An Evolving
     Australian Gold
        Producer
      AUGUST 2011



TSX:CRK   OTCQX:CROCF
FRANKFURT:XGC
Disclaimer
   Forward Looking Statements                                                                                                                    TSX:CRK

This presentation contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but are not limited to, statements
with respect to the development potential and timetable of the projects; the Company‟s ability to raise additional funds as necessary; the future price of gold; the
estimation of mineral resources; conclusions of economic evaluation (including scoping studies); the realization of mineral resource estimates; the timing and amount
of estimated future production, development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; mining or
processing issues; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking statements can be
identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”,
“intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”,
“could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements are based on the opinions and estimates of management as of the
date such statements are made. Estimates regarding the anticipated timing, amount and cost of mining at the projects are based on assumptions underlying mineral
resource estimates and the realization of such estimates; results of previous mining activities at the projects, and detailed research and analysis completed by
independent of the Company; research and estimates regarding the timing of delivery for long-lead items; knowledge regarding the factors consultants and
management involved in building a mine and other factors described in the technical reports and Annual Information Form filed under the profile of the Company on
SEDAR. Capital and operating cost estimates are based on results of previous mining activities, research of the Company and independent consultants, recent
estimates of construction and mining costs and other factors that are set out in the scoping study. Production estimates are based on mine plans and production
schedules, which have been developed by the Company‟s personnel and independent consultants. Forward-looking statements are subject to known and unknown
risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from
those expressed or implied by such forward-looking statements, including but not limited to risks related to: timing and availability of external financing on acceptable
terms; unexpected events and delays during construction, expansion and start-up; variations in ore grade and recovery rates; receipt and revocation of government
approvals; actual results of exploration and mining activities; changes in project parameters as plans continue to be refined; future prices of gold; failure of plant,
equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry. Although management of the Company has
attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other
factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results
and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking
statements. The Company does not undertake to update any forward-looking statements except in accordance with applicable securities laws.
Investors are advised that National Instrument NI 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral
resources be reported separately. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty of measured,
indicated or inferred mineral resources, these mineral resources may never be upgraded to proven and probable mineral reserves.
Non-GAAP Measures
Crocodile Gold believes that investors use certain indicators to assess gold mining companies. The indicators are intended to provide additional information and should
not be considered in isolation or as a substitute for measures of performance in accordance with the International Financial Reporting Standards.
“Cash Cost per Ounce” is a non-GAAP performance measure which could provide an indication of the mining and processing efficiency at the operations. It is
determined by dividing the operating expenses, excluding stock-based compensation allocated to the operating expense and next of silver revenue, by the number of
ounces of gold sold. There are variations in the method of computation of „cash cost per ounce” as determined by the Company compared with other mining
companies.
Qualified Person
David Keough, MAusIMM of Crocodile Gold Australia Operations is a “qualified person” as such term is defined in National Instrument 43-101 and has reviewed and
confirmed the technical information and data included in this presentation.
Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources
The information presented uses the terms “measured”, “indicated” and “inferred” mineral resources. United States investors are advised that while such terms are
recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize these terms. “Inferred mineral
resources” have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an
inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of
feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be
converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically
or legally mineable.
First World Location &
Infrastructure           TSX:CRK
Our Assets
                                                                 TSX:CRK


Production                 Development               Mills
Howley Trend               Cosmo                     Union Reefs Mill
 open pit mine             underground mine          2.4 mtpy
                            initial ore mined 3rd     in operation
North Point                  Qtr 2011
 open pit mine                                      Tom’s Gully Mill
 oxide, low strip ratio   Pine Creek-                 240,000 tpy
 dry season operation       International             Care and
  (May – Nov)               open pit mine              maintenance
                            Production upon
Princess Louise              receipt of permits
 open pit mine
 dry season operation
  (May – Nov)                    Exploration Potential
                                     >2,700 km2
                                                                           4
Investment Advantage
                                                TSX:CRK



