SlideShare a Scribd company logo
1 of 11
Results Based Management: Logical
    Framework Matrix (LFM)

          ,.Abeer Shakweer, Ph.D
        Planning and Monitoring Manager
    Science and Technology Development Fund

                December 30th, 2009
LFM is a

  Result Based Management (RBM) tool for
systematic planning, implementation , monitoring,
           and evaluation of projects
LFM

   Activity description    Performance Indicators   Means of Verification   Risks and
                                                                            Assumptions
Goal (Overall Objective)



Project Objectives




Outputs (Results)




Activities                 Means
Features of LFM

• Results oriented- not activity driven

• logically sets objectives and their causal relationships

• shows whether objectives have been achieved: Indicators
  (for M&E)

• describes external factors that influence the project’s
  success: assumptions and risks
Indicators

• Measures to verify to what extant the results are achieved.

• Specify how the achievement of an objective can be verified or

  demonstrated

• Provide a basis for Monitoring and Evaluation

• Quantitative and Qualitative
Means of Verification

• Source and means by which indicators will
  be verified
     field verification

     Benchmarking

     project documents

     Publications
Assumptions

• Conditions that are necessary for the success of the

  project, but which are not under the direct influence of

  the project.

• Assumptions are risks, which can jeopardize the success

  of the project.

• Should be relevant and probable

• Do not include if not important
Components of LFM
  3. Basic Steps and Elements

  Planning Phase
Vertical Logic
  Project Planning Matrix (PPM        )
• Identifies what the project intends to do and achieve
                                                   GOAL
• Clarifies the causal relationship
                                                   Objectives
• Specifies important assumptions and risks        OUTPUTS
                                                    ACTIVITIES




Horizontal Logic
• Identifies the source and means by which indicators
  will be verified
• Specifies indicators to measure progress
                                                             Aims measured by indicators
                                                                  through information
                                                          collected and presented in specified
                                                                  means of verification
Sustainable Coastal Development of Lake Manzala
  Activity description                    Indicators                Means of Verification                   Assumptions
Goal (Overall Objectives)
- Contribute to the achievement
of Sustainable Development in
the area of Lake Manzala
Purpose (Project Objectives)      - Water quality                  - Regular monitoring of fish        - Political will
- Improve water quality in Lake   - Fish productivity              productivity
Manzala                           - Quantity and quality of reed   - Regular monitoring of quantity
                                  swamps, salt marshes, and        and quality of reed swamps, salt
                                  sandy areas                      marshes, and sandy areas
                                                                   - Regular reporting
Outputs (Results)                 -Water quality                   - Regular monitoring of water       - Public participation
- Good water quality              - fish productivity              quality
- Better fish productivity                                         - Regular reporting
- Conservation of existing
habitats
Activities                        - penalties                      - Regular monitoring of ongoing     -Strong law enforcement
- Baseline study to detect type   - trained personnel              activities and compatibility with   -Continues capacity
of contaminants and level of      - public hearings                the project timeplan                building
water pollution                   - protected areas                -Regular reporting
- Track sources of Pollution                                       -- budget
- Introduction of appropriate
remediation techniques (e.g.
Bioremediation)
- Better Law enforcement
- Develop more protected areas
- Capacity building for local
governance
- Public participation
Activity description                                   Performance Indicators                         Means of              Risks and Assumptions
                                                                                                                       Verification
Goal (Overall Objective)        This research aims to develop    1.Results will be obtained experimentally and      Publications in        We need data about contaminated
appropriate remediation methods for contaminated sites in        verified against numerical models and              international          sites in Egypt from ministry of
Egypt to clean up the groundwater from contaminants. A           existing analytical solutions. Furthermore, the    journals/              environment, ministry of irrigation
special emphasis will be given to …….                            results will be presented in international         conferences.           and water resources, and ministry of
                                                                 conferences and published in first class                                  petroleum. The traditional routine in
                                                                 international journals.                                                   governmental offices may delay the
                                                                                                                                           collection of these data.
Project Objectives                                               •Verify simple cases of results with               Publications in        •Obtain data about contaminated
• It is expected to predict how far the contaminant has          analytical solutions.                              international          sites.
migrated from its source and the spatial and temporal            •Compare our results with results of other         journals/              •Collecting soil and water samples
distribution of both aqueous and solid phase concentrations.     investigators who used other methods.              conferences            from different boreholes in the
•It is also expected to predict how much contaminant was                                                                                   contaminated site.
absorbed by soil particles……                                                                                                               •Conducting laboratory experiments
                                                                                                                                           to determine the degree of
                                                                                                                                           contamination
Outputs (Results)                                                Validation against results of other                Publications in        What are the conditions necessary to
•Stochastic analysis of contaminant flow &transport;             investigators                                      international          reach the results in alignment with
•Temporal and spatial distributions of the contaminant conc.                                                        journals/              the tie schedule?
•Develop appropriate remediation methods for contaminated                                                           conferences            •Collect data on scheduled time
sites in Egypt.                                                                                                                            •Investigate soil samples
•The amount of contaminated absorbed by soil particles &the                                                                                •Investigate water samples in the
time needed for these contaminant to release to groundwater                                                                                laboratory
again after the aquifer is remediated.

