Chapter 5 Activity-Based Costing and Management
Learning  Objective 1
Traditional, Volume-Based Product-Costing System ,[object Object],[object Object]
Traditional, Volume-Based Product-Costing System ,[object Object],Manufacturing overhead is determined as follows
Traditional, Volume-Based Product-Costing System Budgeted manufacturing overhead  $3,894,000  Budgeted direct-labor hours  118,000 =  $33 per hour
Traditional, Volume-Based Product-Costing System ,[object Object],209.00  x  1.25
Learning  Objective 2
Activity Based Costing System  (ABC) ,[object Object],Stage One Identify significant activities and assign overhead costs to each activity in proportion to resources used. Stage Two Identify cost drivers appropriate to each activity and allocate overhead to the products.
Learning  Objective 3
Overhead Costs Total budgeted cost = $3,894,000 Activity Cost Pools Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level Identification of Activity Cost Pools Activity must be done on each unit produced. Activity performed on each batch produced. Activities needed to support an entire product line Activity required in order for the production process to occur.
Receiving/Inspection cost pool  $200,000 Material-Handling cost pool  $600,000 Quality-Assurance cost pool  $421,000 Packaging/Shipping cost pool  $250,000 Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level
Learning  Objectives 3 & 4
Machinery Cost Pool Total budgeted cost = $1,212,600 Activity cost pool STAGE ONE Various overhead costs related to  machinery Maintenance Depreciation Computer Support Lubrication Electricity Calibration
Calculate the pool rate Budgeted Machinery Costs   $1,212,600 Budgeted Machine Hours  43,000 $28.20/hour Cost Assignment STAGE TWO = =
Calculation of total  setup cost Setup Cost Pool Total budgeted cost = $3,000 Activity cost pool STAGE ONE
Calculate the pool rate Budgeted Setup Costs  $3,000 Planned Production Runs  15 runs $200 per run Cost Assignment STAGE TWO = =
Various overhead costs related to  engineering Engineering salaries Engineering supplies Engineering software Depreciation Engineering Cost Pool Total budgeted cost = $700,000 Activity cost pool STAGE ONE
Allocate based on  engineering transactions Cost Assignment STAGE TWO Engineering Cost Pool Total budgeted cost = $700,000
Various overhead costs related to  general operations Plant depr. Plant mgmt. Plant maint. Property taxes Insurance Security Facility Cost Pool Total budgeted cost = $507,400 Activity cost pool STAGE ONE
Budgeted Facilities Cost  $507,400 Budgeted Direct-Labor Hours  118,000 $4.30/hour Cost Assignment STAGE TWO = = Calculate the pool rate
Other Overhead Costs
Other Overhead Costs $14.82
Product Cost from ABC ,[object Object]
Learning  Objective 5
Distorted Product Costs ,[object Object],[$209.00 × 1.25] [$183.44 ×  1.25] The selling price of Mode I and II are reduced and the selling price for Mode III is increased.
[object Object],Traditional costing understates the cost of complex, low volume products. Distorted Product Costs
Two Key Points ,[object Object],[object Object],[object Object],[object Object]
Learning  Objective 6
Cost Drivers ,[object Object],Degree of Correlation Cost of Measurement Behavioral Effects
Learning  Objective 7
COLLECTING ABC DATA INTERVIEWS AND PAPER TRAILS -  The information for ABC systems initially comes from interviews with employees in the support departments and a review of each department’s records. STORYBOARDING -   A procedure used to develop a detailed process flow chart, which visually represents activities and the relationships among activities. MULTIDISCIPLINARY ABC PROJECT TEAMS  –   To gather information from all facets of an organizations operations, it is essential to involve personnel from a variety of functional areas.  A typical ABC project team includes  ACCOUNTING, FINANCE, PRODUCTION, OPERATIONS, ENGINEERS, MARKETING  etc.
Learning  Objective 8
Activity-Based Management The use of ABC costing  information to help management make decisions
Activity-Based Management Activity-based costing   establishes relationships between overhead costs and activities so that we can better allocate overhead costs. Activity-based management   focuses  on managing activities to reduce costs.
Two-Dimensional ABC and Activity-Based Management Activities
Two-Dimensional ABC and Activity-Based Management Cost Objects Activities Resource costs Cost Assignment View
Two-Dimensional ABC and Activity-Based Management Activity Triggers Cost Objects Activities Root Causes Process View Activity Analysis Resource costs Cost Assignment View Performance Measures Activity Evaluation
Elimination of Non-Value-Added Costs Nonvalue-added activities Necessary Unnecessary Activities Reduce or Eliminate Continually Evaluate  and Improve
Using ABM to Eliminate Non-Value-Added Activities and Costs ,[object Object],[object Object],[object Object],[object Object],[object Object],Specify parts Select vendor Receive parts Produce goods Inspect finished goods Rework defective products
Using ABM to Eliminate Non-Value-Added Activities and Costs Inspection time Process time Storage time Move time Waiting time
Learning  Objective 9
Customer Profitability Analysis Customer profitability analysis uses activity-based costing to determine the activities, costs, and profit associated  with serving particular customers.
Customer Profitability Analysis Orders small quantities. Orders frequently. Often changes orders. Required special packaging. Demand fast service. A costly customer
Customer Profitability Analysis A company may use these customer related costs to help determine the profitability of each customer.
Customer Profitability Analysis 75% of actual operating income 50% of actual operating income 25% of actual operating income
Learning  Objective 10
Activity-Based Management in the Service Industry Activity  Analysis Customer Profitability Analysis
Learning  Objective 11
Just-in-Time Inventory and Production Management ,[object Object],The primary goal of a JIT production system is to reduce or eliminate inventories at every stage of production.
Key Features of the JIT Approach Smooth, uniform production rate Pull method of production Purchase is small lot sizes Quick, inexpensive setups High quality materials Effective preventive maintenance Teamwork Multiskilled workers
JIT Purchasing Long-term contracts with suppliers. Only a few suppliers. Parts delivered in small lots. Minimal inspection of materials. Grouped payments to vendor.
End of Chapter 5 This is my kind of cost pool!

