Appendix E—Construction Approach
This appendix describes the general construction              space for construction equipment, construction
process and methods likely to be used in the                  materials, materials stockpiling and transfer,
construction of the Project. The exact design,                parking, and other construction-related activities.
process, method of construction and timeline                  While future park-and-ride lots and the mainte-
would continue to be refined through the start of             nance and storage facility have been identified as
construction. Temporary effects of construction to            potential staging areas, additional locations would
the transportation system and the environment are             be needed. Additional areas will be identified by
discussed in Chapters 3 and 4 of the Draft EIS.               the contractor and obtained by the City.

The fixed guideway and stations would largely be              Support facilities, such as traction power substa-
aerial structures throughout the system. Prior to             tions, a maintenance and storage facility, and
beginning construction on the facility, existing              park-and-ride lots, would be at-grade unless the
utilities that conflict with the Project’s construction       technology selected or local site conditions demand
would be relocated. The four main components of               otherwise. The locations of these facilities are
the fixed guideway system include foundations, piers          shown in Chapter 2 of the Draft EIS.
(support columns), superstructure (the elevated
guideway structure), and stations. Typical pier spac-         Many utilities are located below and above ground
ing would be 150 feet, with shorter or longer spans           along the fixed guideway alignment. Prior to major
used where needed. The guideway width would                   construction in an area, utility relocations would
generally be between 28 and 32 feet, with wider               be needed. In some cases, a utility may be moved
areas to accommodate track cross-overs, switches,             temporarily to allow for construction and then
and center-platform stations.                                 returned to its original location. In other cases,
                                                              the utility would be permanently moved to allow
Construction staging areas would be needed                    for construction. Where conflicts between aboveg-
throughout the project area to provide adequate               round utilities and the guideway would occur,

June 2010                                   Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement   E-1
the existing aboveground utilities may either be               conditions and would likely range between 50 and
relocated aboveground or be placed underground.                150 feet below the ground surface. Generally, a
                                                               drilled shaft foundation can be completed in one
                                                               week. The procedure for constructing drilled shafts
  The construction industry uses a variety of specialized      is as follows:
  terminology. The following terms are used in the                 1. Drill hole of prescribed size to the design
  description of the construction process:                              depth.
        •	 “Tremie” is a method to place concrete                  2. Stabilize unstable ground conditions by
           underwater using a submerged pipe from the                   suitable means to achieve design comple-
           bottom to the top of a hole to ensure minimal                tion depth.
           contamination with water.                               3. Use slurry or water for drilled shafts com-
        •	 “Slurry” is a wet cementitious mix (bentonite                pleted below the prevailing groundwater
           or polymer) that is placed in an excavation to               level to counterbalance the adverse effect of
           support the excavation until concrete is placed.             an inward seepage gradient.
        •	 “Battered piles” are piles that are driven at           4. Clean bottom of drilled shaft thoroughly
           an angle to improve horizontal resistance,                   and, where water or slurry is used, clean
           resulting in a stronger foundation.                          out the medium to verify that there is no
        •	 A “pile cap” is a concrete foundation linking the            excess detritus in suspension that could
           tops of piles and bottom of a pier column.                   compromise the quality of the placed
        •	 A “gantry” is an overhead trestle structure                  concrete.
           supported at both ends and includes a hoist to          5. Install a rebar cage in the completed shaft.
           lift and place materials.                               6. Fill the shaft with concrete from the
        •	 “Falsework” is a temporary structure that sup‑               bottom up by the tremied placing method
           ports an elevated structure during construction.             using strict tolerances on means and
                                                                        methods. The tremied concrete displaces
                                                                        the drilling fluid (slurry or water) upward
                                                                        and scours any
Foundations                                                             raveling materials upward.
Foundations for the various system components                      7. Treat and manage drilling slurry, if used, in
would be dictated by structural demands and                             accordance with local requirements. Slurry
existing subsurface conditions. Two foundation                          would be recycled through a de-sander
construction methods would be used to support                           and reused. Water would be collected and
the aerial guideway structure: drilled shafts, which                    treated as needed prior to disposal or reuse.
would be integral with columns; and driven piles,
which would require pile caps for connection to                In cases where lateral loads are too large for drilled
columns. Test holes will be bored at anticipated               shafts or where geotechnical or other site condi-
foundation locations to determine soil conditions.             tions prohibit their use, foundations would consist
                                                               of multiple drilled or driven piles with pile caps
Drilled shafts (Figure E-1) would be used for the              (Figure E-2). Piles around the perimeter of the
majority of the alignment because they can be                  foundation may be battered to improve the founda-
installed faster; a smaller area of soil is disturbed;         tion’s lateral load-bearing capacity. A drilled-pile
and it is quieter than driving piles. The drilled              foundation would include multiple small drilled
shafts generally would be 6 to 10 feet in diameter.            shafts, each constructed as described above and
The depth of the shaft depends on local soil                   connected with a pile cap as described for the