Activities                                                       Means                                              This will be done      The main condition which is outside
•Collect data about contaminated sites.                          2.An assistant to help in…..                       by putting time        our control is the collection of the
•Take water and soil boreholes.                                  3.Contractor to collect soil boreholes ….          schedule for all       data from governmental offices. In
•Investigate the collected water and soil samples in the lab..   4.Laboratory to investigate contaminated soil      activities and         Egypt, people always try to hide
•Verify experimental results against numerical model ….          and water samples ….                               prepare alternative    data even if they are not going to
•Input results of experiments to another numerical model that    5.Printer and two computers (one for me and        solutions if any       use it. This may happen even if the
accounts for macroscopic scale problems (e.g. field sites).       another one for the assistant) to carry out the   activity was delayed   project is going to suggest solutions
•Carry out numerical simulations of the site to predict          numerical modeling.                                by any unexpected      for scientific problems they already
temporal and spatial distribution of contaminant.                                                                   thing.                 have.
•Suggest appropriate remediation programs to cleanup the
site.
•Write up results and publish them in international
conferences and journals.
LFM is a “Summary” of the Project
WHY
the project is carried out (development objective, immediate objectives)
WHAT
the project is supposed to produce (outputs)
HOW
the project is going to achieve the outputs (activities)
HOW
 the success of the project can be measured (indicators)
WHERE
 the data can be found (means of verification)
WHICH
 external factors influence the project (assumptions)

More Related Content

What's hot

George Leahy Resume
George Leahy  ResumeGeorge Leahy  Resume
George Leahy Resume
George Leahy
 
Moffett EATS Evaluation Presentation to RAB July 12, 2007
Moffett EATS Evaluation Presentation to RAB July 12, 2007Moffett EATS Evaluation Presentation to RAB July 12, 2007
Moffett EATS Evaluation Presentation to RAB July 12, 2007
Steve Williams
 
John.lyver safety
John.lyver safetyJohn.lyver safety
John.lyver safety
NASAPMC
 
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Jeff Brown, PhD, CNMA
 

What's hot (13)

Maryse Speckner Resume 2012
Maryse Speckner Resume 2012Maryse Speckner Resume 2012
Maryse Speckner Resume 2012
 
George Leahy Resume
George Leahy  ResumeGeorge Leahy  Resume
George Leahy Resume
 
Moffett EATS Evaluation Presentation to RAB July 12, 2007
Moffett EATS Evaluation Presentation to RAB July 12, 2007Moffett EATS Evaluation Presentation to RAB July 12, 2007
Moffett EATS Evaluation Presentation to RAB July 12, 2007
 
John.lyver safety
John.lyver safetyJohn.lyver safety
John.lyver safety
 
MS4 Permits - Get Ready for the Next Round
MS4 Permits - Get Ready for the Next RoundMS4 Permits - Get Ready for the Next Round
MS4 Permits - Get Ready for the Next Round
 
Mira Abdelaziz resume
Mira Abdelaziz resumeMira Abdelaziz resume
Mira Abdelaziz resume
 
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
Dr J N Brown - PhD thesis (2002) Partitioning of Chemical Contaminants in Urb...
 
