SlideShare una empresa de Scribd logo
1 de 10
Descargar para leer sin conexión
STILLWATER PUBLIC LIBRARY
                     TECHNOLOGY PLAN 2008-2010

                               Vision Statement
As a gateway to the greater community, the Stillwater Public Library will utilize
appropriate technology to enhance current resources and expand available
information.

                                      Summary
The 2008-2010 Stillwater Public Library Technology Plan includes nine priorities
that work toward providing library patrons with up-to-date devices, content,
software, and skills that will meet their information and entertainment needs.

In close partnership with the City of Stillwater Information Technology (IT)
Department, the Library will strive to meet the following priorities:

Priority 1: Maintain and improve the public catalog and website.
The library will employ new technological resources to improve services provided
on the library website.

Priority 2: Prepare for new Sirsi software Symphony and investigate
possible new Operating System for the server.
The library software company is releasing a new version of their software which
is a major change from our existing system and will require more staff training.

Priority 3: Re-configure library software to email patrons pre-due, overdue,
holds, and Interlibrary Loan notices.
Many library customers now have email and automatic electronic notification will
enhance our patron contact methods.

Priority 4: Investigate downloadable books.
Access to downloadable materials will allow customers to use personal electronic
devices such as MP3 players, computerized readers, and home computers to
enjoy their books.

Priority 5: Develop a social networking library policy.
The library needs a policy to institutionalize our stance in regards to social
networks accessed via the library.

Priority 6: Investigate building a digital collection.
Digitizing the unique collections of the Stillwater Public Library could be a
solution to preservation of these rare items and make these items more
accessible to a greater number of people.




                                          1
Priority 7: Investigate establishing a music listening station.
Many library customers would like to listen to our selection of music before
checking out the CDs.

Priority 8: Investigate staff collaborative software.
The library staff works as a team developing programs and content. Email has
many deficiencies in this regard and specific collaboration software may enhance
staff cooperation resulting in even better library programs for the community.

Priority 9: Investigate new library technologies.
We need to keep apprised of emerging trends and equipment to better serve our
library customers.




                                        2
Background

The Stillwater Public Library Technology Plan for 1999-2001 was approved by
the Library Board in 1998 and the Oklahoma Department of Libraries in1999.
This plan met the following five priorities:
   1. Expanded the number of OCLC terminals.
   2. Developed the Library Web page.
   3. Upgraded Library terminals to graphical user interface (GUI).
   4. Expanded the number of Internet Terminals.
   5. Provided access to CD-ROM databases through a networked tower (the
       tower has subsequently been removed and databases are accessed
       through online public access computers).

The 2002-2004 Stillwater Public Library Technology Plan was approved by the
Library Board in October 2001 and by the Oklahoma Department of Libraries in
January of 2002. The plan met the following five priorities:
    1. Replaced RISC 6000 computer server.
    2. Resolved Internet scheduling issues.
    3. Maintained and improved the Library web page.
    4. Provided staff computer training.*
    5. Provided public computer training. *
*Priorities four and five were continued in 2005-2007 Plan.

The 2005-2007 Stillwater Public Library Technology Plan met the following five
priorities:
    1. Improved public website with new calendar, New Materials links, and
         integration with the City of Stillwater web page.
    2. Set up a computer training lab for the public and staff and offered regular
         classes.
    3. Met Staff software needs mainly through upgrades of PCs and Microsoft
         Operating System.
    4. Enhanced public access to computers through internet reservation, print
         management and PC based server and the addition of 5 new internet
         stations.
    5. Offered wireless internet connections throughout the library.




                                         3
Technology Assessment

The Stillwater Public Library has 67 computers (Table 1), 2 LCD projectors, 1
staff flatbed scanner, 2 public photocopiers and 16 printers. The City of Stillwater
Information Technology (IT) Department is responsible for maintenance and
replacement of all computers except the IBM server. The main library and all
meeting rooms provide Internet and wireless access to customers.

The Library computers are utilized as follows:
   • 24 staff networked computers. Staff utilizes Unicorn Workflows (GUI)
      software from SIRSI Corporation for library transactions.
   • 9 Online Public Access Computers (OPAC) providing access to library
      information via the online catalog (WebCat), databases, and designated
      Internet links. The Genealogy Room OPAC has additional genealogical
      CD-ROM databases and links to genealogical websites. OPAC
      information is also accessible remotely through the Library’s website at
      library.stillwater.org
   • 21 public Internet stations connected to the City’s network via T1.
   • 2 non-networked computers for public Internet reservation and printing.
   • 2 non-networked computers for pre-school games.
   • 1 non-networked computer for microfilm scanning.
   • 1 PC server for PC Reservation and Print Management software.
   • 5 networked computers for training lab.
   • 1 laptop for staff.
   • 1 server located in Technical Services housing the library automation
      software. The server is an IBM pSeries purchased in November 2004.




