SlideShare a Scribd company logo
1 of 23
Download to read offline
LEED® AP
Operations and Maintenance
WELCOME




          HEARST TOWER
          NEW YORK CITY
          GOLD CERTIFICATION
Copyright Information

Copyrighted Content
All content in this course is the copyrighted property of CleanEdison, LLC.
Unauthorized reproduction or distribution of this course is a violation of United States
and foreign laws and punishable by fines, imprisonment, or both.


LEED® and USGBC® trademarks
LEED® and USGBC® are registered trademarks of the U.S. Green Building
Council (USGBC). This course which is offered by Green Building Education
Services, LLC is not affiliated, endorsed or approved by USGBC. All other
trademarks mentioned in this course are the property of their respective owners.
Course Topics
Identify the technical requirements of the LEED Green Building
Rating System for Existing Buildings: Operations & Maintenance
Utilize the tools, information and lessons learned from examples to
incorporate green building practices into a project
Describe successful Operations & Maintenance strategies
Prepare for the GBCI's LEED AP credential for Operations and
Maintenance
LEED Green Building Categories


                                 1. Site Planning
                                 2. Water Management
                                 3. Energy Management
                                 4. Material Use
                                 5. Indoor
                                    Environmental
                                    Quality
                                 6. Innovation in
                                    Operations
LEED EB:OM Ratings
                     80+ Points     PLATINUM



                     60-79 Points    GOLD




                     50-59 Points    SILVER




                     40-49 Points   CERTIFIED
LEED Certification Process


 1     Meet Minimum Program Requirements

 2     Project Registration


 3     Technical Support


 4     Application

 5     Review and Certification
MINIMUM PROGRAM REQUIREMENTS

MPR Purpose
                         Purpose
Requirements                Give Clear guidance to customers
                            Protect LEED integrity
                            Reduce certification challenges

                         Requirements
                            Comply with environmental laws
                            Must be a complete, permanent building or space
                            Reasonable site boundary
                            Minimum floor area requirements
                            Minimum occupancy rates
                            Commit to sharing whole-building energy and water usage
                             data
                            Comply with a minimum building area to site ratio
REGISTRATION        TECHNICAL SUPPORT   REVIEW & CERTIFICATION

How to register

Registration fees

Select Project
Administrator

When to Register
REGISTRATION             TECHNICAL SUPPORT                      REVIEW & CERTIFICATION

Initial Certification

Recertification         Initial Certification
                           Never certified under LEED
                           Separate submittal documentation

                        Recertification
                           Certified under LEED rating system
                           Minimum 1 year
                           Maximum 5 years
REGISTRATION          TECHNICAL SUPPORT   REVIEW & CERTIFICATION


      Certification Fees
REGISTRATION   TECHNICAL SUPPORT   REVIEW & CERTIFICATION
REGISTRATION        TECHNICAL SUPPORT   REVIEW & CERTIFICATION

      Reference Guide
REGISTRATION          TECHNICAL SUPPORT      REVIEW & CERTIFICATION

      Credit Interpretation Rulings (CIRs)




           questions
               on
               credits
REGISTRATION                 TECHNICAL SUPPORT             REVIEW & CERTIFICATION

      CIR Process
        Consult the LEED Reference Guide
        Review previous CIRs
        Contact LEED customer service
        Submit a formal CIR (fee applies)
           Within two to five weeks, the GBCI Credit
            Ruling Committee posts its decision on the
            Credit Rulings Page.
           Credits/points are NOT awarded from the
            CIR process




      Projects must adhere to current CIRs in order to achieve certification
REGISTRATION            TECHNICAL SUPPORT            REVIEW & CERTIFICATION


      Preliminary LEED Review
        GBCI Ruling
        Credits marked as Anticipated / Pending / Denied
        Response
REGISTRATION              TECHNICAL SUPPORT   REVIEW & CERTIFICATION


      Final LEED Review
        GBCI Ruling
        Credits marked as Achieved/Denied
        Award




       APPEALS

       UPDATES & ERRATA
Performance PeriodResources –
          Team                          Reference Guide

