Presentation dental room 121011
Phase 1: Students measure on sight and draw a
         model of existing conditions.




     Pre – Design Drawings
         •   Floor Plan
         •   Wall Elevations
         •   3D Model screen shots & walk through
         •   LEED Strategies for Green Building Renovation
The following Architectural drawings are cut from the
3D model and put into layout where the title block is
inserted and the scale is applied.
       At this point, important detail dimensions are
added.
F
L
O
O
R


P
L
A
N
E
L
E
V
A
T
I
O
N

W
A
L
L

A
E
L
E
V
A
T
I
O
N

W
A
L
L

B
E
L
E
V
A
T
I
O
N

W
A
L
L

C
E
L
E
V
A
T
I
O
N

W
A
L
L

D
The kitchen area in the Nursing Classroom




I
I
                         I
                         I

                         T




T
                         E




S
                         S
                         X




C
                         G




O
O




N
N
                         N




D
The Examination room




I
I
                       I
                       I




T
                       T




S
                       S
                       X
                       E




N
D
N
C
                       N




O
O
                       G
The Dental Classroom




I
I
                       I
                       I




T
                       T




S
                       S
                       X
                       E




N
D
N
C
                       N
                       G




O
O
E
                    X
                    I
                    S
                    T
                    I
                    N
                    G

                    C
                    O
                    N
The X-Ray Station




                    D
                    I
                    T
                    I
                    O
                    N
                    S
Phase 2: Students consider which LEED Rating System
                best fits their project.




                                                    Rating Systems:
                                           1.   LEED for New Construction
                                           2.   LEED for Existing Buildings
                                           3.   LEED for Commercial Interiors
                                           4.   LEED for Core and Shell
                                           5.   LEED for Homes
                                           6.   LEED for Schools
                                           7.   LEED for Retail
                                           8.   LEED for Healthcare
                                           9.   LEED for Neighborhood Development



The Leadership in Energy and Environmental Design (LEED®) standard, developed by
                     the U.S. Green Building Council (USGBC)
Phase 2, part b: Once the Rating System has been selected,
students first meet ‘Pre-requisites,’ and then consider how to
maximize their potential achievable credits from each ‘Category’
in order to earn highest level of certification for their project.
 LEED for Commercial Interiors
 Certified   40-49 points
 Silver      50-59 points
 Gold        60-79 points          Project Categories:
 Platinum    80 pts and above
                                  1. Sustainable Sites
                                  (21 pts)
                                  2. Water Efficiency             (11
                                     pts)
                                  3. Energy and Atmosphere       (37
                                     pts)
                                  4. Materials and Resource      (14
                                     pts)
                                  5. Indoor Environmental Quality (17
                                     pts)
1. Project Category: Sustainable Sites
 q Project meets standards for all Pre-requisites
 Credits:                                            possible points: 21
 Credit 1     Site selection                                        1-5
 Credit 2     Development Density and Community Connectivity           6
 Credit 3.1   Alternative Transportation--Public Transportation Access   6
 Credit 3.2   Alternative Transport.—Bicycle Storage & Changing Rooms 2
 Credit 3.3   Alternative Transportation--Parking Availability
 2
2. Project Category: Water Efficiency
 q Project meets standards for all Pre-requisites
 Credits:                                                 possible points: 11
 Credit 1 Water use reduction                                    6 - 11
3. Project Category: Energy and Atmosphere
  q Project meets standards for all Pre-requisites
 Credits:                                            possible points: 37
 Credit 1.1 Optimize Energy Performance—Lighting Power
          1-5
 Credit 1.2 Optimize Energy Performance—Lighting Controls
          1-3
 Credit 1.3 Optimize Energy Performance—HVAC
 5-10
 Credit 1.4 Optimize Energy Performance—Equipment & Appliances 1-4
 Credit 2     Enhanced Commissioning (digital measurement devices) 5
 Credit 3     Measurement and Verification
 2-5
 Credit 4     Green Power
 5
4. Project Category: Materials and Resources
 q Project meets standards for all Pre-requisites
 Credits:                                                possible points:
 14