 Expanding production profile, decreasing cash costs
 Outstanding potential to discover additional resources
 3.175 million ounces M&I and 2.14 million ounces Inf.
 Infrastructure replacement value = $200M (Adjacent to
  major highway and utilities)
 2010 production of 82,000 ounces
 2011 production guidance: 77,500 – 82,500 ounces




                                                          5
2011 – Growing Production
Throughout the Year                                                   TSX:CRK


2011 Key Catalysts
 Production from Cosmo
    Initial ore expected 3rd Qtr -2011
    Will contribute 50% of ounces at full production (800,000 t.p.a. ore).
 Production from Pine Creek- International, upon receipt of permits
 Aggressive exploration program (Brownfields and Greenfields)
 Increasing % of high grade mill feed throughout the year from Cosmo


2011 Guidance              2011 Production                  2011 Major
  77,500 -82,500 oz           Sources                         Capital
      Cash Cost               Open Pits: Howley,           Investments
  US$1,150-$1,250/oz         Princess Louise, Pine        Cosmo underground
                            Creek/Union Reefs area
                                                               Exploration
                             Underground: Cosmo,
                                Brocks Creek
                                                                                6
Cosmo/Howley Area
                    TSX:CRK
Howley Trend Open Pit Mining
May 2011                                              TSX:CRK




 Mottrams Pit - Looking South   Mottrams Pit – Looking West




                                                                8
  Howley Pit and Ore ROM Pad    Mottrams Pit – Looking South
Cosmo – East Lode
Expansion Potential   TSX:CRK




                                9
Cosmo – West Lode
Expansion Potential   TSX:CRK




                                10
Cosmo Development
July 2011                                                      TSX:CRK




    Eastern
    Lodes
                                       First Ore




                                              As Constructed
              Design
              Western
              Lodes
                        Potential extension
                        Of Western Lode




                                                                         11
Cosmo – Dewatering
June 2011                        TSX:CRK




            Future Ventilation
                  Raise




                                           12
Cosmo Underground Equipment
                              TSX:CRK




                                        13
Mining Projects –
 Cost Comparison                                                                               TSX:CRK


 Cosmo development
  provides leverage of                                 Open Pit   Open Pit   Open Pit    Open Pit    Underground
  additional high-grade ore                            Example    Example    Example     Example
  leading to significantly                             Burnside   Burnside   Burnside   Pine Creek     Cosmo

  lower cash costs/oz.
 Cosmo mining costs are       Mining Cost per Tonne    $2.50      $2.50      $2.50       $2.50        $44.00
  higher than open pits but    Strip Ratio               3.0        3.0        6.5         2.5
  the ounces per vertical      Mining Cost per Tonne
  meter assist in lower        Milled                  $10.00     $10.00     $18.75      $8.75         $44.00
  mining costs for             Processing Cost         $16.00     $16.00     $16.00      $16.00        $16.00
                               Ore Haulage             $8.25      $8.25      $8.25       $2.50         $8.50
  underground.
                               Site General &
 Cosmo will eventually        Administration           $3.50      $3.50      $3.50       $3.50        $3.50
  make up 40% of mill feed
  (50% of ounces) which will   Total $/Tonne Milled    $37.75     $37.75     $46.50      $30.75        $72.00

  help lower overall costs     Ore Grade                 1.30       1.50       1.50        1.30         4.50
  and improve overall          Recovery                 90.0%      90.0%      93.0%       80.0%        92.0%
  production.
                               Cost per Ounce          $1,003      $870      $1,037       $920          $541
 Open Pits provide good
  margin (US$400) to
  current gold price.
                                                                                                                14
Outside Exploration - Cosmo
Conductive/Magnetic Targets Associated
With the Cosmo Trend                     TSX:CRK