    Initial Certification
       Continuous
       Minimum of 3 months
        • One prerequisite & one credit have 24 month requirements
       Maximum of 24 months
       End within the same week

    Recertification
       Period extends from last certification to new application
       Credits new to application have original performance period
        requirements
Team Resources – LEED
LEED Online Documentation Requirements         Online

    Required Data
       Credit templates show what data is needed per prerequisite
        and credit
           Documentation
           Photos
           Drawings

    Project Narrative
       Required
       Describes
           Organization
           Building
           Site
           Team
Multitenant Team Resources – LEED Online
            Buildings & Facility Alterations / Additions


     90% Floor Area Required
        Does not have to be under one owner
        Divide project floor space by gross floor space
        Commitment and cooperation by tenants

     Facility Alterations / Additions
        Maximum
             Alterations < 50%
             Additions cannot increase floor area > 50%
        Minimum
             Must involve more than 1 trade
             Additions must be > = 5% floor area
Policy ModelTeam   Resources – CIRs

    Policies required in EB:OM must meet model
       Scope
       Performance Metric
       Goals
       Procedures and Strategies
       Responsible Party
       Time Period
Prerequisites



Minimum Indoor Plumbing Fixture and Fitting Efficiency
Energy Efficiency Best Management Practices
Minimum Energy Efficiency Performance
Fundamental Refrigerant Management
Sustainable Purchasing Policy
Solid Waste Management Policy
Minimum Indoor Air Quality Performance
Environmental Tobacco Smoke Control
Green Cleaning Policy
Building                    LEED Exam Prep             Other Green
 Performance                 • Green Associate Test     • RESNET HERS Rater
 Institute                     Prep
                               P                        • Green 101
 Certifications              • Building Design and      • Lead Renovator
                               Construction Test Prep     Training
 •    Building Analyst
                             • Operations and           • Geothermal Installer
 •    Envelope and Shell       Maintenance Test Prep      and Driller
 •    Heating Specialist     • Interior Design and      • Solar PV Installer
 •    AC/ Heat Pump            Construction Test Prep   • Solar PV for Sales
 •              y
      Multifamily            • Homes Test Prep  p       • Solar Thermal Boot
 •    Manufactured Housing   • Continuing Ed              Camp
 •    Installer                                         • Hybrid Auto




245

More Related Content

What's hot

Horizon Restoration
Horizon RestorationHorizon Restoration
Horizon Restoration
guest4140c4c
 
Presentation Enviro Management 2012
Presentation Enviro Management 2012Presentation Enviro Management 2012
Presentation Enviro Management 2012
Cristian Agapie
 

What's hot (9)

Dcb 949
Dcb 949Dcb 949
Dcb 949
 
Commercial Building Disclosure Scheme Presentation
Commercial Building Disclosure Scheme PresentationCommercial Building Disclosure Scheme Presentation
Commercial Building Disclosure Scheme Presentation
 
2011 Aei Soq
2011 Aei Soq2011 Aei Soq
2011 Aei Soq
 
Bldg 6561 Feasibility Study Presentation Group#8
Bldg 6561   Feasibility Study Presentation   Group#8Bldg 6561   Feasibility Study Presentation   Group#8
Bldg 6561 Feasibility Study Presentation Group#8
 
Horizon Restoration
Horizon RestorationHorizon Restoration
Horizon Restoration
 
Smart Construction by Leopardo
Smart Construction by LeopardoSmart Construction by Leopardo
Smart Construction by Leopardo
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
Presentation Enviro Management 2012
Presentation Enviro Management 2012Presentation Enviro Management 2012
Presentation Enviro Management 2012
 
LEED Design for Buildings and Communities with an Emphasis on Energy Conserva...
LEED Design for Buildings and Communities with an Emphasis on Energy Conserva...LEED Design for Buildings and Communities with an Emphasis on Energy Conserva...
LEED Design for Buildings and Communities with an Emphasis on Energy Conserva...
 