 Credit 1.1 Tenant Space—Long-Term Commitment – (10 year minimum) 1
 Credit 1.2 Building Reuse—Maintain Interior Nonstructural Components 1-2
 Credit 2 Construction Waste Management                               1-2
 Credit 3.1 Materials Reuse                                           1-2
 Credit 3.2 Materials Reuse--Furniture and Furnishings                1
 Credit 4 Recycled Content                                            1-2
 Credit 5 Regional Materials                                          1-2
 Credit 6 Rapidly Renewable Materials                                 1
 Credit 7 Certified Wood
         1
5. Project Category: Indoor Environmental Quality
q Project meets standards for all Pre-requisites
Credits:                                                       possible points:
17
Credit 1       Outdoor Air Delivery Monitoring
           1
Credit 2       Increased Ventilation
        1
Credit 3.1     Reduce Indoor Air Quality Problems– During Construction    1
Credit 3.2     Reduce Indoor Air Quality Problems– Before Occupancy
        1
Credit 4.1     Low-Emitting Materials– Adhesives & Sealants
        1
Credit 4.2     Low-Emitting Materials– Paints & Coatings                  1
Credit 4.3     Low-Emitting Materials– Flooring Systems                   1
Credit 4.4     Low-Emitting Materials– Composite Wood & Agrifiber Products
        1
Credit 4.5     Low-Emitting Materials– Systems Furniture and Seating
        1
. . Continued (Indoor Environmental Quality)

Credit 5     Indoor Chemical and Pollutant Source Control       1

Credit 6.1   Controllability of Systems—Lighting            1
Credit 6.2   Controllability of Systems—Thermal Comfort     1
Credit 7.1   Thermal Comfort– Design                        1
Credit 7.2   Thermal Comfort– Verification                      1
Credit 8.1   Daylight and Views– Daylight                       1
-2
Credit 8.2   Daylight and Views– Views for Seated Spaces        1
6. Project Category: Innovation in Design
 q Project meets standards for all Pre-requisites
 Credits:                                           possible
 points: 6
 Credit 1 New Design Techniques                                1-
 5
 Credit 2 LEED Accredited Professional                  1
7. Project Category: Regional Priority
 q Project meets standards for all Pre-requisites
 Credits:                                           possible
 points: 4
 Credit 1 New Design Techniques                                1-
 4
Indoor Environmental Quality




                               Credit 4.2 Low emitting material:
                               paints and coatings
ENERGY AND ATMOSPHERE




                        Optimize Energy
                        Performance:
                        Equipment and
                        Appliances
ENERGY AND ATMOSPHERE




                        Credit 1.1 Optimize
                        Energy performance:
                        Lighting
MATERIALS AND RESOURCES




                          Credit 3.1 -materials reuse
Credit 1 Water use
                   Reduction:    (automatic
                   faucets)
WATER EFFICIENCY
INDOOR ENVIRONMENTAL QUALITY



                               Credit 8.2 Daylight
                               and Views– Views for
                               Seated Spaces
Energy and Atmosphere




                                            Credit 1.3
                        Credit 1.2          Optimize
                        Optimize Energy     Energy
                        Performance—        Performance
                        Lighting Controls   —HVAC
Teacher’s office space
Birds Eye View
Phase 3: After the presentation drawings are viewed,
    discussions are initiated with the client to consider all ideas
    and possibilities for the renovation.
      • The Conversion of existing use to desired new use of
        space.
      • The additions and subtraction of
        walls, electrical, plumbing, windows or doors, floors and
        ceilings.
• The Use & re-use of existing materials.
• The LEED benefits are then discussed to fully
  understand the enhanced value of the project through
  sustainable design solutions.
After the detailed discussions . . .
• These ideas are drawn into the existing model and
   presented again to assure clear communication between
   client and designer/builder.
• Once agreed upon, cost estimates are made and submitted
   with revised drawings and specifications.
• Contracts are drawn and signed and project work is then
   scheduled.
Presentation dental room 121011
Presentation dental room 121011
Presentation dental room 121011
In thanks to the collaborative efforts of:
               Marcos Arce
               Michael Hagee
               Daniel Perry
               Dylan Wood