Steering meeting presentation april 15 2014
Steering meeting presentation april 15 2014 Steering meeting presentation april 15 2014
Steering meeting presentation april 15 2014
 
A field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshareA field study assessing the impact of on site valerie mc-carthy_slideshare
A field study assessing the impact of on site valerie mc-carthy_slideshare
 
CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2CL:AIRE Site Bulletin SB2
CL:AIRE Site Bulletin SB2
 
Kestrel pres feb 13, 13
Kestrel pres feb 13, 13Kestrel pres feb 13, 13
Kestrel pres feb 13, 13
 
29 reed synergies
29 reed synergies29 reed synergies
29 reed synergies
 
Nevada
NevadaNevada
Nevada
 

Viewers also liked

Сервис Artezio SendFile
Сервис Artezio SendFileСервис Artezio SendFile
Сервис Artezio SendFile
Anna Vishnyakova
 
A film review
A film reviewA film review
A film review
esther240
 
How to write case study
How to write case studyHow to write case study
How to write case study
komurkomur
 
deSPREKER.nl
deSPREKER.nldeSPREKER.nl
deSPREKER.nl
despreker
 
KATALOG TIANDE
KATALOG TIANDEKATALOG TIANDE
KATALOG TIANDE
annatiande
 
Ethics classroom guidance
Ethics classroom guidanceEthics classroom guidance
Ethics classroom guidance
richardtav
 

Viewers also liked (20)

Katalog TianDe Premiera Piekna
Katalog TianDe Premiera PieknaKatalog TianDe Premiera Piekna
Katalog TianDe Premiera Piekna
 
Сервис Artezio SendFile
Сервис Artezio SendFileСервис Artezio SendFile
Сервис Artezio SendFile
 
A film review
A film reviewA film review
A film review
 
Selvitys sähköisestä äänestämisestä HYYn edustajistovaaleissa
Selvitys sähköisestä äänestämisestä HYYn edustajistovaaleissaSelvitys sähköisestä äänestämisestä HYYn edustajistovaaleissa
Selvitys sähköisestä äänestämisestä HYYn edustajistovaaleissa
 
Hudson Opportunities June 2012
Hudson Opportunities June 2012Hudson Opportunities June 2012
Hudson Opportunities June 2012
 
How to write case study
How to write case studyHow to write case study
How to write case study
 
Prezentacja zestawów świątecznych 2012
Prezentacja zestawów świątecznych 2012Prezentacja zestawów świątecznych 2012
Prezentacja zestawów świątecznych 2012
 
DuPage Children's Museum FY14 Annual Report
DuPage Children's Museum FY14 Annual ReportDuPage Children's Museum FY14 Annual Report
DuPage Children's Museum FY14 Annual Report
 
Presentatie Jacques Brinkman
Presentatie Jacques Brinkman Presentatie Jacques Brinkman
Presentatie Jacques Brinkman
 
Part prog1
Part prog1Part prog1
Part prog1
 
deSPREKER.nl
deSPREKER.nldeSPREKER.nl
deSPREKER.nl
 
Starbucks case study
Starbucks case studyStarbucks case study
Starbucks case study
 
KATALOG TIANDE
KATALOG TIANDEKATALOG TIANDE
KATALOG TIANDE
 
Artezio SendFile
Artezio SendFileArtezio SendFile
Artezio SendFile
 
Kalendar Bidang 3 UI - Rapimkap 2014 feb 17
Kalendar Bidang 3 UI - Rapimkap 2014 feb 17Kalendar Bidang 3 UI - Rapimkap 2014 feb 17
Kalendar Bidang 3 UI - Rapimkap 2014 feb 17
 
Environmental Business Council Connecticut Brownfields Seminar Bridgeport, CT...
Environmental Business Council Connecticut Brownfields Seminar Bridgeport, CT...Environmental Business Council Connecticut Brownfields Seminar Bridgeport, CT...
Environmental Business Council Connecticut Brownfields Seminar Bridgeport, CT...
 