Viewers also liked (12)

Igbc green eb o&amp;m rating system (pilot version)
Igbc green eb o&amp;m rating system (pilot version)Igbc green eb o&amp;m rating system (pilot version)
Igbc green eb o&amp;m rating system (pilot version)
 
LEED Existing Buildings Process And Issues Burnet D Brown 1 31 2009
LEED Existing Buildings Process And Issues   Burnet D Brown 1 31 2009LEED Existing Buildings Process And Issues   Burnet D Brown 1 31 2009
LEED Existing Buildings Process And Issues Burnet D Brown 1 31 2009
 
CARBON FOOTPRINT
CARBON FOOTPRINTCARBON FOOTPRINT
CARBON FOOTPRINT
 
LEED-EB Presentation
LEED-EB PresentationLEED-EB Presentation
LEED-EB Presentation
 
Leed
Leed Leed
Leed
 
An Introduction to the LEED Rating Systems
An Introduction to the LEED Rating SystemsAn Introduction to the LEED Rating Systems
An Introduction to the LEED Rating Systems
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
Energy efficiency in buildings
Energy efficiency in buildingsEnergy efficiency in buildings
Energy efficiency in buildings
 
GREEN BUILDINGS
GREEN BUILDINGSGREEN BUILDINGS
GREEN BUILDINGS
 
LEED green buildings
LEED green buildingsLEED green buildings
LEED green buildings
 
Green Technology
Green TechnologyGreen Technology
Green Technology
 
Ppt green
Ppt greenPpt green
Ppt green
 

Similar to CleanEdison LEED EBOM Overview

July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13
GreenHomeNYC
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leed
GreenHomeNYC
 
The Cotocon Group LEED EBOM Program
The Cotocon Group LEED EBOM ProgramThe Cotocon Group LEED EBOM Program
The Cotocon Group LEED EBOM Program
Jimmy Carchietta
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc
Amber Joan Wood
 
LEED_Certification_Arguuyuhchit_Arham.pdf
LEED_Certification_Arguuyuhchit_Arham.pdfLEED_Certification_Arguuyuhchit_Arham.pdf
LEED_Certification_Arguuyuhchit_Arham.pdf
VatsalyaSingh5YearBA
 

Similar to CleanEdison LEED EBOM Overview (20)

LEED Green Associate Study Session #1
LEED Green Associate Study Session #1LEED Green Associate Study Session #1
LEED Green Associate Study Session #1
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
 
BLUG LEED Version 3 Changes Presentation
BLUG LEED Version 3 Changes PresentationBLUG LEED Version 3 Changes Presentation
BLUG LEED Version 3 Changes Presentation
 
CleanEdison LEED BD&C: How to Interpret the Reference Guide
CleanEdison LEED BD&C: How to Interpret the Reference GuideCleanEdison LEED BD&C: How to Interpret the Reference Guide
CleanEdison LEED BD&C: How to Interpret the Reference Guide
 
July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13July2013 ghnyc -alternatives to leed-7-17-13
July2013 ghnyc -alternatives to leed-7-17-13
 
July2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leedJuly2013 ghnyc -alternatives to leed
July2013 ghnyc -alternatives to leed
 
LEED 2009 Rating System and Credentials Overview
LEED 2009 Rating System and Credentials OverviewLEED 2009 Rating System and Credentials Overview
LEED 2009 Rating System and Credentials Overview
 
The business case for leed certification
The business case for leed certificationThe business case for leed certification
The business case for leed certification
 
The Cotocon Group LEED EBOM Program
The Cotocon Group LEED EBOM ProgramThe Cotocon Group LEED EBOM Program
The Cotocon Group LEED EBOM Program
 
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGHESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
ESC PRESENTATION PPT (2).ppt VDRHFTGHJMXGH
 
Dispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building CertificationDispelling Myths and Making Cents of Multifamily Green Building Certification
Dispelling Myths and Making Cents of Multifamily Green Building Certification
 
Fci Green Advantage Presentation 6 10
Fci Green Advantage Presentation 6 10Fci Green Advantage Presentation 6 10
Fci Green Advantage Presentation 6 10
 