2011-2012 Green Technology Class at CATEC,
       Charlottesville, Virginia 22901

Más contenido relacionado

La actualidad más candente

Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklistJ C
 
Leed For Homes Vs BIG
Leed For Homes Vs BIGLeed For Homes Vs BIG
Leed For Homes Vs BIGMatt Macko
 
Making Project management SEXY with Prince 2
Making Project management SEXY with Prince 2Making Project management SEXY with Prince 2
Making Project management SEXY with Prince 2Vision Presentations
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bcAmber Joan Wood
 
Build green services presentation
Build green services presentationBuild green services presentation
Build green services presentationemmak781
 
Greg labbe home performance verification
Greg labbe home performance verificationGreg labbe home performance verification
Greg labbe home performance verificationToronto 2030 District
 
Phoenix Habitat For Humanity Leed Presentation
Phoenix   Habitat For Humanity Leed  PresentationPhoenix   Habitat For Humanity Leed  Presentation
Phoenix Habitat For Humanity Leed PresentationICF_HCD
 
Brittain Hadley Brochure
Brittain Hadley BrochureBrittain Hadley Brochure
Brittain Hadley BrochureNathanSproule
 
Sustainable Site Design
Sustainable Site DesignSustainable Site Design
Sustainable Site Designemilydean
 
Overview of portfolio
Overview of portfolioOverview of portfolio
Overview of portfolioRCREEE
 

La actualidad más candente (14)

Leed 2009 checklist
Leed 2009 checklistLeed 2009 checklist
Leed 2009 checklist
 
Leed For Homes Vs BIG
Leed For Homes Vs BIGLeed For Homes Vs BIG
Leed For Homes Vs BIG
 
The Greening Curve
The Greening CurveThe Greening Curve
The Greening Curve
 
Making Project management SEXY with Prince 2
Making Project management SEXY with Prince 2Making Project management SEXY with Prince 2
Making Project management SEXY with Prince 2
 
2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc2010 10-14 eeba 2010 ngbs-bc
2010 10-14 eeba 2010 ngbs-bc
 
Skanska Profile
Skanska ProfileSkanska Profile
Skanska Profile
 
Build green services presentation
Build green services presentationBuild green services presentation
Build green services presentation
 
Greg labbe home performance verification
Greg labbe home performance verificationGreg labbe home performance verification
Greg labbe home performance verification
 
Skanska presentation
Skanska presentationSkanska presentation
Skanska presentation
 
Phoenix Habitat For Humanity Leed Presentation
Phoenix   Habitat For Humanity Leed  PresentationPhoenix   Habitat For Humanity Leed  Presentation
Phoenix Habitat For Humanity Leed Presentation
 
Brittain Hadley Brochure
Brittain Hadley BrochureBrittain Hadley Brochure
Brittain Hadley Brochure
 
Campus square building
Campus square buildingCampus square building
Campus square building
 
Sustainable Site Design
Sustainable Site DesignSustainable Site Design
Sustainable Site Design
 
Overview of portfolio
Overview of portfolioOverview of portfolio
Overview of portfolio
 

Similar a Presentation dental room 121011

Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated ManualTom_Pritscher
 
Myths vs. Reality of Green Building Certifications SEBC 2012
Myths vs. Reality of Green Building Certifications SEBC 2012Myths vs. Reality of Green Building Certifications SEBC 2012
Myths vs. Reality of Green Building Certifications SEBC 2012Two Trails
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFThe Design Partnership
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excelimaduddin91
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laneylaneycollege
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovationssaif hasan
 