  E-2      Appendix E Construction Process
Competent Soil                   Competent Soil                     Competent Soil                     Competent Soil
                                                                                                                  etent




       Drill the shaft to the        Clean out accumulated                    Positioning the                   Concrete placed
         designed depth              water and loose material              reinforcement cage

Figure E‑1  Drilled Shaft Foundatioin Construction




  Competent Soil                    Competent Soil                      Competent Soil                        Competent Soil




   Excavate for Pile Cap                 Drive First Pile                 Drive Additional Piles                    Cast Pile Cap
Figure E‑2  Driven-pile Foundation Construction Piers

June 2010                                            Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement   E-3
driven-pile foundation. Piles may be driven by         Superstructure
striking the pile with a heavy weight, vibrating the   Because of the repetitive nature of the spans and
pile, or jacking the pile into the ground.             the desire to minimize impacts on surrounding
                                                       areas, the majority of the guideway structure
The following process describes construction of        would consist of precast, span-by-span segments,
driven-pile foundations:                               most likely erected using an overhead erection
   1. Excavate to accommodate the pile cap. It         gantry (Figure E-3). The falsework required for
        may be necessary to support the excavation     cast-in-place concrete structures would close
        with sheet piling in high congestion areas     the area below the guideway for the duration of
        to limit the construction area. Addition-      the superstructure construction, and full-length
        ally, dewatering would be required where       precast girders are limited in the span lengths that
        ground water is at levels above the base of    can be achieved. Span-by-span segmental bridges
        the pile caps.                                 for transit have been constructed with spans of
   2. Drive each pile. Pre-drilling may be re-         up to 180 feet, although spans between 120 and
        quired in areas where hard layers or strata    150 feet are more common. Construction of the
        otherwise impenetrable to driven piles are     superstructure can begin once the two support-
        encountered above targeted depth.              ing piers have cured for about four weeks. Initial
   3. Splice additional pile lengths in instances      erection and final disassembly of the gantry would
        where pile capacities are not achieved         require additional working space.
        and further driving may be necessary to
        achieve design capacity.                       The segmental precast bridge method generally
   4. Conduct field-verification testing, includ-      proceeds as follows:
        ing restrike, to ensure minimum design           1. An overhead erection gantry is installed on
        pile capacity is being achieved.                      top of two completed piers and positioned
   5. Form, cast, and cure the pile cap.                      above what will become the guideway deck.
   6. Backfill over the foundation.                      2. Superstructure segments are delivered to
                                                              the job site and are erected into place by the
Piers                                                         gantry and temporarily held in place by the
The piers, or columns, may be precast or cast-in-             gantry until the span is fully assembled.
place on top of the foundations. The structure           3. Post-tensioning tendons are threaded
includes the column and pier table, to which the              through ducts that run the length of each
superstructure attaches. Work on the piers can                span.
begin once the foundation has cured, approxi-            4. The tendons are tensioned to tie together
mately one week after it is poured. The following             all segments within a given span.
process describes construction of piers:                 5. The truss is launched to span the next gap,
   1. Construct and support three sides of form               and the process is repeated.
       on top of completed foundation.
   2. Position reinforcement cage inside form.         For longer spans, another precast segmental
   3. Close remaining side of form.                    construction method—commonly referred to as
   4. Place concrete in form either pumped from        balanced cantilever construction—would most
       ports in the form or from the top.              likely be used (Figure E-4). This would be neces-
   5. Allow concrete to cure and remove form.          sary when spanning wide obstructions, such as
                                                       large intersections, freeways, or streams. Various
                                                       construction methods may be used for erecting

 E-4    Appendix E Construction Process
Erection Gantry




                                     Pier
                                                                                        Segment




               Superstructure                                                                          Segment




Figure E‑3  Segmental Precast Bridge Construction




June 2010                                           Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement   E-5
Figure E‑4  Balanced Cantilever Construction Stations