Ga 08 07 02 Leed For Manufacturers
Ga 08 07 02 Leed For ManufacturersGa 08 07 02 Leed For Manufacturers
Ga 08 07 02 Leed For Manufacturers
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc
 
Build green services presentation
Build green services presentationBuild green services presentation
Build green services presentation
 
LEED_Certification_Arguuyuhchit_Arham.pdf
LEED_Certification_Arguuyuhchit_Arham.pdfLEED_Certification_Arguuyuhchit_Arham.pdf
LEED_Certification_Arguuyuhchit_Arham.pdf
 
Explore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market TodayExplore the Value of LEED Green Building in the Market Today
Explore the Value of LEED Green Building in the Market Today
 
LEED Green Factory
LEED Green FactoryLEED Green Factory
LEED Green Factory
 
Opitz writing sample_technical
Opitz writing sample_technicalOpitz writing sample_technical
Opitz writing sample_technical
 
GBCI presents EDGE in Latin America - Auditor EDGE
GBCI presents EDGE in Latin America - Auditor EDGEGBCI presents EDGE in Latin America - Auditor EDGE
GBCI presents EDGE in Latin America - Auditor EDGE
 

Recently uploaded

+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
?#DUbAI#??##{{(☎️+971_581248768%)**%*]'#abortion pills for sale in dubai@
 

Recently uploaded (20)

Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...Apidays New York 2024 - The value of a flexible API Management solution for O...
Apidays New York 2024 - The value of a flexible API Management solution for O...
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)Powerful Google developer tools for immediate impact! (2023-24 C)
Powerful Google developer tools for immediate impact! (2023-24 C)
 
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
Apidays New York 2024 - The Good, the Bad and the Governed by David O'Neill, ...
 
AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, AdobeApidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
Apidays New York 2024 - Scaling API-first by Ian Reasor and Radu Cotescu, Adobe
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
How to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected WorkerHow to Troubleshoot Apps for the Modern Connected Worker
How to Troubleshoot Apps for the Modern Connected Worker
 
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ..."I see eyes in my soup": How Delivery Hero implemented the safety system for ...
"I see eyes in my soup": How Delivery Hero implemented the safety system for ...
 
Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024Manulife - Insurer Transformation Award 2024
Manulife - Insurer Transformation Award 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024Axa Assurance Maroc - Insurer Innovation Award 2024
Axa Assurance Maroc - Insurer Innovation Award 2024
 
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
+971581248768>> SAFE AND ORIGINAL ABORTION PILLS FOR SALE IN DUBAI AND ABUDHA...
 
Boost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdfBoost Fertility New Invention Ups Success Rates.pdf
Boost Fertility New Invention Ups Success Rates.pdf
 
A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?A Year of the Servo Reboot: Where Are We Now?
A Year of the Servo Reboot: Where Are We Now?
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 

