Central Artery/Tunnel Project “The Big Dig” PROJECT 0 GROUP 4 Chris Miner Sabah Tasnuva Tingting Liu Nicholas Johnson
What Is The Big Dig? “Largest, most complex, and technologically challenging highway project in the history of the United States” -Solution To Boston’s Traffic Problem -Reconnect Waterfront Towns To Downtown
Widest Cable-Stayed Bridge
WHY WE CHOSE “THE BIG DIG” A Big Part of Civil Engineering Involves Transportation
WHAT DID IT TAKE TO COMPLETE “THE BIG DIG”? 1982-Environmental Impact Documents 2007- Restoration of City Streets 7.8 miles of highway, 161 lanes miles 3.8 million cubic yards of concrete More than 16 million cubic yards of soil excavated 1999 through 2002, about $3 million of work  completed each day About 5,000 construction workers were on the job  Jay Cashman, Modern Continental 118 separate construction contracts, with 26 geotechnical drilling contracts. 22 billion
CONSTRUCTION PROBLEMS Faulty Loose Fixtures: September 2004  	- Water seeps through traffic barriers in Interstate 93 tunnel 	-Workers sandbagged one wall -Independent engineers hired to study problem  -Reported that the tunnels may have more than 400 leaks  
July 2006 -39-year-old woman killed after 12 tons of cement ceiling panels fell on car. -Lead to investigation where federal and state officials uncovered additional problems almost on a daily basis Bechtel: engineering, construction and management company’s reputation damaged
FINANCIAL PROBLEMS - Over the course of the Project, costs kept increasing - 2.6 Billion to 22 Billion - Taxpayers ended up paying half of the project’s cost ENVIRONMENTAL ISSUES -Downtown area through which the tunnels were to be dug was largely landfill and included existing subway lines as well as innumerable pipes and utility lines that would have to be replaced or moved. -Tunnel workers encountered many unexpected geological and archaeological barriers  -Glacial debris 	-Foundations of buried houses and sunken ships

Más contenido relacionado

La actualidad más candente

BP's Deepwater Oil Spill Case Study Analysis - Business Ethics
BP's Deepwater Oil Spill Case Study Analysis - Business EthicsBP's Deepwater Oil Spill Case Study Analysis - Business Ethics
BP's Deepwater Oil Spill Case Study Analysis - Business EthicsÔn Thi
 
Discovery Driven Planning for new ventures, products and services
Discovery Driven Planning for new ventures, products and servicesDiscovery Driven Planning for new ventures, products and services
Discovery Driven Planning for new ventures, products and servicesStocker Partnership
 
Construction Management Case Study on Burj Khalifa
Construction Management Case Study on  Burj KhalifaConstruction Management Case Study on  Burj Khalifa
Construction Management Case Study on Burj KhalifaVaibhav Shrivastava
 
消费品牌产品经理如何做新品销量预测
消费品牌产品经理如何做新品销量预测消费品牌产品经理如何做新品销量预测
消费品牌产品经理如何做新品销量预测Shelley Lai
 
The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)PaulWaskett
 
Hong Kong Airport
Hong Kong AirportHong Kong Airport
Hong Kong Airportsandy_vasan
 
Co-Creation & Co-Creativity - innovating together with end-users on-line and ...
Co-Creation & Co-Creativity - innovating together with end-users on-line and ...Co-Creation & Co-Creativity - innovating together with end-users on-line and ...
Co-Creation & Co-Creativity - innovating together with end-users on-line and ...Liliane Kuiper-Hoyng
 
Deepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spill
Deepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spillDeepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spill
Deepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spillGaurav Singh Rajput
 
The Physical Interface
The Physical InterfaceThe Physical Interface
The Physical InterfaceJosh Clark
 
Deepwater Horizon oil spill case
Deepwater Horizon oil spill caseDeepwater Horizon oil spill case
Deepwater Horizon oil spill caseCaterpillar Inc.
 
Denver airport case study
Denver airport case studyDenver airport case study
Denver airport case studyJohn Mulhollen
 
Airbnb Pitch Deck
Airbnb Pitch DeckAirbnb Pitch Deck
Airbnb Pitch Deckstartuphome
 
3. palm jumeirah final
3. palm jumeirah final3. palm jumeirah final
3. palm jumeirah finaladib ankon
 
Bp oil spill midterm presentation
Bp oil spill   midterm presentationBp oil spill   midterm presentation
Bp oil spill midterm presentationMaimona Afzal
 

La actualidad más candente (20)

BP's Deepwater Oil Spill Case Study Analysis - Business Ethics
BP's Deepwater Oil Spill Case Study Analysis - Business EthicsBP's Deepwater Oil Spill Case Study Analysis - Business Ethics
BP's Deepwater Oil Spill Case Study Analysis - Business Ethics
 