LEED v4 Transformation
LEED v4 TransformationLEED v4 Transformation
LEED v4 TransformationOC_Composites
 
LEED 2009 Rating System and Credentials Overview
LEED 2009 Rating System and Credentials OverviewLEED 2009 Rating System and Credentials Overview
LEED 2009 Rating System and Credentials OverviewAllison Beer
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfSunshineBeats
 
Regina Dominican High School Presentation
Regina Dominican High School PresentationRegina Dominican High School Presentation
Regina Dominican High School PresentationKorey Witalka
 
Leed green associate pool b - answer
Leed green associate   pool b - answer Leed green associate   pool b - answer
Leed green associate pool b - answer Bilal Mohamed
 
Fci Green Advantage Presentation 6 10
Fci Green Advantage Presentation 6 10Fci Green Advantage Presentation 6 10
Fci Green Advantage Presentation 6 10cjacksonfiocon
 

Similar a Presentation dental room 121011 (20)

Leed CI Abbreviated Manual
Leed CI Abbreviated ManualLeed CI Abbreviated Manual
Leed CI Abbreviated Manual
 
Myths vs. Reality of Green Building Certifications SEBC 2012
Myths vs. Reality of Green Building Certifications SEBC 2012Myths vs. Reality of Green Building Certifications SEBC 2012
Myths vs. Reality of Green Building Certifications SEBC 2012
 
Achieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSFAchieving a LEED Gold Laboratory @ UCSF
Achieving a LEED Gold Laboratory @ UCSF
 
58092676 project-checklist-excel
58092676 project-checklist-excel58092676 project-checklist-excel
58092676 project-checklist-excel
 
LEED Green Factory
LEED Green FactoryLEED Green Factory
LEED Green Factory
 
LEED Presentation
LEED PresentationLEED Presentation
LEED Presentation
 
Green building materials laney
Green building materials laneyGreen building materials laney
Green building materials laney
 
Leed
LeedLeed
Leed
 
LEED
LEEDLEED
LEED
 
Green building rating system on des innovations
Green building rating system on des innovationsGreen building rating system on des innovations
Green building rating system on des innovations
 
LEED v4 Transformation
LEED v4 TransformationLEED v4 Transformation
LEED v4 Transformation
 
LEED.pptx
LEED.pptxLEED.pptx
LEED.pptx
 
Why Build Green?
Why Build Green?Why Build Green?
Why Build Green?
 
LEED
LEEDLEED
LEED
 
LEED 2009 Rating System and Credentials Overview
LEED 2009 Rating System and Credentials OverviewLEED 2009 Rating System and Credentials Overview
LEED 2009 Rating System and Credentials Overview
 
LEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdfLEED CERTIFIATTION.pdf
LEED CERTIFIATTION.pdf
 
Regina Dominican High School Presentation
Regina Dominican High School PresentationRegina Dominican High School Presentation
Regina Dominican High School Presentation
 
Leed green associate pool b - answer
Leed green associate   pool b - answer Leed green associate   pool b - answer
Leed green associate pool b - answer
 
Fci Green Advantage Presentation 6 10
Fci Green Advantage Presentation 6 10Fci Green Advantage Presentation 6 10
Fci Green Advantage Presentation 6 10
 
Leed nd drcog
Leed nd drcogLeed nd drcog
Leed nd drcog
 

Último

Cayden Ingman's apparel design portfolio | Oregon State University|
Cayden Ingman's apparel design portfolio | Oregon State University|Cayden Ingman's apparel design portfolio | Oregon State University|
Cayden Ingman's apparel design portfolio | Oregon State University|CaydenIngman
 
