SlideShare una empresa de Scribd logo
1 de 70
Descargar para leer sin conexión
IBM Power Systems




IBM i Technology Refreshes
Strategy, Definition, Best Practices & Content
Steve Will - Chief Architect – IBM i




                                                 © 2012 IBM Corporation
IBM Power Systems



                      Technology Refreshes
                     & Related Enhancements

    Strategy, Definition & Best Practices

    Information Sources
     – Official Technology Refresh page
     – developerWorks

    Example Technology Refresh Content
    – Latest & Greatest session Wednesday
2    A system designed for business           © 2012 IBM Corporation
IBM Power Systems


IBM i Roadmap
    2006      2007    2008   2009




 V5R4                  6.1


             V5R4M5            6.1.1

           Clients requesting fewer operating system releases; and longer support cycles
            – Major release upgrades can be disruptive for a business

           Clients requesting access to newest technology

           Before 7.1
            – Small changes could be added using PTFs
            – Major new support required a “point release”
3     A system designed for business                                           © 2012 IBM Corporation
IBM Power Systems


IBM i Roadmap
    2006     2007   2008     2009      2010   2011   2012




 V5R4                 6.1               7.1                       i next           i next + 1


           V5R4M5              6.1.1
                                                     ………
                                                     7.1 TRs
                                                                           …
           At 7.1 Technology Refreshes were added
            – Built from experiences with PTF Groups
            – Treated as a mini-release for planning & testing purposes
            – Simpler to install on a current release and less disruptive
            – Now i had a means to stretch releases, yet deliver enhancements

                                       … but …

4     A system designed for business                                       © 2012 IBM Corporation
IBM Power Systems


Technically ….



    Technology Refreshes are only for SLIC
     – and really only for some of SLIC

    WHAT?


     – What do you mean by SLIC?

     – What about that DB2 stuff I saw in the announcement?
        Or the Java stuff?
        Or PowerHA?
        Or …




5    A system designed for business                           © 2012 IBM Corporation
IBM Power Systems


IBM i Architecture – Big Animal Picture


         •Higher-level functions for users & applications: MI-based
         •Integrated Middleware: Directory Services, SQL APIs, etc.
         •Web-based capabilities: Apache Web Server; Web App Server
         •High-level language (C/C++, RPG, COBOL, SQL, CL, etc.)

                    Technology Independent Machine Interface
       • Security
                        System Licensed Internal Code
       • Networking                                   • DB2 Database
       • PASE (AIX Runtime)                                       • Storage management
       • JVM                                                      • File systems
                                       • I/O Device Usage
                                       • Virtualization Layers
                                       • Processor Exploitation
                                       • Workload Scheduling
                                      Firmware & Hardware


6    A system designed for business                                             © 2012 IBM Corporation
IBM Power Systems


Big Animal Point Release



                    Point Releases such as V5R4M5 and 6.1.1 replaced all of SLIC.
                        Everything below the MI, above Firmware & Hardware


                    Technology Independent Machine Interface
       • Security
                        System Licensed Internal Code
       • Networking                                   • DB2 Database
       • PASE (AIX Runtime)                                          • Storage management
       • JVM                                                         • File systems
                                          • I/O Device Usage
                                          • Virtualization Layers
                                          • Processor Exploitation
                                          • Workload Scheduling
                                        Firmware & Hardware


7    A system designed for business                                                 © 2012 IBM Corporation
IBM Power Systems


Technology Refreshes: Enable Hardware, I/O & Virtualization




                      Technology Independent Machine Interface
                          System Licensed Internal Code




                                       • I/O Device Usage
 Technology Refreshes                  • Virtualization Layers
Enable New Capabilities                • Processor Exploitation
                                       • Workload Scheduling
                                      Firmware & Hardware


8    A system designed for business                               © 2012 IBM Corporation
IBM Power Systems


Technology Refresh Concept as Delivered by TR Groups

         Beginning with IBM i 7.1 GA, future point / modification releases are replaced
         with a new delivery mechanism:

                             “Technology Refresh”

         Definition: A collection of OS software for “new function enablement” that is
          – packaged together,
          – tested together, and
          – delivered as a single PTF Group.

         A Technology Refresh may include:
           – Support for new hardware and firmware
             (for example, new I/O devices or newly
             announced models)
           – Support for new virtualization functions
           – Performance improvements
           – New function enablement

9    A system designed for business                                              © 2012 IBM Corporation
IBM Power Systems




Technology Refresh: Technically Speaking




                                   © 2012 IBM Corporation
IBM Power Systems


What Is a Technology Refresh – Really?
                                                       CUM
                                                                 Other function
     Overloaded Term                                             GAed at same
      – System Management definition                                     time
                                                Other PTFs
          TR PTF Group + GA CUM
            (+ GA Resave if upgrading to 7.1)
      – General communications
                                                 GA Resave      TR PTF Group
          Everything announced when TR PTF
            Group is delivered
          developerWorks uses the term
            TECHNOLOGY UPDATE                                 TR-Reqs
                                                  TR-PTF
     Think of the Technology Refresh
     as the TR PTF Group + GA CUM
     (+ GA Resave if upgrading to 7.1)
       – Orderable entities – bundle various
                                                         Managed
         PTFs, including a TR PTF                      Add Function
       – Together they provide enablement of              PTFs
         new hardware, firmware, and
         virtualization
11    A system designed for business                                  © 2012 IBM Corporation
IBM Power Systems


                                             CUM
                                                            Other function
                                                            GAed at same
                                                                    time
                                  Other PTFs
Typical Fixes

                                        GA Resave          TR PTF Group           For example,
                                                                                  DB2, Java,
                                                                                  BRMS

                                        TR-PTF          TR-Reqs
 New TR function


                                                                                 Fixes made to
      New function
                                               Managed                           the TR code,
      outside the TR.
                                             Add Function                        or which
      For example,
                                                PTFs                             require the TR
      IBM i has added
      tape support
      outside the TR                        Some TR function requires non-SLIC
                                            components to deliver complete
 12
                                            solutions. Example: Cryptography
       A system designed for business                                          © 2012 IBM Corporation
IBM Power Systems


The Technology Refresh Web Site


                     www.ibm.com/systems/support/i/planning/techrefresh/index.html




13   A system designed for business                                       © 2012 IBM Corporation
IBM Power Systems


Technology Refresh Details Page




14   A system designed for business   © 2012 IBM Corporation
IBM Power Systems


A Look Under the Covers – The Technology Refresh PTF

     Provides much of “magic” of the Technology Refresh
       – Large multiple-component Licensed Internal Code (LIC) PTF
       – Allows development and testing like a modification release, but
         distribution like a PTF

     Part of the “magic” is accomplished by breaking the supersede chain after each
     Technology Refresh PTF
       – Therefore, it must be perm applied to install follow-on PTFs
       – PTF Install will enforce rules and try to do this for you

     Built and approved well before GA, so can be included in GA resave
       – It is NOT a “marker PTF” – it is an actual, functional PTF
       – At GA time, it is bundled in TR PTF Group along with follow-on PTFs and
         additional function
       – IBM DOES NOT recommend installing the individual TR PTF before GA or
         without the corresponding TR PTF Group, unless the TR PTF is required by a
         PTF Group or a follow-on PTF

15   A system designed for business                                           © 2012 IBM Corporation
IBM Power Systems


Technology Refresh PTF (cont.)


     Follow-on PTFs: Non-Technology Refresh PTFs
     containing common objects with the
     Technology Refresh PTF

     Follow-on PTFs:
       – Will NOT supersede the Technology Refresh PTF                                TR


       – Will have new *TRREQ (Technology Refresh requisite) designation
       – New *TRREQ type supported on DSPPTF and QPZRTVFX API
              In RETAIN, follow-on PTF will prereq the Technology Refresh PTF (RETAIN will
                 not support new *TRREQ).
       – Cannot be loaded until the Tech Refresh PTF is permanently applied
       – Can be *IMMED even though Tech Refresh PTF is *DELAYED.

     Technology Refresh PTF identified via:
       – New PTF attribute (DSPPTF command, QPZRTVFX, QpzListPTF APIs)
       – Reserved prefix range: MF99nnn – e.g., MF99004 for 7.1 is PTF for TR4
16   A system designed for business                                               © 2012 IBM Corporation
IBM Power Systems


A Very Good FAQ




     Are Technology Refreshes available for the entire IBM i
     operating system?

      – No, Technology Refreshes are currently only available for
        Licensed Internal Code

      – However, other system function may be GAed at the same
        time as a TR



17    A system designed for business                       © 2012 IBM Corporation
IBM Power Systems


Strategically Speaking



     Historically

       – DB2 was already producing PTF Groups for new off-release function

       – Other technologies were delivering capabilities in groups, or individual PTFs

       – No coordination: themes, communication, documentation



     IBM i needed to emulate Technology Refreshes throughout the Operating System

       – Coming to fruition in TR4 timeframe

       – Let’s look at developerWorks – THE place to go for TRs and more new function


18     A system designed for business                                                    © 2012 IBM Corporation
IBM Power Systems


developerWorks: IBM i front page




                                ibm.com/developerworks/ibmi
19   A system designed for business                           © 2012 IBM Corporation
IBM Power Systems


developerWorks: Technology Updates page




                                                                 Technology Refreshes




                        Notice: Many technologies have updates
                            outside the Technology Refresh




                    www.ibm.com/developerworks/ibmi/techupdates
20   A system designed for business                                          © 2012 IBM Corporation
IBM Power Systems


developerWorks: Hardware & I/O – TR pages




                    www.ibm.com/developerworks/ibmi/techupdates/hw
21   A system designed for business                                  © 2012 IBM Corporation
IBM Power Systems


TR Virtualization - Summary




22   A system designed for business   © 2012 IBM Corporation
IBM Power Systems


TR Virtualization - Details




23   A system designed for business   © 2012 IBM Corporation
IBM Power Systems


developerWorks: DB2




24   A system designed for business   © 2012 IBM Corporation
IBM Power Systems


developerWorks: More Technologies, More Groups




     • Over time, technology groups which have been delivering functions between
     releases are being gathered here.

     • BRMS & PowerHA, for example, have been added since TR3, gathering
     material from “marketing” pages where they were initially created.

     • In any specific TR, there may or may not be enhancements in some
     technologies.
25   A system designed for business                                       © 2012 IBM Corporation
IBM Power Systems


TR Announcements


                                   TR
     Coordinated around TR


                                        TR   DB   Java   BRMS

     Contain much more than
     actual TR Group




     Cover anything delivered
     since prior TR
     Announcement




26    A system designed for business                     © 2012 IBM Corporation
IBM Power Systems




                                                       Redbook updates in 2011:

                                                       • IBM i 7.1 Technical Overview
                                                            • Cover through TR3
                                                            • Supplement Info Center

                                                       • PowerHA SystemMirror for i
                                                           • “How To Implement”
                                                           • V7000, SVC and more




                    http://www.redbooks.ibm.com/redbooks/pdfs/sg247858.pdf
27   A system designed for business                                          © 2012 IBM Corporation
IBM Power Systems


What Are Best Practices ?

                                                                                           H
     At a minimum should consider applying:                                                I




                                                                            W
      – CUM, HIPERs, DB Group, TR Group –                                                  P




                                                                                                     TP
                                                                             eb
        roughly every 6 months                                                             E




                                                                               Qu




                                                                                                  HT
                                                                                           R




                                                                                 er
      – Do not “pick and choose” individual PTFs                   Se                      S




                                                                                   y
        from the groups – load everything                             c                                         IP
                                                                          uri
                                                                             ty                              P/
      – This is the best way to avoid unplanned                                                            TC
        downtime
                                                                TR Group                  CUM              DB Group
     Depending on needs & your environment
      – Other groups
            (Security, Java, HTTP, TCP/IP, Print, BRMS, etc.)           S                                  Ja
                                                                                                             va
                                                                     BRM
      – Individual PTFs for particular support




                                                                                                Pe
                                                                                    int
      – Consult developerWorks and PSP web pages                                           E




                                                                                                   rf.
                                                                                  Pr
        for info to help make decision                                                     T




                                                                                                       To
                                                                                                         ols
                                                                                           C
     Load all into same image catalog
       – Apply from there
       – Let the system decide
         how to apply most                Virtual
                                          Optical
         efficiently
                                       Image Catalog

28    A system designed for business                                                                       © 2012 IBM Corporation
IBM Power Systems


The TR PTF Itself


     The TR PTF will be available before GA
      – TR PTF is created well before GA, so it can be included in the
         GA Resave
      – It is extensively tested on older levels of supported hardware
         before that – so it is safe to install on older supported systems
      – BUT IBM does not recommend that it be installed without the
         TR PTF Group, unless it is required by another PTF or PTF Group being installed.

     The TR PTF can become a requisite of another PTF before (or after) GA
      – If a part / module in the TR PTF is changed by a subsequent PTF,   TR
                                                                            TRREQ
         the TR PTF becomes a special kind of requisite, called a *TRREQ
         (looks like prereq in Retain)
      – Follow on PTFs can be *IMMED even though Tech Refresh PTF is *DELAYED.

     The TR PTF can be included in PTF groups (like HIPERs and CUMs)
      – If a PTF in the HIPER group or CUM calls out
         the TR PTF as a *TRREQ, then the TR PTF                   HIPER
         will be pulled into the HIPER group or CUM         PTF
                                                                PTF
                                                                          PTF
                                                         TR           PTF
      – In fact, this likely will occur                                     PTF
                                                                     PTF
                                                               PTF           TRREQ
                                                                                 PTF
                                                                           PTF

29    A system designed for business                                                   © 2012 IBM Corporation
IBM Power Systems


Some Other Things to Remember

     The TR PTF may be required for debug or future fixes
      – Development / support will generally try to debug
         a problem when the system is in the failing state
            Sometimes development builds traps or special             1                    3
              debug code to help isolate the problem                          2

      – If system is back-level, may need to bring fix level
        up to date before can get permanent fix – if TR PTF
        is in PTF chains of fix, this will mean applying the TR PTF

     Later Technology Refreshes are supersets of previous ones
       – This means that if a system is back level on Technology
         Refreshes, only the latest TR must be installed to               1       2            3
         bring the system up to date

     Make sure the TR PTF is permanently applied
      – Will need to be perm applied before any
        follow on PTFs that require it can be
        applied

30    A system designed for business                                                  © 2012 IBM Corporation
IBM Power Systems


Details for Planning Purposes

     Before installing the TR PTF, TR Group, CUM, etc. make sure the Double IPL Automation
     PTF is installed on your system – SI43585
      – It will save you time when applying TRs, Groups, PTFs, etc.
      – Has been in HIPER group since 05/10/11
      – In TR Group for TR 2 – 05/13/11
      – In CUM and Resave available at same time as TR 2

     Must be installing from an image catalog, in order to take advantage of the “Double IPL”
     automation support
       – If installing from a remote virtual optical device on a different partition, make sure the
         server partition has PTF SI42302 applied (contains required image catalog and optical
         code for “Automatic Double-IPL”).