Más contenido relacionado

La actualidad más candente

Activity base costing.pptx presentation
Activity base costing.pptx presentationActivity base costing.pptx presentation
Activity base costing.pptx presentation
Tanweer Sudhan
 
Managerial Accounting Garrison Noreen Brewer Chapter 01
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting Garrison Noreen Brewer Chapter 01
Managerial Accounting Garrison Noreen Brewer Chapter 01
Asif Hasan
 
Ratio analysis - Introduction
Ratio analysis - IntroductionRatio analysis - Introduction
Ratio analysis - Introduction
uma reur
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysis
Sumit Malhotra
 

La actualidad más candente (20)

TARGET COSTING
TARGET COSTINGTARGET COSTING
TARGET COSTING
 
Cash budget
Cash budgetCash budget
Cash budget
 
Activity base costing.pptx presentation
Activity base costing.pptx presentationActivity base costing.pptx presentation
Activity base costing.pptx presentation
 
Managerial Accounting Garrison Noreen Brewer Chapter 01
Managerial Accounting Garrison Noreen Brewer Chapter 01Managerial Accounting Garrison Noreen Brewer Chapter 01
Managerial Accounting Garrison Noreen Brewer Chapter 01
 
Chapter 16 Lean Accounting, Target Costing, And The Balanced Scorecard
Chapter 16 Lean Accounting, Target Costing, And The Balanced ScorecardChapter 16 Lean Accounting, Target Costing, And The Balanced Scorecard
Chapter 16 Lean Accounting, Target Costing, And The Balanced Scorecard
 
Cost terms, Concepts and classification-C1.ppt.pdf
Cost terms, Concepts and classification-C1.ppt.pdfCost terms, Concepts and classification-C1.ppt.pdf
Cost terms, Concepts and classification-C1.ppt.pdf
 
Absorption costing vs variable costing
Absorption costing  vs variable costingAbsorption costing  vs variable costing
Absorption costing vs variable costing
 
Job costing
Job costingJob costing
Job costing
 
Chapter 5 : Relevant Costing For Decision Making
Chapter 5 : Relevant Costing For Decision MakingChapter 5 : Relevant Costing For Decision Making
Chapter 5 : Relevant Costing For Decision Making
 
Job costing and batch costing
Job costing and batch costingJob costing and batch costing
Job costing and batch costing
 
Flexible Budgeting
Flexible BudgetingFlexible Budgeting
Flexible Budgeting
 
Ratio analysis - Introduction
Ratio analysis - IntroductionRatio analysis - Introduction
Ratio analysis - Introduction
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Chapter 7 Support Department Cost Allocation
Chapter 7 Support Department Cost AllocationChapter 7 Support Department Cost Allocation
Chapter 7 Support Department Cost Allocation
 