  E-6    Appendix E Construction Process
balanced cantilevers. Common methods include                Construction would be more complex in station
using a crane on either the ground or on the struc-         areas. The erection gantry would typically erect
ture being constructed, a beam and winch system             spans through the station area followed by con-
on the structure, or an overhead gantry. For any of         struction of the platforms, mezzanines, elevators,
those methods, the typical construction sequence            escalators, stairs, roofing, and architectural items.
would be as follows:                                        It is expected that stations would include a combi-
   1. A pier table is cast in place on top of the           nation of precast, cast-in-place, and structural steel
       pier column.                                         elements that would vary from station to station.
   2. Two segments are delivered to the job site
       and are erected on each side of the pier             Other Activities
       table.                                               Construction of park-and-ride lots would include
   3. Post-tensioning tendons are threaded                  grading and paving. The maintenance and
       through ducts that run between the two               storage facility would require grading, paving,
       segments that were erected and through               trackwork, and building construction. After
       the pier table.                                      completion of major construction activities,
   4. The tendons are tensioned to tie the seg-             landscaping, paving, sidewalk construction, and
       ments to the pier table.                             other activities would be completed to restore
   5. Two more segments are delivered to the site           areas disturbed during construction.
       and are erected similarly.
   6. The segments are erected in pairs, as
       described above, until the cantilevers are
       complete.
   7. A mid-span closure point is cast in place
       between this cantilever and an adjacent
       cantilever to complete the span.
   8. Continuity post-tensioning tendons are
       placed and tensioned across the mid-
       span closure joint to tie both cantilevers
       together.
   9. The equipment is moved to the next loca-
       tion, and the process is repeated.

After the superstructure is completed, the remain-
ing work would include items such as installation
of concrete plinths and steel rails, systemwide
conduits and pull boxes, drainage scuppers and
downspouts, handrails, noise barriers, and any
other superstructure accessories. Then, under
separate follow-on system(s) contracts, power,
communication, and train-control cables and
equipment are installed. Follow-on activities can
be undertaken with little impact on the surround-
ing area relative to the civil work of foundations,
columns, and guideway.

June 2010                                 Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement   E-7

Más contenido relacionado

La actualidad más candente

Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanShoaib Madridista
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsNagma Modi
 
Foundation Types
Foundation TypesFoundation Types
Foundation TypesAjit Sabnis
 
Embankment dam by sitaram saini
Embankment dam by sitaram sainiEmbankment dam by sitaram saini
Embankment dam by sitaram sainiSitaramSaini11
 
Coffer dams 01
Coffer dams 01Coffer dams 01
Coffer dams 01juwes
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSShivananda Roy
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plantSagnik Datta
 
Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisationselvem
 
Cofferdam 02
Cofferdam 02Cofferdam 02
Cofferdam 02juwes
 
Pile foundation
Pile foundation Pile foundation
Pile foundation Abid Khan
 
The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )Kamel Elsayed
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringSahl Buhary
 
Construction dewatering
Construction dewateringConstruction dewatering
Construction dewateringShubham Parab
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cutsGimmick
 
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...Michal Krzeminski
 

La actualidad más candente (20)

Lesson4
Lesson4Lesson4
Lesson4
 
Design of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistanDesign of diversion dam in tarbela dam pakistan
Design of diversion dam in tarbela dam pakistan
 
Pile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipmentsPile Foundation for advanced construction equipments
Pile Foundation for advanced construction equipments
 
Foundation Types
Foundation TypesFoundation Types
Foundation Types
 
Embankment dam by sitaram saini
Embankment dam by sitaram sainiEmbankment dam by sitaram saini
Embankment dam by sitaram saini
 
Coffer dams 01
Coffer dams 01Coffer dams 01
Coffer dams 01
 
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONSPILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
PILE FOUNDATION and METHODS OF INSTALLING PILE FOUNDATIONS
 
Dam safety
Dam safetyDam safety
Dam safety
 
PILE-CAP & Batching plant
PILE-CAP & Batching plantPILE-CAP & Batching plant
PILE-CAP & Batching plant
 
Innovative Slope Stabilisation
Innovative Slope StabilisationInnovative Slope Stabilisation
Innovative Slope Stabilisation
 
Cofferdam 02
Cofferdam 02Cofferdam 02
Cofferdam 02
 
Pile foundation
Pile foundation Pile foundation
Pile foundation
 
The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )The Road to Saqqara ( Jack-up units and Move )
The Road to Saqqara ( Jack-up units and Move )
 
Unit 37: Advanced Civil Engineering
Unit 37: Advanced Civil EngineeringUnit 37: Advanced Civil Engineering
Unit 37: Advanced Civil Engineering
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
Construction dewatering
Construction dewateringConstruction dewatering
Construction dewatering
 
John Hart TAC Paper
John Hart TAC PaperJohn Hart TAC Paper
John Hart TAC Paper
 
Unit iii braced_cuts
Unit iii braced_cutsUnit iii braced_cuts
Unit iii braced_cuts
 
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
(2010) - Yates M, Krzeminski M, Berthier D, Hamidi B - The Application of Jet...
 
