Boilers Manufacturing
M. LABBE : Stainless Steel Boilers ManufacturingM. LABBE : Stainless Steel Boilers Manufacturing
M. LABBE : Stainless Steel Boilers ManufacturingTHOMASLABBE
 
PMI-UAE
PMI-UAEPMI-UAE
PMI-UAEPMIUAE
 
KERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATION
KERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATIONKERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATION
KERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATIONGuy Pomphrey
 

Similar a Bauer fdp lost bit projects english (20)

Blastman Foundry References
Blastman Foundry ReferencesBlastman Foundry References
Blastman Foundry References
 
Blastman General References
Blastman General ReferencesBlastman General References
Blastman General References
 
Selected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge CabacoSelected Projects Portfolio Jorge Cabaco
Selected Projects Portfolio Jorge Cabaco
 
Stream D_David Riley
Stream D_David RileyStream D_David Riley
Stream D_David Riley
 
Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016
Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016
Gas Nitriding ZeroFlow(r) Webinar, Oct. 18, 2016
 
Bauer panama presentacion completa julio 2010
Bauer panama presentacion completa julio 2010Bauer panama presentacion completa julio 2010
Bauer panama presentacion completa julio 2010
 
paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...
paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...
paperChain project - Circular case 2 - Spain - Adriana Martinez (UPC) & Teres...
 
ICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening TechnologyICRI - Modern Trends - FRCM Strengthening Technology
ICRI - Modern Trends - FRCM Strengthening Technology
 
Hpm solutions for industry, transportation and marine
Hpm solutions for industry, transportation and marineHpm solutions for industry, transportation and marine
Hpm solutions for industry, transportation and marine
 
Sandfits Business Presentation #2 - Creative Works | Every Media Works
Sandfits Business Presentation #2 - Creative Works | Every Media Works Sandfits Business Presentation #2 - Creative Works | Every Media Works
Sandfits Business Presentation #2 - Creative Works | Every Media Works
 
Beta solutions succes stories helium recovery system n²/he mixture
Beta solutions succes stories helium recovery system n²/he mixtureBeta solutions succes stories helium recovery system n²/he mixture
Beta solutions succes stories helium recovery system n²/he mixture
 
Beta solutions succes stories n² he mixture
Beta solutions succes stories n² he mixtureBeta solutions succes stories n² he mixture
Beta solutions succes stories n² he mixture
 
Ruredil Projects List
Ruredil Projects ListRuredil Projects List
Ruredil Projects List
 
Technometal_ Desc research report_ VF2 (3) (4).pptx
Technometal_ Desc research report_ VF2 (3) (4).pptxTechnometal_ Desc research report_ VF2 (3) (4).pptx
Technometal_ Desc research report_ VF2 (3) (4).pptx
 
Technometal_ Desc research report_ VF2 (3) (3).pptx
Technometal_ Desc research report_ VF2 (3) (3).pptxTechnometal_ Desc research report_ VF2 (3) (3).pptx
Technometal_ Desc research report_ VF2 (3) (3).pptx
 
M. LABBE : Stainless Steel Boilers Manufacturing
M. LABBE : Stainless Steel Boilers ManufacturingM. LABBE : Stainless Steel Boilers Manufacturing
M. LABBE : Stainless Steel Boilers Manufacturing
 
PMI-UAE
PMI-UAEPMI-UAE
PMI-UAE
 
KERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATION
KERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATIONKERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATION
KERKSTOEL PRECAST TWIN WALLS AND WIDE SLABS PRESENTATION
 
Mouse-PS Presentation
Mouse-PS PresentationMouse-PS Presentation
Mouse-PS Presentation
 
Brochure Norton W448 belts
Brochure Norton W448 beltsBrochure Norton W448 belts
Brochure Norton W448 belts
 

Más de cfpbolivia

Design and dynamic testing of precast piles oscar varde
Design and dynamic testing of precast piles   oscar vardeDesign and dynamic testing of precast piles   oscar varde
Design and dynamic testing of precast piles oscar vardecfpbolivia
 
French standard for deep foundations roger frank
French standard for deep foundations   roger frankFrench standard for deep foundations   roger frank
French standard for deep foundations roger frankcfpbolivia
 
Unisoft software bengt h. fellenius, pierre goudrault
Unisoft software   bengt h. fellenius, pierre goudraultUnisoft software   bengt h. fellenius, pierre goudrault
Unisoft software bengt h. fellenius, pierre goudraultcfpbolivia
 