CleanEdison LEED EBOM Overview

  • 2. WELCOME HEARST TOWER NEW YORK CITY GOLD CERTIFICATION
  • 3. Copyright Information Copyrighted Content All content in this course is the copyrighted property of CleanEdison, LLC. Unauthorized reproduction or distribution of this course is a violation of United States and foreign laws and punishable by fines, imprisonment, or both. LEED® and USGBC® trademarks LEED® and USGBC® are registered trademarks of the U.S. Green Building Council (USGBC). This course which is offered by Green Building Education Services, LLC is not affiliated, endorsed or approved by USGBC. All other trademarks mentioned in this course are the property of their respective owners.
  • 4. Course Topics Identify the technical requirements of the LEED Green Building Rating System for Existing Buildings: Operations & Maintenance Utilize the tools, information and lessons learned from examples to incorporate green building practices into a project Describe successful Operations & Maintenance strategies Prepare for the GBCI's LEED AP credential for Operations and Maintenance
  • 5. LEED Green Building Categories 1. Site Planning 2. Water Management 3. Energy Management 4. Material Use 5. Indoor Environmental Quality 6. Innovation in Operations
  • 6. LEED EB:OM Ratings 80+ Points PLATINUM 60-79 Points GOLD 50-59 Points SILVER 40-49 Points CERTIFIED
  • 7. LEED Certification Process 1 Meet Minimum Program Requirements 2 Project Registration 3 Technical Support 4 Application 5 Review and Certification
  • 8. MINIMUM PROGRAM REQUIREMENTS MPR Purpose Purpose Requirements  Give Clear guidance to customers  Protect LEED integrity  Reduce certification challenges Requirements  Comply with environmental laws  Must be a complete, permanent building or space  Reasonable site boundary  Minimum floor area requirements  Minimum occupancy rates  Commit to sharing whole-building energy and water usage data  Comply with a minimum building area to site ratio
  • 9. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION How to register Registration fees Select Project Administrator When to Register
  • 10. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION Initial Certification Recertification Initial Certification  Never certified under LEED  Separate submittal documentation Recertification  Certified under LEED rating system  Minimum 1 year  Maximum 5 years
  • 11. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION Certification Fees
  • 12. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION
  • 13. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION Reference Guide
  • 14. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION Credit Interpretation Rulings (CIRs) questions on credits
  • 15. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION CIR Process Consult the LEED Reference Guide Review previous CIRs Contact LEED customer service Submit a formal CIR (fee applies)  Within two to five weeks, the GBCI Credit Ruling Committee posts its decision on the Credit Rulings Page.  Credits/points are NOT awarded from the CIR process Projects must adhere to current CIRs in order to achieve certification
  • 16. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION Preliminary LEED Review GBCI Ruling Credits marked as Anticipated / Pending / Denied Response
  • 17. REGISTRATION TECHNICAL SUPPORT REVIEW & CERTIFICATION Final LEED Review GBCI Ruling Credits marked as Achieved/Denied Award APPEALS UPDATES & ERRATA
  • 18. Performance PeriodResources – Team Reference Guide Initial Certification  Continuous  Minimum of 3 months • One prerequisite & one credit have 24 month requirements  Maximum of 24 months  End within the same week Recertification  Period extends from last certification to new application  Credits new to application have original performance period requirements
  • 19. Team Resources – LEED LEED Online Documentation Requirements Online Required Data  Credit templates show what data is needed per prerequisite and credit  Documentation  Photos  Drawings Project Narrative  Required  Describes  Organization  Building  Site  Team
  • 20. Multitenant Team Resources – LEED Online Buildings & Facility Alterations / Additions 90% Floor Area Required  Does not have to be under one owner  Divide project floor space by gross floor space  Commitment and cooperation by tenants Facility Alterations / Additions  Maximum  Alterations < 50%  Additions cannot increase floor area > 50%  Minimum  Must involve more than 1 trade  Additions must be > = 5% floor area
  • 21. Policy ModelTeam Resources – CIRs Policies required in EB:OM must meet model  Scope  Performance Metric  Goals  Procedures and Strategies  Responsible Party  Time Period
  • 22. Prerequisites Minimum Indoor Plumbing Fixture and Fitting Efficiency Energy Efficiency Best Management Practices Minimum Energy Efficiency Performance Fundamental Refrigerant Management Sustainable Purchasing Policy Solid Waste Management Policy Minimum Indoor Air Quality Performance Environmental Tobacco Smoke Control Green Cleaning Policy
  • 23. Building LEED Exam Prep Other Green Performance • Green Associate Test • RESNET HERS Rater Institute Prep P • Green 101 Certifications • Building Design and • Lead Renovator Construction Test Prep Training • Building Analyst • Operations and • Geothermal Installer • Envelope and Shell Maintenance Test Prep and Driller • Heating Specialist • Interior Design and • Solar PV Installer • AC/ Heat Pump Construction Test Prep • Solar PV for Sales • y Multifamily • Homes Test Prep p • Solar Thermal Boot • Manufactured Housing • Continuing Ed Camp • Installer • Hybrid Auto 245