Unit 3
Unit 3Unit 3
Unit 3
 

Destacado (6)

Appendix i
Appendix iAppendix i
Appendix i
 
Final EIS Appendix B
Final EIS Appendix BFinal EIS Appendix B
Final EIS Appendix B
 
Final EIS Appendix F
Final EIS Appendix FFinal EIS Appendix F
Final EIS Appendix F
 
Citizenship entry
Citizenship entryCitizenship entry
Citizenship entry
 
Oahu Census Tracts
Oahu Census TractsOahu Census Tracts
Oahu Census Tracts
 
Acluhidoj complaint prisonovercrowding
Acluhidoj complaint prisonovercrowdingAcluhidoj complaint prisonovercrowding
Acluhidoj complaint prisonovercrowding
 

Similar a Final EIS Appendix E

Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakambaJohn Chakamba
 
Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !Ricko Guerrero
 
Foundation 2
Foundation 2Foundation 2
Foundation 2cfdcfd2
 
Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !Ricko Guerrero
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)varun km
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniquesShrideviAnil
 
Pile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatraPile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatraSUNIL KUMAR MOHAPATRA
 
bulding foundation for costruction (6).ppt
bulding foundation for costruction (6).pptbulding foundation for costruction (6).ppt
bulding foundation for costruction (6).pptAbdulwalimusemohamed
 
Types Of Foundation
Types Of FoundationTypes Of Foundation
Types Of Foundationstooty s
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptbryankalindo888
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)Daphne Tan
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_aryaAbdul Khader Shahadaf TH
 

Similar a Final EIS Appendix E (20)

Underpinning presentation chakamba
Underpinning presentation  chakambaUnderpinning presentation  chakamba
Underpinning presentation chakamba
 
Foundation & Footings
Foundation & FootingsFoundation & Footings
Foundation & Footings
 
Dam engineering i 5
Dam engineering i 5Dam engineering i 5
Dam engineering i 5
 
Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !Types of foundation...Sana Po May Matutunan tayo !
Types of foundation...Sana Po May Matutunan tayo !
 
Foundation 2
Foundation 2Foundation 2
Foundation 2
 
UNderpinning.pptx.pdf
UNderpinning.pptx.pdfUNderpinning.pptx.pdf
UNderpinning.pptx.pdf
 
Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !Types of Foundation..Sana may matutunan po tayo !
Types of Foundation..Sana may matutunan po tayo !
 
accelerated bridge construction(ABC)
accelerated bridge construction(ABC)accelerated bridge construction(ABC)
accelerated bridge construction(ABC)
 
special foundation techniques
 special foundation techniques special foundation techniques
special foundation techniques
 
Pile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatraPile foundation -sunil kumar mohapatra
Pile foundation -sunil kumar mohapatra
 
bulding foundation for costruction (6).ppt
bulding foundation for costruction (6).pptbulding foundation for costruction (6).ppt
bulding foundation for costruction (6).ppt
 
Underpinning
UnderpinningUnderpinning
Underpinning
 
Types Of Foundation
Types Of FoundationTypes Of Foundation
Types Of Foundation
 
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.pptCHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
CHAPTER 5 DEEP FOUNDATION (2)7788788.ppt
 
Pile foundtion
Pile foundtionPile foundtion
Pile foundtion
 
Cofferdam
CofferdamCofferdam
Cofferdam
 
Tutorial 2 (1)
Tutorial 2 (1)Tutorial 2 (1)
Tutorial 2 (1)
 
Pile foundation
Pile foundationPile foundation
Pile foundation
 
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
12 fundamentals for_seismic_design_of_rcc_buildings_by_prof_arya
 
Types of foundations.
Types of foundations.Types of foundations.
Types of foundations.
 