     AEM
Burnside: Howley Trend
25 Kilometres of Potential   TSX:CRK




                                       16
Union Reefs/Pine Creek Area
                              TSX:CRK




                                        17
Union Reefs & Pine Creek
Near Term, Low Cost Production        TSX:CRK


                        New targets adjacent
                         to Union Reefs Mill
                        Potential for near
                         term, low cost
                         production
                        Currently prioritizing
                         targets
                        Potential production
                         mid 2011
                        Pine Creek Indicated
                         Resources increased
                         from 69,600 oz to
                         288,600 oz
                                                18
Union Reefs
                                                           TSX:CRK


              Historical Production/Intercepts:
              Union Reefs = 800,000 oz Au
              Pine Creek = 750,000 oz Au
              Significant potential to increase existing resources


              Union North:                     Lady Alice:
              3m @ 24.56 g/t Au                5m @ 31.97 g/t Au
                                               3m @ 45.10 g/t Au


                              Prospect Claim:
                               3m @ 37.50 g/t Au

              Crosscourse – “Cosmo” scale target:
              11m @ 6.60g/t Au 19m @ 10.62 g/t Au
              36m @ 4.10 g/t Au 9m @ 24.40 g/t Au
              16m @ 6.00 g/t Au 9m @ 4.00 g/t Au
                                                                     19
Union Reef
Crosscourse Deposit                                                       TSX:CRK




        1.5 g/t Au                      4 g/t Au over 30 metres

                                                        Mineralized
                                                        Quartz Veins




 Crosscourse Pit Mineralization (Photo taken in base of pit at Crosscourse in
 2003 looking north. Mineralization is estimated to be around 30m wide at a grade
 of 4g/t plunging to the north at around 60o. Red line is showing high grade zone
                                                                                    20
 and orange line is lower grade margin (~1.5g/t).)
Union Reef Development
    Conceptual Cost Profile                                                                             TSX:CRK


   Using previous operating data,                                              Conceptual    Conceptual    Conceptual
    existing cost regime, and                                    Underground   Underground   Underground   Underground
    projected grades, deposits show                                Cosmo         Prospect      Prospect    Crosscourse
    excellent potential to deliver low                                          Union Reef    Union Reef    Union Reef
    cost ounces to the production
    profile.
                                         Mining Cost per Tonne
   Number 1 Exploration priority
                                         Milled                    $44.00        $80.00        $80.00        $44.00
       High-Grade vein targets
                                         Processing Cost           $16.00        $16.00        $16.00        $16.00
          (Prospect & Lady Alice)
                                         Ore Haulage                $8.50         $0.00         $0.00         $0.00
       Bulk-Ore targets
          (Crosscourse- “Cosmo           Site General &
          Style”)                        Administration             $3.50         $3.50         $3.50         $3.50

   Need to expand resources and
    complete detailed mining             Total $/Tonne Milled      $72.00        $99.50        $99.50        $63.50
    studies before deposits can be
    included in any future               Ore Grade                  4.50          6.00          7.50          4.50
    production forecasts.                Recovery                  92.0%         92.0%         92.0%         92.0%
   No guarantee that an economic
    resource will be discovered to       Cost per Ounce             $541          $561          $448          $477
    justify a production decision.

                                                                                                                     21
Exploration
              TSX:CRK




                        22
Massive Sulfide Deposits
                                                                                                                                                                               TSX:CRK


     MOUNT BONNIE                                                                                                        IRON BLOW
   Historic Resource*                                                                                                   Historic Production
  650,000t - 1.7g/t Au, 279g/t Ag = Au eq 9.3g/t or                                                                   10,000t oxide @ 9g/t Au and 250g/t Ag = Au eq
   194,000oz                                                                                                            15.8g
  plus 9% Zn, 2% Pb, 0.5% Cu                                                                                          25,000t sulphide (supergene) @ 7g/t Au and
                                                                                                                        360g/t Ag = Au eq 17g
   Oxide Cap previously mined                                                                                          Total production Au eq = 18,747oz
  110,000t @ 7g/t Au and 230g/t Ag
                                                                                                                        Current Inferred Resources
  Au eq = 13.3g/t Au or 47,000oz Au
                                                                                                                       3,175,000t @ 2.1g/t Au, 101g/t Ag, 3.3% Zn,
                                                                                                                        0.76% Pb, 0.19% Cu
       Aeromagnetics- tilt derivative
                                                                                                                       Au eq = 4.85g or 495,000oz
                                                                                                                                       (only Au and Ag considered)