Basics of cost accounting
Basics of cost accounting Basics of cost accounting
Basics of cost accounting
 
Standard costs and variance analysis
Standard costs and variance analysisStandard costs and variance analysis
Standard costs and variance analysis
 
Job order costing
Job order costingJob order costing
Job order costing
 
Joint product and by product costing
Joint product and by product costingJoint product and by product costing
Joint product and by product costing
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Investment decision
Investment decisionInvestment decision
Investment decision
 

Destacado

Activity based costing
Activity based costingActivity based costing
Activity based costing
Ankur Verma
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
Mulyono Joyo
 
Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)
Mvs Krishna
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
Flevy.com Best Practices
 

Destacado (20)

Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity based costing ppt @ mba finace
Activity based costing ppt @ mba finaceActivity based costing ppt @ mba finace
Activity based costing ppt @ mba finace
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
新呈介紹與 Abc & abm
新呈介紹與 Abc & abm新呈介紹與 Abc & abm
新呈介紹與 Abc & abm
 
Abc ho
Abc hoAbc ho
Abc ho
 
Activity Based Costing System
Activity Based Costing SystemActivity Based Costing System
Activity Based Costing System
 
Jaiden and archie final
Jaiden and archie finalJaiden and archie final
Jaiden and archie final
 
Abc parker and youssef final
Abc parker and youssef finalAbc parker and youssef final
Abc parker and youssef final
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Activity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim CorporationActivity Based Costing: A Case of Plastim Corporation
Activity Based Costing: A Case of Plastim Corporation
 
Abc costig
Abc costigAbc costig
Abc costig
 
Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)Jiambalvo text book solutions (3)
Jiambalvo text book solutions (3)
 
Cost volume-profit (cvp)
Cost volume-profit (cvp)Cost volume-profit (cvp)
Cost volume-profit (cvp)
 
Cvp
CvpCvp
Cvp
 
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha reportPrima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
Prima Plastics Ltd (Bse Code 530589) - Jan16 katalyst wealth alpha report
 
Activity Based Costing
Activity Based CostingActivity Based Costing
Activity Based Costing
 
Wilkerson Company Case
Wilkerson Company CaseWilkerson Company Case
Wilkerson Company Case
 
ACTIVITY BASED COSTING
ACTIVITY BASED COSTINGACTIVITY BASED COSTING
ACTIVITY BASED COSTING
 

Similar a Chap005 abc

0324663854 151818
0324663854 1518180324663854 151818
0324663854 151818
Nhu Le
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx
1986anu
 
Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...
Katherine Alexander
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
Rahul Kumar
 

Similar a Chap005 abc (20)

PPT on PM_Unit 1 .pptx.
PPT                  on PM_Unit 1 .pptx.PPT                  on PM_Unit 1 .pptx.
PPT on PM_Unit 1 .pptx.
 
0324663854 151818
0324663854 1518180324663854 151818
0324663854 151818
 
APC costing
APC costingAPC costing
APC costing
 
A b c
A b cA b c
A b c
 
CA NOTES ON COSTING
CA NOTES ON COSTINGCA NOTES ON COSTING
CA NOTES ON COSTING
 
Job Costing & ABC costing
Job Costing & ABC costingJob Costing & ABC costing
Job Costing & ABC costing
 
Activity Based Costing.pptx
Activity Based Costing.pptxActivity Based Costing.pptx
Activity Based Costing.pptx
 
Traditional & Abc
Traditional & AbcTraditional & Abc
Traditional & Abc
 
7594572.ppt
7594572.ppt7594572.ppt
7594572.ppt
 
7594572.ppt
7594572.ppt7594572.ppt
7594572.ppt
 
Acc 349 Preview Full Course
Acc 349 Preview Full Course Acc 349 Preview Full Course
Acc 349 Preview Full Course
 
Activity Based costing
Activity Based costingActivity Based costing
Activity Based costing
 
Activity-Based Costing (ABC
Activity-Based Costing (ABCActivity-Based Costing (ABC
Activity-Based Costing (ABC
 
Acc mgt noreen03 systems design activity based costing
Acc mgt noreen03 systems design activity based costingAcc mgt noreen03 systems design activity based costing
Acc mgt noreen03 systems design activity based costing
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 
Cost allocation
Cost allocationCost allocation
Cost allocation
 
Chapter 11 : Activity Based Costing and Accounting Information
Chapter 11 : Activity Based Costing and Accounting InformationChapter 11 : Activity Based Costing and Accounting Information
Chapter 11 : Activity Based Costing and Accounting Information
 
Presentation on Activity-Based Costing.pptx
Presentation on Activity-Based Costing.pptxPresentation on Activity-Based Costing.pptx
Presentation on Activity-Based Costing.pptx
 
Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...Activity Based Costing From The Perspective Of Competitive...
Activity Based Costing From The Perspective Of Competitive...
 