Static load testing and prediction bengt h. fellenius
Static load testing  and prediction   bengt h. felleniusStatic load testing  and prediction   bengt h. fellenius
Static load testing and prediction bengt h. felleniuscfpbolivia
 
Risk evaluation according to standards cristina de hc tsuha
Risk evaluation according to standards  cristina de hc tsuhaRisk evaluation according to standards  cristina de hc tsuha
Risk evaluation according to standards cristina de hc tsuhacfpbolivia
 
Ingeniería sostenible de fundaciones profundas alessandro mandolini
Ingeniería sostenible de fundaciones profundas   alessandro mandoliniIngeniería sostenible de fundaciones profundas   alessandro mandolini
Ingeniería sostenible de fundaciones profundas alessandro mandolinicfpbolivia
 
Spt energy calibration frank rausche
Spt energy calibration  frank rauscheSpt energy calibration  frank rausche
Spt energy calibration frank rauschecfpbolivia
 
Pda capwap - frank rausche
Pda capwap - frank rauschePda capwap - frank rausche
Pda capwap - frank rauschecfpbolivia
 
Integrity frank rausche
Integrity  frank rauscheIntegrity  frank rausche
Integrity frank rauschecfpbolivia
 
Grlweap frank rausche
Grlweap  frank rauscheGrlweap  frank rausche
Grlweap frank rauschecfpbolivia
 
4.4 integrity gray
4.4   integrity gray4.4   integrity gray
4.4 integrity graycfpbolivia
 
3.6 spt energy calibration -gray
3.6   spt energy calibration -gray3.6   spt energy calibration -gray
3.6 spt energy calibration -graycfpbolivia
 
2.5 pda-capwap - gray
2.5   pda-capwap - gray2.5   pda-capwap - gray
2.5 pda-capwap - graycfpbolivia
 
1.1 grlweap - gray
1.1   grlweap - gray1.1   grlweap - gray
1.1 grlweap - graycfpbolivia
 
Bolivia seismic properties k. rainer massarsch
Bolivia seismic properties   k. rainer massarschBolivia seismic properties   k. rainer massarsch
Bolivia seismic properties k. rainer massarschcfpbolivia
 
Bolivia driven vibrated piles 04 30.compressed
Bolivia driven vibrated piles 04 30.compressedBolivia driven vibrated piles 04 30.compressed
Bolivia driven vibrated piles 04 30.compressedcfpbolivia
 
Seismic cpt (scpt) peter robertson
Seismic cpt (scpt)   peter robertsonSeismic cpt (scpt)   peter robertson
Seismic cpt (scpt) peter robertsoncfpbolivia
 
The flat dilatomer test silvano marchetti
The flat dilatomer test   silvano marchettiThe flat dilatomer test   silvano marchetti
The flat dilatomer test silvano marchetticfpbolivia
 
Keynote silvano marchetti
Keynote   silvano marchettiKeynote   silvano marchetti
Keynote silvano marchetticfpbolivia
 
El ensayo dilatométrico de marchetti silvano marchetti
El ensayo dilatométrico de marchetti   silvano marchettiEl ensayo dilatométrico de marchetti   silvano marchetti
El ensayo dilatométrico de marchetti silvano marchetticfpbolivia
 

Más de cfpbolivia (20)

Design and dynamic testing of precast piles oscar varde
Design and dynamic testing of precast piles   oscar vardeDesign and dynamic testing of precast piles   oscar varde
Design and dynamic testing of precast piles oscar varde
 
French standard for deep foundations roger frank
French standard for deep foundations   roger frankFrench standard for deep foundations   roger frank
French standard for deep foundations roger frank
 
Unisoft software bengt h. fellenius, pierre goudrault
Unisoft software   bengt h. fellenius, pierre goudraultUnisoft software   bengt h. fellenius, pierre goudrault
Unisoft software bengt h. fellenius, pierre goudrault
 
Static load testing and prediction bengt h. fellenius
Static load testing  and prediction   bengt h. felleniusStatic load testing  and prediction   bengt h. fellenius
Static load testing and prediction bengt h. fellenius
 
Risk evaluation according to standards cristina de hc tsuha
Risk evaluation according to standards  cristina de hc tsuhaRisk evaluation according to standards  cristina de hc tsuha
Risk evaluation according to standards cristina de hc tsuha
 
Ingeniería sostenible de fundaciones profundas alessandro mandolini
Ingeniería sostenible de fundaciones profundas   alessandro mandoliniIngeniería sostenible de fundaciones profundas   alessandro mandolini
Ingeniería sostenible de fundaciones profundas alessandro mandolini
 