     Read InfoApar II14482 when planning your upgrade to 7.1
      – Lists PTFs and process needed to avoid a potential problem trying to
        apply a TR immediately after doing an upgrade to 7.1 from 5.4.x or 6.1.x,
      – This was initially thought to be a TR problem, but was actually related to image
        catalog support




31    A system designed for business                                                    © 2012 IBM Corporation
IBM Power Systems


If You Have Questions


     Don’t just assume
      – Consult the web pages, FAQs, Info Center, etc.
      – And if still confused – ASK




32    A system designed for business                     © 2012 IBM Corporation
IBM Power Systems




Enhancements provided by TRs




                               © 2012 IBM Corporation
IBM Power Systems


IBM i 7.1 Technology Refreshes Add Value



     Technology Refresh 1 – September 2010
      – Virtual Media support to reduce hardware dependencies and costs
      – Network Installation of all IBM i software for more efficient operations
      – Web Services support for integrating legacy applications into business processes

     Technology Refresh 2 – May 2011
      – Suspend/Resume IBM i partition as another step towards clouds
      – Sharing Tape Drives across IBM i partitions to reduce infrastructure complexity
      – XML and Security enhancements to DB2 for i

     Technology Refresh 3 – October 2011
      – VM Image Management in cooperation with Systems Director VMControl
      – PowerHA support of V7000 & SVC – Metro Mirror, Global Mirror & FlashCopy
      – Thin Provisioning for DS8700 and DS8800 storage servers, and for VIOS Shared
         Storage Pools allows configurations set up with a smaller amount of real disk storage

34    A system designed for business                                                  © 2012 IBM Corporation
IBM Power Systems


PowerHA SystemMirror Enhancements                                                           Translated Version TR4

  • PowerHA SystemMirror for IBM i support includes
       • DS8000 (DS8K)
       • SAN Volume Controller (SVC) and IBM Storage Systems Storwize V7000                                  TR3
  • Advanced Copy Services (ACS)
       • Currently available for DS8K
       • Future direction - V7000



                                                          Admin domain
                    Local Site
                                    *SYSBAS
                                                                             *SYSBAS
                                                                               (DR)
                                                                                                DR Site
                       POWER7
                                      (Prod)             Metro Mirror
                        IBM i

                                                                         F     IASP
                                      IASP
                                   (Switchable)          Global Mirror   l                                HA
                                                                                                          DR
                                                                         a
                                                                         s
                                                                         h
                                                                         C     IASP
                        DR
                        HA
                                                                                                          Flash
                                                                         o
                                                                                                         Backup
                                                                         p    *SYBAS
                                                                         y   (Backup I)

                       POWER7                                                                            POWER7
                        IBM i         DS8000                                  DS8000                      IBM i
                      Production      SVC*                                    SVC
                                      Storewize V7000*                        Storewize V7000        ©


35   A system designed for business                                                                        © 2012 IBM Corporation
IBM Power Systems


IBM i Technology Refresh 4 - Highlights
       Moving running workloads from one machine to another with Live
       Partition Mobility delivers the next step for cloud environments
       DB2 for i enhancements improve performance as well as delivering
       additional security, error monitoring and SQL functions
                                                                               Virtualized SAN and Network Infrastructure




                                      DB2 WebQuery for i simplifies ordering with Express and Standard
                                      offerings
                                      New options in Application Runtime Expert allow access to the tool
                                      without granting high security levels




       IBM i Workload Groups allows clients to license SWG products at "less
       than capacity" level
     • PowerHA for IBM i now includes support for IBM Storage Systems
       Storwize V7000 and San Volume Controller (SVC)



36    A system designed for business                                                                   © 2012 IBM Corporation
IBM Power Systems



Live Partition Mobility for IBM i

     Improves service levels for IBM i workloads
       – Business and IT security and resiliency are as critical as ever, and must
         be dynamic and intelligent in order to match the speed of business
         change
       – PowerVM Live Partition Mobility
              Move running IBM i partitions between systems
     Eliminate planned outages and balance workloads across systems
     VIOS is required




                                                                          TR4 Group Required




                            Virtualized SAN and Network Infrastructure
                             Virtualized SAN and Network Infrastructure



37   A system designed for business                                                  © 2012 IBM Corporation
IBM Power Systems


New I/O Support for IBM i

                                  New SFF SSD:
                                   – 2X performance      2X capacity
                                   – Better price performance

                                  High performance low profile SAS SSD Adapter
                                    – RAID 5/6 with just one adapter (vs two)
                                    – May lower the cost for SSD configuration

                                  New lower price, 4-port 1Gb LAN adapter
                                   – Native support plus support through VIOS
                                   – Replaces existing 2-port and 4-port LAN adapters in most POWER7
                                      proposals

                                  New DAT160 USB-attached tape drive config option
                                   – for Power 720/740/750 HH bay of system unit
                                   – Supported through VIOS
                                   – Potentially improves performance for saves/restores


                                                                          TR4 Group Required


38   A system designed for business                                                        © 2012 IBM Corporation
IBM Power Systems


DB2 for i Enhancements                                              Row Lock Performance

                                                              250
       Significant functional enhancements                                228

         – Short names
                                                              200
         – Where used information
         – Support for JDBC 4.1 specification                 150
       SQL enhancements                                                                          Before
                                                    Minutes
                                                                                                 After
         – Subselect                                          100

         – RUNSQL command
                                                               50
       Security enhancements
                                                                                 12
         – Object Auditing Control
                                                                0
       Performance improvements
         – based on analysis of index statistics
       DB Management Improvements
         – adding SYSDISKSTAT catalog to QSYS
           library
       Enhanced SQL Error Reporting using monitor
       records

                            DB2 Group Required
                            See developerWorks
39   A system designed for business                                                        © 2012 IBM Corporation
IBM Power Systems


Web Integration Enhancements



       Java 7 5761-JV1 Options 14 & 15
         – 32 and 64 bit version Java 7 runtime engine
         – Available only on IBM i 7.1

       XML Service GA Dec 2011
        – New Open Source tool to access Native IBM i objects from any language
        – Access RPG programs from PHP, RUBY, or other languages
        – Use in a Tier 1 or Tier 2 environment




40   A system designed for business                                               © 2012 IBM Corporation
IBM Power Systems


IBM i Workload Groups – Enhanced Management & Licensing

     Workload Groups new capabilities to manage/license workloads on IBM i
      – Limit the number of cores that are used by specific applications
         within single system/partition/subsystem
      – Limits placed at the whole processor-core level
      – Applications licensed for the number of capped cores
      – Can cap a single job or all jobs/threads in a subsystem




                           IBM i Today                              IBM i with Workload Groups

                        Application #1= 6 Cores               Application #1 = 3 Cores

                        Application #2 = 6 Cores                  Application #2 = 4 Cores


                             IBM i = 6 Cores                                    IBM i = 6 Cores


                    IBM i System / Partition / Subsystem                IBM i System / Partition / Subsystem

                https://www.ibm.com/developerworks/mydeveloperworks/wikis/home?lang
                =en#/wiki/IBM%20i%20Technology%20Updates/page/IBM%20i%20workload%20groups
41   A system designed for business                                                                            © 2012 IBM Corporation
IBM Power Systems


Summary



     Without Technology Refreshes
      – IBM i would be delivering another release this year – 2012
           There would have been impacts to V5R4 & 6.1 EoS
      – Partition Mobility would not be available on 7.1
           Along with Suspend/Resume & other virtualization enhancements
      – Coordination of deliverables would have been unlikely
           “Same As Always” would have occurred

     With Technology Refreshes
      – Full-release function has been delivered
           In a staged approach
      – Isolation of new function allows for mini-release testing
           While ensuring that TRs do not require requalification
      – No Release Upgrade is required
           Disruption of release is removed

42    A system designed for business                                       © 2012 IBM Corporation
IBM Power Systems




                              Thank You!
43   A system designed for business        © 2012 IBM Corporation
IBM Power Systems




Technology Refresh: Backup Details




                                     © 2012 IBM Corporation
IBM Power Systems




     A very detailed walk-through using system interfaces to install and inspect the TR was written
     in spring 2011 with TR2 as the example TR. I include that example here for reference
     purposes.



     COMMON 2011 had a very detailed presentation on Technology Refreshes, and that “helpful
     hint” information is also included, because it might help you with the details of TRs.




45    A system designed for business                                                   © 2012 IBM Corporation
IBM Power Systems


Display PTF – DSPPTF LICPGM(5770999)
                                                                                         PTFs are displayed in
                                Display PTF Status
                                                                                         descending order by
                                                System: SYSTEM1                          PTF ID, so the Tech
                    Product ID . . . . . . . . . . . . . : 5770999
                                                                                         Refresh PTFs (MF99*)
                    IPL source . . . . . . . . . . . . . : ##MACH#B                      will be listed after the
                    Release of base option . . . . . . . : V7R1M0 L00                    marker (TL*) PTFs, but
                    Type options, press Enter.                                           before the remaining
                     5=Display PTF details 6=Print cover letter 8=Display cover letter
                                                                                         MF* PTFs.
                      PTF                                 IPL
                    Opt ID  Status                              Action
                    5 MF99002 Permanently applied                      None
                      MF99001 Permanently applied                     None
                    5 MF52149 Permanently applied                      None
                      MF50941 Superseded                            None
                      MF50925 Permanently applied                     None
                      MF50860 Not applied                          None
                      MF50836 Temporarily applied                     None


                                                                       More ...
                    F3=Exit F11=Display alternate view F17=Position to F12=Cancel




46                                                                                                   © 2011 IBM Corporation
IBM Power Systems


Display PTF – DSPPTF details of Tech Refresh PTF
                                                                            • Note the Technology
                                Display PTF Details                         Refresh PTF will call out
                    Product ID/PTF ID . . . . . . . . . : 5770999 MF99002   Link/Loader (LIC PTF
                    Release . . . . . . . . . . . . . . : V7R1M0            Management) PTF MF51814
                    Select one of the following:                            as a prereq.
                      1. General information
                      2. Requisite PTFs                                     • TR2 supersedes TR1 and
                                                                            339 existing LIC PTFs (110
                        4. Superseded PTFs
                                                                            chains), TR1 superseded 87
                      6. PTF Objects                                        PTFs.
                      7. Symptom strings

                      9. APARs fixed                                        • Option 6 to list objects in
                      20. All of the above                                  TR2 will show 1507 RUs
                                                                            (replaceable units). Each TR
                                                                            is cumulative, so the object
                                                                                  Bottom
                    Selection                                               list will grow every 6 months
                       1
                                                                            when we release a new TR
                    F3=Exit F12=Cancel                                      (TR1 had 525 RUs). PTF
                                                                            save file for TR2 is 20 meg
47
                                                                            (TR1 was 8.6 meg). © 2011 IBM Corporation
IBM Power Systems


Display PTF – DSPPTF Tech Refresh PTF, option 1

                                  General information

                    Product ID/PTF ID . . . . . . . . . . : 5770999 MF99002
                    Release . . . . . . . . . . . . . . . : V7R1M0

                    On order . . . . . . . . . . . . . . . : No
                    PTF save file . . . . . . . . . . . . : Yes
                    PTF status . . . . . . . . . . . . . . : Permanently applied
                    Latest superseding PTF . . . . . . . . : None
                    Type . . . . . . . . . . . . . . . . . : Delayed
                    Unattended IPL action . . . . . . . . : None
                                                                                      Note Tech Refresh
                    Optional part . . . . . . . . . . . . : *BASE                     PTF will always be
                    PTF library . . . . . . . . . . . . . : QGPL                      Delayed and require
                    Cover letter . . . . . . . . . . . . . : No
                    Mandatory instructions . . . . . . . . : No                       an IPL to apply.
                    Test Fix . . . . . . . . . . . . . . . : No
                    Action pending . . . . . . . . . . . . : No
                    Action required . . . . . . . . . . . : No
                                                                                   More...
                    Press Enter to continue

                    F3=Exit F12=Cancel




48                                                                                              © 2011 IBM Corporation
IBM Power Systems


Display PTF – DSPPTF Tech Refresh PTF, option 1

                                               General information

                    Product ID/PTF ID . . . . . . . . . . : 5770999 MF99002
                    Release . . . . . . . . . . . . . . . : V7R1M0

                    Target release . . . . . . . . . . . . : V7R1M0
                    Minimum-Maximum level . . . . . . . . : L00-L00
                    PTF creation date/time . . . . . . . . : 01/21/11 10:04:34
                    Technology refresh PTF . . . . . . . . : Yes

                                                                                 New Technology
                                                                                 refresh field added to
                                                                                 the panel. Note new
                                                                                 attribute is only
                                                                                 applicable for LIC
                                                              Bottom             (57xx999) PTFs.
                    Press Enter to continue

                    F3=Exit F12=Cancel




49                                                                                           © 2011 IBM Corporation
IBM Power Systems


Display PTF – DSPPTF details of Follow-on PTF

                                Display PTF Details
                                                                             •Note: Option 2
                    Product ID/PTF ID . . . . . . . . . : 5770999 MF52149
                    Release . . . . . . . . . . . . . . : V7R1M0             (Requisite PTFs) is
                                                                             listed because the
                    Select one of the following:
                                                                             follow-on PTF will
                      1. General information                                 *TRREQ the Tech
                      2. Requisite PTFs
                                                                             Refresh PTF.
                      6. PTF Objects
                      7. Symptom strings
                                                                              •Note: Option 4
                      9. APARs fixed                                          (Superseded PTFs) is
                      20. All of the above                                    not listed because the
                                                                              follow-on PTF does
                                                                            Bottom supersede the
                                                                              not
                    Selection
                       2                                                      Tech Refresh PTF (or
                                                                              any other PTFs in this
                    F3=Exit F12=Cancel
                                                                              example).



