// Acumen 360: Scenario Builder
Intelligent Decision Support through ‘What If...’ Analysis
Building on the analytics engine in Fuse, Acumen 360 is the fastest, easiest means of project acceleration
and decision support. As both a planning and execution tool, 360 can be used to align plans with target
dates and project stakeholder expectations, or to get a delayed project back on track. Acumen 360:
helps you achieve faster, cheaper more aligned schedules;
allows you to define the acceleration criteria to ensure the scenario is doable, and;
gives you scenario options from any point in the project, whether it is up front during the
planning phase, or for recovery after delays.
Unlike traditional “network crash” techniques, Acumen 360 provides pinpointed focus and
intelligent optimization. It selects the most efficient means of achieving acceleration goals.
Acumen 360 puts you in control of your schedule
Only you know where acceleration is physically possible. Acumen 360 captures this insight through
criteria, defined by you, directing where to focus acceleration efforts.
A single window through which you can accelerate your schedule intelligently, quickly and repeatedly.
Two-way integration capability
1 – Import project schedule data directly from your scheduling tool
2 – Generate accelerated scenarios
3 – Export the chosen scenario back to Primavera P6 or MS Project
Schedule cleanser: improve the
quality of the schedule by
removing select constraints,
lags or redundancies.
Criteria builder: define the
acceleration goals and the
means by which to achieve
them.
Scenario generator:
automatically run multiple
iterations until the best
possible scenario is found.
www.projectacumen.com
Identify the best path forward
Compare Multiple Scenarios – Use the Acumen timeline view and Forensic Analyzer to compare and
identify the best acceleration option. Use Fuse metrics to evaluate scenario quality and achievability.
Compression Efficiency Factor™ – The Acumen 360 compression efficiency factor looks at how much
effort is required for acceleration allowing you to easily identify which contractor, WBS, or phase of the
schedule provides the highest return.
Run Multiple Simulations – Create acceleration scripts to try multiple accleration options. Try
accelerating activities, changing calendars, or reducing the remaining duration of a certain WBS until the
ideal acceleration is achieved.
Scenario Analysis
Use the Fuse scenario comparision metrics to
pinpoint activities with duration changes, float
changes, and more after the acceleration.
Scenario Comparison
Visualize each scenario option in the Fuse timeline
view.

Más contenido relacionado

Más de Cisco

CMCS Statement of Qualification
CMCS Statement of QualificationCMCS Statement of Qualification
CMCS Statement of QualificationCisco
 
Professional Development Catalogue 2014
Professional Development Catalogue 2014Professional Development Catalogue 2014
Professional Development Catalogue 2014Cisco
 
Project Management Diploma with Instructors
Project Management Diploma with InstructorsProject Management Diploma with Instructors
Project Management Diploma with InstructorsCisco
 
CMCS Reference Letters
CMCS Reference LettersCMCS Reference Letters
CMCS Reference LettersCisco
 
GPM: PRiSM Practitioner
GPM: PRiSM Practitioner GPM: PRiSM Practitioner
GPM: PRiSM Practitioner Cisco
 
CMCS Website Training Experience 2013
CMCS Website Training Experience 2013CMCS Website Training Experience 2013
CMCS Website Training Experience 2013Cisco
 
Our Awards and Achievements
Our Awards and AchievementsOur Awards and Achievements
Our Awards and AchievementsCisco
 
Our Partners
Our PartnersOur Partners
Our PartnersCisco
 
CMCS PMO Solution
CMCS PMO SolutionCMCS PMO Solution
CMCS PMO SolutionCisco
 
Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?Cisco
 
Our 2,000+ Clients
Our 2,000+ ClientsOur 2,000+ Clients
Our 2,000+ ClientsCisco
 
Asta Powerproject: Business Case
Asta Powerproject: Business CaseAsta Powerproject: Business Case
Asta Powerproject: Business CaseCisco
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines ArticleCisco
 
CoSign Digital Signatures: General Presentation
CoSign Digital Signatures: General Presentation CoSign Digital Signatures: General Presentation
CoSign Digital Signatures: General Presentation Cisco
 
Acumen Fuse: Datasheet
Acumen Fuse: DatasheetAcumen Fuse: Datasheet
Acumen Fuse: DatasheetCisco
 
Acumen Risk: Data Sheet
Acumen Risk: Data SheetAcumen Risk: Data Sheet
Acumen Risk: Data SheetCisco
 
Acumen Risk: Brochure
Acumen Risk: BrochureAcumen Risk: Brochure
Acumen Risk: BrochureCisco
 
Acumen Fuse: Metrics
Acumen Fuse: MetricsAcumen Fuse: Metrics
Acumen Fuse: MetricsCisco
 
Acumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis DatasheetAcumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis DatasheetCisco
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewCisco
 

Más de Cisco (20)

CMCS Statement of Qualification
CMCS Statement of QualificationCMCS Statement of Qualification
CMCS Statement of Qualification
 