Spt energy calibration frank rausche
Spt energy calibration  frank rauscheSpt energy calibration  frank rausche
Spt energy calibration frank rausche
 
Pda capwap - frank rausche
Pda capwap - frank rauschePda capwap - frank rausche
Pda capwap - frank rausche
 
Integrity frank rausche
Integrity  frank rauscheIntegrity  frank rausche
Integrity frank rausche
 
Grlweap frank rausche
Grlweap  frank rauscheGrlweap  frank rausche
Grlweap frank rausche
 
4.4 integrity gray
4.4   integrity gray4.4   integrity gray
4.4 integrity gray
 
3.6 spt energy calibration -gray
3.6   spt energy calibration -gray3.6   spt energy calibration -gray
3.6 spt energy calibration -gray
 
2.5 pda-capwap - gray
2.5   pda-capwap - gray2.5   pda-capwap - gray
2.5 pda-capwap - gray
 
1.1 grlweap - gray
1.1   grlweap - gray1.1   grlweap - gray
1.1 grlweap - gray
 
Bolivia seismic properties k. rainer massarsch
Bolivia seismic properties   k. rainer massarschBolivia seismic properties   k. rainer massarsch
Bolivia seismic properties k. rainer massarsch
 
Bolivia driven vibrated piles 04 30.compressed
Bolivia driven vibrated piles 04 30.compressedBolivia driven vibrated piles 04 30.compressed
Bolivia driven vibrated piles 04 30.compressed
 
Seismic cpt (scpt) peter robertson
Seismic cpt (scpt)   peter robertsonSeismic cpt (scpt)   peter robertson
Seismic cpt (scpt) peter robertson
 
The flat dilatomer test silvano marchetti
The flat dilatomer test   silvano marchettiThe flat dilatomer test   silvano marchetti
The flat dilatomer test silvano marchetti
 
Keynote silvano marchetti
Keynote   silvano marchettiKeynote   silvano marchetti
Keynote silvano marchetti
 
El ensayo dilatométrico de marchetti silvano marchetti
El ensayo dilatométrico de marchetti   silvano marchettiEl ensayo dilatométrico de marchetti   silvano marchetti
El ensayo dilatométrico de marchetti silvano marchetti
 

Último

THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONjhunlian
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...Chandu841456
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxVelmuruganTECE
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptSAURABHKUMAR892774
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncssuser2ae721
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvLewisJB
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESNarmatha D
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...121011101441
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm Systemirfanmechengr
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxKartikeyaDwivedi3
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsSachinPawar510423
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxsiddharthjain2303
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...asadnawaz62
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - GuideGOPINATHS437943
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdfCaalaaAbdulkerim
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleAlluxio, Inc.
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingBootNeck1
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptJasonTagapanGulla
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsDILIPKUMARMONDAL6
 

Último (20)

THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTIONTHE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
THE SENDAI FRAMEWORK FOR DISASTER RISK REDUCTION
 
An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...An experimental study in using natural admixture as an alternative for chemic...
An experimental study in using natural admixture as an alternative for chemic...
 
Internet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptxInternet of things -Arshdeep Bahga .pptx
Internet of things -Arshdeep Bahga .pptx
 
Arduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.pptArduino_CSE ece ppt for working and principal of arduino.ppt
Arduino_CSE ece ppt for working and principal of arduino.ppt
 
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsyncWhy does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
Why does (not) Kafka need fsync: Eliminating tail latency spikes caused by fsync
 
Work Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvvWork Experience-Dalton Park.pptxfvvvvvvv
Work Experience-Dalton Park.pptxfvvvvvvv
 
Industrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIESIndustrial Safety Unit-I SAFETY TERMINOLOGIES
Industrial Safety Unit-I SAFETY TERMINOLOGIES
 
Design and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdfDesign and analysis of solar grass cutter.pdf
Design and analysis of solar grass cutter.pdf
 
Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...Instrumentation, measurement and control of bio process parameters ( Temperat...
Instrumentation, measurement and control of bio process parameters ( Temperat...
 
Class 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm SystemClass 1 | NFPA 72 | Overview Fire Alarm System
Class 1 | NFPA 72 | Overview Fire Alarm System
 
Concrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptxConcrete Mix Design - IS 10262-2019 - .pptx
Concrete Mix Design - IS 10262-2019 - .pptx
 
Vishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documentsVishratwadi & Ghorpadi Bridge Tender documents
Vishratwadi & Ghorpadi Bridge Tender documents
 
Energy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptxEnergy Awareness training ppt for manufacturing process.pptx
Energy Awareness training ppt for manufacturing process.pptx
 
complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...complete construction, environmental and economics information of biomass com...
complete construction, environmental and economics information of biomass com...
 