50                                                                                           © 2011 IBM Corporation
IBM Power Systems


Display PTF – DSPPTF Follow-on PTF, option 2

                                Display Requisite PTFs

                    Product ID/PTF ID . . . . . . . . . : 5770999 MF52149
                    Release . . . . . . . . . . . . . . : V7R1M0

                         Product Requisite       Product Requisite
                    PTF ID ID     type     PTF ID ID     type
                    MF99002 5770999 *TRREQ

                                                                            New *TRREQ
                                                                            (Technology refresh
                                                                            requisite) type defined
                                                                                Bottom
                                                                            in addition to
                    Press Enter to continue                                 *PREREQ, *COREQ,
                                                                            *DSTREQ.
                    F3=Exit F12=Cancel




51                                                                                      © 2011 IBM Corporation
IBM Power Systems


Display PTF – DSPPTF Requisite type help (*TRREQ)

                                 Requisite type - Help

                    The type of the requisite. The types are:

                    *PREREQ
                      The PTF is required to be installed on the system before you
                       can apply this PTF.
                    *COREQ
                      The PTF is required to be applied with the PTF that is being
                      displayed.                                                     Note the *TRREQ is a
                    *TRREQ                                                           load time check where
                      The technology refresh PTF is required to be permanently       *PREREQ and
                      applied on the system before you can load this PTF.
                    *DSTREQ
                                                                                     *COREQ are apply
                      The PTF is required for distribution purposes only.            time checks.

                                                                  Bottom
                    F2=Extended help F3=Exit help F10=Move to top F12=Cancel
                    F13=Information Assistant   F14=Print help




52                                                                                             © 2011 IBM Corporation
IBM Power Systems


Installing Follow-on (*TRREQ) PTF when Tech Refresh PTF not installed


     Can occur in the following scenarios:

       – Order and Install cumulative PTF package                      CUM
                                                             PTF                    PTF
         C1116710 for IBM i 7.1 where the cumulative               PTF
                                                                             PTF
                                                                                         PTF
         PTF package contains TR2 and follow-on PTFs.       PTF
                                                                  TR
                                                                           TRREQ
                                                                               PTF
                                                                         PTF




       – Order and Install a PTF group (e.g. Technology                             HIPER
         Refresh, TCP/IP, HIPER) that contains a follow-on PTF.             PTF
                                                                                  PTF
                                                                                                  PTF
                                                                       TR                   PTF
                                                                                                     PTF
                                                                                  PTF
                                                                          PTF             TRREQ
                                                                                              PTF
                                                                                        PTF


       – Order and Install an individual PTF that is a
         follow-on (*TRREQ) PTF for the Technology
         Refresh PTF.                                                    TR
                                                                          TRREQ




53                                                                                        © 2011 IBM Corporation
IBM Power Systems


Installing Follow-on (*TRREQ) PTF when Tech Refresh PTF not installed

     For each of the previous scenarios:

        – Make sure “Automatic Double-IPL” PTF SI42445 is applied (PTF is in
          HIPER PTF group SF99709 level 26 or higher). Note this PTF automates
          the extra IPL for both Technology Refresh and Special Handling pre-apply
          PTFs.

        – If your PTFs are on physical DVDs, create image catalog and use the Add
          Image Catalog Entry (ADDIMGCLGE) command for each DVD.

        – If you are installing PTFs from a remote virtual optical device on a different
          partition, make sure the server partition has
          PTF SI42302 applied (contains required image
          catalog and optical code for
          “Automatic Double-IPL”).

        – Use GO PTF command, option 8 to install PTFs.

54                                                                           © 2011 IBM Corporation
IBM Power Systems


Installing Follow-on (*TRREQ) PTF when Tech Refresh PTF not installed

     For each of the previous scenarios:


       – Make sure “Automatic Double-IPL” PTF SI42445 is applied (PTF is in
         HIPER PTF group SF99709 level 26 or higher). Note this PTF automates the
         extra IPL for both Technology Refresh and Special Handling pre-apply PTFs.

       – If your PTFs are on physical DVDs, create image catalog and use the Add
         Image Catalog Entry (ADDIMGCLGE) command for each DVD.

       – If you are installing PTFs from a remote virtual optical device on a different
         partition, make sure the server partition has
         PTF SI42302 applied (contains required image
         catalog and optical code for
         “Automatic Double-IPL”).

       – Use GO PTF command, option 8 to install PTFs.

55   A system designed for business                                          © 2012 IBM Corporation
IBM Power Systems


GO PTF, option 8 (Install a PTF package)

                            Install Options for Program Temporary Fixes       • For Device, enter
                                                  System: SYSTEM1             name of virtual optical
                    Type choices, press Enter.
                                                                              device with loaded
                    Device . . . . . . . . . OPTVRT01 Name, *SERVICE, *NONE   image catalog, or
                                                                              *SERVICE. To install
                    Automatic IPL . . . . . N    Y=Yes
                                            N=No
                                                                              from both optical and
                                                                              *SERVICE, change
                    Prompt for Media . . . . 1     1=Single PTF volume set    Prompt for Media field
                                            2=Multiple PTF volume sets
                                            3=Multiple volume sets and        to 3.
                                             *SERVICE
                                                                              • For Automatic IPL,
                    Restart type . . . . . . *SYS   *SYS, *FULL
                                                                              enter Y or N. Auto
                    Other options . . . . . N     Y=Yes                       IPL=Y will power down
                                             N=No
                                                                              immediately if IPL
                                                                              required to perm apply
                    F3=Exit F12=Cancel                                        TR PTF.



56                                                                                           © 2011 IBM Corporation
IBM Power Systems


GO PTF – Load PTFs from device for all products

                                PTF Load in Progress             • PTF Install code will
                                               System: SYSTEM1   load the TR PTF and
                                                                 its requisites, then
                    Product
                    ID    Description
                                                                 automatically set
                    5770999 Licensed Internal Code               them for perm apply.

                                                                 • PTF Install code will
                                                                 not load any LIC PTFs
                                                                 from media files
                                                                 containing a follow-on
                                                                 (*TRREQ) PTF. For
                                                                 *SERVICE, all LIC
                                                                 PTFs that are not
                                                                 follow-on (*TRREQ)
                                                       Bottom    PTFs are loaded.
                    Loading PTFs for 1 of 39 Licensed Programs




57                                                                              © 2011 IBM Corporation
IBM Power Systems


GO PTF – Message CPF362E: IPL required

                                 Program Temporary Fix                 •New CPF362E (IPL required)
                                                 System: SYSTEM1       message is English only. We
                    Select one of the following:
                     1. Load a program temporary fix
                                                                       save GO PTF parms in an
                     2. Apply a program temporary fix                  internal space to use on the
                     3. Copy a program temporary fix                   next normal, unattended IPL to
                     4. Remove a program temporary fix
                     5. Display a program temporary fix
                                                                       finish the PTF Install. So …
                     6. Order a program temporary fix                  don’t delete the image catalog
                     7. Install a program temporary fix from a list    until the PTF install is
                     8. Install a program temporary fix package
                     9. Copy PTF Cover letter                          complete. If using remote
                    10. Display PTF Cover letter                       optical device, make sure
                    11. Delete a program temporary fix
                                                                       server partition has image
                                                      More ...
                                                                       catalog with PTFs still loaded
                    Selection or command                               when you IPL the client
                    ===> 8
                                                                       partition.
                    F3=Exit F4=Prompt F9=Retrieve F12=Cancel
                                                                       •Note if IPL required for special
                    IPL required to complete PTF install processing.
                                                                       handling pre-apply PTF (cume
                                                                       pkg), same message.
58                                                                                            © 2011 IBM Corporation
IBM Power Systems


Operating System IPL (SCPF job)

                              Operating System IPL in Progress                     •During LIC IPL, Link/Loader
                                               5/02/11 06:30:23
                                                                                   perm applies TR PTF and its
                    IPL:
                     Type . . . . . . . . . . . . : Unattended                     requisites (mini IPL to A side).
                     Start date and time . . . . : 5/02/11 06:15:08                •OS IPL, XPF PTF
                     Previous system end . . . . : Normal                          Management syncs with LL
                     Current step / total . . . . : 17 49
                     Reference code detail . . . : C900 2967
                                                                                   and marks TR PTF and
                                                                                   requisites perm applied.
                    IPL Step:                Time elapsed Time remaining           •Load remaining LIC PTFs
                     Internal journal recovery      00:00:02                       from previous device and
                     SAG initialization         00:00:01
                    > PTF Processing              05:14:28   11:30:41
                                                                                   image catalog. Activity:
                     Signals initialization                                        Loading PTFs
                                                                                   •Set all PTFs for delayed
                    Item:                                                          apply. Activity: Setting IPL
                      Current / total . . . . . . : 1       254
                      Identifier . . . . . . . . . : 5770999-MFxxxxx V7R1M0
                                                                                   Action for PTFs
                      Activity . . . . . . . . . . : Setting IPL Action for PTFs   •New English msg CPI35ED –
                                                                                   IPL requested by PTF
                    IPL requested by PTF processing.                               processing – restart partition

59                                                                                                       © 2011 IBM Corporation
IBM Power Systems


Operating System IPL (SCPF job)

                             Operating System IPL in Progress                 •During 2nd LIC IPL,
                                              5/02/11 07:08:18
                                                                              Link/Loader applies all
                    IPL:
                     Type . . . . . . . . . . . . : Unattended                LIC PTFs set for
                     Start date and time . . . . : 5/02/11 07:02:45           delayed apply.
                     Previous system end . . . . : Normal
                     Current step / total . . . . : 17 49
                     Reference code detail . . . : C900 2967
                                                                              •During 2nd OS IPL,
                                                                              normal PTF processing
                    IPL Step:                Time elapsed Time remaining      to apply all PTFs set
                     Internal journal recovery      00:00:02                  for delayed apply.
                     SAG initialization         00:00:01
                    > PTF Processing              16:13:28   9:33:51
                                                                              Continue IPL to sign-
                     Signals initialization                                   on.

                    Item:
                      Current / total . . . . . . : 52      254
                      Identifier . . . . . . . . . : 5770SS1-SIxxxxx V7R1M0
                      Activity . . . . . . . . . . : Applying PTFs




60                                                                                          © 2011 IBM Corporation
IBM Power Systems


Verify PTFs installed: WRKPTFGRP or DSPPTF

                                  Work with PTF Groups
                                                System: SYSTEM1
                                                                                    -If PTFs not installed,
                    Type options, press Enter.                                      previous SCPF joblog
                     1=Order 4=Delete 5=Display 6=Print                             has debug information.
                     8=Display special handling PTFs 9=Display related PTF groups

                    Opt PTF Group Level Status
                    _ SF99710    11116 Installed
                    _ SF99710    10229 Installed
                    _ SF99709      27 Installed
                    _ SF99709      26 Installed
                    _ SF99707       2 Installed
                    _ SF99707       1 Installed
                    _ SF99701       6 Not installed
                    _ SF99701       5 Installed
                    _ SF99362       9 On order




                                                     Bottom
                    F3=Exit F6=Print F11=Display descriptions F12=Cancel
                    F22= Display entire field




61                                                                                                 © 2011 IBM Corporation
IBM Power Systems


Just the FAQs – the TR PTF

     Is TR PTF available before GA, and if so, is it safe to install?
       – Yes, and yes
       – TR PTF is created well before GA, so it can be included in the GA
         Resave
       – Extensively tested on older levels of supported hardware before that – so it is safe to
         install on older supported systems
       – BUT IBM does not recommend that it be installed, unless it is required by another
         PTF or PTF Group you are installing.

     Can the TR PTF become a requisite of another PTF before (or after) GA?
       – Yes
       – If a part / module in the TR PTF is changed by a subsequent PTF, the TR PTF
         becomes a special kind of requisite, called a *TRREQ

     Can the TR PTF be included in PTF groups (like HIPERs and CUMs)?
       – Yes
       – If a PTF in the HIPER group or CUM calls out the TR PTF as a
         TRREQ, then the TR PTF will be pulled into the HIPER group or
         CUM – in fact, this likely will occur


62                                                                                    © 2011 IBM Corporation
IBM Power Systems


Just the FAQs – Install and Requisites

     Will the TR PTF be required for debug or future fixes?
       – Perhaps
       – Development / support will generally try to debug
         a problem when the system is in the failing state                 1
                                                                                   2
                                                                                           3
             • Sometimes development builds traps or special
               debug code to help isolate the problem
       – If system is back-level, may need to bring fix level
         up to date before can get permanent fix – if TR PTF is in PTF chains of fix, this will
         mean applying the TR PTF

     How are later Technology Refreshes related to previous ones?
       – Later Technology Refreshes are supersets of previous ones for the same base release
             • This means that if a system is back level on Technology
               Refreshes, only the latest one must be installed to bring       1       2             3
               the system up to date

     Are Technology Refreshes available for the entire IBM i operating system?
       – No, Technology Refreshes are currently only available for Licensed Internal Code
       – However, other system function may be GAed at the same time as a TR

63                                                                                         © 2011 IBM Corporation
IBM Power Systems


Just the FAQs – Recovery and Best Practices

     How do I remove a Technology Refresh from my system?
     –        ***DON’T*** – the TR will eventually be required for future fixes (but can temporarily)
          •         Install a save of the system made before the Technology Refresh install
          •         Install a previous Resave level or the base install media, and bring the system up to date by
                    applying appropriate PTFs, CUMs, groups

     How do I restore my system back to a known level after a failure?
     –        If system was at current Technology Refresh level, install the latest Resave,
              plus CUM, plus TR PTF Group, and any other PTFs, groups, etc.
     –        To restore to an earlier level, must archive media or a save of the system

     What are some BEST PRACTICES?
     1.       Keep systems up to date with latest Technology Refresh PTF Group
     2.       When installing a Technology Refresh, install either the
              TR Group plus the CUM, or the Resave plus the TR
              Group plus the CUM; do not install just the TR PTF
     3.       Install the Double IPL Automation PTF SI42445
     4.       Make sure the Technology Refresh PTF is permanently
              applied to your system
     5.       Install from an image catalog, rather than from physical
              media, for simplicity and improved performance

64                                                                                                   © 2011 IBM Corporation
IBM Power Systems