Strawberry Jams But My Glock Don't Shirt
Strawberry Jams But My Glock Don't ShirtStrawberry Jams But My Glock Don't Shirt
Strawberry Jams But My Glock Don't ShirtTeeFusion
 
Unit 12 - Level Design and how it affects the player.
Unit 12 - Level Design and how it affects the player.Unit 12 - Level Design and how it affects the player.
Unit 12 - Level Design and how it affects the player.JoshHolmes21
 
如何办理西英格兰大学毕业证书学位证书成绩单?
如何办理西英格兰大学毕业证书学位证书成绩单?如何办理西英格兰大学毕业证书学位证书成绩单?
如何办理西英格兰大学毕业证书学位证书成绩单?krc0yvm5
 
Revit Drafting – Drafting Tools and Software
Revit Drafting – Drafting Tools and SoftwareRevit Drafting – Drafting Tools and Software
Revit Drafting – Drafting Tools and SoftwareResDraft
 
DSGN 253 Design Portfolio Project - Julien Fedou
DSGN 253 Design Portfolio Project - Julien FedouDSGN 253 Design Portfolio Project - Julien Fedou
DSGN 253 Design Portfolio Project - Julien Fedoujfedou2105
 
Oregon State University Interior Design Portfolio
Oregon State University Interior Design PortfolioOregon State University Interior Design Portfolio
Oregon State University Interior Design Portfoliopagei
 
F.LAB Credential ©2024 : Looking The World of Experience by F.LAB
F.LAB Credential ©2024 : Looking The World of Experience by F.LABF.LAB Credential ©2024 : Looking The World of Experience by F.LAB
F.LAB Credential ©2024 : Looking The World of Experience by F.LAButariworks
 
Mike Tyson Sign The Contract Big Boy Shirt
Mike Tyson Sign The Contract Big Boy ShirtMike Tyson Sign The Contract Big Boy Shirt
Mike Tyson Sign The Contract Big Boy ShirtTeeFusion
 
Digi Pack for the impulse band coursework.pptx
Digi Pack for the impulse band coursework.pptxDigi Pack for the impulse band coursework.pptx
Digi Pack for the impulse band coursework.pptxRufusGleave
 
second stories test a method kit for co creationnnnnnn
second stories test a method kit for co creationnnnnnnsecond stories test a method kit for co creationnnnnnn
second stories test a method kit for co creationnnnnnnjohannesrothkegel
 
Jackson Henry 24 Flock The Vote Shirt Jackson Henry 24 Flock The Vote Shirt
Jackson Henry 24 Flock The Vote Shirt  Jackson Henry 24 Flock The Vote ShirtJackson Henry 24 Flock The Vote Shirt  Jackson Henry 24 Flock The Vote Shirt
Jackson Henry 24 Flock The Vote Shirt Jackson Henry 24 Flock The Vote ShirtTeeFusion
 
Sign The Contract Big Boy Shirt Sign The Contract Big Boy Shirt
Sign The Contract Big Boy Shirt  Sign The Contract Big Boy ShirtSign The Contract Big Boy Shirt  Sign The Contract Big Boy Shirt
Sign The Contract Big Boy Shirt Sign The Contract Big Boy ShirtTeeFusion
 
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...ssuseraaa1581
 
ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...
ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...
ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...Peter139483
 
Complete Coffee table book on Jiapur.pdf
Complete Coffee table book on Jiapur.pdfComplete Coffee table book on Jiapur.pdf
Complete Coffee table book on Jiapur.pdfaimonayesha7
 
FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.
FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.
FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.Vaishnavi R
 
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...ssuseraaa1581
 
DesignKit IDEO Human-Centered Design course report
DesignKit IDEO Human-Centered Design course reportDesignKit IDEO Human-Centered Design course report
DesignKit IDEO Human-Centered Design course reportstudiotelon
 