* “Gold Deposits of the Northern Territory” by Ahmad, Wygralak and Ferenczi, 2009. A qualified person has not done sufficient work to classify this historical estimate
as current mineral resources or mineral reserves. Crocodile Gold is not treating the historical estimate as current mineral resources or mineral reserves and the historical
estimate should not be relied upon. Crocodile Gold believes with minimal confirmatory drilling this historic resource information could be included in the Mineral Resource
inventory.
Maud Creek Deposit
                                                                                                                                                            TSX:CRK


 Resources*
 Mined 173,600t @3.32g/t Au – 18,500oz
 Indicated - 9,288,000t @3.1g/t Au for 935,000oz
 Inferred - 1,072,000t @2.4g/t Au for 82,000oz using a
 1.0g/t Au cut-off
        Indicated Resource -Greater than 4.5g/t Au – 3.1 Mt
         @ 6.3 g/t for 628,000oz
        Partially refractory – metallurgical testing indicates
         90-95% recovery by flotation with concentrates
         grading 6 opt.
        Near the town of Katherine – 8km haul road to
         paved highway
        Significant asset to Crocodile Gold
        North south trending, good widths, excellent
         configuration for underground mining
*Mineral Reserves are included in Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated
economic viability. Depleted for mining as at December 31, 2010 and does not include any depletion for mining since such date.
The Mineral Reserve estimate was reviewed and optimized by Mark Edwards who is a “qualified person” as such term is defined in National
Instrument 43-101 and has supervised the preparation of the technical information in this presentation. The mineral resource estimate was   Cross section
generated using the following parameters:
•Models used have been reviewed and optimized by Mark Edwards and Fleur Muller
•Model technique is Ordinary Kriging, Multiple Indicator Kriging or Inverse Distance (review NI43-101 for more details)
•Mineralization wireframes conducted on 0.4-2g/t material with a minimum width of 1-2m depending on deposit and mineralization styles
•High grade top cut used of 2-40g/t depending on statistical review of sample results
•1m metre samples with core half core or split RC samples used in models
•Samples were generally submitted to NAL and analyzed using 50g fire assay with AAS finish, some samples were submitted to umpire
laboratory for QAQC purposes
Regional Exploration Program
(Airborne Geophysics Survey Areas)                                         TSX:CRK



  Bons Rush




                      Mt. Ellison


                                             Woolwonga




                           Brocks Creek
                                                          3,700 line Km’s Scheduled
                                                           for Mid June
              Cosmo Mine        Mt. Bonnie
                                                          Combined AEM and
                                                           magnetometer survey
                                                          Geotech VTEM system- state
                                                           of the art
                                                          Includes Moline and Maud
                                                           Creek tenements          25
Undervalued on Equivalent/oz Au
Comparison                                                                                                   TSX:CRK

                         $400

                                      MFL
                                                            EV/oz Au Producer Average
                         $350                                           = $US 145/oz
                         $300                   KCN
                                                                                       Crocodile Gold
     EV/oz Au (US$/oz)




                                                          GAM
                         $250
                                    HRG                                                 = $US 45/oz
                                          TGZ                   AGI
                         $200                                         SMF                     NGD
                                          P