Potential “Gotchas” to Consider

     DON’T confuse the Technology Refresh PTF with the Technology Refresh
     PTF Group and the overall Technology Refresh itself
       – The Technology Refresh for a particular GA is the Technology Refresh PTF Group
         plus the corresponding GA CUM
           • See the TR web pages for the appropriate levels
       – Timeline works like this:
           • TR PTF is approved and becomes visible well
              before GA, to include in GA Resave
           • TR Web Pages are updated with information on
              new TR levels at Announce
           • TR PTF Group, Resave, and CUM become available at GA

     DON’T install the Technology Refresh PTF by itself
       – The Technology Refresh PTF by itself may not supply complete support or include
         the latest fixes for a particular Technology Refresh.
       – IBM recommends that customers should NOT install the
         Technology Refresh PTF by itself, but instead should
         install the Technology Refresh PTF Group and the
         matching CUM (or, if upgrading from older release,
         the Resave + TR Group + CUM)

65                                                                             © 2011 IBM Corporation
IBM Power Systems


Potential “Gotchas” to Consider -2-

     DON’T install the Technology Refresh PTF before GA
       – The Technology Refresh PTF will be available before GA,
         so it can be included in the GA Resave and CUM
       – However, IBM does not recommend installing the TR PTF
         before GA unless it is required by a follow-on PTF, because:
             • The TR PTF is not needed for existing hardware or function
             • The TR PTF by itself may not contain complete support for new hardware or
               function
             • The new hardware or function the TR PTF enables is not supported until after GA
       – If the Technology Refresh PTF is not required to install a follow-on PTF or PTF Group,
         customers should wait until the Technology Refresh GA and install the TR PTF
         Group + GA CUM at that time

     DO permanently apply the Technology Refresh PTF as soon as convenient
       – This will save time later when applying follow-on PTFs
         that require it (*TRREQ it)




66                                                                                  © 2011 IBM Corporation
IBM Power Systems


Potential “Gotchas” to Consider -3-

     DO have the Double IPL Automation PTF installed on a system before trying
     to install the TR Group, TR PTF, Resave, CUM, HIPER Group, etc.
       – This will avoid confusion and potentially additional time required,
         when upgrading to a new TR level or installing a follow-on PTF that
         requires a TR (*TRREQ)

     DO keep your system up to date with latest Technology Refreshes
       – This can help reduce debug time for system problems, and can avoid
         unnecessary outages for system problems that already have fixes available
       – Installing a Technology Refresh as soon as it is convenient may avoid having to
         install it at an inconvenient time, in order to get a needed fix

     DO install a Technology Refresh from an image catalog
     rather than physical media, if possible
       – It will be simpler and will improve performance
       – Using an image catalog is necessary for the
         “Double IPL” automation support


67                                                                                © 2011 IBM Corporation
IBM Power Systems


References
     System i Software Information Center: http://publib.boulder.ibm.com/eserver/ibmi.html
      – Maintaining and managing IBM i and related software
      – Application Programming Interfaces (APIs)
      – Service and support

     Additional URLs
      – IBM i Technology Refresh:
           http://www-947.ibm.com/systems/support/i/planning/techrefresh/index.html
      – IBM i Resaves:
           http://www-947.ibm.com/systems/support/i/planning/resave/v7r1.html
      – IBM i PTF Groups
           http://www-
              912.ibm.com/s_dir/sline003.NSF/GroupPTFs?OpenView&view=GroupPTFs
      – Preventative Service Planning (PSP) for IBM i:
           http://www-912.ibm.com/s_dir/sline003.nsf/sline003home
      – IBM Systems Support, System i, Fixes:
           http://www-947.ibm.com/systems/support/i/fixes/index.html
      – “Automate Extra IPL for PTF Install,” iDevelop Blog article:
           http://ibmsystemsmag.blogs.com/i_can/2011/03/automate-extra-ipl-for-ptf-
              install.html
68   A system designed for business                                              © 2012 IBM Corporation
IBM Power Systems

Special notices
 This document was developed for IBM offerings in the United States as of the date of publication. IBM may not make these offerings available in
 other countries, and the information is subject to change without notice. Consult your local IBM business contact for information on the IBM
 offerings available in your area.
 Information in this document concerning non-IBM products was obtained from the suppliers of these products or other public sources. Questions
 on the capabilities of non-IBM products should be addressed to the suppliers of those products.
 IBM may have patents or pending patent applications covering subject matter in this document. The furnishing of this document does not give
 you any license to these patents. Send license inquires, in writing, to IBM Director of Licensing, IBM Corporation, New Castle Drive, Armonk, NY
 10504-1785 USA.
 All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives
 only.
 The information contained in this document has not been submitted to any formal IBM test and is provided "AS IS" with no warranties or
 guarantees either expressed or implied.
 All examples cited or described in this document are presented as illustrations of the manner in which some IBM products can be used and the
 results that may be achieved. Actual environmental costs and performance characteristics will vary depending on individual client configurations
 and conditions.
 IBM Global Financing offerings are provided through IBM Credit Corporation in the United States and other IBM subsidiaries and divisions
 worldwide to qualified commercial and government clients. Rates are based on a client's credit rating, financing terms, offering type, equipment
 type and options, and may vary by country. Other restrictions may apply. Rates and offerings are subject to change, extension or withdrawal
 without notice.
 IBM is not responsible for printing errors in this document that result in pricing or information inaccuracies.
 All prices shown are IBM's United States suggested list prices and are subject to change without notice; reseller prices may vary.
 IBM hardware products are manufactured from new parts, or new and serviceable used parts. Regardless, our warranty terms apply.
 Any performance data contained in this document was determined in a controlled environment. Actual results may vary significantly and are
 dependent on many factors including system hardware configuration and software design and configuration. Some measurements quoted in this
 document may have been made on development-level systems. There is no guarantee these measurements will be the same on generally-
 available systems. Some measurements quoted in this document may have been estimated through extrapolation. Users of this document
 should verify the applicable data for their specific environment.




69                                                                                                                                    © 2012 IBM Corporation
IBM Power Systems

 Special notices (cont.)
IBM, the IBM logo, ibm.com AIX, AIX (logo), AIX 6 (logo), AS/400, BladeCenter, Blue Gene, ClusterProven, DB2, ESCON, i5/OS, i5/OS (logo), IBM Business Partner
(logo), IntelliStation, LoadLeveler, Lotus, Lotus Notes, Notes, Operating System/400, OS/400, PartnerLink, PartnerWorld, PowerPC, pSeries, Rational, RISC
System/6000, RS/6000, THINK, Tivoli, Tivoli (logo), Tivoli Management Environment, WebSphere, xSeries, z/OS, zSeries, AIX 5L, Chiphopper, Chipkill, Cloudscape, DB2
Universal Database, DS4000, DS6000, DS8000, EnergyScale, Enterprise Workload Manager, General Purpose File System, , GPFS, HACMP, HACMP/6000, HASM, IBM
Systems Director Active Energy Manager, iSeries, Micro-Partitioning, POWER, PowerExecutive, PowerVM, PowerVM (logo), PowerHA, Power Architecture, Power
Everywhere, Power Family, POWER Hypervisor, Power Systems, Power Systems (logo), Power Systems Software, Power Systems Software (logo), POWER2,
POWER3, POWER4, POWER4+, POWER5, POWER5+, POWER6, POWER6+, System i, System p, System p5, System Storage, System z, Tivoli Enterprise, TME 10,
Workload Partitions Manager and X-Architecture are trademarks or registered trademarks of International Business Machines Corporation in the United States, other
countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols
indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law
trademarks in other countries. A current list of IBM trademarks is available on the Web at "Copyright and trademark information" at www.ibm.com/legal/copytrade.shtml

The Power Architecture and Power.org wordmarks and the Power and Power.org logos and related marks are trademarks and service marks licensed by Power.org.
UNIX is a registered trademark of The Open Group in the United States, other countries or both.
Linux is a registered trademark of Linus Torvalds in the United States, other countries or both.
Microsoft, Windows and the Windows logo are registered trademarks of Microsoft Corporation in the United States, other countries or both.
Intel, Itanium, Pentium are registered trademarks and Xeon is a trademark of Intel Corporation or its subsidiaries in the United States, other countries or both.
AMD Opteron is a trademark of Advanced Micro Devices, Inc.
Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc. in the United States, other countries or both.
TPC-C and TPC-H are trademarks of the Transaction Performance Processing Council (TPPC).
SPECint, SPECfp, SPECjbb, SPECweb, SPECjAppServer, SPEC OMP, SPECviewperf, SPECapc, SPEChpc, SPECjvm, SPECmail, SPECimap and SPECsfs are
trademarks of the Standard Performance Evaluation Corp (SPEC).
NetBench is a registered trademark of Ziff Davis Media in the United States, other countries or both.
AltiVec is a trademark of Freescale Semiconductor, Inc.
Cell Broadband Engine is a trademark of Sony Computer Entertainment Inc.
InfiniBand, InfiniBand Trade Association and the InfiniBand design marks are trademarks and/or service marks of the InfiniBand Trade Association.
Other company, product and service names may be trademarks or service marks of others.




 70                                                                                                                                               © 2012 IBM Corporation

Más contenido relacionado

La actualidad más candente

Future of Power: PureFlex and IBM i - Erik Rex
Future of Power: PureFlex and IBM i - Erik RexFuture of Power: PureFlex and IBM i - Erik Rex
Future of Power: PureFlex and IBM i - Erik RexIBM Danmark
 
IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012COMMON Europe
 
Ims13 ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...
Ims13   ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...Ims13   ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...
Ims13 ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...Robert Hain
 
IBM Power Event, Keynote Presentation Doug Davis
IBM Power Event, Keynote Presentation Doug DavisIBM Power Event, Keynote Presentation Doug Davis
IBM Power Event, Keynote Presentation Doug DavisIBM Danmark
 
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...IBM India Smarter Computing
 
Xtw01t6v0210 dcn
Xtw01t6v0210 dcnXtw01t6v0210 dcn
Xtw01t6v0210 dcnpgnguyen44
 
ISD 6.3 and IBM i june 2012
ISD 6.3 and IBM i june 2012ISD 6.3 and IBM i june 2012
ISD 6.3 and IBM i june 2012COMMON Europe
 
Ims keeping current for phoenix
Ims keeping current for phoenixIms keeping current for phoenix
Ims keeping current for phoenixJeff Pearce
 
System z Technology Summit Streamlining Utilities
System z Technology Summit Streamlining UtilitiesSystem z Technology Summit Streamlining Utilities
System z Technology Summit Streamlining UtilitiesSurekha Parekh
 
Aix The Future of UNIX
Aix The Future of UNIX Aix The Future of UNIX
Aix The Future of UNIX xKinAnx
 
電力使用量を抑制する4つのアプローチ
電力使用量を抑制する4つのアプローチ電力使用量を抑制する4つのアプローチ
電力使用量を抑制する4つのアプローチTakumi Kurosawa
 

La actualidad más candente (12)

Future of Power: PureFlex and IBM i - Erik Rex
Future of Power: PureFlex and IBM i - Erik RexFuture of Power: PureFlex and IBM i - Erik Rex
Future of Power: PureFlex and IBM i - Erik Rex
 
IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012IBM i 7.1 & TRs CEC 2012
IBM i 7.1 & TRs CEC 2012
 
Ims13 ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...
Ims13   ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...Ims13   ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...
Ims13 ims tools ims v13 migration workshop - IMS UG May 2014 Sydney & Melbo...
 
IBM Power Event, Keynote Presentation Doug Davis
IBM Power Event, Keynote Presentation Doug DavisIBM Power Event, Keynote Presentation Doug Davis
IBM Power Event, Keynote Presentation Doug Davis
 
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
IBM PureFlex Solution for Cloud Backup and Recovery: Private Cloud Disaster R...
 
Xtw01t6v0210 dcn
Xtw01t6v0210 dcnXtw01t6v0210 dcn
Xtw01t6v0210 dcn
 
Xen App Fp2
Xen App Fp2Xen App Fp2
Xen App Fp2
 
ISD 6.3 and IBM i june 2012
ISD 6.3 and IBM i june 2012ISD 6.3 and IBM i june 2012
ISD 6.3 and IBM i june 2012
 
Ims keeping current for phoenix
Ims keeping current for phoenixIms keeping current for phoenix
Ims keeping current for phoenix
 
System z Technology Summit Streamlining Utilities
System z Technology Summit Streamlining UtilitiesSystem z Technology Summit Streamlining Utilities
System z Technology Summit Streamlining Utilities
 
Aix The Future of UNIX
Aix The Future of UNIX Aix The Future of UNIX
Aix The Future of UNIX
 
電力使用量を抑制する4つのアプローチ
電力使用量を抑制する4つのアプローチ電力使用量を抑制する4つのアプローチ
電力使用量を抑制する4つのアプローチ
 

Similar a IBM i Technology Refreshes Overview 2012 06-04

IBM's Pure and Flexible Integrated Solution
IBM's Pure and Flexible Integrated SolutionIBM's Pure and Flexible Integrated Solution
IBM's Pure and Flexible Integrated SolutionTony Pearson
 
Smarter Computing: Expert Integrated System
Smarter Computing: Expert Integrated SystemSmarter Computing: Expert Integrated System
Smarter Computing: Expert Integrated SystemIBM Danmark
 
Zend Products and PHP for IBMi
Zend Products and PHP for IBMi  Zend Products and PHP for IBMi
Zend Products and PHP for IBMi Shlomo Vanunu
 
Red Hat for IBM System z IBM Enterprise2014 Las Vegas
Red Hat for IBM System z IBM Enterprise2014 Las Vegas Red Hat for IBM System z IBM Enterprise2014 Las Vegas
Red Hat for IBM System z IBM Enterprise2014 Las Vegas Filipe Miranda
 
Softchoice Webinar: IBM PureSystems launch
 Softchoice Webinar: IBM PureSystems launch Softchoice Webinar: IBM PureSystems launch
Softchoice Webinar: IBM PureSystems launchSoftchoice Corporation
 
Workload Groups overview updates
Workload Groups overview updatesWorkload Groups overview updates
Workload Groups overview updatesCOMMON Europe
 
Microsoft power point computer-operation [read-only] [compatibility mode]
Microsoft power point   computer-operation [read-only] [compatibility mode]Microsoft power point   computer-operation [read-only] [compatibility mode]
Microsoft power point computer-operation [read-only] [compatibility mode]David Lepisto
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateNovell
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateNovell
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateNovell
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateNovell
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateNovell
 
Tools for developing and monitoring SQL in DB2 for z/OS
Tools for developing and monitoring SQL in DB2 for z/OSTools for developing and monitoring SQL in DB2 for z/OS
Tools for developing and monitoring SQL in DB2 for z/OSSurekha Parekh
 
Cloud Technology: Now Entering the Business Process Phase
Cloud Technology: Now Entering the Business Process PhaseCloud Technology: Now Entering the Business Process Phase
Cloud Technology: Now Entering the Business Process Phasefinteligent
 
We4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshell
We4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshellWe4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshell
We4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshellWe4IT Group
 
Evolving from Products to Product Suite Solutions in High-Tech
Evolving from Products to Product Suite Solutions in High-TechEvolving from Products to Product Suite Solutions in High-Tech
Evolving from Products to Product Suite Solutions in High-TechSVPMA
 
How and why to upgrade to hitachi device manager v7 webinar
How and why to upgrade to hitachi device manager v7 webinarHow and why to upgrade to hitachi device manager v7 webinar
How and why to upgrade to hitachi device manager v7 webinarHitachi Vantara
 

Similar a IBM i Technology Refreshes Overview 2012 06-04 (20)

IBM's Pure and Flexible Integrated Solution
IBM's Pure and Flexible Integrated SolutionIBM's Pure and Flexible Integrated Solution
IBM's Pure and Flexible Integrated Solution
 
Smarter Computing: Expert Integrated System
Smarter Computing: Expert Integrated SystemSmarter Computing: Expert Integrated System
Smarter Computing: Expert Integrated System
 
What's New in RHEL 6 for Linux on System z?
What's New in RHEL 6 for Linux on System z?What's New in RHEL 6 for Linux on System z?
What's New in RHEL 6 for Linux on System z?
 