Discovery Driven Planning for new ventures, products and services
Discovery Driven Planning for new ventures, products and servicesDiscovery Driven Planning for new ventures, products and services
Discovery Driven Planning for new ventures, products and services
 
Burj Khalifa Tower Project
Burj Khalifa Tower ProjectBurj Khalifa Tower Project
Burj Khalifa Tower Project
 
The palm islands
The palm islandsThe palm islands
The palm islands
 
Construction Management Case Study on Burj Khalifa
Construction Management Case Study on  Burj KhalifaConstruction Management Case Study on  Burj Khalifa
Construction Management Case Study on Burj Khalifa
 
消费品牌产品经理如何做新品销量预测
消费品牌产品经理如何做新品销量预测消费品牌产品经理如何做新品销量预测
消费品牌产品经理如何做新品销量预测
 
Burj Khalifa
Burj KhalifaBurj Khalifa
Burj Khalifa
 
The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)The Analytical Design Planning Technique (ADePT)
The Analytical Design Planning Technique (ADePT)
 
Hong Kong Airport
Hong Kong AirportHong Kong Airport
Hong Kong Airport
 
Co-Creation & Co-Creativity - innovating together with end-users on-line and ...
Co-Creation & Co-Creativity - innovating together with end-users on-line and ...Co-Creation & Co-Creativity - innovating together with end-users on-line and ...
Co-Creation & Co-Creativity - innovating together with end-users on-line and ...
 
Deepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spill
Deepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spillDeepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spill
Deepwater horizon oil spill | Gulf of mexico oil spill | The BP oil spill
 
The Physical Interface
The Physical InterfaceThe Physical Interface
The Physical Interface
 
Deepwater Horizon oil spill case
Deepwater Horizon oil spill caseDeepwater Horizon oil spill case
Deepwater Horizon oil spill case
 
4 Stages of Disruption
4 Stages of Disruption4 Stages of Disruption
4 Stages of Disruption
 
Panama Canal Presentation
Panama Canal PresentationPanama Canal Presentation
Panama Canal Presentation
 
Denver airport case study
Denver airport case studyDenver airport case study
Denver airport case study
 
Palm jumeirah
Palm jumeirah Palm jumeirah
Palm jumeirah
 
Airbnb Pitch Deck
Airbnb Pitch DeckAirbnb Pitch Deck
Airbnb Pitch Deck
 
3. palm jumeirah final
3. palm jumeirah final3. palm jumeirah final
3. palm jumeirah final
 
Bp oil spill midterm presentation
Bp oil spill   midterm presentationBp oil spill   midterm presentation
Bp oil spill midterm presentation
 

Destacado (20)

Big dig
Big digBig dig
Big dig
 
Big Dig
Big DigBig Dig
Big Dig
 
Topics
TopicsTopics
Topics
 
smart quill pen
smart quill pensmart quill pen
smart quill pen
 
Dig powerpoint
Dig powerpointDig powerpoint
Dig powerpoint
 
Big dig powerpoint
Big dig powerpointBig dig powerpoint
Big dig powerpoint
 
Construindo maravilhas
Construindo maravilhasConstruindo maravilhas
Construindo maravilhas
 
Trabalho académico big dig
Trabalho académico   big digTrabalho académico   big dig
Trabalho académico big dig
 
Blue star holidays ppt
Blue star holidays pptBlue star holidays ppt
Blue star holidays ppt
 
Digital Cinema
Digital CinemaDigital Cinema
Digital Cinema
 
Topics
TopicsTopics
Topics
 
electronics seminar ppt
electronics seminar pptelectronics seminar ppt
electronics seminar ppt
 
Moletronics or molecular electronics - technical seminar
Moletronics or molecular electronics - technical seminarMoletronics or molecular electronics - technical seminar
Moletronics or molecular electronics - technical seminar
 
BUMP
BUMPBUMP
BUMP
 
Wardriving
WardrivingWardriving
Wardriving
 
Digital cinema
Digital cinemaDigital cinema
Digital cinema
 
Finfet
FinfetFinfet
Finfet
 
Finfets
FinfetsFinfets
Finfets
 
Smart quill
Smart quillSmart quill
Smart quill
 
Electronic watchdog
Electronic watchdogElectronic watchdog
Electronic watchdog
 

Similar a Big dig powerpoint

Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdfSaqib Imran
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfPramodLimbore
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineeringAdil Shaikh
 
Alexander Bridge Rehab ENR 2.4.13 issue[1]
Alexander Bridge Rehab ENR 2.4.13 issue[1]Alexander Bridge Rehab ENR 2.4.13 issue[1]
Alexander Bridge Rehab ENR 2.4.13 issue[1]Manuel J. Silva, P.E.
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Soumalya Bag
 