                         $150
                                                                  Average
                                                      ORA
                                    EDV
                         $100                           AVMAUQ
                                                            JAG   ARZ
                                                                    OGCGSC RSG
                                          CLF
                         $50                                                     NGX
                                                         CRK
                                                                                            RML
                          $0
                                0               5,000                 10,000       15,000           20,000
Source: NBF                                                 Total Resources (Koz Au)
Updated on June 15, 2011                                                                                               26
Undervalued on Price to Net
   Asset Value Comparison                                                     TSX:CRK


               2



            1.5



               1


                              0.5x
            0.5



               0
                     ORA      CRK    AGI     GSC   LSG      YRI   ANO   ELD   AEM
Source: Raymond James                      Gold Producers                               27
Updated as of June 14, 2011
Management & Board
                                                                      TSX:CRK


Management                                Board of Directors
Chantal Lavoie, P.Eng.                    Stan Bharti, P.Eng.
  President and Chief Executive Officer     Chairman
                                          Chantal Lavoie, P.Eng
David Keough
  Chief Operating Officer                 George Faught, CA


Steve Woodhead                            Mike Hoffman, P.Eng.
  Chief Financial Officer
                                          Bruce Humphrey, P.Eng.
Bill Nielsen, P. Geo
   Vice President Exploration
                                          Peter Tagliamonte, P.Eng.
Colinda Parent
  Vice President Business Development

Brianna Davies
  Corporate Secretary

                                                                                28
Capital Structure
                                                                                                                  TSX:CRK



Share Structure                            (at July 31, 2011)
                                                                                        Analyst Coverage

                                                                                        Cormark Securities
TSX:CRK
                                                                                        Fraser Mackenzie
Shares Issued &                                       309,851,311                       Raymond James
Outstanding                                                                             Union Securities
Warrants                                                 69,499,116                                 CRK Share Price
Options                                                  19,441,204                     $1.80
                                                                                        $1.60
Fully Diluted                                       409,291,631*                        $1.40
                                                                                        $1.20
Market                                                  $217 Million                    $1.00
Capitalization                                                                          $0.80
                                                                                        $0.60
(approximately, as of July 31, 2011)
                                                                                        $0.40
 *Including 2.5 million shares to be issued under the Company Share Compensation Plan
                                                                                        $0.20
                                                                                        $0.00




                                                                                                                            29
Reserve Summary
December 31, 2010                                                                                                                                                        TSX:CRK


                                                                                                         PROBABLE MINERAL RESERVE
                                                                                                                            Gold Grade                                     Ounces
               Project                                 Deposit                             Cut-off (g/t)         Tonnes
                                                                                                                               (g/t)                                         Gold
              Burnside                            Brocks Creek                                 7.1               34,000         8.6                                          9,300
                                                  Cosmo Deeps                                  3.1             3,100,000        4.2                                        420,000
                                                     Howley                                    1.0              340,000         1.6                                         18,000
                                                   North Point                                 1.0               55,000         2.3                                          4,000
                                                 Princess Louise                               1.0              200,000         1.5                                          9,700
                                                    Mottrams                                   1.0              980,000         1.2                                         39,000
            Pine Creek                              Kohinoor                                   1.0              290,000         1.9                                         18,000
                                                       Cox                                     1.0              500,000         1.6                                         26,000
                                                  International                                1.0             1,300,000        1.5                                         65,000
                                                     Gandys                                    1.0              480,000         1.7                                         26,000
                                                South Enterprise                               1.0              420,000         2.0                                         27,000
                                                     TOTAL                                                     7,699,000        2.7                                        662,000
                                         Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability
                                                                               Gold Price:    $US1000/oz
                                                                                    $A:$US         0.91