                                         4
2008-2010 Technology Plan Priorities

Priority 1: Maintain and improve the public catalog and website.
As a gateway to providing for the informational needs of its users, the Stillwater
Public Library website (library.stillwater.org) is a vital resource and must be
constantly maintained and improved. The website currently provides an online
card catalog (Webcat); eleven databases, four of which are provided by the
Oklahoma Department of Libraries; and general library information.

Action Steps
The Stillwater Public Library will:
   • Investigate upgrading to a newer SIRSI online card catalog design.
   • Explore the purchase of a metaportal software product to streamline
       accessing information from the Library’s catalog and databases.
   • Determine the content and cost of additional databases.
   • Analyze the website for improvements and receive staff training from the
       City of Stillwater Information Technology (IT) Department.
   • Update the website with new pages to improve the ease of navigation for
       users.

Projected Costs:
Staff Training: $1,000-$4,000
New design: $6,000-10,000
New databases: $500-$2,000 per database


Priority 2: Prepare for new Sirsi software Symphony and investigate
possible new Operating System for the server.
Sirsi has merged with another library software company (Dynix) and is offering a
brand new hybrid version (Symphony) which will be radically different than our
existing Workflows client version. Our next upgrade will involve much more than
an overview of new features. Staff will need to be re-trained for the new software
for daily procedures and workflow, server maintenance, and database
maintenance. A new Operating System (OS) for the server may have to be
purchased to run the Symphony software. The library now uses UNIX, but may
have to change to a JAVA based OS. This will involve another major upgrade to
the server and will require training for the Technical Services staff.

Action Steps
The Stillwater Public Library will:
   • Monitor how new software is working for beta libraries.
   • Develop a timeline for the upgrade to Symphony.
   • Investigate moving to new server operating system.
   • Provide initial and on-going staff training on Symphony and possibly for
       JAVA.
   • Develop and/or find materials and curriculum to meet the needs of staff.


                                         5
Projected costs:
Upgrade: $11,000
Training and staff time: $1,000-5,000.


Priority 3: Re-configure library software to email patrons pre-due, overdue,
holds, and Interlibrary Loan notices.
Email notification for patrons should improve item overdues and free up time staff
spends calling via telephone and mailing paper notices.

Action steps
The Stillwater Public Library will:
   • Generate new texts for pre-due, hold availability and Interlibrary Loan
       availability on UNIX with v editor software.
   • Manipulate the reports module to generate pre-due and holds reports daily
       and automatically.
   • Re-configure our server to send and receive emails and work with City IT
       department to allow email through their firewalls.

Projected costs:
Unix consultant: $500


Priority 4: Investigate downloadable books.
Downloadable books can come in many forms, but basically they are Mp3 files.
The library could subscribe to a database that offers this format and the customer
“checks out” an Mp3 file, or the library could provide “readers” that have a book
loaded on them and the customer can take the reader with them.

Action steps
The Stillwater Public Library will:
   • Investigate available databases.
   • Investigate available readers or takeaways.
   • Consider public relations and advertising to let the public know about
       downloadable books.

Projected Costs:
Upgraded Netlibrary database: $2,500 minimum
Overdrive base package database: $2,000
Takeaways: $300/unit


Priority 5: Develop a social networking library policy.
The public’s information and entertainment needs have gone from one-way
communication from the library to interactive and collaborative use internet sites
such as Wikipedia, librarything, and myspace. The library needs approved


                                         6
policies to deal with any situations that may arise with these new two-way
communications.

Action steps
The Stillwater Public Library will:
   • Develop a Social Software policy for Library Board approval.

Projected costs:
In-house: $0


Priority 6: Investigate building a digital collection.
The library has many unique items that will need preserving for the future. One
strategy of preservation is to digitize these items. This would allow both
preservation and greater access by the public.

Action steps:
The Stillwater Public Library will:
       • Investigate using the City of Stillwater’s new digital imaging
          management software.
       • Investigate digitizing on our own with flatbed and photocopy scanners.
       • Investigate where to put a digital collection.
       • Decide on a digitization project.
       • Develop a digitization plan.

Projected costs:
Scanning items: $1,000-2,000
Cataloging and maintaining collection: $2,000-20,000


Priority 7: Investigate establishing a music listening station.
Customers would like to preview music CDs before checking them out. A music
listening center would allow for CD previews.

Action steps:
The Stillwater Public Library will:
       • Investigate available listening centers.
       • Search out appropriate furniture and location.
       • Develop procedures for possible clean-up/re-shelving of CDs.

Projected costs:
Listening center: $1,500-2,500
Furniture: $1,000-2,000




                                        7
Priority 8: Investigate staff collaborative software.
The library staff works as a team developing programming and content. Email
has many deficiencies in this regard and specific collaboration software may
work to help us work together.

Action steps:
The Stillwater Public Library will:
       • Investigate available collaborative software.
       • Decide if applicable to library team work.