ورشة الطريق إلى البيم ورشة الطريق إلى البيم
ورشة الطريق إلى البيم   ورشة الطريق إلى البيمورشة الطريق إلى البيم   ورشة الطريق إلى البيم
ورشة الطريق إلى البيم ورشة الطريق إلى البيمOmarSelim27
 

Último (20)

Cayden Ingman's apparel design portfolio | Oregon State University|
Cayden Ingman's apparel design portfolio | Oregon State University|Cayden Ingman's apparel design portfolio | Oregon State University|
Cayden Ingman's apparel design portfolio | Oregon State University|
 
Strawberry Jams But My Glock Don't Shirt
Strawberry Jams But My Glock Don't ShirtStrawberry Jams But My Glock Don't Shirt
Strawberry Jams But My Glock Don't Shirt
 
Unit 12 - Level Design and how it affects the player.
Unit 12 - Level Design and how it affects the player.Unit 12 - Level Design and how it affects the player.
Unit 12 - Level Design and how it affects the player.
 
如何办理西英格兰大学毕业证书学位证书成绩单?
如何办理西英格兰大学毕业证书学位证书成绩单?如何办理西英格兰大学毕业证书学位证书成绩单?
如何办理西英格兰大学毕业证书学位证书成绩单?
 
Revit Drafting – Drafting Tools and Software
Revit Drafting – Drafting Tools and SoftwareRevit Drafting – Drafting Tools and Software
Revit Drafting – Drafting Tools and Software
 
DSGN 253 Design Portfolio Project - Julien Fedou
DSGN 253 Design Portfolio Project - Julien FedouDSGN 253 Design Portfolio Project - Julien Fedou
DSGN 253 Design Portfolio Project - Julien Fedou
 
Oregon State University Interior Design Portfolio
Oregon State University Interior Design PortfolioOregon State University Interior Design Portfolio
Oregon State University Interior Design Portfolio
 
F.LAB Credential ©2024 : Looking The World of Experience by F.LAB
F.LAB Credential ©2024 : Looking The World of Experience by F.LABF.LAB Credential ©2024 : Looking The World of Experience by F.LAB
F.LAB Credential ©2024 : Looking The World of Experience by F.LAB
 
Mike Tyson Sign The Contract Big Boy Shirt
Mike Tyson Sign The Contract Big Boy ShirtMike Tyson Sign The Contract Big Boy Shirt
Mike Tyson Sign The Contract Big Boy Shirt
 
Digi Pack for the impulse band coursework.pptx
Digi Pack for the impulse band coursework.pptxDigi Pack for the impulse band coursework.pptx
Digi Pack for the impulse band coursework.pptx
 
second stories test a method kit for co creationnnnnnn
second stories test a method kit for co creationnnnnnnsecond stories test a method kit for co creationnnnnnn
second stories test a method kit for co creationnnnnnn
 
Jackson Henry 24 Flock The Vote Shirt Jackson Henry 24 Flock The Vote Shirt
Jackson Henry 24 Flock The Vote Shirt  Jackson Henry 24 Flock The Vote ShirtJackson Henry 24 Flock The Vote Shirt  Jackson Henry 24 Flock The Vote Shirt
Jackson Henry 24 Flock The Vote Shirt Jackson Henry 24 Flock The Vote Shirt
 
Sign The Contract Big Boy Shirt Sign The Contract Big Boy Shirt
Sign The Contract Big Boy Shirt  Sign The Contract Big Boy ShirtSign The Contract Big Boy Shirt  Sign The Contract Big Boy Shirt
Sign The Contract Big Boy Shirt Sign The Contract Big Boy Shirt
 
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
 
ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...
ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...
ALISIA: HOW MIGHT WE ACHIEVE HIGH ENVIRONMENTAL PERFORMANCE WHILE MAINTAINING...
 
Complete Coffee table book on Jiapur.pdf
Complete Coffee table book on Jiapur.pdfComplete Coffee table book on Jiapur.pdf
Complete Coffee table book on Jiapur.pdf
 
FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.
FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.
FARMER'S HOUSING PORTFOLIO. DESIGN PTOBLEM OF 7TH SEM. ARCHITECTURE DESIGN.
 