Zend Products and PHP for IBMi
Zend Products and PHP for IBMi  Zend Products and PHP for IBMi
Zend Products and PHP for IBMi
 
Red Hat for IBM System z IBM Enterprise2014 Las Vegas
Red Hat for IBM System z IBM Enterprise2014 Las Vegas Red Hat for IBM System z IBM Enterprise2014 Las Vegas
Red Hat for IBM System z IBM Enterprise2014 Las Vegas
 
Softchoice Webinar: IBM PureSystems launch
 Softchoice Webinar: IBM PureSystems launch Softchoice Webinar: IBM PureSystems launch
Softchoice Webinar: IBM PureSystems launch
 
Workload Groups overview updates
Workload Groups overview updatesWorkload Groups overview updates
Workload Groups overview updates
 
IBM PureSystems
IBM PureSystemsIBM PureSystems
IBM PureSystems
 
Microsoft power point computer-operation [read-only] [compatibility mode]
Microsoft power point   computer-operation [read-only] [compatibility mode]Microsoft power point   computer-operation [read-only] [compatibility mode]
Microsoft power point computer-operation [read-only] [compatibility mode]
 
It's time to optimize
It's time to optimizeIt's time to optimize
It's time to optimize
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin Orchestrate
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin Orchestrate
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin Orchestrate
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin Orchestrate
 
Run Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin OrchestrateRun Book Automation with PlateSpin Orchestrate
Run Book Automation with PlateSpin Orchestrate
 
Tools for developing and monitoring SQL in DB2 for z/OS
Tools for developing and monitoring SQL in DB2 for z/OSTools for developing and monitoring SQL in DB2 for z/OS
Tools for developing and monitoring SQL in DB2 for z/OS
 
Cloud Technology: Now Entering the Business Process Phase
Cloud Technology: Now Entering the Business Process PhaseCloud Technology: Now Entering the Business Process Phase
Cloud Technology: Now Entering the Business Process Phase
 
We4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshell
We4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshellWe4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshell
We4IT LCTY 2013 - x-pages-men - ibm domino xpages - performance in a nutshell
 
Evolving from Products to Product Suite Solutions in High-Tech
Evolving from Products to Product Suite Solutions in High-TechEvolving from Products to Product Suite Solutions in High-Tech
Evolving from Products to Product Suite Solutions in High-Tech
 
How and why to upgrade to hitachi device manager v7 webinar
How and why to upgrade to hitachi device manager v7 webinarHow and why to upgrade to hitachi device manager v7 webinar
How and why to upgrade to hitachi device manager v7 webinar
 

Más de COMMON Europe

What's New in WebSphere Application Server
What's New in WebSphere Application ServerWhat's New in WebSphere Application Server
What's New in WebSphere Application ServerCOMMON Europe
 
Compiling the Compiler
Compiling the CompilerCompiling the Compiler
Compiling the CompilerCOMMON Europe
 
Why i - Common Europe 2012
Why i - Common Europe 2012Why i - Common Europe 2012
Why i - Common Europe 2012COMMON Europe
 
The Ruby OpenSSL extension
The Ruby OpenSSL extensionThe Ruby OpenSSL extension
The Ruby OpenSSL extensionCOMMON Europe
 
Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)COMMON Europe
 
IBM Systems Director Navigator for i
IBM Systems Director Navigator for iIBM Systems Director Navigator for i
IBM Systems Director Navigator for iCOMMON Europe
 
IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012COMMON Europe
 
DB2 Web Query whats new
DB2 Web Query whats newDB2 Web Query whats new
DB2 Web Query whats newCOMMON Europe
 
Access client solutions overview
Access client solutions overviewAccess client solutions overview
Access client solutions overviewCOMMON Europe
 
What's new with Zend server
What's new with Zend serverWhat's new with Zend server
What's new with Zend serverCOMMON Europe
 
Php arrays for RPG programmers
Php arrays for RPG programmersPhp arrays for RPG programmers
Php arrays for RPG programmersCOMMON Europe
 
Open source report writing tools for IBM i Vienna 2012
Open source report writing tools for IBM i  Vienna 2012Open source report writing tools for IBM i  Vienna 2012
Open source report writing tools for IBM i Vienna 2012COMMON Europe
 
Moving 5.4 to 7.1 AB
Moving 5.4 to 7.1 ABMoving 5.4 to 7.1 AB
Moving 5.4 to 7.1 ABCOMMON Europe
 
Introduction to My SQL
Introduction to My SQLIntroduction to My SQL
Introduction to My SQLCOMMON Europe
 
IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012COMMON Europe
 
Getting started with PHP on IBM i
Getting started with PHP on IBM iGetting started with PHP on IBM i
Getting started with PHP on IBM iCOMMON Europe
 
Developing mobile applications for i using open source tools Venna 2012
Developing mobile applications for i using open source tools  Venna 2012Developing mobile applications for i using open source tools  Venna 2012
Developing mobile applications for i using open source tools Venna 2012COMMON Europe
 
DB2 for i 7.1 - Whats New?
DB2 for i 7.1 - Whats New?DB2 for i 7.1 - Whats New?
DB2 for i 7.1 - Whats New?COMMON Europe
 
Common Europe SAP on i for beginners
Common Europe SAP on i for beginnersCommon Europe SAP on i for beginners
Common Europe SAP on i for beginnersCOMMON Europe
 

Más de COMMON Europe (20)

What's New in WebSphere Application Server
What's New in WebSphere Application ServerWhat's New in WebSphere Application Server
What's New in WebSphere Application Server
 
Compiling the Compiler
Compiling the CompilerCompiling the Compiler
Compiling the Compiler
 
Why i - Common Europe 2012
Why i - Common Europe 2012Why i - Common Europe 2012
Why i - Common Europe 2012
 
The Ruby OpenSSL extension
The Ruby OpenSSL extensionThe Ruby OpenSSL extension
The Ruby OpenSSL extension
 
Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)Using Ruby on IBM i (i5/OS)
Using Ruby on IBM i (i5/OS)
 
IBM Systems Director Navigator for i
IBM Systems Director Navigator for iIBM Systems Director Navigator for i
IBM Systems Director Navigator for i
 
IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012IBM i Trends & Directions Common Europe 2012
IBM i Trends & Directions Common Europe 2012
 
DB2 Web Query whats new
DB2 Web Query whats newDB2 Web Query whats new
DB2 Web Query whats new
 
Access client solutions overview
Access client solutions overviewAccess client solutions overview
Access client solutions overview
 
What's new with Zend server
What's new with Zend serverWhat's new with Zend server
What's new with Zend server
 
RPG investment
RPG investmentRPG investment
RPG investment
 
Php arrays for RPG programmers
Php arrays for RPG programmersPhp arrays for RPG programmers
Php arrays for RPG programmers
 
Open source report writing tools for IBM i Vienna 2012
Open source report writing tools for IBM i  Vienna 2012Open source report writing tools for IBM i  Vienna 2012
Open source report writing tools for IBM i Vienna 2012
 
Moving 5.4 to 7.1 AB
Moving 5.4 to 7.1 ABMoving 5.4 to 7.1 AB
Moving 5.4 to 7.1 AB
 
Introduction to My SQL
Introduction to My SQLIntroduction to My SQL
Introduction to My SQL
 
IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012IBM CEC 2012 Storage june 11, 2012
IBM CEC 2012 Storage june 11, 2012
 
Getting started with PHP on IBM i
Getting started with PHP on IBM iGetting started with PHP on IBM i
Getting started with PHP on IBM i
 
Developing mobile applications for i using open source tools Venna 2012
Developing mobile applications for i using open source tools  Venna 2012Developing mobile applications for i using open source tools  Venna 2012
Developing mobile applications for i using open source tools Venna 2012
 
DB2 for i 7.1 - Whats New?
DB2 for i 7.1 - Whats New?DB2 for i 7.1 - Whats New?
DB2 for i 7.1 - Whats New?
 
Common Europe SAP on i for beginners
Common Europe SAP on i for beginnersCommon Europe SAP on i for beginners
Common Europe SAP on i for beginners
 

Último

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsEnterprise Knowledge
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationRidwan Fadjar
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...gurkirankumar98700
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonetsnaman860154
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsMaria Levchenko
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Servicegiselly40
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonAnna Loughnan Colquhoun
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhisoniya singh
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘RTylerCroy
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024Rafal Los
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...shyamraj55
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountPuma Security, LLC
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking MenDelhi Call girls
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slidevu2urc
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersThousandEyes
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Miguel Araújo
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slidespraypatel2
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxOnBoard
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Igalia
 

Último (20)

IAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI SolutionsIAC 2024 - IA Fast Track to Search Focused AI Solutions
IAC 2024 - IA Fast Track to Search Focused AI Solutions
 
My Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 PresentationMy Hashitalk Indonesia April 2024 Presentation
My Hashitalk Indonesia April 2024 Presentation
 
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
Kalyanpur ) Call Girls in Lucknow Finest Escorts Service 🍸 8923113531 🎰 Avail...
 
How to convert PDF to text with Nanonets
How to convert PDF to text with NanonetsHow to convert PDF to text with Nanonets
How to convert PDF to text with Nanonets
 
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
Neo4j - How KGs are shaping the future of Generative AI at AWS Summit London ...
 
Handwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed textsHandwritten Text Recognition for manuscripts and early printed texts
Handwritten Text Recognition for manuscripts and early printed texts
 
CNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of ServiceCNv6 Instructor Chapter 6 Quality of Service
CNv6 Instructor Chapter 6 Quality of Service
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | DelhiFULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
FULL ENJOY 🔝 8264348440 🔝 Call Girls in Diplomatic Enclave | Delhi
 
🐬 The future of MySQL is Postgres 🐘
🐬  The future of MySQL is Postgres   🐘🐬  The future of MySQL is Postgres   🐘
🐬 The future of MySQL is Postgres 🐘
 
The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024The 7 Things I Know About Cyber Security After 25 Years | April 2024
The 7 Things I Know About Cyber Security After 25 Years | April 2024
 
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
Automating Business Process via MuleSoft Composer | Bangalore MuleSoft Meetup...
 
Breaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path MountBreaking the Kubernetes Kill Chain: Host Path Mount
Breaking the Kubernetes Kill Chain: Host Path Mount
 
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
08448380779 Call Girls In Diplomatic Enclave Women Seeking Men
 
Histor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slideHistor y of HAM Radio presentation slide
Histor y of HAM Radio presentation slide
 
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for PartnersEnhancing Worker Digital Experience: A Hands-on Workshop for Partners
Enhancing Worker Digital Experience: A Hands-on Workshop for Partners
 
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
Mastering MySQL Database Architecture: Deep Dive into MySQL Shell and MySQL R...
 
Slack Application Development 101 Slides
Slack Application Development 101 SlidesSlack Application Development 101 Slides
Slack Application Development 101 Slides
 
Maximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptxMaximizing Board Effectiveness 2024 Webinar.pptx
Maximizing Board Effectiveness 2024 Webinar.pptx
 
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
Raspberry Pi 5: Challenges and Solutions in Bringing up an OpenGL/Vulkan Driv...
 