Note: Mineral Reserves are included in Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Depleted for mining as at December
31, 2010 and does not include any depletion for mining since such date.
The Mineral Reserve estimate was reviewed and optimized by Mark Edwards who is a “qualified person” as such term is defined in National Instrument 43-101 and has supervised the preparation
of the technical information and data included in this news release. The mineral resource estimate was generated using the following parameters:
• Models used have been reviewed and optimized by Mark Edwards and Fleur Muller
• Model technique is Ordinary Kriging, Multiple Indicator Kriging or Inverse Distance (review NI43-101 for more details)
• Mineralization wireframes conducted on 0.4-2g/t material with a minimum width of 1-2m depending on deposit and mineralization styles
• High grade top cut used of 2-40g/t depending on statistical review of sample results
• 1m metre samples with core half core or split RC samples used in models
• Samples were generally submitted to NAL and analyzed using 50g fire assay with AAS finish, some samples were submitted to umpire laboratory for QAQC purposes


                                                                                                                                                                                               30
Resource Summary
December 31, 2010                                                                                                                                         TSX:CRK

                                                       M+I MINERAL RESOURCE                                       INFERRED MINERAL RESOURCE
                                                             Gold Grade                                                   Gold Grade
                    Project                      Tonnes                  Ounces Gold
                                                                (g/t)                                          Tonnes        (g/t)     Ounces Gold
                Mt Bundy*A                     20,241,000        1.0       664,800                           10,513,000       1.0        350,800
                Burnside*                      16,553,330        2.4      1,268,500                          18,679,800       2.2       1,323,200
                Union Reefs                      239,000                   2.4                18,200          3,740,000                1.7               204,200
                 Pine Creek                     5,528,000                  1.6               288,600          2,347,000                2.4               183,200
               Maud Creek*                      9,288,000                  3.1               935,000          1,072,000                2.4                82,000
      Total                                    51,849,330                 1.9               3,175,100        36,351,800                1.8              2,143,400
       *Includes Underground Resources
       A
         Crocodile Gold holes 80% interest in the Rustlers Roost deposit which is included in this Project

       Please Note: Mineral Resources include Mineral Reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to
       the uncertainty of measured, indicated or inferred mineral resources, these mineral resources may never be upgraded to proven and probable mineral reserves.

       Calculated at a gold price of US$1,000>/oz and exchange rate of $A0.91:US$1.00 ) and contained within optimizing pit shells using current operating costs

                                                 MINERAL RESOURCE STATEMENT (Other Commodities)
                                                                             INFERRED MINERAL RESOURCE
              Project                     Deposit     Commodity      Cut-off       Tonnes     Grade (ppm)                                          Contained metal
                                                         Lead       1.0g/t Au     3,175,000      7,595                                            53,163,000 pounds
                                       Iron Blow          Zinc      1.0g/t Au     3,175,000      32,823                                          229,750,000 pounds
             Burnside                                    Silver     1.0g/t Au     3,175,000       101                                             10,200,000 ounces
                                                  C
                                       Thunderball     Uranium       200ppm        316,800        796                                              556,000 pounds
C
    Crocodile Gold has a 30% free carried interest in this deposit

                                                                                                                                                                      31
Investor Contact Info
                                                                         TSX:CRK


Chantal Lavoie                                          www.crocgold.com
President and CEO                                       Find us on
416-861-2964
clavoie@crocgold.com

Investor Relations
Rob Hopkins
416-861-5899
info@crocgold.com

                                                                     Union Reefs Mill




A Member of the Forbes & Manhattan Group of Companies                              32

Más contenido relacionado

La actualidad más candente

Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013QMX Gold Corporation
 
Crocodile Gold Corporate Presentation April 2012
Crocodile Gold Corporate Presentation April 2012Crocodile Gold Corporate Presentation April 2012
Crocodile Gold Corporate Presentation April 2012Crocodile Gold
 
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold ProducerCrocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold ProducerCrocodile Gold
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentationpacificcoal
 
Sage corporate presentation june 2016
Sage corporate presentation   june 2016Sage corporate presentation   june 2016
Sage corporate presentation june 2016Sagegold
 
Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Sagegold
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013pacificcoal
 
Company Presentation May, 2015.
Company Presentation May, 2015.Company Presentation May, 2015.
Company Presentation May, 2015.VMS Ventures
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentationSagegold
 