Projected costs:
Software: $100-1,000
Training: In-house or through City IT Department


Priority 9: Investigate new library technologies.
We need to keep apprised of emerging trends and equipment to better serve our
library customers. The library will diligently research new technology and trends
as they become available. Some areas that are just breaking in 2008 are self-
check stations, RFID (radio frequency identification), downloadable
books/music/films, patron driven content, social network tools, wireless handheld
circ computers, e-commerce solutions for patrons.

Action steps:
The Stillwater Public Library will:
       • Stay apprised of new technology and innovation.
       • Analyze the potentials for our local situation.
       • Plan for fast-paced technology change.

Projected costs examples:
RFID: $50,000
Self-check station: $30,000
Downloadable items: $2,500-10,000
Social networking: $0-20,000


                                   Evaluation

The Stillwater Public Library 2008-2010 Technology Plan will be reviewed
annually based upon the following criteria:
   • The degree to which the priority has been met.
   • Input from customer, staff, and Library Board.
   • Statistics gathered from Internet, web page, and computer use.
   • Statistics gathered from customer and staff training sessions.
   • New technological developments or advancements.



                                        8
Table 1: Computer Inventory

  COMPUTER LOCATION               Type           SIZE
  TECHNICAL SERVICES           IBM pseries      13500
    ADULT REFERENCE            Optiplex 745     8 GB
 CHILDRENS REFERENCE           Optiplex 745     8 GB
   CIRCULATION DESK 1          Optiplex 745     8 GB
   CIRCULATION DESK 2          Optiplex 745     8 GB
   CIRCULATION DESK 3          Optiplex 745     8 GB
CIRCULATION WORKROOM           Optiplex 745     8 GB
            1
CIRCULATION WORKROOM           Optiplex 745     8 GB
            2
CIRCULATION WORKROOM           Optiplex 745     8 GB
            3
CIRCULATION WORKROOM           Optiplex 745     8 GB
            4
CIRCULATION WORKROOM           Optiplex 745     8 GB
            5
CIRCULATION SUPERVISOR         Optiplex 745     8 GB
       CATALOGER               Optiplex 745     8 GB
  INTERLIBRARY LOAN 1          Optiplex 745     8 GB
  INTERLIBRARY LOAN 2          Optiplex 745     8 GB
        DIRECTOR               Optiplex 745     8 GB
   ADULT REF OFFICE 1          Optiplex 745     8 GB
   ADULT REF OFFICE 2          Optiplex 745     8 GB
   ADULT REF OFFICE 3          Optiplex 745     8 GB
   ADULT REF OFFICE 4          Optiplex 745     8 GB
  TECHNICAL SERVICES           Optiplex 745     8 GB
    MECHANICAL ROOM            Optiplex 745     8 GB
    CHILDRENS OFFICE           Optiplex 745     8 GB
    TECH ADMIN. CLERK          Optiplex 745     8 GB
  ADMINISTRATIVE ASST.         Optiplex 745     8 GB
  MEETING ROOM COOR.           Optiplex 745     8 GB
   PUBLIC INTERNET #1         Optiplex GX 240   2 GB
   PUBLIC INTERNET #2         Optiplex GX 240   2 GB
   PUBLIC INTERNET #3         Optiplex GX 240   2 GB
   PUBLIC INTERNET #4         Optiplex GX 240   2 GB
   PUBLIC INTERNET #5         Optiplex GX 240   2 GB
   PUBLIC INTERNET #6         Optiplex GX 240   2 GB
   PUBLIC INTERNET #7         Optiplex GX 240   2 GB
   PUBLIC INTERNET #8         Optiplex GX 240   2 GB
   PUBLIC INTERNET #9         Optiplex GX 240   2 GB
   PUBLIC INTERNET #10        Optiplex GX 240   2 GB
   PUBLIC INTERNET #11        Optiplex GX 240   2 GB



                                         9
PUBLIC INTERNET #12   Optiplex GX 240   2 GB
  PUBLIC INTERNET #13   Optiplex GX 240   2 GB
  PUBLIC INTERNET #14   Optiplex GX 240   2 GB
  PUBLIC INTERNET #15   Optiplex GX 240   2 GB
  PUBLIC INTERNET #16   Optiplex GX 240   2 GB
  PUBLIC INTERNET #17   Optiplex GX 240   2 GB
  PUBLIC INTERNET #18   Optiplex GX 240   2 GB
  PUBLIC INTERNET #19   Optiplex GX 240   2 GB
  PUBLIC INTERNET #20   Optiplex GX 240   2 GB
  PUBLIC INTERNET #21   Optiplex GX 240   2 GB
 INTERNET RESERVE PC    Optiplex GX 240   2 GB
   INTERNET PRINT PC    Optiplex GX 240   2 GB
PC RESERVATION SERVER   Optiplex GX 240   2 GB
     PUBLIC OPAC 1      Optiplex GX 240   2 GB
     PUBLIC OPAC 2      Optiplex GX 240   2 GB
     PUBLIC OPAC 3      Optiplex GX 240   2 GB
     PUBLIC OPAC 4      Optiplex GX 240   2 GB
     PUBLIC OPAC 5      Optiplex GX 240   2 GB
     PUBLIC OPAC 6      Optiplex GX 240   2 GB
     PUBLIC OPAC 7      Optiplex GX 240   2 GB
     PUBLIC OPAC 8      Optiplex GX 240   2 GB
     PUBLIC OPAC 9      Optiplex GX 240   2 GB
 GENEALOGY MICROFILM    Optiplex GX 240   2 GB
      JUV GAMES 1       Optiplex GX 240   2 GB
      JUV GAMES 2       Optiplex GX 240   2 GB
    COMPUTER LAB 1      Optiplex GX 240   2 GB
    COMPUTER LAB 2      Optiplex GX 240   2 GB
    COMPUTER LAB 3      Optiplex GX 240   2 GB
    COMPUTER LAB 4      Optiplex GX 240   2 GB
    COMPUTER LAB 5      Optiplex GX 240   2 GB