Más de Honolulu Civil Beat

Gov. David Ige response to U.S. Rep. Anna Eshoo
Gov. David Ige response to U.S. Rep. Anna EshooGov. David Ige response to U.S. Rep. Anna Eshoo
Gov. David Ige response to U.S. Rep. Anna EshooHonolulu Civil Beat
 
Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...
Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...
Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...Honolulu Civil Beat
 
Audit of the Honolulu Police Department’s Policies, Procedures, and Controls
Audit of the Honolulu Police Department’s Policies, Procedures, and ControlsAudit of the Honolulu Police Department’s Policies, Procedures, and Controls
Audit of the Honolulu Police Department’s Policies, Procedures, and ControlsHonolulu Civil Beat
 
2019 Use of Force Annual Report HPD
2019 Use of Force Annual Report HPD 2019 Use of Force Annual Report HPD
2019 Use of Force Annual Report HPD Honolulu Civil Beat
 
Office of Health Equity Goals Draft 10
Office of Health Equity Goals Draft 10Office of Health Equity Goals Draft 10
Office of Health Equity Goals Draft 10Honolulu Civil Beat
 
ACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profilingACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profilingHonolulu Civil Beat
 
ACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profilingACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profilingHonolulu Civil Beat
 
Guam Governor's Letter to Pence
Guam Governor's Letter to Pence Guam Governor's Letter to Pence
Guam Governor's Letter to Pence Honolulu Civil Beat
 
List Of Pro Bono Legal Service Providers
List Of Pro Bono Legal Service ProvidersList Of Pro Bono Legal Service Providers
List Of Pro Bono Legal Service ProvidersHonolulu Civil Beat
 
Arbitration Hearing Transcript December 2018
Arbitration Hearing Transcript December 2018Arbitration Hearing Transcript December 2018
Arbitration Hearing Transcript December 2018Honolulu Civil Beat
 

Más de Honolulu Civil Beat (20)

Gov. David Ige response to U.S. Rep. Anna Eshoo
Gov. David Ige response to U.S. Rep. Anna EshooGov. David Ige response to U.S. Rep. Anna Eshoo
Gov. David Ige response to U.S. Rep. Anna Eshoo
 
Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...
Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...
Audit of the Department of the Honolulu Prosecuting Attorney’s Policies, Proc...
 
Audit of the Honolulu Police Department’s Policies, Procedures, and Controls
Audit of the Honolulu Police Department’s Policies, Procedures, and ControlsAudit of the Honolulu Police Department’s Policies, Procedures, and Controls
Audit of the Honolulu Police Department’s Policies, Procedures, and Controls
 
2019 Use of Force Annual Report HPD
2019 Use of Force Annual Report HPD 2019 Use of Force Annual Report HPD
2019 Use of Force Annual Report HPD
 
Office of Health Equity Goals Draft 10
Office of Health Equity Goals Draft 10Office of Health Equity Goals Draft 10
Office of Health Equity Goals Draft 10
 
NHPI COVID-19 Statement
NHPI COVID-19 StatementNHPI COVID-19 Statement
NHPI COVID-19 Statement
 
DLIR Response Language Access
DLIR Response Language AccessDLIR Response Language Access
DLIR Response Language Access
 
Language Access Letter To DLIR
Language Access Letter To DLIRLanguage Access Letter To DLIR
Language Access Letter To DLIR
 
ACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profilingACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profiling
 
ACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profilingACLU Letter to HPD regarding racial profiling
ACLU Letter to HPD regarding racial profiling
 
Jane Doe v. Rehab Hospital
Jane Doe v. Rehab HospitalJane Doe v. Rehab Hospital
Jane Doe v. Rehab Hospital
 
Coronavirus HPHA
Coronavirus HPHA Coronavirus HPHA
Coronavirus HPHA
 
OHA Data Request
OHA Data RequestOHA Data Request
OHA Data Request
 
Letter from Palau to Guam
Letter from Palau to GuamLetter from Palau to Guam
Letter from Palau to Guam
 
Guam Governor's Letter to Pence
Guam Governor's Letter to Pence Guam Governor's Letter to Pence
Guam Governor's Letter to Pence
 
OHA Analysis by Akina
OHA Analysis by AkinaOHA Analysis by Akina
OHA Analysis by Akina
 
Case COFA Letter
Case COFA LetterCase COFA Letter
Case COFA Letter
 
List Of Pro Bono Legal Service Providers
List Of Pro Bono Legal Service ProvidersList Of Pro Bono Legal Service Providers
List Of Pro Bono Legal Service Providers
 