Green & Sustainable Remediation
Green & Sustainable RemediationGreen & Sustainable Remediation
Green & Sustainable Remediation
 
Ethics classroom guidance
Ethics classroom guidanceEthics classroom guidance
Ethics classroom guidance
 
Brownfields Redevelopment Overview
Brownfields Redevelopment Overview Brownfields Redevelopment Overview
Brownfields Redevelopment Overview
 
Physiologic Monitoring
Physiologic MonitoringPhysiologic Monitoring
Physiologic Monitoring
 

Similar to Lfm ver3

Esi Landfill And Waste Management Brochure
Esi Landfill And Waste Management BrochureEsi Landfill And Waste Management Brochure
Esi Landfill And Waste Management Brochure
chrisberryman
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
hydrologyproject001
 
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
IJERD Editor
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
hydrologyproject001
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
hydrologywebsite1
 
Biodiversity meeting-bilbao-feb2013
Biodiversity meeting-bilbao-feb2013Biodiversity meeting-bilbao-feb2013
Biodiversity meeting-bilbao-feb2013
devotesproject
 
Network and mandates of wq monitoring
Network and mandates of wq monitoringNetwork and mandates of wq monitoring
Network and mandates of wq monitoring
hydrologyproject0
 
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGYFRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
iQHub
 

Similar to Lfm ver3 (20)

Day 1 neno kukuric igrac- ggreta project
Day 1 neno kukuric   igrac- ggreta projectDay 1 neno kukuric   igrac- ggreta project
Day 1 neno kukuric igrac- ggreta project
 
Acedp november 2010 beijing workshop bond
Acedp november 2010 beijing workshop bondAcedp november 2010 beijing workshop bond
Acedp november 2010 beijing workshop bond
 
Esi Landfill And Waste Management Brochure
Esi Landfill And Waste Management BrochureEsi Landfill And Waste Management Brochure
Esi Landfill And Waste Management Brochure
 
Key Air Management Initiatives - national to regional
Key Air Management Initiatives - national to regionalKey Air Management Initiatives - national to regional
Key Air Management Initiatives - national to regional
 
5 Investigative Assessments. Donal Daly
5 Investigative Assessments. Donal Daly5 Investigative Assessments. Donal Daly
5 Investigative Assessments. Donal Daly
 
Download-manuals-ground water-manual-standardsforg-wmonitoring
 Download-manuals-ground water-manual-standardsforg-wmonitoring Download-manuals-ground water-manual-standardsforg-wmonitoring
Download-manuals-ground water-manual-standardsforg-wmonitoring
 
Bioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and AssessmentBioassessment Approach to MS4 Evaluation and Assessment
Bioassessment Approach to MS4 Evaluation and Assessment
 
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
Evaluating and Developing of Water Resources Quality Monitoring Program Imple...
 
Day1 1 3
Day1 1 3Day1 1 3
Day1 1 3
 
Syr darya 2
Syr darya 2Syr darya 2
Syr darya 2
 
Day1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisationDay1 3 ross_execution_andorganisation
Day1 3 ross_execution_andorganisation
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys... Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
Download-manuals-water quality-wq-manuals-gwvolume6designmanualwaterqualitys...
 
Biodiversity meeting-bilbao-feb2013
Biodiversity meeting-bilbao-feb2013Biodiversity meeting-bilbao-feb2013
Biodiversity meeting-bilbao-feb2013
 
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...
The Nile Basin Development Challenge: A component of  the CGIAR Challenge Pro...The Nile Basin Development Challenge: A component of  the CGIAR Challenge Pro...
The Nile Basin Development Challenge: A component of the CGIAR Challenge Pro...
 
Network and mandates of wq monitoring
Network and mandates of wq monitoringNetwork and mandates of wq monitoring
Network and mandates of wq monitoring
 
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGYFRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
FRESHWATER RESOURCE USE AS PART OF A RESPONSIBLY SOURCED GAS STRATEGY
 
Eia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigrationEia prediction, evaluation & mitigration
Eia prediction, evaluation & mitigration
 
CPWF2‐V3: where we come from and where we are
CPWF2‐V3: where we come from and where we areCPWF2‐V3: where we come from and where we are
CPWF2‐V3: where we come from and where we are
 
Humidtropics Strategic Research Theme 1 – Systems analysis and global synthes...
Humidtropics Strategic Research Theme 1 – Systems analysis and global synthes...Humidtropics Strategic Research Theme 1 – Systems analysis and global synthes...
Humidtropics Strategic Research Theme 1 – Systems analysis and global synthes...
 