                                   10

Más contenido relacionado

Similar a Stillwater tech plan

Tech plan updated final draft 815
Tech plan updated final draft 815Tech plan updated final draft 815
Tech plan updated final draft 815ecolby
 
Next Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital PlatformNext Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital PlatformTrevor Owens
 
Next Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital PlatformNext Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital PlatformTrevor Owens
 
Ict uses in libraries
Ict uses in librariesIct uses in libraries
Ict uses in librariesLiaquat Rahoo
 
The IMLS National Digital Platform & Your Library: Tools You Can Use
The IMLS National Digital Platform & Your Library: Tools You Can UseThe IMLS National Digital Platform & Your Library: Tools You Can Use
The IMLS National Digital Platform & Your Library: Tools You Can UseTrevor Owens
 
New ICT Trends and Issues of Librarianship
New ICT Trends and Issues of LibrarianshipNew ICT Trends and Issues of Librarianship
New ICT Trends and Issues of LibrarianshipLiaquat Rahoo
 
Pioneer consortium reaches agreement with ptfs
Pioneer consortium reaches agreement with ptfsPioneer consortium reaches agreement with ptfs
Pioneer consortium reaches agreement with ptfsgilibrary
 
Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...
Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...
Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...San Antonio Public Library
 
Digital library-overview
Digital library-overviewDigital library-overview
Digital library-overviewAnkit Dubey
 
web world wide defination introduction.pptx
web world wide defination introduction.pptxweb world wide defination introduction.pptx
web world wide defination introduction.pptxubaidullah75790
 
Digital Initiatives and Digital Scholarship at the British Library
Digital Initiatives and Digital Scholarship at the British LibraryDigital Initiatives and Digital Scholarship at the British Library
Digital Initiatives and Digital Scholarship at the British LibraryIMPACT Centre of Competence
 
Edge Initiative Benchmarks
Edge Initiative BenchmarksEdge Initiative Benchmarks
Edge Initiative BenchmarksKULTOntario
 
An Introduction to digital preservation at the Library of Congress
An Introduction to digital preservation at the Library of CongressAn Introduction to digital preservation at the Library of Congress
An Introduction to digital preservation at the Library of Congresslljohnston
 
815 - technology plan
815 - technology plan815 - technology plan
815 - technology plankpatric1
 
CS8651 Internet Programming - Basics of HTML, HTML5, CSS
CS8651   Internet Programming - Basics of HTML, HTML5, CSSCS8651   Internet Programming - Basics of HTML, HTML5, CSS
CS8651 Internet Programming - Basics of HTML, HTML5, CSSVigneshkumar Ponnusamy
 

Similar a Stillwater tech plan (20)

Tech plan updated final draft 815
Tech plan updated final draft 815Tech plan updated final draft 815
Tech plan updated final draft 815
 
Next Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital PlatformNext Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital Platform
 
Next Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital PlatformNext Steps for IMLS's National Digital Platform
Next Steps for IMLS's National Digital Platform
 
Ict uses in libraries
Ict uses in librariesIct uses in libraries
Ict uses in libraries
 
The IMLS National Digital Platform & Your Library: Tools You Can Use
The IMLS National Digital Platform & Your Library: Tools You Can UseThe IMLS National Digital Platform & Your Library: Tools You Can Use
The IMLS National Digital Platform & Your Library: Tools You Can Use
 
Pawlowski and Beadles: Authentication and Access of Licensed Content in Ohio
Pawlowski and Beadles: Authentication and Access of Licensed Content in OhioPawlowski and Beadles: Authentication and Access of Licensed Content in Ohio
Pawlowski and Beadles: Authentication and Access of Licensed Content in Ohio
 
amaha internet course
amaha internet courseamaha internet course
amaha internet course
 
Hamooya
HamooyaHamooya
Hamooya
 
New ICT Trends and Issues of Librarianship
New ICT Trends and Issues of LibrarianshipNew ICT Trends and Issues of Librarianship
New ICT Trends and Issues of Librarianship
 
Ai Library
Ai LibraryAi Library
Ai Library
 
Pioneer consortium reaches agreement with ptfs
Pioneer consortium reaches agreement with ptfsPioneer consortium reaches agreement with ptfs
Pioneer consortium reaches agreement with ptfs
 
Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...
Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...
Seoul, Republic of Korea: Libraries as a Catalyst for Economic Growth and Com...
 