IBM i Technology Refreshes Overview 2012 06-04

  • 1. IBM Power Systems IBM i Technology Refreshes Strategy, Definition, Best Practices & Content Steve Will - Chief Architect – IBM i © 2012 IBM Corporation
  • 2. IBM Power Systems Technology Refreshes & Related Enhancements Strategy, Definition & Best Practices Information Sources – Official Technology Refresh page – developerWorks Example Technology Refresh Content – Latest & Greatest session Wednesday 2 A system designed for business © 2012 IBM Corporation
  • 3. IBM Power Systems IBM i Roadmap 2006 2007 2008 2009 V5R4 6.1 V5R4M5 6.1.1 Clients requesting fewer operating system releases; and longer support cycles – Major release upgrades can be disruptive for a business Clients requesting access to newest technology Before 7.1 – Small changes could be added using PTFs – Major new support required a “point release” 3 A system designed for business © 2012 IBM Corporation
  • 4. IBM Power Systems IBM i Roadmap 2006 2007 2008 2009 2010 2011 2012 V5R4 6.1 7.1 i next i next + 1 V5R4M5 6.1.1 ……… 7.1 TRs … At 7.1 Technology Refreshes were added – Built from experiences with PTF Groups – Treated as a mini-release for planning & testing purposes – Simpler to install on a current release and less disruptive – Now i had a means to stretch releases, yet deliver enhancements … but … 4 A system designed for business © 2012 IBM Corporation
  • 5. IBM Power Systems Technically …. Technology Refreshes are only for SLIC – and really only for some of SLIC WHAT? – What do you mean by SLIC? – What about that DB2 stuff I saw in the announcement? Or the Java stuff? Or PowerHA? Or … 5 A system designed for business © 2012 IBM Corporation
  • 6. IBM Power Systems IBM i Architecture – Big Animal Picture •Higher-level functions for users & applications: MI-based •Integrated Middleware: Directory Services, SQL APIs, etc. •Web-based capabilities: Apache Web Server; Web App Server •High-level language (C/C++, RPG, COBOL, SQL, CL, etc.) Technology Independent Machine Interface • Security System Licensed Internal Code • Networking • DB2 Database • PASE (AIX Runtime) • Storage management • JVM • File systems • I/O Device Usage • Virtualization Layers • Processor Exploitation • Workload Scheduling Firmware & Hardware 6 A system designed for business © 2012 IBM Corporation
  • 7. IBM Power Systems Big Animal Point Release Point Releases such as V5R4M5 and 6.1.1 replaced all of SLIC. Everything below the MI, above Firmware & Hardware Technology Independent Machine Interface • Security System Licensed Internal Code • Networking • DB2 Database • PASE (AIX Runtime) • Storage management • JVM • File systems • I/O Device Usage • Virtualization Layers • Processor Exploitation • Workload Scheduling Firmware & Hardware 7 A system designed for business © 2012 IBM Corporation
  • 8. IBM Power Systems Technology Refreshes: Enable Hardware, I/O & Virtualization Technology Independent Machine Interface System Licensed Internal Code • I/O Device Usage Technology Refreshes • Virtualization Layers Enable New Capabilities • Processor Exploitation • Workload Scheduling Firmware & Hardware 8 A system designed for business © 2012 IBM Corporation
  • 9. IBM Power Systems Technology Refresh Concept as Delivered by TR Groups Beginning with IBM i 7.1 GA, future point / modification releases are replaced with a new delivery mechanism: “Technology Refresh” Definition: A collection of OS software for “new function enablement” that is – packaged together, – tested together, and – delivered as a single PTF Group. A Technology Refresh may include: – Support for new hardware and firmware (for example, new I/O devices or newly announced models) – Support for new virtualization functions – Performance improvements – New function enablement 9 A system designed for business © 2012 IBM Corporation
  • 10. IBM Power Systems Technology Refresh: Technically Speaking © 2012 IBM Corporation
  • 11. IBM Power Systems What Is a Technology Refresh – Really? CUM Other function Overloaded Term GAed at same – System Management definition time Other PTFs TR PTF Group + GA CUM (+ GA Resave if upgrading to 7.1) – General communications GA Resave TR PTF Group Everything announced when TR PTF Group is delivered developerWorks uses the term TECHNOLOGY UPDATE TR-Reqs TR-PTF Think of the Technology Refresh as the TR PTF Group + GA CUM (+ GA Resave if upgrading to 7.1) – Orderable entities – bundle various Managed PTFs, including a TR PTF Add Function – Together they provide enablement of PTFs new hardware, firmware, and virtualization 11 A system designed for business © 2012 IBM Corporation
  • 12. IBM Power Systems CUM Other function GAed at same time Other PTFs Typical Fixes GA Resave TR PTF Group For example, DB2, Java, BRMS TR-PTF TR-Reqs New TR function Fixes made to New function Managed the TR code, outside the TR. Add Function or which For example, PTFs require the TR IBM i has added tape support outside the TR Some TR function requires non-SLIC components to deliver complete 12 solutions. Example: Cryptography A system designed for business © 2012 IBM Corporation
  • 13. IBM Power Systems The Technology Refresh Web Site www.ibm.com/systems/support/i/planning/techrefresh/index.html 13 A system designed for business © 2012 IBM Corporation
  • 14. IBM Power Systems Technology Refresh Details Page 14 A system designed for business © 2012 IBM Corporation
  • 15. IBM Power Systems A Look Under the Covers – The Technology Refresh PTF Provides much of “magic” of the Technology Refresh – Large multiple-component Licensed Internal Code (LIC) PTF – Allows development and testing like a modification release, but distribution like a PTF Part of the “magic” is accomplished by breaking the supersede chain after each Technology Refresh PTF – Therefore, it must be perm applied to install follow-on PTFs – PTF Install will enforce rules and try to do this for you Built and approved well before GA, so can be included in GA resave – It is NOT a “marker PTF” – it is an actual, functional PTF – At GA time, it is bundled in TR PTF Group along with follow-on PTFs and additional function – IBM DOES NOT recommend installing the individual TR PTF before GA or without the corresponding TR PTF Group, unless the TR PTF is required by a PTF Group or a follow-on PTF 15 A system designed for business © 2012 IBM Corporation
  • 16. IBM Power Systems Technology Refresh PTF (cont.) Follow-on PTFs: Non-Technology Refresh PTFs containing common objects with the Technology Refresh PTF Follow-on PTFs: – Will NOT supersede the Technology Refresh PTF TR – Will have new *TRREQ (Technology Refresh requisite) designation – New *TRREQ type supported on DSPPTF and QPZRTVFX API In RETAIN, follow-on PTF will prereq the Technology Refresh PTF (RETAIN will not support new *TRREQ). – Cannot be loaded until the Tech Refresh PTF is permanently applied – Can be *IMMED even though Tech Refresh PTF is *DELAYED. Technology Refresh PTF identified via: – New PTF attribute (DSPPTF command, QPZRTVFX, QpzListPTF APIs) – Reserved prefix range: MF99nnn – e.g., MF99004 for 7.1 is PTF for TR4 16 A system designed for business © 2012 IBM Corporation
  • 17. IBM Power Systems A Very Good FAQ Are Technology Refreshes available for the entire IBM i operating system? – No, Technology Refreshes are currently only available for Licensed Internal Code – However, other system function may be GAed at the same time as a TR 17 A system designed for business © 2012 IBM Corporation
  • 18. IBM Power Systems Strategically Speaking Historically – DB2 was already producing PTF Groups for new off-release function – Other technologies were delivering capabilities in groups, or individual PTFs – No coordination: themes, communication, documentation IBM i needed to emulate Technology Refreshes throughout the Operating System – Coming to fruition in TR4 timeframe – Let’s look at developerWorks – THE place to go for TRs and more new function 18 A system designed for business © 2012 IBM Corporation
  • 19. IBM Power Systems developerWorks: IBM i front page ibm.com/developerworks/ibmi 19 A system designed for business © 2012 IBM Corporation
  • 20. IBM Power Systems developerWorks: Technology Updates page Technology Refreshes Notice: Many technologies have updates outside the Technology Refresh www.ibm.com/developerworks/ibmi/techupdates 20 A system designed for business © 2012 IBM Corporation
  • 21. IBM Power Systems developerWorks: Hardware & I/O – TR pages www.ibm.com/developerworks/ibmi/techupdates/hw 21 A system designed for business © 2012 IBM Corporation
  • 22. IBM Power Systems TR Virtualization - Summary 22 A system designed for business © 2012 IBM Corporation
  • 23. IBM Power Systems TR Virtualization - Details 23 A system designed for business © 2012 IBM Corporation
  • 24. IBM Power Systems developerWorks: DB2 24 A system designed for business © 2012 IBM Corporation
  • 25. IBM Power Systems developerWorks: More Technologies, More Groups • Over time, technology groups which have been delivering functions between releases are being gathered here. • BRMS & PowerHA, for example, have been added since TR3, gathering material from “marketing” pages where they were initially created. • In any specific TR, there may or may not be enhancements in some technologies. 25 A system designed for business © 2012 IBM Corporation
  • 26. IBM Power Systems TR Announcements TR Coordinated around TR TR DB Java BRMS Contain much more than actual TR Group Cover anything delivered since prior TR Announcement 26 A system designed for business © 2012 IBM Corporation
  • 27. IBM Power Systems Redbook updates in 2011: • IBM i 7.1 Technical Overview • Cover through TR3 • Supplement Info Center • PowerHA SystemMirror for i • “How To Implement” • V7000, SVC and more http://www.redbooks.ibm.com/redbooks/pdfs/sg247858.pdf 27 A system designed for business © 2012 IBM Corporation
  • 28. IBM Power Systems What Are Best Practices ? H At a minimum should consider applying: I W – CUM, HIPERs, DB Group, TR Group – P TP eb roughly every 6 months E Qu HT R er – Do not “pick and choose” individual PTFs Se S y from the groups – load everything c IP uri ty P/ – This is the best way to avoid unplanned TC downtime TR Group CUM DB Group Depending on needs & your environment – Other groups (Security, Java, HTTP, TCP/IP, Print, BRMS, etc.) S Ja va BRM – Individual PTFs for particular support Pe int – Consult developerWorks and PSP web pages E rf. Pr for info to help make decision T To ols C Load all into same image catalog – Apply from there – Let the system decide how to apply most Virtual Optical efficiently Image Catalog 28 A system designed for business © 2012 IBM Corporation
  • 29. IBM Power Systems The TR PTF Itself The TR PTF will be available before GA – TR PTF is created well before GA, so it can be included in the GA Resave – It is extensively tested on older levels of supported hardware before that – so it is safe to install on older supported systems – BUT IBM does not recommend that it be installed without the TR PTF Group, unless it is required by another PTF or PTF Group being installed. The TR PTF can become a requisite of another PTF before (or after) GA – If a part / module in the TR PTF is changed by a subsequent PTF, TR TRREQ the TR PTF becomes a special kind of requisite, called a *TRREQ (looks like prereq in Retain) – Follow on PTFs can be *IMMED even though Tech Refresh PTF is *DELAYED. The TR PTF can be included in PTF groups (like HIPERs and CUMs) – If a PTF in the HIPER group or CUM calls out the TR PTF as a *TRREQ, then the TR PTF HIPER will be pulled into the HIPER group or CUM PTF PTF PTF TR PTF – In fact, this likely will occur PTF PTF PTF TRREQ PTF PTF 29 A system designed for business © 2012 IBM Corporation
  • 30. IBM Power Systems Some Other Things to Remember The TR PTF may be required for debug or future fixes – Development / support will generally try to debug a problem when the system is in the failing state Sometimes development builds traps or special 1 3 debug code to help isolate the problem 2 – If system is back-level, may need to bring fix level up to date before can get permanent fix – if TR PTF is in PTF chains of fix, this will mean applying the TR PTF Later Technology Refreshes are supersets of previous ones – This means that if a system is back level on Technology Refreshes, only the latest TR must be installed to 1 2 3 bring the system up to date Make sure the TR PTF is permanently applied – Will need to be perm applied before any follow on PTFs that require it can be applied 30 A system designed for business © 2012 IBM Corporation
  • 31. IBM Power Systems Details for Planning Purposes Before installing the TR PTF, TR Group, CUM, etc. make sure the Double IPL Automation PTF is installed on your system – SI43585 – It will save you time when applying TRs, Groups, PTFs, etc. – Has been in HIPER group since 05/10/11 – In TR Group for TR 2 – 05/13/11 – In CUM and Resave available at same time as TR 2 Must be installing from an image catalog, in order to take advantage of the “Double IPL” automation support – If installing from a remote virtual optical device on a different partition, make sure the server partition has PTF SI42302 applied (contains required image catalog and optical code for “Automatic Double-IPL”). Read InfoApar II14482 when planning your upgrade to 7.1 – Lists PTFs and process needed to avoid a potential problem trying to apply a TR immediately after doing an upgrade to 7.1 from 5.4.x or 6.1.x, – This was initially thought to be a TR problem, but was actually related to image catalog support 31 A system designed for business © 2012 IBM Corporation
  • 32. IBM Power Systems If You Have Questions Don’t just assume – Consult the web pages, FAQs, Info Center, etc. – And if still confused – ASK 32 A system designed for business © 2012 IBM Corporation
  • 33. IBM Power Systems Enhancements provided by TRs © 2012 IBM Corporation
  • 34. IBM Power Systems IBM i 7.1 Technology Refreshes Add Value Technology Refresh 1 – September 2010 – Virtual Media support to reduce hardware dependencies and costs – Network Installation of all IBM i software for more efficient operations – Web Services support for integrating legacy applications into business processes Technology Refresh 2 – May 2011 – Suspend/Resume IBM i partition as another step towards clouds – Sharing Tape Drives across IBM i partitions to reduce infrastructure complexity – XML and Security enhancements to DB2 for i Technology Refresh 3 – October 2011 – VM Image Management in cooperation with Systems Director VMControl – PowerHA support of V7000 & SVC – Metro Mirror, Global Mirror & FlashCopy – Thin Provisioning for DS8700 and DS8800 storage servers, and for VIOS Shared Storage Pools allows configurations set up with a smaller amount of real disk storage 34 A system designed for business © 2012 IBM Corporation
  • 35. IBM Power Systems PowerHA SystemMirror Enhancements Translated Version TR4 • PowerHA SystemMirror for IBM i support includes • DS8000 (DS8K) • SAN Volume Controller (SVC) and IBM Storage Systems Storwize V7000 TR3 • Advanced Copy Services (ACS) • Currently available for DS8K • Future direction - V7000 Admin domain Local Site *SYSBAS *SYSBAS (DR) DR Site POWER7 (Prod) Metro Mirror IBM i F IASP IASP (Switchable) Global Mirror l HA DR a s h C IASP DR HA Flash o Backup p *SYBAS y (Backup I) POWER7 POWER7 IBM i DS8000 DS8000 IBM i Production SVC* SVC Storewize V7000* Storewize V7000 © 35 A system designed for business © 2012 IBM Corporation