Arbitration Hearing Transcript December 2018
Arbitration Hearing Transcript December 2018Arbitration Hearing Transcript December 2018
Arbitration Hearing Transcript December 2018
 
Caldwell Press Release
Caldwell Press ReleaseCaldwell Press Release
Caldwell Press Release
 

Último

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFChandresh Chudasama
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCRashishs7044
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCRashishs7044
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Seta Wicaksana
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03DallasHaselhorst
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Servicecallgirls2057
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxsaniyaimamuddin
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdfKhaled Al Awadi
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCRashishs7044
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCRashishs7044
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessSeta Wicaksana
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menzaictsugar
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxmbikashkanyari
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckHajeJanKamps
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfRbc Rbcua
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditNhtLNguyn9
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Doge Mining Website
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaoncallgirls2057
 

Último (20)

Guide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDFGuide Complete Set of Residential Architectural Drawings PDF
Guide Complete Set of Residential Architectural Drawings PDF
 
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
8447779800, Low rate Call girls in Shivaji Enclave Delhi NCR
 
8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR8447779800, Low rate Call girls in Rohini Delhi NCR
8447779800, Low rate Call girls in Rohini Delhi NCR
 
Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...Ten Organizational Design Models to align structure and operations to busines...
Ten Organizational Design Models to align structure and operations to busines...
 
Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03Cybersecurity Awareness Training Presentation v2024.03
Cybersecurity Awareness Training Presentation v2024.03
 
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort ServiceCall US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
Call US-88OO1O2216 Call Girls In Mahipalpur Female Escort Service
 
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptxFinancial-Statement-Analysis-of-Coca-cola-Company.pptx
Financial-Statement-Analysis-of-Coca-cola-Company.pptx
 
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdfNewBase  19 April  2024  Energy News issue - 1717 by Khaled Al Awadi.pdf
NewBase 19 April 2024 Energy News issue - 1717 by Khaled Al Awadi.pdf
 
8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR8447779800, Low rate Call girls in Saket Delhi NCR
8447779800, Low rate Call girls in Saket Delhi NCR
 
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
8447779800, Low rate Call girls in New Ashok Nagar Delhi NCR
 
Organizational Structure Running A Successful Business
Organizational Structure Running A Successful BusinessOrganizational Structure Running A Successful Business
Organizational Structure Running A Successful Business
 
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu MenzaYouth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
Youth Involvement in an Innovative Coconut Value Chain by Mwalimu Menza
 
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptxThe-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
The-Ethical-issues-ghhhhhhhhjof-Byjus.pptx
 
Call Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North GoaCall Us ➥9319373153▻Call Girls In North Goa
Call Us ➥9319373153▻Call Girls In North Goa
 
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deckPitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
Pitch Deck Teardown: Geodesic.Life's $500k Pre-seed deck
 
APRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdfAPRIL2024_UKRAINE_xml_0000000000000 .pdf
APRIL2024_UKRAINE_xml_0000000000000 .pdf
 
Chapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal auditChapter 9 PPT 4th edition.pdf internal audit
Chapter 9 PPT 4th edition.pdf internal audit
 
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
Unlocking the Future: Explore Web 3.0 Workshop to Start Earning Today!
 
Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)Japan IT Week 2024 Brochure by 47Billion (English)
Japan IT Week 2024 Brochure by 47Billion (English)
 
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City GurgaonCall Us 📲8800102216📞 Call Girls In DLF City Gurgaon
Call Us 📲8800102216📞 Call Girls In DLF City Gurgaon
 