Digital library-overview
Digital library-overviewDigital library-overview
Digital library-overview
 
web world wide defination introduction.pptx
web world wide defination introduction.pptxweb world wide defination introduction.pptx
web world wide defination introduction.pptx
 
Digital Initiatives and Digital Scholarship at the British Library
Digital Initiatives and Digital Scholarship at the British LibraryDigital Initiatives and Digital Scholarship at the British Library
Digital Initiatives and Digital Scholarship at the British Library
 
Edge Initiative Benchmarks
Edge Initiative BenchmarksEdge Initiative Benchmarks
Edge Initiative Benchmarks
 
An Introduction to digital preservation at the Library of Congress
An Introduction to digital preservation at the Library of CongressAn Introduction to digital preservation at the Library of Congress
An Introduction to digital preservation at the Library of Congress
 
815 - technology plan
815 - technology plan815 - technology plan
815 - technology plan
 
CS8651 Internet Programming - Basics of HTML, HTML5, CSS
CS8651   Internet Programming - Basics of HTML, HTML5, CSSCS8651   Internet Programming - Basics of HTML, HTML5, CSS
CS8651 Internet Programming - Basics of HTML, HTML5, CSS
 
Ukgs2013 dave pattern
Ukgs2013 dave patternUkgs2013 dave pattern
Ukgs2013 dave pattern
 

Último

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingTechSoup
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13Steve Thomason
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)eniolaolutunde
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppCeline George
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityGeoBlogs
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdfQucHHunhnh
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxNirmalaLoungPoorunde1
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactdawncurless
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdfSoniaTolstoy
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptxVS Mahajan Coaching Centre
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docxPoojaSen20
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3JemimahLaneBuaron
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdfQucHHunhnh
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Sapana Sha
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introductionMaksud Ahmed
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxheathfieldcps1
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionSafetyChain Software
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxmanuelaromero2013
 

Último (20)

Grant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy ConsultingGrant Readiness 101 TechSoup and Remy Consulting
Grant Readiness 101 TechSoup and Remy Consulting
 
The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13The Most Excellent Way | 1 Corinthians 13
The Most Excellent Way | 1 Corinthians 13
 
Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)Software Engineering Methodologies (overview)
Software Engineering Methodologies (overview)
 
URLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website AppURLs and Routing in the Odoo 17 Website App
URLs and Routing in the Odoo 17 Website App
 
Paris 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activityParis 2024 Olympic Geographies - an activity
Paris 2024 Olympic Geographies - an activity
 
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"Mattingly "AI & Prompt Design: The Basics of Prompt Design"
Mattingly "AI & Prompt Design: The Basics of Prompt Design"
 
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
Mattingly "AI & Prompt Design: Structured Data, Assistants, & RAG"
 
1029-Danh muc Sach Giao Khoa khoi 6.pdf
1029-Danh muc Sach Giao Khoa khoi  6.pdf1029-Danh muc Sach Giao Khoa khoi  6.pdf
1029-Danh muc Sach Giao Khoa khoi 6.pdf
 
Employee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptxEmployee wellbeing at the workplace.pptx
Employee wellbeing at the workplace.pptx
 
Accessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impactAccessible design: Minimum effort, maximum impact
Accessible design: Minimum effort, maximum impact
 
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdfBASLIQ CURRENT LOOKBOOK  LOOKBOOK(1) (1).pdf
BASLIQ CURRENT LOOKBOOK LOOKBOOK(1) (1).pdf
 
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions  for the students and aspirants of Chemistry12th.pptxOrganic Name Reactions  for the students and aspirants of Chemistry12th.pptx
Organic Name Reactions for the students and aspirants of Chemistry12th.pptx
 
mini mental status format.docx
mini    mental       status     format.docxmini    mental       status     format.docx
mini mental status format.docx
 
Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3Q4-W6-Restating Informational Text Grade 3
Q4-W6-Restating Informational Text Grade 3
 
1029 - Danh muc Sach Giao Khoa 10 . pdf
1029 -  Danh muc Sach Giao Khoa 10 . pdf1029 -  Danh muc Sach Giao Khoa 10 . pdf
1029 - Danh muc Sach Giao Khoa 10 . pdf
 
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111Call Girls in Dwarka Mor Delhi Contact Us 9654467111
Call Girls in Dwarka Mor Delhi Contact Us 9654467111
 
microwave assisted reaction. General introduction
microwave assisted reaction. General introductionmicrowave assisted reaction. General introduction
microwave assisted reaction. General introduction
 
The basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptxThe basics of sentences session 2pptx copy.pptx
The basics of sentences session 2pptx copy.pptx
 
Mastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory InspectionMastering the Unannounced Regulatory Inspection
Mastering the Unannounced Regulatory Inspection
 
How to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptxHow to Make a Pirate ship Primary Education.pptx
How to Make a Pirate ship Primary Education.pptx
 

Stillwater tech plan

  • 1. STILLWATER PUBLIC LIBRARY TECHNOLOGY PLAN 2008-2010 Vision Statement As a gateway to the greater community, the Stillwater Public Library will utilize appropriate technology to enhance current resources and expand available information. Summary The 2008-2010 Stillwater Public Library Technology Plan includes nine priorities that work toward providing library patrons with up-to-date devices, content, software, and skills that will meet their information and entertainment needs. In close partnership with the City of Stillwater Information Technology (IT) Department, the Library will strive to meet the following priorities: Priority 1: Maintain and improve the public catalog and website. The library will employ new technological resources to improve services provided on the library website. Priority 2: Prepare for new Sirsi software Symphony and investigate possible new Operating System for the server. The library software company is releasing a new version of their software which is a major change from our existing system and will require more staff training. Priority 3: Re-configure library software to email patrons pre-due, overdue, holds, and Interlibrary Loan notices. Many library customers now have email and automatic electronic notification will enhance our patron contact methods. Priority 4: Investigate downloadable books. Access to downloadable materials will allow customers to use personal electronic devices such as MP3 players, computerized readers, and home computers to enjoy their books. Priority 5: Develop a social networking library policy. The library needs a policy to institutionalize our stance in regards to social networks accessed via the library. Priority 6: Investigate building a digital collection. Digitizing the unique collections of the Stillwater Public Library could be a solution to preservation of these rare items and make these items more accessible to a greater number of people. 1
  • 2. Priority 7: Investigate establishing a music listening station. Many library customers would like to listen to our selection of music before checking out the CDs. Priority 8: Investigate staff collaborative software. The library staff works as a team developing programs and content. Email has many deficiencies in this regard and specific collaboration software may enhance staff cooperation resulting in even better library programs for the community. Priority 9: Investigate new library technologies. We need to keep apprised of emerging trends and equipment to better serve our library customers. 2
  • 3. Background The Stillwater Public Library Technology Plan for 1999-2001 was approved by the Library Board in 1998 and the Oklahoma Department of Libraries in1999. This plan met the following five priorities: 1. Expanded the number of OCLC terminals. 2. Developed the Library Web page. 3. Upgraded Library terminals to graphical user interface (GUI). 4. Expanded the number of Internet Terminals. 5. Provided access to CD-ROM databases through a networked tower (the tower has subsequently been removed and databases are accessed through online public access computers). The 2002-2004 Stillwater Public Library Technology Plan was approved by the Library Board in October 2001 and by the Oklahoma Department of Libraries in January of 2002. The plan met the following five priorities: 1. Replaced RISC 6000 computer server. 2. Resolved Internet scheduling issues. 3. Maintained and improved the Library web page. 4. Provided staff computer training.* 5. Provided public computer training. * *Priorities four and five were continued in 2005-2007 Plan. The 2005-2007 Stillwater Public Library Technology Plan met the following five priorities: 1. Improved public website with new calendar, New Materials links, and integration with the City of Stillwater web page. 2. Set up a computer training lab for the public and staff and offered regular classes. 3. Met Staff software needs mainly through upgrades of PCs and Microsoft Operating System. 4. Enhanced public access to computers through internet reservation, print management and PC based server and the addition of 5 new internet stations. 5. Offered wireless internet connections throughout the library. 3