  • 36. IBM Power Systems IBM i Technology Refresh 4 - Highlights Moving running workloads from one machine to another with Live Partition Mobility delivers the next step for cloud environments DB2 for i enhancements improve performance as well as delivering additional security, error monitoring and SQL functions Virtualized SAN and Network Infrastructure DB2 WebQuery for i simplifies ordering with Express and Standard offerings New options in Application Runtime Expert allow access to the tool without granting high security levels IBM i Workload Groups allows clients to license SWG products at "less than capacity" level • PowerHA for IBM i now includes support for IBM Storage Systems Storwize V7000 and San Volume Controller (SVC) 36 A system designed for business © 2012 IBM Corporation
  • 37. IBM Power Systems Live Partition Mobility for IBM i Improves service levels for IBM i workloads – Business and IT security and resiliency are as critical as ever, and must be dynamic and intelligent in order to match the speed of business change – PowerVM Live Partition Mobility Move running IBM i partitions between systems Eliminate planned outages and balance workloads across systems VIOS is required TR4 Group Required Virtualized SAN and Network Infrastructure Virtualized SAN and Network Infrastructure 37 A system designed for business © 2012 IBM Corporation
  • 38. IBM Power Systems New I/O Support for IBM i New SFF SSD: – 2X performance 2X capacity – Better price performance High performance low profile SAS SSD Adapter – RAID 5/6 with just one adapter (vs two) – May lower the cost for SSD configuration New lower price, 4-port 1Gb LAN adapter – Native support plus support through VIOS – Replaces existing 2-port and 4-port LAN adapters in most POWER7 proposals New DAT160 USB-attached tape drive config option – for Power 720/740/750 HH bay of system unit – Supported through VIOS – Potentially improves performance for saves/restores TR4 Group Required 38 A system designed for business © 2012 IBM Corporation
  • 39. IBM Power Systems DB2 for i Enhancements Row Lock Performance 250 Significant functional enhancements 228 – Short names 200 – Where used information – Support for JDBC 4.1 specification 150 SQL enhancements Before Minutes After – Subselect 100 – RUNSQL command 50 Security enhancements 12 – Object Auditing Control 0 Performance improvements – based on analysis of index statistics DB Management Improvements – adding SYSDISKSTAT catalog to QSYS library Enhanced SQL Error Reporting using monitor records DB2 Group Required See developerWorks 39 A system designed for business © 2012 IBM Corporation
  • 40. IBM Power Systems Web Integration Enhancements Java 7 5761-JV1 Options 14 & 15 – 32 and 64 bit version Java 7 runtime engine – Available only on IBM i 7.1 XML Service GA Dec 2011 – New Open Source tool to access Native IBM i objects from any language – Access RPG programs from PHP, RUBY, or other languages – Use in a Tier 1 or Tier 2 environment 40 A system designed for business © 2012 IBM Corporation
  • 41. IBM Power Systems IBM i Workload Groups – Enhanced Management & Licensing Workload Groups new capabilities to manage/license workloads on IBM i – Limit the number of cores that are used by specific applications within single system/partition/subsystem – Limits placed at the whole processor-core level – Applications licensed for the number of capped cores – Can cap a single job or all jobs/threads in a subsystem IBM i Today IBM i with Workload Groups Application #1= 6 Cores Application #1 = 3 Cores Application #2 = 6 Cores Application #2 = 4 Cores IBM i = 6 Cores IBM i = 6 Cores IBM i System / Partition / Subsystem IBM i System / Partition / Subsystem https://www.ibm.com/developerworks/mydeveloperworks/wikis/home?lang =en#/wiki/IBM%20i%20Technology%20Updates/page/IBM%20i%20workload%20groups 41 A system designed for business © 2012 IBM Corporation
  • 42. IBM Power Systems Summary Without Technology Refreshes – IBM i would be delivering another release this year – 2012 There would have been impacts to V5R4 & 6.1 EoS – Partition Mobility would not be available on 7.1 Along with Suspend/Resume & other virtualization enhancements – Coordination of deliverables would have been unlikely “Same As Always” would have occurred With Technology Refreshes – Full-release function has been delivered In a staged approach – Isolation of new function allows for mini-release testing While ensuring that TRs do not require requalification – No Release Upgrade is required Disruption of release is removed 42 A system designed for business © 2012 IBM Corporation
  • 43. IBM Power Systems Thank You! 43 A system designed for business © 2012 IBM Corporation
  • 44. IBM Power Systems Technology Refresh: Backup Details © 2012 IBM Corporation
  • 45. IBM Power Systems A very detailed walk-through using system interfaces to install and inspect the TR was written in spring 2011 with TR2 as the example TR. I include that example here for reference purposes. COMMON 2011 had a very detailed presentation on Technology Refreshes, and that “helpful hint” information is also included, because it might help you with the details of TRs. 45 A system designed for business © 2012 IBM Corporation
  • 46. IBM Power Systems Display PTF – DSPPTF LICPGM(5770999) PTFs are displayed in Display PTF Status descending order by System: SYSTEM1 PTF ID, so the Tech Product ID . . . . . . . . . . . . . : 5770999 Refresh PTFs (MF99*) IPL source . . . . . . . . . . . . . : ##MACH#B will be listed after the Release of base option . . . . . . . : V7R1M0 L00 marker (TL*) PTFs, but Type options, press Enter. before the remaining 5=Display PTF details 6=Print cover letter 8=Display cover letter MF* PTFs. PTF IPL Opt ID Status Action 5 MF99002 Permanently applied None MF99001 Permanently applied None 5 MF52149 Permanently applied None MF50941 Superseded None MF50925 Permanently applied None MF50860 Not applied None MF50836 Temporarily applied None More ... F3=Exit F11=Display alternate view F17=Position to F12=Cancel 46 © 2011 IBM Corporation
  • 47. IBM Power Systems Display PTF – DSPPTF details of Tech Refresh PTF • Note the Technology Display PTF Details Refresh PTF will call out Product ID/PTF ID . . . . . . . . . : 5770999 MF99002 Link/Loader (LIC PTF Release . . . . . . . . . . . . . . : V7R1M0 Management) PTF MF51814 Select one of the following: as a prereq. 1. General information 2. Requisite PTFs • TR2 supersedes TR1 and 339 existing LIC PTFs (110 4. Superseded PTFs chains), TR1 superseded 87 6. PTF Objects PTFs. 7. Symptom strings 9. APARs fixed • Option 6 to list objects in 20. All of the above TR2 will show 1507 RUs (replaceable units). Each TR is cumulative, so the object Bottom Selection list will grow every 6 months 1 when we release a new TR F3=Exit F12=Cancel (TR1 had 525 RUs). PTF save file for TR2 is 20 meg 47 (TR1 was 8.6 meg). © 2011 IBM Corporation
  • 48. IBM Power Systems Display PTF – DSPPTF Tech Refresh PTF, option 1 General information Product ID/PTF ID . . . . . . . . . . : 5770999 MF99002 Release . . . . . . . . . . . . . . . : V7R1M0 On order . . . . . . . . . . . . . . . : No PTF save file . . . . . . . . . . . . : Yes PTF status . . . . . . . . . . . . . . : Permanently applied Latest superseding PTF . . . . . . . . : None Type . . . . . . . . . . . . . . . . . : Delayed Unattended IPL action . . . . . . . . : None Note Tech Refresh Optional part . . . . . . . . . . . . : *BASE PTF will always be PTF library . . . . . . . . . . . . . : QGPL Delayed and require Cover letter . . . . . . . . . . . . . : No Mandatory instructions . . . . . . . . : No an IPL to apply. Test Fix . . . . . . . . . . . . . . . : No Action pending . . . . . . . . . . . . : No Action required . . . . . . . . . . . : No More... Press Enter to continue F3=Exit F12=Cancel 48 © 2011 IBM Corporation
  • 49. IBM Power Systems Display PTF – DSPPTF Tech Refresh PTF, option 1 General information Product ID/PTF ID . . . . . . . . . . : 5770999 MF99002 Release . . . . . . . . . . . . . . . : V7R1M0 Target release . . . . . . . . . . . . : V7R1M0 Minimum-Maximum level . . . . . . . . : L00-L00 PTF creation date/time . . . . . . . . : 01/21/11 10:04:34 Technology refresh PTF . . . . . . . . : Yes New Technology refresh field added to the panel. Note new attribute is only applicable for LIC Bottom (57xx999) PTFs. Press Enter to continue F3=Exit F12=Cancel 49 © 2011 IBM Corporation
  • 50. IBM Power Systems Display PTF – DSPPTF details of Follow-on PTF Display PTF Details •Note: Option 2 Product ID/PTF ID . . . . . . . . . : 5770999 MF52149 Release . . . . . . . . . . . . . . : V7R1M0 (Requisite PTFs) is listed because the Select one of the following: follow-on PTF will 1. General information *TRREQ the Tech 2. Requisite PTFs Refresh PTF. 6. PTF Objects 7. Symptom strings •Note: Option 4 9. APARs fixed (Superseded PTFs) is 20. All of the above not listed because the follow-on PTF does Bottom supersede the not Selection 2 Tech Refresh PTF (or any other PTFs in this F3=Exit F12=Cancel example). 50 © 2011 IBM Corporation
  • 51. IBM Power Systems Display PTF – DSPPTF Follow-on PTF, option 2 Display Requisite PTFs Product ID/PTF ID . . . . . . . . . : 5770999 MF52149 Release . . . . . . . . . . . . . . : V7R1M0 Product Requisite Product Requisite PTF ID ID type PTF ID ID type MF99002 5770999 *TRREQ New *TRREQ (Technology refresh requisite) type defined Bottom in addition to Press Enter to continue *PREREQ, *COREQ, *DSTREQ. F3=Exit F12=Cancel 51 © 2011 IBM Corporation
  • 52. IBM Power Systems Display PTF – DSPPTF Requisite type help (*TRREQ) Requisite type - Help The type of the requisite. The types are: *PREREQ The PTF is required to be installed on the system before you can apply this PTF. *COREQ The PTF is required to be applied with the PTF that is being displayed. Note the *TRREQ is a *TRREQ load time check where The technology refresh PTF is required to be permanently *PREREQ and applied on the system before you can load this PTF. *DSTREQ *COREQ are apply The PTF is required for distribution purposes only. time checks. Bottom F2=Extended help F3=Exit help F10=Move to top F12=Cancel F13=Information Assistant F14=Print help 52 © 2011 IBM Corporation
  • 53. IBM Power Systems Installing Follow-on (*TRREQ) PTF when Tech Refresh PTF not installed Can occur in the following scenarios: – Order and Install cumulative PTF package CUM PTF PTF C1116710 for IBM i 7.1 where the cumulative PTF PTF PTF PTF package contains TR2 and follow-on PTFs. PTF TR TRREQ PTF PTF – Order and Install a PTF group (e.g. Technology HIPER Refresh, TCP/IP, HIPER) that contains a follow-on PTF. PTF PTF PTF TR PTF PTF PTF PTF TRREQ PTF PTF – Order and Install an individual PTF that is a follow-on (*TRREQ) PTF for the Technology Refresh PTF. TR TRREQ 53 © 2011 IBM Corporation
  • 54. IBM Power Systems Installing Follow-on (*TRREQ) PTF when Tech Refresh PTF not installed For each of the previous scenarios: – Make sure “Automatic Double-IPL” PTF SI42445 is applied (PTF is in HIPER PTF group SF99709 level 26 or higher). Note this PTF automates the extra IPL for both Technology Refresh and Special Handling pre-apply PTFs. – If your PTFs are on physical DVDs, create image catalog and use the Add Image Catalog Entry (ADDIMGCLGE) command for each DVD. – If you are installing PTFs from a remote virtual optical device on a different partition, make sure the server partition has PTF SI42302 applied (contains required image catalog and optical code for “Automatic Double-IPL”). – Use GO PTF command, option 8 to install PTFs. 54 © 2011 IBM Corporation
  • 55. IBM Power Systems Installing Follow-on (*TRREQ) PTF when Tech Refresh PTF not installed For each of the previous scenarios: – Make sure “Automatic Double-IPL” PTF SI42445 is applied (PTF is in HIPER PTF group SF99709 level 26 or higher). Note this PTF automates the extra IPL for both Technology Refresh and Special Handling pre-apply PTFs. – If your PTFs are on physical DVDs, create image catalog and use the Add Image Catalog Entry (ADDIMGCLGE) command for each DVD. – If you are installing PTFs from a remote virtual optical device on a different partition, make sure the server partition has PTF SI42302 applied (contains required image catalog and optical code for “Automatic Double-IPL”). – Use GO PTF command, option 8 to install PTFs. 55 A system designed for business © 2012 IBM Corporation
  • 56. IBM Power Systems GO PTF, option 8 (Install a PTF package) Install Options for Program Temporary Fixes • For Device, enter System: SYSTEM1 name of virtual optical Type choices, press Enter. device with loaded Device . . . . . . . . . OPTVRT01 Name, *SERVICE, *NONE image catalog, or *SERVICE. To install Automatic IPL . . . . . N Y=Yes N=No from both optical and *SERVICE, change Prompt for Media . . . . 1 1=Single PTF volume set Prompt for Media field 2=Multiple PTF volume sets 3=Multiple volume sets and to 3. *SERVICE • For Automatic IPL, Restart type . . . . . . *SYS *SYS, *FULL enter Y or N. Auto Other options . . . . . N Y=Yes IPL=Y will power down N=No immediately if IPL required to perm apply F3=Exit F12=Cancel TR PTF. 56 © 2011 IBM Corporation
  • 57. IBM Power Systems GO PTF – Load PTFs from device for all products PTF Load in Progress • PTF Install code will System: SYSTEM1 load the TR PTF and its requisites, then Product ID Description automatically set 5770999 Licensed Internal Code them for perm apply. • PTF Install code will not load any LIC PTFs from media files containing a follow-on (*TRREQ) PTF. For *SERVICE, all LIC PTFs that are not follow-on (*TRREQ) Bottom PTFs are loaded. Loading PTFs for 1 of 39 Licensed Programs 57 © 2011 IBM Corporation
  • 58. IBM Power Systems GO PTF – Message CPF362E: IPL required Program Temporary Fix •New CPF362E (IPL required) System: SYSTEM1 message is English only. We Select one of the following: 1. Load a program temporary fix save GO PTF parms in an 2. Apply a program temporary fix internal space to use on the 3. Copy a program temporary fix next normal, unattended IPL to 4. Remove a program temporary fix 5. Display a program temporary fix finish the PTF Install. So … 6. Order a program temporary fix don’t delete the image catalog 7. Install a program temporary fix from a list until the PTF install is 8. Install a program temporary fix package 9. Copy PTF Cover letter complete. If using remote 10. Display PTF Cover letter optical device, make sure 11. Delete a program temporary fix server partition has image More ... catalog with PTFs still loaded Selection or command when you IPL the client ===> 8 partition. F3=Exit F4=Prompt F9=Retrieve F12=Cancel •Note if IPL required for special IPL required to complete PTF install processing. handling pre-apply PTF (cume pkg), same message. 58 © 2011 IBM Corporation