Final EIS Appendix E

  • 1. Appendix E—Construction Approach This appendix describes the general construction space for construction equipment, construction process and methods likely to be used in the materials, materials stockpiling and transfer, construction of the Project. The exact design, parking, and other construction-related activities. process, method of construction and timeline While future park-and-ride lots and the mainte- would continue to be refined through the start of nance and storage facility have been identified as construction. Temporary effects of construction to potential staging areas, additional locations would the transportation system and the environment are be needed. Additional areas will be identified by discussed in Chapters 3 and 4 of the Draft EIS. the contractor and obtained by the City. The fixed guideway and stations would largely be Support facilities, such as traction power substa- aerial structures throughout the system. Prior to tions, a maintenance and storage facility, and beginning construction on the facility, existing park-and-ride lots, would be at-grade unless the utilities that conflict with the Project’s construction technology selected or local site conditions demand would be relocated. The four main components of otherwise. The locations of these facilities are the fixed guideway system include foundations, piers shown in Chapter 2 of the Draft EIS. (support columns), superstructure (the elevated guideway structure), and stations. Typical pier spac- Many utilities are located below and above ground ing would be 150 feet, with shorter or longer spans along the fixed guideway alignment. Prior to major used where needed. The guideway width would construction in an area, utility relocations would generally be between 28 and 32 feet, with wider be needed. In some cases, a utility may be moved areas to accommodate track cross-overs, switches, temporarily to allow for construction and then and center-platform stations. returned to its original location. In other cases, the utility would be permanently moved to allow Construction staging areas would be needed for construction. Where conflicts between aboveg- throughout the project area to provide adequate round utilities and the guideway would occur, June 2010 Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement E-1
  • 2. the existing aboveground utilities may either be conditions and would likely range between 50 and relocated aboveground or be placed underground. 150 feet below the ground surface. Generally, a drilled shaft foundation can be completed in one week. The procedure for constructing drilled shafts The construction industry uses a variety of specialized is as follows: terminology. The following terms are used in the 1. Drill hole of prescribed size to the design description of the construction process: depth. • “Tremie” is a method to place concrete 2. Stabilize unstable ground conditions by underwater using a submerged pipe from the suitable means to achieve design comple- bottom to the top of a hole to ensure minimal tion depth. contamination with water. 3. Use slurry or water for drilled shafts com- • “Slurry” is a wet cementitious mix (bentonite pleted below the prevailing groundwater or polymer) that is placed in an excavation to level to counterbalance the adverse effect of support the excavation until concrete is placed. an inward seepage gradient. • “Battered piles” are piles that are driven at 4. Clean bottom of drilled shaft thoroughly an angle to improve horizontal resistance, and, where water or slurry is used, clean resulting in a stronger foundation. out the medium to verify that there is no • A “pile cap” is a concrete foundation linking the excess detritus in suspension that could tops of piles and bottom of a pier column. compromise the quality of the placed • A “gantry” is an overhead trestle structure concrete. supported at both ends and includes a hoist to 5. Install a rebar cage in the completed shaft. lift and place materials. 6. Fill the shaft with concrete from the • “Falsework” is a temporary structure that sup‑ bottom up by the tremied placing method ports an elevated structure during construction. using strict tolerances on means and methods. The tremied concrete displaces the drilling fluid (slurry or water) upward and scours any Foundations raveling materials upward. Foundations for the various system components 7. Treat and manage drilling slurry, if used, in would be dictated by structural demands and accordance with local requirements. Slurry existing subsurface conditions. Two foundation would be recycled through a de-sander construction methods would be used to support and reused. Water would be collected and the aerial guideway structure: drilled shafts, which treated as needed prior to disposal or reuse. would be integral with columns; and driven piles, which would require pile caps for connection to In cases where lateral loads are too large for drilled columns. Test holes will be bored at anticipated shafts or where geotechnical or other site condi- foundation locations to determine soil conditions. tions prohibit their use, foundations would consist of multiple drilled or driven piles with pile caps Drilled shafts (Figure E-1) would be used for the (Figure E-2). Piles around the perimeter of the majority of the alignment because they can be foundation may be battered to improve the founda- installed faster; a smaller area of soil is disturbed; tion’s lateral load-bearing capacity. A drilled-pile and it is quieter than driving piles. The drilled foundation would include multiple small drilled shafts generally would be 6 to 10 feet in diameter. shafts, each constructed as described above and The depth of the shaft depends on local soil connected with a pile cap as described for the E-2 Appendix E Construction Process
  • 3. Competent Soil Competent Soil Competent Soil Competent Soil etent Drill the shaft to the Clean out accumulated Positioning the Concrete placed designed depth water and loose material reinforcement cage Figure E‑1  Drilled Shaft Foundatioin Construction Competent Soil Competent Soil Competent Soil Competent Soil Excavate for Pile Cap Drive First Pile Drive Additional Piles Cast Pile Cap Figure E‑2  Driven-pile Foundation Construction Piers June 2010 Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement E-3