Activity based costing
Activity based costingActivity based costing
Activity based costing
 

Último

Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
AnaAcapella
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
ZurliaSoop
 

Último (20)

Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...Kodo Millet  PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
Kodo Millet PPT made by Ghanshyam bairwa college of Agriculture kumher bhara...
 
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17  How to Extend Models Using Mixin ClassesMixin Classes in Odoo 17  How to Extend Models Using Mixin Classes
Mixin Classes in Odoo 17 How to Extend Models Using Mixin Classes
 
Unit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptxUnit-IV; Professional Sales Representative (PSR).pptx
Unit-IV; Professional Sales Representative (PSR).pptx
 
Application orientated numerical on hev.ppt
Application orientated numerical on hev.pptApplication orientated numerical on hev.ppt
Application orientated numerical on hev.ppt
 
Spellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please PractiseSpellings Wk 3 English CAPS CARES Please Practise
Spellings Wk 3 English CAPS CARES Please Practise
 
Micro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdfMicro-Scholarship, What it is, How can it help me.pdf
Micro-Scholarship, What it is, How can it help me.pdf
 
How to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POSHow to Manage Global Discount in Odoo 17 POS
How to Manage Global Discount in Odoo 17 POS
 
On National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan FellowsOn National Teacher Day, meet the 2024-25 Kenan Fellows
On National Teacher Day, meet the 2024-25 Kenan Fellows
 
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdfUGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
UGC NET Paper 1 Mathematical Reasoning & Aptitude.pdf
 
Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...Making communications land - Are they received and understood as intended? we...
Making communications land - Are they received and understood as intended? we...
 
Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)Accessible Digital Futures project (20/03/2024)
Accessible Digital Futures project (20/03/2024)
 
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
2024-NATIONAL-LEARNING-CAMP-AND-OTHER.pptx
 
Graduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - EnglishGraduate Outcomes Presentation Slides - English
Graduate Outcomes Presentation Slides - English
 
Python Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docxPython Notes for mca i year students osmania university.docx
Python Notes for mca i year students osmania university.docx
 
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
Jual Obat Aborsi Hongkong ( Asli No.1 ) 085657271886 Obat Penggugur Kandungan...
 
Holdier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdfHoldier Curriculum Vitae (April 2024).pdf
Holdier Curriculum Vitae (April 2024).pdf
 
Key note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdfKey note speaker Neum_Admir Softic_ENG.pdf
Key note speaker Neum_Admir Softic_ENG.pdf
 
Unit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptxUnit-V; Pricing (Pharma Marketing Management).pptx
Unit-V; Pricing (Pharma Marketing Management).pptx
 
General Principles of Intellectual Property: Concepts of Intellectual Proper...
General Principles of Intellectual Property: Concepts of Intellectual  Proper...General Principles of Intellectual Property: Concepts of Intellectual  Proper...
General Principles of Intellectual Property: Concepts of Intellectual Proper...
 
Introduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The BasicsIntroduction to Nonprofit Accounting: The Basics
Introduction to Nonprofit Accounting: The Basics
 