  • 59. IBM Power Systems Operating System IPL (SCPF job) Operating System IPL in Progress •During LIC IPL, Link/Loader 5/02/11 06:30:23 perm applies TR PTF and its IPL: Type . . . . . . . . . . . . : Unattended requisites (mini IPL to A side). Start date and time . . . . : 5/02/11 06:15:08 •OS IPL, XPF PTF Previous system end . . . . : Normal Management syncs with LL Current step / total . . . . : 17 49 Reference code detail . . . : C900 2967 and marks TR PTF and requisites perm applied. IPL Step: Time elapsed Time remaining •Load remaining LIC PTFs Internal journal recovery 00:00:02 from previous device and SAG initialization 00:00:01 > PTF Processing 05:14:28 11:30:41 image catalog. Activity: Signals initialization Loading PTFs •Set all PTFs for delayed Item: apply. Activity: Setting IPL Current / total . . . . . . : 1 254 Identifier . . . . . . . . . : 5770999-MFxxxxx V7R1M0 Action for PTFs Activity . . . . . . . . . . : Setting IPL Action for PTFs •New English msg CPI35ED – IPL requested by PTF IPL requested by PTF processing. processing – restart partition 59 © 2011 IBM Corporation
  • 60. IBM Power Systems Operating System IPL (SCPF job) Operating System IPL in Progress •During 2nd LIC IPL, 5/02/11 07:08:18 Link/Loader applies all IPL: Type . . . . . . . . . . . . : Unattended LIC PTFs set for Start date and time . . . . : 5/02/11 07:02:45 delayed apply. Previous system end . . . . : Normal Current step / total . . . . : 17 49 Reference code detail . . . : C900 2967 •During 2nd OS IPL, normal PTF processing IPL Step: Time elapsed Time remaining to apply all PTFs set Internal journal recovery 00:00:02 for delayed apply. SAG initialization 00:00:01 > PTF Processing 16:13:28 9:33:51 Continue IPL to sign- Signals initialization on. Item: Current / total . . . . . . : 52 254 Identifier . . . . . . . . . : 5770SS1-SIxxxxx V7R1M0 Activity . . . . . . . . . . : Applying PTFs 60 © 2011 IBM Corporation
  • 61. IBM Power Systems Verify PTFs installed: WRKPTFGRP or DSPPTF Work with PTF Groups System: SYSTEM1 -If PTFs not installed, Type options, press Enter. previous SCPF joblog 1=Order 4=Delete 5=Display 6=Print has debug information. 8=Display special handling PTFs 9=Display related PTF groups Opt PTF Group Level Status _ SF99710 11116 Installed _ SF99710 10229 Installed _ SF99709 27 Installed _ SF99709 26 Installed _ SF99707 2 Installed _ SF99707 1 Installed _ SF99701 6 Not installed _ SF99701 5 Installed _ SF99362 9 On order Bottom F3=Exit F6=Print F11=Display descriptions F12=Cancel F22= Display entire field 61 © 2011 IBM Corporation
  • 62. IBM Power Systems Just the FAQs – the TR PTF Is TR PTF available before GA, and if so, is it safe to install? – Yes, and yes – TR PTF is created well before GA, so it can be included in the GA Resave – Extensively tested on older levels of supported hardware before that – so it is safe to install on older supported systems – BUT IBM does not recommend that it be installed, unless it is required by another PTF or PTF Group you are installing. Can the TR PTF become a requisite of another PTF before (or after) GA? – Yes – If a part / module in the TR PTF is changed by a subsequent PTF, the TR PTF becomes a special kind of requisite, called a *TRREQ Can the TR PTF be included in PTF groups (like HIPERs and CUMs)? – Yes – If a PTF in the HIPER group or CUM calls out the TR PTF as a TRREQ, then the TR PTF will be pulled into the HIPER group or CUM – in fact, this likely will occur 62 © 2011 IBM Corporation
  • 63. IBM Power Systems Just the FAQs – Install and Requisites Will the TR PTF be required for debug or future fixes? – Perhaps – Development / support will generally try to debug a problem when the system is in the failing state 1 2 3 • Sometimes development builds traps or special debug code to help isolate the problem – If system is back-level, may need to bring fix level up to date before can get permanent fix – if TR PTF is in PTF chains of fix, this will mean applying the TR PTF How are later Technology Refreshes related to previous ones? – Later Technology Refreshes are supersets of previous ones for the same base release • This means that if a system is back level on Technology Refreshes, only the latest one must be installed to bring 1 2 3 the system up to date Are Technology Refreshes available for the entire IBM i operating system? – No, Technology Refreshes are currently only available for Licensed Internal Code – However, other system function may be GAed at the same time as a TR 63 © 2011 IBM Corporation
  • 64. IBM Power Systems Just the FAQs – Recovery and Best Practices How do I remove a Technology Refresh from my system? – ***DON’T*** – the TR will eventually be required for future fixes (but can temporarily) • Install a save of the system made before the Technology Refresh install • Install a previous Resave level or the base install media, and bring the system up to date by applying appropriate PTFs, CUMs, groups How do I restore my system back to a known level after a failure? – If system was at current Technology Refresh level, install the latest Resave, plus CUM, plus TR PTF Group, and any other PTFs, groups, etc. – To restore to an earlier level, must archive media or a save of the system What are some BEST PRACTICES? 1. Keep systems up to date with latest Technology Refresh PTF Group 2. When installing a Technology Refresh, install either the TR Group plus the CUM, or the Resave plus the TR Group plus the CUM; do not install just the TR PTF 3. Install the Double IPL Automation PTF SI42445 4. Make sure the Technology Refresh PTF is permanently applied to your system 5. Install from an image catalog, rather than from physical media, for simplicity and improved performance 64 © 2011 IBM Corporation
  • 65. IBM Power Systems Potential “Gotchas” to Consider DON’T confuse the Technology Refresh PTF with the Technology Refresh PTF Group and the overall Technology Refresh itself – The Technology Refresh for a particular GA is the Technology Refresh PTF Group plus the corresponding GA CUM • See the TR web pages for the appropriate levels – Timeline works like this: • TR PTF is approved and becomes visible well before GA, to include in GA Resave • TR Web Pages are updated with information on new TR levels at Announce • TR PTF Group, Resave, and CUM become available at GA DON’T install the Technology Refresh PTF by itself – The Technology Refresh PTF by itself may not supply complete support or include the latest fixes for a particular Technology Refresh. – IBM recommends that customers should NOT install the Technology Refresh PTF by itself, but instead should install the Technology Refresh PTF Group and the matching CUM (or, if upgrading from older release, the Resave + TR Group + CUM) 65 © 2011 IBM Corporation
  • 66. IBM Power Systems Potential “Gotchas” to Consider -2- DON’T install the Technology Refresh PTF before GA – The Technology Refresh PTF will be available before GA, so it can be included in the GA Resave and CUM – However, IBM does not recommend installing the TR PTF before GA unless it is required by a follow-on PTF, because: • The TR PTF is not needed for existing hardware or function • The TR PTF by itself may not contain complete support for new hardware or function • The new hardware or function the TR PTF enables is not supported until after GA – If the Technology Refresh PTF is not required to install a follow-on PTF or PTF Group, customers should wait until the Technology Refresh GA and install the TR PTF Group + GA CUM at that time DO permanently apply the Technology Refresh PTF as soon as convenient – This will save time later when applying follow-on PTFs that require it (*TRREQ it) 66 © 2011 IBM Corporation
  • 67. IBM Power Systems Potential “Gotchas” to Consider -3- DO have the Double IPL Automation PTF installed on a system before trying to install the TR Group, TR PTF, Resave, CUM, HIPER Group, etc. – This will avoid confusion and potentially additional time required, when upgrading to a new TR level or installing a follow-on PTF that requires a TR (*TRREQ) DO keep your system up to date with latest Technology Refreshes – This can help reduce debug time for system problems, and can avoid unnecessary outages for system problems that already have fixes available – Installing a Technology Refresh as soon as it is convenient may avoid having to install it at an inconvenient time, in order to get a needed fix DO install a Technology Refresh from an image catalog rather than physical media, if possible – It will be simpler and will improve performance – Using an image catalog is necessary for the “Double IPL” automation support 67 © 2011 IBM Corporation
  • 68. IBM Power Systems References System i Software Information Center: http://publib.boulder.ibm.com/eserver/ibmi.html – Maintaining and managing IBM i and related software – Application Programming Interfaces (APIs) – Service and support Additional URLs – IBM i Technology Refresh: http://www-947.ibm.com/systems/support/i/planning/techrefresh/index.html – IBM i Resaves: http://www-947.ibm.com/systems/support/i/planning/resave/v7r1.html – IBM i PTF Groups http://www- 912.ibm.com/s_dir/sline003.NSF/GroupPTFs?OpenView&view=GroupPTFs – Preventative Service Planning (PSP) for IBM i: http://www-912.ibm.com/s_dir/sline003.nsf/sline003home – IBM Systems Support, System i, Fixes: http://www-947.ibm.com/systems/support/i/fixes/index.html – “Automate Extra IPL for PTF Install,” iDevelop Blog article: http://ibmsystemsmag.blogs.com/i_can/2011/03/automate-extra-ipl-for-ptf- install.html 68 A system designed for business © 2012 IBM Corporation
  • 69. IBM Power Systems Special notices This document was developed for IBM offerings in the United States as of the date of publication. IBM may not make these offerings available in other countries, and the information is subject to change without notice. Consult your local IBM business contact for information on the IBM offerings available in your area. Information in this document concerning non-IBM products was obtained from the suppliers of these products or other public sources. Questions on the capabilities of non-IBM products should be addressed to the suppliers of those products. IBM may have patents or pending patent applications covering subject matter in this document. The furnishing of this document does not give you any license to these patents. Send license inquires, in writing, to IBM Director of Licensing, IBM Corporation, New Castle Drive, Armonk, NY 10504-1785 USA. All statements regarding IBM future direction and intent are subject to change or withdrawal without notice, and represent goals and objectives only. The information contained in this document has not been submitted to any formal IBM test and is provided "AS IS" with no warranties or guarantees either expressed or implied. All examples cited or described in this document are presented as illustrations of the manner in which some IBM products can be used and the results that may be achieved. Actual environmental costs and performance characteristics will vary depending on individual client configurations and conditions. IBM Global Financing offerings are provided through IBM Credit Corporation in the United States and other IBM subsidiaries and divisions worldwide to qualified commercial and government clients. Rates are based on a client's credit rating, financing terms, offering type, equipment type and options, and may vary by country. Other restrictions may apply. Rates and offerings are subject to change, extension or withdrawal without notice. IBM is not responsible for printing errors in this document that result in pricing or information inaccuracies. All prices shown are IBM's United States suggested list prices and are subject to change without notice; reseller prices may vary. IBM hardware products are manufactured from new parts, or new and serviceable used parts. Regardless, our warranty terms apply. Any performance data contained in this document was determined in a controlled environment. Actual results may vary significantly and are dependent on many factors including system hardware configuration and software design and configuration. Some measurements quoted in this document may have been made on development-level systems. There is no guarantee these measurements will be the same on generally- available systems. Some measurements quoted in this document may have been estimated through extrapolation. Users of this document should verify the applicable data for their specific environment. 69 © 2012 IBM Corporation
  • 70. IBM Power Systems Special notices (cont.) IBM, the IBM logo, ibm.com AIX, AIX (logo), AIX 6 (logo), AS/400, BladeCenter, Blue Gene, ClusterProven, DB2, ESCON, i5/OS, i5/OS (logo), IBM Business Partner (logo), IntelliStation, LoadLeveler, Lotus, Lotus Notes, Notes, Operating System/400, OS/400, PartnerLink, PartnerWorld, PowerPC, pSeries, Rational, RISC System/6000, RS/6000, THINK, Tivoli, Tivoli (logo), Tivoli Management Environment, WebSphere, xSeries, z/OS, zSeries, AIX 5L, Chiphopper, Chipkill, Cloudscape, DB2 Universal Database, DS4000, DS6000, DS8000, EnergyScale, Enterprise Workload Manager, General Purpose File System, , GPFS, HACMP, HACMP/6000, HASM, IBM Systems Director Active Energy Manager, iSeries, Micro-Partitioning, POWER, PowerExecutive, PowerVM, PowerVM (logo), PowerHA, Power Architecture, Power Everywhere, Power Family, POWER Hypervisor, Power Systems, Power Systems (logo), Power Systems Software, Power Systems Software (logo), POWER2, POWER3, POWER4, POWER4+, POWER5, POWER5+, POWER6, POWER6+, System i, System p, System p5, System Storage, System z, Tivoli Enterprise, TME 10, Workload Partitions Manager and X-Architecture are trademarks or registered trademarks of International Business Machines Corporation in the United States, other countries, or both. If these and other IBM trademarked terms are marked on their first occurrence in this information with a trademark symbol (® or ™), these symbols indicate U.S. registered or common law trademarks owned by IBM at the time this information was published. Such trademarks may also be registered or common law trademarks in other countries. A current list of IBM trademarks is available on the Web at "Copyright and trademark information" at www.ibm.com/legal/copytrade.shtml The Power Architecture and Power.org wordmarks and the Power and Power.org logos and related marks are trademarks and service marks licensed by Power.org. UNIX is a registered trademark of The Open Group in the United States, other countries or both. Linux is a registered trademark of Linus Torvalds in the United States, other countries or both. Microsoft, Windows and the Windows logo are registered trademarks of Microsoft Corporation in the United States, other countries or both. Intel, Itanium, Pentium are registered trademarks and Xeon is a trademark of Intel Corporation or its subsidiaries in the United States, other countries or both. AMD Opteron is a trademark of Advanced Micro Devices, Inc. Java and all Java-based trademarks and logos are trademarks of Sun Microsystems, Inc. in the United States, other countries or both. TPC-C and TPC-H are trademarks of the Transaction Performance Processing Council (TPPC). SPECint, SPECfp, SPECjbb, SPECweb, SPECjAppServer, SPEC OMP, SPECviewperf, SPECapc, SPEChpc, SPECjvm, SPECmail, SPECimap and SPECsfs are trademarks of the Standard Performance Evaluation Corp (SPEC). NetBench is a registered trademark of Ziff Davis Media in the United States, other countries or both. AltiVec is a trademark of Freescale Semiconductor, Inc. Cell Broadband Engine is a trademark of Sony Computer Entertainment Inc. InfiniBand, InfiniBand Trade Association and the InfiniBand design marks are trademarks and/or service marks of the InfiniBand Trade Association. Other company, product and service names may be trademarks or service marks of others. 70 © 2012 IBM Corporation