Professional Development Catalogue 2014
Professional Development Catalogue 2014Professional Development Catalogue 2014
Professional Development Catalogue 2014
 
Project Management Diploma with Instructors
Project Management Diploma with InstructorsProject Management Diploma with Instructors
Project Management Diploma with Instructors
 
CMCS Reference Letters
CMCS Reference LettersCMCS Reference Letters
CMCS Reference Letters
 
GPM: PRiSM Practitioner
GPM: PRiSM Practitioner GPM: PRiSM Practitioner
GPM: PRiSM Practitioner
 
CMCS Website Training Experience 2013
CMCS Website Training Experience 2013CMCS Website Training Experience 2013
CMCS Website Training Experience 2013
 
Our Awards and Achievements
Our Awards and AchievementsOur Awards and Achievements
Our Awards and Achievements
 
Our Partners
Our PartnersOur Partners
Our Partners
 
CMCS PMO Solution
CMCS PMO SolutionCMCS PMO Solution
CMCS PMO Solution
 
Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?Can You Afford Not To Manage Your Project's Contracts?
Can You Afford Not To Manage Your Project's Contracts?
 
Our 2,000+ Clients
Our 2,000+ ClientsOur 2,000+ Clients
Our 2,000+ Clients
 
Asta Powerproject: Business Case
Asta Powerproject: Business CaseAsta Powerproject: Business Case
Asta Powerproject: Business Case
 
TILOS: World Pipelines Article
TILOS: World Pipelines ArticleTILOS: World Pipelines Article
TILOS: World Pipelines Article
 
CoSign Digital Signatures: General Presentation
CoSign Digital Signatures: General Presentation CoSign Digital Signatures: General Presentation
CoSign Digital Signatures: General Presentation
 
Acumen Fuse: Datasheet
Acumen Fuse: DatasheetAcumen Fuse: Datasheet
Acumen Fuse: Datasheet
 
Acumen Risk: Data Sheet
Acumen Risk: Data SheetAcumen Risk: Data Sheet
Acumen Risk: Data Sheet
 
Acumen Risk: Brochure
Acumen Risk: BrochureAcumen Risk: Brochure
Acumen Risk: Brochure
 
Acumen Fuse: Metrics
Acumen Fuse: MetricsAcumen Fuse: Metrics
Acumen Fuse: Metrics
 
Acumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis DatasheetAcumen Fuse: Enterprise Project Analysis Datasheet
Acumen Fuse: Enterprise Project Analysis Datasheet
 
Nomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product OverviewNomitech: CostOs Estimating Product Overview
Nomitech: CostOs Estimating Product Overview
 

Acumen 360: Scenario Builder Datasheet

  • 1. info@projectacumen.com | (512) 291-6261 www.projectacumen.com // Acumen 360: Scenario Builder Intelligent Decision Support through ‘What If...’ Analysis Building on the analytics engine in Fuse, Acumen 360 is the fastest, easiest means of project acceleration and decision support. As both a planning and execution tool, 360 can be used to align plans with target dates and project stakeholder expectations, or to get a delayed project back on track. Acumen 360: helps you achieve faster, cheaper more aligned schedules; allows you to define the acceleration criteria to ensure the scenario is doable, and; gives you scenario options from any point in the project, whether it is up front during the planning phase, or for recovery after delays. Unlike traditional “network crash” techniques, Acumen 360 provides pinpointed focus and intelligent optimization. It selects the most efficient means of achieving acceleration goals. Acumen 360 puts you in control of your schedule Only you know where acceleration is physically possible. Acumen 360 captures this insight through criteria, defined by you, directing where to focus acceleration efforts. A single window through which you can accelerate your schedule intelligently, quickly and repeatedly. Two-way integration capability 1 – Import project schedule data directly from your scheduling tool 2 – Generate accelerated scenarios 3 – Export the chosen scenario back to Primavera P6 or MS Project Schedule cleanser: improve the quality of the schedule by removing select constraints, lags or redundancies. Criteria builder: define the acceleration goals and the means by which to achieve them. Scenario generator: automatically run multiple iterations until the best possible scenario is found.
  • 2. www.projectacumen.com Identify the best path forward Compare Multiple Scenarios – Use the Acumen timeline view and Forensic Analyzer to compare and identify the best acceleration option. Use Fuse metrics to evaluate scenario quality and achievability. Compression Efficiency Factor™ – The Acumen 360 compression efficiency factor looks at how much effort is required for acceleration allowing you to easily identify which contractor, WBS, or phase of the schedule provides the highest return. Run Multiple Simulations – Create acceleration scripts to try multiple accleration options. Try accelerating activities, changing calendars, or reducing the remaining duration of a certain WBS until the ideal acceleration is achieved. Scenario Analysis Use the Fuse scenario comparision metrics to pinpoint activities with duration changes, float changes, and more after the acceleration. Scenario Comparison Visualize each scenario option in the Fuse timeline view.