Recently uploaded

Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
WSO2
 

Recently uploaded (20)

AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024AXA XL - Insurer Innovation Award Americas 2024
AXA XL - Insurer Innovation Award Americas 2024
 
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu SubbuApidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
Apidays Singapore 2024 - Modernizing Securities Finance by Madhu Subbu
 
Data Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt RobisonData Cloud, More than a CDP by Matt Robison
Data Cloud, More than a CDP by Matt Robison
 
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
Apidays Singapore 2024 - Building Digital Trust in a Digital Economy by Veron...
 
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot TakeoffStrategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
Strategize a Smooth Tenant-to-tenant Migration and Copilot Takeoff
 
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
Connector Corner: Accelerate revenue generation using UiPath API-centric busi...
 
FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024FWD Group - Insurer Innovation Award 2024
FWD Group - Insurer Innovation Award 2024
 
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWEREMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
EMPOWERMENT TECHNOLOGY GRADE 11 QUARTER 2 REVIEWER
 
Corporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptxCorporate and higher education May webinar.pptx
Corporate and higher education May webinar.pptx
 
presentation ICT roal in 21st century education
presentation ICT roal in 21st century educationpresentation ICT roal in 21st century education
presentation ICT roal in 21st century education
 
Architecting Cloud Native Applications
Architecting Cloud Native ApplicationsArchitecting Cloud Native Applications
Architecting Cloud Native Applications
 
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
Emergent Methods: Multi-lingual narrative tracking in the news - real-time ex...
 
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law DevelopmentsTrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
TrustArc Webinar - Stay Ahead of US State Data Privacy Law Developments
 
MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024MINDCTI Revenue Release Quarter One 2024
MINDCTI Revenue Release Quarter One 2024
 
GenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdfGenAI Risks & Security Meetup 01052024.pdf
GenAI Risks & Security Meetup 01052024.pdf
 
AWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of TerraformAWS Community Day CPH - Three problems of Terraform
AWS Community Day CPH - Three problems of Terraform
 
Real Time Object Detection Using Open CV
Real Time Object Detection Using Open CVReal Time Object Detection Using Open CV
Real Time Object Detection Using Open CV
 
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemkeProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
ProductAnonymous-April2024-WinProductDiscovery-MelissaKlemke
 
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost SavingRepurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
Repurposing LNG terminals for Hydrogen Ammonia: Feasibility and Cost Saving
 
Automating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps ScriptAutomating Google Workspace (GWS) & more with Apps Script
Automating Google Workspace (GWS) & more with Apps Script
 