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
Integrating Artificial Intelligence (AI) with User Experience(UX)/User Interf...
 
DesignKit IDEO Human-Centered Design course report
DesignKit IDEO Human-Centered Design course reportDesignKit IDEO Human-Centered Design course report
DesignKit IDEO Human-Centered Design course report
 
ورشة الطريق إلى البيم ورشة الطريق إلى البيم
ورشة الطريق إلى البيم   ورشة الطريق إلى البيمورشة الطريق إلى البيم   ورشة الطريق إلى البيم
ورشة الطريق إلى البيم ورشة الطريق إلى البيم
 

Presentation dental room 121011

  • 2. Phase 1: Students measure on sight and draw a model of existing conditions. Pre – Design Drawings • Floor Plan • Wall Elevations • 3D Model screen shots & walk through • LEED Strategies for Green Building Renovation
  • 3. The following Architectural drawings are cut from the 3D model and put into layout where the title block is inserted and the scale is applied. At this point, important detail dimensions are added.
  • 9. The kitchen area in the Nursing Classroom I I I I T T E S S X C G O O N N N D
  • 10. The Examination room I I I I T T S S X E N D N C N O O G
  • 11. The Dental Classroom I I I I T T S S X E N D N C N G O O
  • 12. E X I S T I N G C O N The X-Ray Station D I T I O N S
  • 13. Phase 2: Students consider which LEED Rating System best fits their project. Rating Systems: 1. LEED for New Construction 2. LEED for Existing Buildings 3. LEED for Commercial Interiors 4. LEED for Core and Shell 5. LEED for Homes 6. LEED for Schools 7. LEED for Retail 8. LEED for Healthcare 9. LEED for Neighborhood Development The Leadership in Energy and Environmental Design (LEED®) standard, developed by the U.S. Green Building Council (USGBC)
  • 14. Phase 2, part b: Once the Rating System has been selected, students first meet ‘Pre-requisites,’ and then consider how to maximize their potential achievable credits from each ‘Category’ in order to earn highest level of certification for their project. LEED for Commercial Interiors Certified 40-49 points Silver 50-59 points Gold 60-79 points Project Categories: Platinum 80 pts and above 1. Sustainable Sites (21 pts) 2. Water Efficiency (11 pts) 3. Energy and Atmosphere (37 pts) 4. Materials and Resource (14 pts) 5. Indoor Environmental Quality (17 pts)
  • 15. 1. Project Category: Sustainable Sites q Project meets standards for all Pre-requisites Credits: possible points: 21 Credit 1 Site selection 1-5 Credit 2 Development Density and Community Connectivity 6 Credit 3.1 Alternative Transportation--Public Transportation Access 6 Credit 3.2 Alternative Transport.—Bicycle Storage & Changing Rooms 2 Credit 3.3 Alternative Transportation--Parking Availability 2 2. Project Category: Water Efficiency q Project meets standards for all Pre-requisites Credits: possible points: 11 Credit 1 Water use reduction 6 - 11
  • 16. 3. Project Category: Energy and Atmosphere q Project meets standards for all Pre-requisites Credits: possible points: 37 Credit 1.1 Optimize Energy Performance—Lighting Power 1-5 Credit 1.2 Optimize Energy Performance—Lighting Controls 1-3 Credit 1.3 Optimize Energy Performance—HVAC 5-10 Credit 1.4 Optimize Energy Performance—Equipment & Appliances 1-4 Credit 2 Enhanced Commissioning (digital measurement devices) 5 Credit 3 Measurement and Verification 2-5 Credit 4 Green Power 5