Golden gate bridge construction
Golden gate bridge constructionGolden gate bridge construction
Golden gate bridge constructionNouman Tahir
 
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)Hamed Zarei
 
Civil10
Civil10Civil10
Civil10saihem
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyAlexASquare1
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technologyAlexASquare1
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridgeBismillah Arif
 

Similar a Big dig powerpoint (20)

Bigdig project
Bigdig projectBigdig project
Bigdig project
 
Construction Job Story in GeoDrilling International
Construction Job Story in GeoDrilling InternationalConstruction Job Story in GeoDrilling International
Construction Job Story in GeoDrilling International
 
Megastructures design pdf
Megastructures design pdfMegastructures design pdf
Megastructures design pdf
 
Golden gate bridge
Golden gate bridgeGolden gate bridge
Golden gate bridge
 
Water_Intrusion
Water_IntrusionWater_Intrusion
Water_Intrusion
 
CTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdfCTM_tutorial3 (1).pdf
CTM_tutorial3 (1).pdf
 
Study of tunnel engineering
Study of tunnel engineeringStudy of tunnel engineering
Study of tunnel engineering
 
Foundation Drilling Magazine Cover Story
Foundation Drilling Magazine Cover StoryFoundation Drilling Magazine Cover Story
Foundation Drilling Magazine Cover Story
 
Alexander Bridge Rehab ENR 2.4.13 issue[1]
Alexander Bridge Rehab ENR 2.4.13 issue[1]Alexander Bridge Rehab ENR 2.4.13 issue[1]
Alexander Bridge Rehab ENR 2.4.13 issue[1]
 
TindellPersuasive
TindellPersuasiveTindellPersuasive
TindellPersuasive
 
Linn Cove Viaduct
Linn Cove ViaductLinn Cove Viaduct
Linn Cove Viaduct
 
time_will_tell.pdf
time_will_tell.pdftime_will_tell.pdf
time_will_tell.pdf
 
Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891Hooverdambypassbridge 151003030959-lva1-app6891
Hooverdambypassbridge 151003030959-lva1-app6891
 
Golden gate bridge construction
Golden gate bridge constructionGolden gate bridge construction
Golden gate bridge construction
 
Engineering Ethics
 Engineering Ethics Engineering Ethics
Engineering Ethics
 
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
Tunnelling & underground design (Topic1-introduction to the tunnelling industry)
 
Civil10
Civil10Civil10
Civil10
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Trenchless technology
Trenchless technologyTrenchless technology
Trenchless technology
 
Hoover dam bypass bridge
Hoover dam bypass bridgeHoover dam bypass bridge
Hoover dam bypass bridge
 

Big dig powerpoint

  • 1. Central Artery/Tunnel Project “The Big Dig” PROJECT 0 GROUP 4 Chris Miner Sabah Tasnuva Tingting Liu Nicholas Johnson
  • 2. What Is The Big Dig? “Largest, most complex, and technologically challenging highway project in the history of the United States” -Solution To Boston’s Traffic Problem -Reconnect Waterfront Towns To Downtown
  • 4. WHY WE CHOSE “THE BIG DIG” A Big Part of Civil Engineering Involves Transportation
  • 5. WHAT DID IT TAKE TO COMPLETE “THE BIG DIG”? 1982-Environmental Impact Documents 2007- Restoration of City Streets 7.8 miles of highway, 161 lanes miles 3.8 million cubic yards of concrete More than 16 million cubic yards of soil excavated 1999 through 2002, about $3 million of work completed each day About 5,000 construction workers were on the job Jay Cashman, Modern Continental 118 separate construction contracts, with 26 geotechnical drilling contracts. 22 billion
  • 6.
  • 7. CONSTRUCTION PROBLEMS Faulty Loose Fixtures: September 2004 - Water seeps through traffic barriers in Interstate 93 tunnel -Workers sandbagged one wall -Independent engineers hired to study problem -Reported that the tunnels may have more than 400 leaks  
  • 8. July 2006 -39-year-old woman killed after 12 tons of cement ceiling panels fell on car. -Lead to investigation where federal and state officials uncovered additional problems almost on a daily basis Bechtel: engineering, construction and management company’s reputation damaged
  • 9. FINANCIAL PROBLEMS - Over the course of the Project, costs kept increasing - 2.6 Billion to 22 Billion - Taxpayers ended up paying half of the project’s cost ENVIRONMENTAL ISSUES -Downtown area through which the tunnels were to be dug was largely landfill and included existing subway lines as well as innumerable pipes and utility lines that would have to be replaced or moved. -Tunnel workers encountered many unexpected geological and archaeological barriers -Glacial debris -Foundations of buried houses and sunken ships