Lfm ver3

  • 1. Results Based Management: Logical Framework Matrix (LFM) ,.Abeer Shakweer, Ph.D Planning and Monitoring Manager Science and Technology Development Fund December 30th, 2009
  • 2. LFM is a Result Based Management (RBM) tool for systematic planning, implementation , monitoring, and evaluation of projects
  • 3. LFM Activity description Performance Indicators Means of Verification Risks and Assumptions Goal (Overall Objective) Project Objectives Outputs (Results) Activities Means
  • 4. Features of LFM • Results oriented- not activity driven • logically sets objectives and their causal relationships • shows whether objectives have been achieved: Indicators (for M&E) • describes external factors that influence the project’s success: assumptions and risks
  • 5. Indicators • Measures to verify to what extant the results are achieved. • Specify how the achievement of an objective can be verified or demonstrated • Provide a basis for Monitoring and Evaluation • Quantitative and Qualitative
  • 6. Means of Verification • Source and means by which indicators will be verified  field verification  Benchmarking  project documents  Publications
  • 7. Assumptions • Conditions that are necessary for the success of the project, but which are not under the direct influence of the project. • Assumptions are risks, which can jeopardize the success of the project. • Should be relevant and probable • Do not include if not important
  • 8. Components of LFM 3. Basic Steps and Elements Planning Phase Vertical Logic Project Planning Matrix (PPM ) • Identifies what the project intends to do and achieve GOAL • Clarifies the causal relationship Objectives • Specifies important assumptions and risks OUTPUTS ACTIVITIES Horizontal Logic • Identifies the source and means by which indicators will be verified • Specifies indicators to measure progress Aims measured by indicators through information collected and presented in specified means of verification
  • 9. Sustainable Coastal Development of Lake Manzala Activity description Indicators Means of Verification Assumptions Goal (Overall Objectives) - Contribute to the achievement of Sustainable Development in the area of Lake Manzala Purpose (Project Objectives) - Water quality - Regular monitoring of fish - Political will - Improve water quality in Lake - Fish productivity productivity Manzala - Quantity and quality of reed - Regular monitoring of quantity swamps, salt marshes, and and quality of reed swamps, salt sandy areas marshes, and sandy areas - Regular reporting Outputs (Results) -Water quality - Regular monitoring of water - Public participation - Good water quality - fish productivity quality - Better fish productivity - Regular reporting - Conservation of existing habitats Activities - penalties - Regular monitoring of ongoing -Strong law enforcement - Baseline study to detect type - trained personnel activities and compatibility with -Continues capacity of contaminants and level of - public hearings the project timeplan building water pollution - protected areas -Regular reporting - Track sources of Pollution -- budget - Introduction of appropriate remediation techniques (e.g. Bioremediation) - Better Law enforcement - Develop more protected areas - Capacity building for local governance - Public participation
  • 10. Activity description Performance Indicators Means of Risks and Assumptions Verification Goal (Overall Objective) This research aims to develop 1.Results will be obtained experimentally and Publications in We need data about contaminated appropriate remediation methods for contaminated sites in verified against numerical models and international sites in Egypt from ministry of Egypt to clean up the groundwater from contaminants. A existing analytical solutions. Furthermore, the journals/ environment, ministry of irrigation special emphasis will be given to ……. results will be presented in international conferences. and water resources, and ministry of conferences and published in first class petroleum. The traditional routine in international journals. governmental offices may delay the collection of these data. Project Objectives •Verify simple cases of results with Publications in •Obtain data about contaminated • It is expected to predict how far the contaminant has analytical solutions. international sites. migrated from its source and the spatial and temporal •Compare our results with results of other journals/ •Collecting soil and water samples distribution of both aqueous and solid phase concentrations. investigators who used other methods. conferences from different boreholes in the •It is also expected to predict how much contaminant was contaminated site. absorbed by soil particles…… •Conducting laboratory experiments to determine the degree of contamination Outputs (Results) Validation against results of other Publications in What are the conditions necessary to •Stochastic analysis of contaminant flow &transport; investigators international reach the results in alignment with •Temporal and spatial distributions of the contaminant conc. journals/ the tie schedule? •Develop appropriate remediation methods for contaminated conferences •Collect data on scheduled time sites in Egypt. •Investigate soil samples •The amount of contaminated absorbed by soil particles &the •Investigate water samples in the time needed for these contaminant to release to groundwater laboratory again after the aquifer is remediated. Activities Means This will be done The main condition which is outside •Collect data about contaminated sites. 2.An assistant to help in….. by putting time our control is the collection of the •Take water and soil boreholes. 3.Contractor to collect soil boreholes …. schedule for all data from governmental offices. In •Investigate the collected water and soil samples in the lab.. 4.Laboratory to investigate contaminated soil activities and Egypt, people always try to hide •Verify experimental results against numerical model …. and water samples …. prepare alternative data even if they are not going to •Input results of experiments to another numerical model that 5.Printer and two computers (one for me and solutions if any use it. This may happen even if the accounts for macroscopic scale problems (e.g. field sites). another one for the assistant) to carry out the activity was delayed project is going to suggest solutions •Carry out numerical simulations of the site to predict numerical modeling. by any unexpected for scientific problems they already temporal and spatial distribution of contaminant. thing. have. •Suggest appropriate remediation programs to cleanup the site. •Write up results and publish them in international conferences and journals.
  • 11. LFM is a “Summary” of the Project WHY the project is carried out (development objective, immediate objectives) WHAT the project is supposed to produce (outputs) HOW the project is going to achieve the outputs (activities) HOW the success of the project can be measured (indicators) WHERE the data can be found (means of verification) WHICH external factors influence the project (assumptions)