  • 17. 4. Project Category: Materials and Resources q Project meets standards for all Pre-requisites Credits: possible points: 14 Credit 1.1 Tenant Space—Long-Term Commitment – (10 year minimum) 1 Credit 1.2 Building Reuse—Maintain Interior Nonstructural Components 1-2 Credit 2 Construction Waste Management 1-2 Credit 3.1 Materials Reuse 1-2 Credit 3.2 Materials Reuse--Furniture and Furnishings 1 Credit 4 Recycled Content 1-2 Credit 5 Regional Materials 1-2 Credit 6 Rapidly Renewable Materials 1 Credit 7 Certified Wood 1
  • 18. 5. Project Category: Indoor Environmental Quality q Project meets standards for all Pre-requisites Credits: possible points: 17 Credit 1 Outdoor Air Delivery Monitoring 1 Credit 2 Increased Ventilation 1 Credit 3.1 Reduce Indoor Air Quality Problems– During Construction 1 Credit 3.2 Reduce Indoor Air Quality Problems– Before Occupancy 1 Credit 4.1 Low-Emitting Materials– Adhesives & Sealants 1 Credit 4.2 Low-Emitting Materials– Paints & Coatings 1 Credit 4.3 Low-Emitting Materials– Flooring Systems 1 Credit 4.4 Low-Emitting Materials– Composite Wood & Agrifiber Products 1 Credit 4.5 Low-Emitting Materials– Systems Furniture and Seating 1
  • 19. . . Continued (Indoor Environmental Quality) Credit 5 Indoor Chemical and Pollutant Source Control 1 Credit 6.1 Controllability of Systems—Lighting 1 Credit 6.2 Controllability of Systems—Thermal Comfort 1 Credit 7.1 Thermal Comfort– Design 1 Credit 7.2 Thermal Comfort– Verification 1 Credit 8.1 Daylight and Views– Daylight 1 -2 Credit 8.2 Daylight and Views– Views for Seated Spaces 1
  • 20. 6. Project Category: Innovation in Design q Project meets standards for all Pre-requisites Credits: possible points: 6 Credit 1 New Design Techniques 1- 5 Credit 2 LEED Accredited Professional 1 7. Project Category: Regional Priority q Project meets standards for all Pre-requisites Credits: possible points: 4 Credit 1 New Design Techniques 1- 4
  • 21. Indoor Environmental Quality Credit 4.2 Low emitting material: paints and coatings
  • 22. ENERGY AND ATMOSPHERE Optimize Energy Performance: Equipment and Appliances
  • 23. ENERGY AND ATMOSPHERE Credit 1.1 Optimize Energy performance: Lighting
  • 24. MATERIALS AND RESOURCES Credit 3.1 -materials reuse
  • 25. Credit 1 Water use Reduction: (automatic faucets) WATER EFFICIENCY
  • 26. INDOOR ENVIRONMENTAL QUALITY Credit 8.2 Daylight and Views– Views for Seated Spaces
  • 27. Energy and Atmosphere Credit 1.3 Credit 1.2 Optimize Optimize Energy Energy Performance— Performance Lighting Controls —HVAC
  • 30. Phase 3: After the presentation drawings are viewed, discussions are initiated with the client to consider all ideas and possibilities for the renovation. • The Conversion of existing use to desired new use of space. • The additions and subtraction of walls, electrical, plumbing, windows or doors, floors and ceilings.
  • 31. • The Use & re-use of existing materials. • The LEED benefits are then discussed to fully understand the enhanced value of the project through sustainable design solutions.
  • 32. After the detailed discussions . . . • These ideas are drawn into the existing model and presented again to assure clear communication between client and designer/builder. • Once agreed upon, cost estimates are made and submitted with revised drawings and specifications. • Contracts are drawn and signed and project work is then scheduled.
  • 36. In thanks to the collaborative efforts of: Marcos Arce Michael Hagee Daniel Perry Dylan Wood 2011-2012 Green Technology Class at CATEC, Charlottesville, Virginia 22901