  • 4. driven-pile foundation. Piles may be driven by Superstructure striking the pile with a heavy weight, vibrating the Because of the repetitive nature of the spans and pile, or jacking the pile into the ground. the desire to minimize impacts on surrounding areas, the majority of the guideway structure The following process describes construction of would consist of precast, span-by-span segments, driven-pile foundations: most likely erected using an overhead erection 1. Excavate to accommodate the pile cap. It gantry (Figure E-3). The falsework required for may be necessary to support the excavation cast-in-place concrete structures would close with sheet piling in high congestion areas the area below the guideway for the duration of to limit the construction area. Addition- the superstructure construction, and full-length ally, dewatering would be required where precast girders are limited in the span lengths that ground water is at levels above the base of can be achieved. Span-by-span segmental bridges the pile caps. for transit have been constructed with spans of 2. Drive each pile. Pre-drilling may be re- up to 180 feet, although spans between 120 and quired in areas where hard layers or strata 150 feet are more common. Construction of the otherwise impenetrable to driven piles are superstructure can begin once the two support- encountered above targeted depth. ing piers have cured for about four weeks. Initial 3. Splice additional pile lengths in instances erection and final disassembly of the gantry would where pile capacities are not achieved require additional working space. and further driving may be necessary to achieve design capacity. The segmental precast bridge method generally 4. Conduct field-verification testing, includ- proceeds as follows: ing restrike, to ensure minimum design 1. An overhead erection gantry is installed on pile capacity is being achieved. top of two completed piers and positioned 5. Form, cast, and cure the pile cap. above what will become the guideway deck. 6. Backfill over the foundation. 2. Superstructure segments are delivered to the job site and are erected into place by the Piers gantry and temporarily held in place by the The piers, or columns, may be precast or cast-in- gantry until the span is fully assembled. place on top of the foundations. The structure 3. Post-tensioning tendons are threaded includes the column and pier table, to which the through ducts that run the length of each superstructure attaches. Work on the piers can span. begin once the foundation has cured, approxi- 4. The tendons are tensioned to tie together mately one week after it is poured. The following all segments within a given span. process describes construction of piers: 5. The truss is launched to span the next gap, 1. Construct and support three sides of form and the process is repeated. on top of completed foundation. 2. Position reinforcement cage inside form. For longer spans, another precast segmental 3. Close remaining side of form. construction method—commonly referred to as 4. Place concrete in form either pumped from balanced cantilever construction—would most ports in the form or from the top. likely be used (Figure E-4). This would be neces- 5. Allow concrete to cure and remove form. sary when spanning wide obstructions, such as large intersections, freeways, or streams. Various construction methods may be used for erecting E-4 Appendix E Construction Process
  • 5. Erection Gantry Pier Segment Superstructure Segment Figure E‑3  Segmental Precast Bridge Construction June 2010 Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement E-5
  • 7. balanced cantilevers. Common methods include Construction would be more complex in station using a crane on either the ground or on the struc- areas. The erection gantry would typically erect ture being constructed, a beam and winch system spans through the station area followed by con- on the structure, or an overhead gantry. For any of struction of the platforms, mezzanines, elevators, those methods, the typical construction sequence escalators, stairs, roofing, and architectural items. would be as follows: It is expected that stations would include a combi- 1. A pier table is cast in place on top of the nation of precast, cast-in-place, and structural steel pier column. elements that would vary from station to station. 2. Two segments are delivered to the job site and are erected on each side of the pier Other Activities table. Construction of park-and-ride lots would include 3. Post-tensioning tendons are threaded grading and paving. The maintenance and through ducts that run between the two storage facility would require grading, paving, segments that were erected and through trackwork, and building construction. After the pier table. completion of major construction activities, 4. The tendons are tensioned to tie the seg- landscaping, paving, sidewalk construction, and ments to the pier table. other activities would be completed to restore 5. Two more segments are delivered to the site areas disturbed during construction. and are erected similarly. 6. The segments are erected in pairs, as described above, until the cantilevers are complete. 7. A mid-span closure point is cast in place between this cantilever and an adjacent cantilever to complete the span. 8. Continuity post-tensioning tendons are placed and tensioned across the mid- span closure joint to tie both cantilevers together. 9. The equipment is moved to the next loca- tion, and the process is repeated. After the superstructure is completed, the remain- ing work would include items such as installation of concrete plinths and steel rails, systemwide conduits and pull boxes, drainage scuppers and downspouts, handrails, noise barriers, and any other superstructure accessories. Then, under separate follow-on system(s) contracts, power, communication, and train-control cables and equipment are installed. Follow-on activities can be undertaken with little impact on the surround- ing area relative to the civil work of foundations, columns, and guideway. June 2010 Honolulu High-Capacity Transit Corridor Project Environmental Impact Statement E-7