Chap005 abc

  • 1. Chapter 5 Activity-Based Costing and Management
  • 3.
  • 4.
  • 5. Traditional, Volume-Based Product-Costing System Budgeted manufacturing overhead $3,894,000 Budgeted direct-labor hours 118,000 = $33 per hour
  • 6.
  • 8.
  • 10. Overhead Costs Total budgeted cost = $3,894,000 Activity Cost Pools Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level Identification of Activity Cost Pools Activity must be done on each unit produced. Activity performed on each batch produced. Activities needed to support an entire product line Activity required in order for the production process to occur.
  • 11. Receiving/Inspection cost pool $200,000 Material-Handling cost pool $600,000 Quality-Assurance cost pool $421,000 Packaging/Shipping cost pool $250,000 Machinery cost pool $1,212,600 Setup cost pool $3,000 Engineering cost pool $700,000 Facility cost pool $507,400 Unit Level Batch Level Product- Sustaining Level Facility Level
  • 13. Machinery Cost Pool Total budgeted cost = $1,212,600 Activity cost pool STAGE ONE Various overhead costs related to machinery Maintenance Depreciation Computer Support Lubrication Electricity Calibration
  • 14. Calculate the pool rate Budgeted Machinery Costs $1,212,600 Budgeted Machine Hours 43,000 $28.20/hour Cost Assignment STAGE TWO = =
  • 15. Calculation of total setup cost Setup Cost Pool Total budgeted cost = $3,000 Activity cost pool STAGE ONE
  • 16. Calculate the pool rate Budgeted Setup Costs $3,000 Planned Production Runs 15 runs $200 per run Cost Assignment STAGE TWO = =
  • 17. Various overhead costs related to engineering Engineering salaries Engineering supplies Engineering software Depreciation Engineering Cost Pool Total budgeted cost = $700,000 Activity cost pool STAGE ONE
  • 18. Allocate based on engineering transactions Cost Assignment STAGE TWO Engineering Cost Pool Total budgeted cost = $700,000
  • 19. Various overhead costs related to general operations Plant depr. Plant mgmt. Plant maint. Property taxes Insurance Security Facility Cost Pool Total budgeted cost = $507,400 Activity cost pool STAGE ONE
  • 20. Budgeted Facilities Cost $507,400 Budgeted Direct-Labor Hours 118,000 $4.30/hour Cost Assignment STAGE TWO = = Calculate the pool rate
  • 23.
  • 25.
  • 26.
  • 27.
  • 29.
  • 31. COLLECTING ABC DATA INTERVIEWS AND PAPER TRAILS - The information for ABC systems initially comes from interviews with employees in the support departments and a review of each department’s records. STORYBOARDING - A procedure used to develop a detailed process flow chart, which visually represents activities and the relationships among activities. MULTIDISCIPLINARY ABC PROJECT TEAMS – To gather information from all facets of an organizations operations, it is essential to involve personnel from a variety of functional areas. A typical ABC project team includes ACCOUNTING, FINANCE, PRODUCTION, OPERATIONS, ENGINEERS, MARKETING etc.
  • 33. Activity-Based Management The use of ABC costing information to help management make decisions
  • 34. Activity-Based Management Activity-based costing establishes relationships between overhead costs and activities so that we can better allocate overhead costs. Activity-based management focuses on managing activities to reduce costs.
  • 35. Two-Dimensional ABC and Activity-Based Management Activities
  • 36. Two-Dimensional ABC and Activity-Based Management Cost Objects Activities Resource costs Cost Assignment View
  • 37. Two-Dimensional ABC and Activity-Based Management Activity Triggers Cost Objects Activities Root Causes Process View Activity Analysis Resource costs Cost Assignment View Performance Measures Activity Evaluation
  • 38. Elimination of Non-Value-Added Costs Nonvalue-added activities Necessary Unnecessary Activities Reduce or Eliminate Continually Evaluate and Improve
  • 39.
  • 40. Using ABM to Eliminate Non-Value-Added Activities and Costs Inspection time Process time Storage time Move time Waiting time
  • 42. Customer Profitability Analysis Customer profitability analysis uses activity-based costing to determine the activities, costs, and profit associated with serving particular customers.
  • 43. Customer Profitability Analysis Orders small quantities. Orders frequently. Often changes orders. Required special packaging. Demand fast service. A costly customer
  • 44. Customer Profitability Analysis A company may use these customer related costs to help determine the profitability of each customer.
  • 45. Customer Profitability Analysis 75% of actual operating income 50% of actual operating income 25% of actual operating income
  • 47. Activity-Based Management in the Service Industry Activity Analysis Customer Profitability Analysis
  • 49.
  • 50. Key Features of the JIT Approach Smooth, uniform production rate Pull method of production Purchase is small lot sizes Quick, inexpensive setups High quality materials Effective preventive maintenance Teamwork Multiskilled workers
  • 51. JIT Purchasing Long-term contracts with suppliers. Only a few suppliers. Parts delivered in small lots. Minimal inspection of materials. Grouped payments to vendor.
  • 52. End of Chapter 5 This is my kind of cost pool!