Transport layer issues and challenges - Guide
Transport layer issues and challenges - GuideTransport layer issues and challenges - Guide
Transport layer issues and challenges - Guide
 
Research Methodology for Engineering pdf
Research Methodology for Engineering pdfResearch Methodology for Engineering pdf
Research Methodology for Engineering pdf
 
Correctly Loading Incremental Data at Scale
Correctly Loading Incremental Data at ScaleCorrectly Loading Incremental Data at Scale
Correctly Loading Incremental Data at Scale
 
System Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event SchedulingSystem Simulation and Modelling with types and Event Scheduling
System Simulation and Modelling with types and Event Scheduling
 
Solving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.pptSolving The Right Triangles PowerPoint 2.ppt
Solving The Right Triangles PowerPoint 2.ppt
 
The SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teamsThe SRE Report 2024 - Great Findings for the teams
The SRE Report 2024 - Great Findings for the teams
 

Bauer fdp lost bit projects english

  • 1. Lost bit projectsBAUER Full displacement pile (FDP) April 2008
  • 2. Piles for new IKEA building FDP lost bit - Projects Padova, Italy Contractor: Dolomiti Rocce Base carrier: BG 24 H+ lattice mast extension FDP Tool: 620 mm dia. lost bit Pile length: L = 24 m Quantity: >350
  • 3. 800mmdiaboredpileto23,4m 800mmdiaboredpileto23,4m 610mmdiaFDPto18,8m 610mmdiaFDPto16,8m 610mmdiaFDPto18,8m 610mmdiaFDPto16,8m Soft silty clay with sand lenses Silty fine sand Silty fine sand Soft silty clay Soft silty clay FDP lost bit - Projects Padova, Italy CPT test
  • 4. FDP lost bit - Projects Padova, Italy BG 24 H Lattice mast extension Concrete pump on crawler
  • 5. FDP lost bit - Projects Padova, Italy Excavated pilecaps
  • 6. FDP lost bit - Projects Padova, Italy Tension anchors BAUER load test equipment Anchordrilling with same machine Load test
  • 7. FDP lost bit - Projects Padova, Italy Load [t] Settlement[mm]
  • 8. FDP lost bit - Projects Dolo, Italy Contractor: Dolomiti Rocce Base carrier: BG 28 V + lattice mast extension FDP Tool: 620 mm dia. lost bit Pile length: L = 28 m Quantity: >500 Tension piles for underpasses
  • 9. ORIGINAL DESIGN 800 mm dia Jet grout columns, 14.5 m long reinforced with Gewi bars 1200 mm bored pile 28 m long 4 Tie-downs / pile FDP lost bit - Projects Dolo, Italy
  • 10. ALTERNATIVE DESIGN - 610 mm dia. FDP, 24 m long FDP lost bit - Projects Dolo, Italy
  • 11. FDP lost bit - Projects Dolo, Italy BG 28 V BG 28 V with lattice mast extension max. drilling depth = 30 m
  • 12. FDP lost bit - Projects Dolo, Italy 620 mm FDP tool with 1,50 m auger Cage installation through the stem Joining 2 pieces of cage, each is 10 m long
  • 13. FDP lost bit - Projects Dolo, Italy Drilling down in automatic mode Pulling up automatic is monitored by the quantity of the concrete pump BTronic operating screen in concreting mode
  • 14. FDP lost bit - Projects Nordenham, Germany Contractor: Akril Base carrier: RG 20 S FDP Tool: 440 mm lost bit Pile length: L = 13 m Quantity: 377 Foundation piles for a supermarket
  • 15. FDP lost bit - Projects Nordenham, Germany Soil conditions CPT test Exploration borehole and dynamic probing peat c´=2-5 kN/m² sand sandy silt
  • 16. FDP lost bit - Projects Nordenham, Germany Peat with c ´= 2 - 5 kN/m² Concreting with mobile truckpump
  • 17. FDP lost bit - Projects Durban and Capetown, South Africa Introduction of FDP in South Africa Contractor: FRANKI Base carrier: MG 48 FDP Tool: 710 mm lost bit Pile length: up to 18 m Scope of work: 10 testpiles
  • 18. FDP lost bit - Projects Durban and Capetown, South Africa MG 48 with lattice mast extension 1. Torque converter 2. Gearbox 3. Hopper 1 2 3
  • 19. FDP lost bit - Projects Durban and Capetown, South Africa 710 mm FDP tool with 1,50 auger MG 48