  • 4. Technology Assessment The Stillwater Public Library has 67 computers (Table 1), 2 LCD projectors, 1 staff flatbed scanner, 2 public photocopiers and 16 printers. The City of Stillwater Information Technology (IT) Department is responsible for maintenance and replacement of all computers except the IBM server. The main library and all meeting rooms provide Internet and wireless access to customers. The Library computers are utilized as follows: • 24 staff networked computers. Staff utilizes Unicorn Workflows (GUI) software from SIRSI Corporation for library transactions. • 9 Online Public Access Computers (OPAC) providing access to library information via the online catalog (WebCat), databases, and designated Internet links. The Genealogy Room OPAC has additional genealogical CD-ROM databases and links to genealogical websites. OPAC information is also accessible remotely through the Library’s website at library.stillwater.org • 21 public Internet stations connected to the City’s network via T1. • 2 non-networked computers for public Internet reservation and printing. • 2 non-networked computers for pre-school games. • 1 non-networked computer for microfilm scanning. • 1 PC server for PC Reservation and Print Management software. • 5 networked computers for training lab. • 1 laptop for staff. • 1 server located in Technical Services housing the library automation software. The server is an IBM pSeries purchased in November 2004. 4
  • 5. 2008-2010 Technology Plan Priorities Priority 1: Maintain and improve the public catalog and website. As a gateway to providing for the informational needs of its users, the Stillwater Public Library website (library.stillwater.org) is a vital resource and must be constantly maintained and improved. The website currently provides an online card catalog (Webcat); eleven databases, four of which are provided by the Oklahoma Department of Libraries; and general library information. Action Steps The Stillwater Public Library will: • Investigate upgrading to a newer SIRSI online card catalog design. • Explore the purchase of a metaportal software product to streamline accessing information from the Library’s catalog and databases. • Determine the content and cost of additional databases. • Analyze the website for improvements and receive staff training from the City of Stillwater Information Technology (IT) Department. • Update the website with new pages to improve the ease of navigation for users. Projected Costs: Staff Training: $1,000-$4,000 New design: $6,000-10,000 New databases: $500-$2,000 per database Priority 2: Prepare for new Sirsi software Symphony and investigate possible new Operating System for the server. Sirsi has merged with another library software company (Dynix) and is offering a brand new hybrid version (Symphony) which will be radically different than our existing Workflows client version. Our next upgrade will involve much more than an overview of new features. Staff will need to be re-trained for the new software for daily procedures and workflow, server maintenance, and database maintenance. A new Operating System (OS) for the server may have to be purchased to run the Symphony software. The library now uses UNIX, but may have to change to a JAVA based OS. This will involve another major upgrade to the server and will require training for the Technical Services staff. Action Steps The Stillwater Public Library will: • Monitor how new software is working for beta libraries. • Develop a timeline for the upgrade to Symphony. • Investigate moving to new server operating system. • Provide initial and on-going staff training on Symphony and possibly for JAVA. • Develop and/or find materials and curriculum to meet the needs of staff. 5
  • 6. Projected costs: Upgrade: $11,000 Training and staff time: $1,000-5,000. Priority 3: Re-configure library software to email patrons pre-due, overdue, holds, and Interlibrary Loan notices. Email notification for patrons should improve item overdues and free up time staff spends calling via telephone and mailing paper notices. Action steps The Stillwater Public Library will: • Generate new texts for pre-due, hold availability and Interlibrary Loan availability on UNIX with v editor software. • Manipulate the reports module to generate pre-due and holds reports daily and automatically. • Re-configure our server to send and receive emails and work with City IT department to allow email through their firewalls. Projected costs: Unix consultant: $500 Priority 4: Investigate downloadable books. Downloadable books can come in many forms, but basically they are Mp3 files. The library could subscribe to a database that offers this format and the customer “checks out” an Mp3 file, or the library could provide “readers” that have a book loaded on them and the customer can take the reader with them. Action steps The Stillwater Public Library will: • Investigate available databases. • Investigate available readers or takeaways. • Consider public relations and advertising to let the public know about downloadable books. Projected Costs: Upgraded Netlibrary database: $2,500 minimum Overdrive base package database: $2,000 Takeaways: $300/unit Priority 5: Develop a social networking library policy. The public’s information and entertainment needs have gone from one-way communication from the library to interactive and collaborative use internet sites such as Wikipedia, librarything, and myspace. The library needs approved 6
  • 7. policies to deal with any situations that may arise with these new two-way communications. Action steps The Stillwater Public Library will: • Develop a Social Software policy for Library Board approval. Projected costs: In-house: $0 Priority 6: Investigate building a digital collection. The library has many unique items that will need preserving for the future. One strategy of preservation is to digitize these items. This would allow both preservation and greater access by the public. Action steps: The Stillwater Public Library will: • Investigate using the City of Stillwater’s new digital imaging management software. • Investigate digitizing on our own with flatbed and photocopy scanners. • Investigate where to put a digital collection. • Decide on a digitization project. • Develop a digitization plan. Projected costs: Scanning items: $1,000-2,000 Cataloging and maintaining collection: $2,000-20,000 Priority 7: Investigate establishing a music listening station. Customers would like to preview music CDs before checking them out. A music listening center would allow for CD previews. Action steps: The Stillwater Public Library will: • Investigate available listening centers. • Search out appropriate furniture and location. • Develop procedures for possible clean-up/re-shelving of CDs. Projected costs: Listening center: $1,500-2,500 Furniture: $1,000-2,000 7
  • 8. Priority 8: Investigate staff collaborative software. The library staff works as a team developing programming and content. Email has many deficiencies in this regard and specific collaboration software may work to help us work together. Action steps: The Stillwater Public Library will: • Investigate available collaborative software. • Decide if applicable to library team work. Projected costs: Software: $100-1,000 Training: In-house or through City IT Department Priority 9: Investigate new library technologies. We need to keep apprised of emerging trends and equipment to better serve our library customers. The library will diligently research new technology and trends as they become available. Some areas that are just breaking in 2008 are self- check stations, RFID (radio frequency identification), downloadable books/music/films, patron driven content, social network tools, wireless handheld circ computers, e-commerce solutions for patrons. Action steps: The Stillwater Public Library will: • Stay apprised of new technology and innovation. • Analyze the potentials for our local situation. • Plan for fast-paced technology change. Projected costs examples: RFID: $50,000 Self-check station: $30,000 Downloadable items: $2,500-10,000 Social networking: $0-20,000 Evaluation The Stillwater Public Library 2008-2010 Technology Plan will be reviewed annually based upon the following criteria: • The degree to which the priority has been met. • Input from customer, staff, and Library Board. • Statistics gathered from Internet, web page, and computer use. • Statistics gathered from customer and staff training sessions. • New technological developments or advancements. 8
  • 9. Table 1: Computer Inventory COMPUTER LOCATION Type SIZE TECHNICAL SERVICES IBM pseries 13500 ADULT REFERENCE Optiplex 745 8 GB CHILDRENS REFERENCE Optiplex 745 8 GB CIRCULATION DESK 1 Optiplex 745 8 GB CIRCULATION DESK 2 Optiplex 745 8 GB CIRCULATION DESK 3 Optiplex 745 8 GB CIRCULATION WORKROOM Optiplex 745 8 GB 1 CIRCULATION WORKROOM Optiplex 745 8 GB 2 CIRCULATION WORKROOM Optiplex 745 8 GB 3 CIRCULATION WORKROOM Optiplex 745 8 GB 4 CIRCULATION WORKROOM Optiplex 745 8 GB 5 CIRCULATION SUPERVISOR Optiplex 745 8 GB CATALOGER Optiplex 745 8 GB INTERLIBRARY LOAN 1 Optiplex 745 8 GB INTERLIBRARY LOAN 2 Optiplex 745 8 GB DIRECTOR Optiplex 745 8 GB ADULT REF OFFICE 1 Optiplex 745 8 GB ADULT REF OFFICE 2 Optiplex 745 8 GB ADULT REF OFFICE 3 Optiplex 745 8 GB ADULT REF OFFICE 4 Optiplex 745 8 GB TECHNICAL SERVICES Optiplex 745 8 GB MECHANICAL ROOM Optiplex 745 8 GB CHILDRENS OFFICE Optiplex 745 8 GB TECH ADMIN. CLERK Optiplex 745 8 GB ADMINISTRATIVE ASST. Optiplex 745 8 GB MEETING ROOM COOR. Optiplex 745 8 GB PUBLIC INTERNET #1 Optiplex GX 240 2 GB PUBLIC INTERNET #2 Optiplex GX 240 2 GB PUBLIC INTERNET #3 Optiplex GX 240 2 GB PUBLIC INTERNET #4 Optiplex GX 240 2 GB PUBLIC INTERNET #5 Optiplex GX 240 2 GB PUBLIC INTERNET #6 Optiplex GX 240 2 GB PUBLIC INTERNET #7 Optiplex GX 240 2 GB PUBLIC INTERNET #8 Optiplex GX 240 2 GB PUBLIC INTERNET #9 Optiplex GX 240 2 GB PUBLIC INTERNET #10 Optiplex GX 240 2 GB PUBLIC INTERNET #11 Optiplex GX 240 2 GB 9
  • 10. PUBLIC INTERNET #12 Optiplex GX 240 2 GB PUBLIC INTERNET #13 Optiplex GX 240 2 GB PUBLIC INTERNET #14 Optiplex GX 240 2 GB PUBLIC INTERNET #15 Optiplex GX 240 2 GB PUBLIC INTERNET #16 Optiplex GX 240 2 GB PUBLIC INTERNET #17 Optiplex GX 240 2 GB PUBLIC INTERNET #18 Optiplex GX 240 2 GB PUBLIC INTERNET #19 Optiplex GX 240 2 GB PUBLIC INTERNET #20 Optiplex GX 240 2 GB PUBLIC INTERNET #21 Optiplex GX 240 2 GB INTERNET RESERVE PC Optiplex GX 240 2 GB INTERNET PRINT PC Optiplex GX 240 2 GB PC RESERVATION SERVER Optiplex GX 240 2 GB PUBLIC OPAC 1 Optiplex GX 240 2 GB PUBLIC OPAC 2 Optiplex GX 240 2 GB PUBLIC OPAC 3 Optiplex GX 240 2 GB PUBLIC OPAC 4 Optiplex GX 240 2 GB PUBLIC OPAC 5 Optiplex GX 240 2 GB PUBLIC OPAC 6 Optiplex GX 240 2 GB PUBLIC OPAC 7 Optiplex GX 240 2 GB PUBLIC OPAC 8 Optiplex GX 240 2 GB PUBLIC OPAC 9 Optiplex GX 240 2 GB GENEALOGY MICROFILM Optiplex GX 240 2 GB JUV GAMES 1 Optiplex GX 240 2 GB JUV GAMES 2 Optiplex GX 240 2 GB COMPUTER LAB 1 Optiplex GX 240 2 GB COMPUTER LAB 2 Optiplex GX 240 2 GB COMPUTER LAB 3 Optiplex GX 240 2 GB COMPUTER LAB 4 Optiplex GX 240 2 GB COMPUTER LAB 5 Optiplex GX 240 2 GB 10