Corporate Presentation January 2013
Corporate Presentation January 2013Corporate Presentation January 2013
Corporate Presentation January 2013QMX Gold Corporation
 
QMX marketing presentation September 2012
QMX marketing presentation September 2012QMX marketing presentation September 2012
QMX marketing presentation September 2012QMX Gold Corporation
 
Vms presentation nov 2015
Vms presentation nov 2015Vms presentation nov 2015
Vms presentation nov 2015VMS Ventures
 
Investor Presentation October 2014
Investor Presentation October 2014Investor Presentation October 2014
Investor Presentation October 2014Sagegold
 
Vms april-corporate-presentation-website
Vms april-corporate-presentation-websiteVms april-corporate-presentation-website
Vms april-corporate-presentation-websiteVMS Ventures
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Gold Corporation
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012PetroMagdalena
 

La actualidad más candente (20)

Corporate Presentation
Corporate PresentationCorporate Presentation
Corporate Presentation
 
Qmx marketing presentation feb2013
Qmx marketing presentation feb2013Qmx marketing presentation feb2013
Qmx marketing presentation feb2013
 
Crocodile Gold Corporate Presentation April 2012
Crocodile Gold Corporate Presentation April 2012Crocodile Gold Corporate Presentation April 2012
Crocodile Gold Corporate Presentation April 2012
 
Crocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold ProducerCrocodile Gold: Up and Coming Australian Gold Producer
Crocodile Gold: Up and Coming Australian Gold Producer
 
Corporate Presentation April 2013
Corporate Presentation April 2013Corporate Presentation April 2013
Corporate Presentation April 2013
 
Investor Presentation
Investor PresentationInvestor Presentation
Investor Presentation
 
Sage corporate presentation june 2016
Sage corporate presentation   june 2016Sage corporate presentation   june 2016
Sage corporate presentation june 2016
 
Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012Investor Presentation Aug-Sept 2012
Investor Presentation Aug-Sept 2012
 
Corporate Presentation June 2013
Corporate Presentation June 2013Corporate Presentation June 2013
Corporate Presentation June 2013
 
Company Presentation May, 2015.
Company Presentation May, 2015.Company Presentation May, 2015.
Company Presentation May, 2015.
 
Sage May 2014 investor presentation
Sage May 2014 investor presentationSage May 2014 investor presentation
Sage May 2014 investor presentation
 
Corporate Presentation January 2013
Corporate Presentation January 2013Corporate Presentation January 2013
Corporate Presentation January 2013
 
QMX marketing presentation September 2012
QMX marketing presentation September 2012QMX marketing presentation September 2012
QMX marketing presentation September 2012
 
Vms presentation nov 2015
Vms presentation nov 2015Vms presentation nov 2015
Vms presentation nov 2015
 
Investor Presentation October 2014
Investor Presentation October 2014Investor Presentation October 2014
Investor Presentation October 2014
 
Vms april-corporate-presentation-website
Vms april-corporate-presentation-websiteVms april-corporate-presentation-website
Vms april-corporate-presentation-website
 
QMX Corporate Presentation (English)
QMX Corporate Presentation (English)QMX Corporate Presentation (English)
QMX Corporate Presentation (English)
 
QMX Gold Corporate Presentation
QMX Gold Corporate PresentationQMX Gold Corporate Presentation
QMX Gold Corporate Presentation
 
Investor Presentation 2012
Investor Presentation 2012Investor Presentation 2012
Investor Presentation 2012
 
Nap investor presentation november 2011
Nap investor presentation november 2011Nap investor presentation november 2011
Nap investor presentation november 2011
 

Similar a An Evolving Australian Gold Producer

Crocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold
 
CRK AGM presentation May 18 2011
CRK AGM presentation May 18  2011CRK AGM presentation May 18  2011
CRK AGM presentation May 18 2011Crocodile Gold
 
Crocodile Gold Corporate Presentation Oct 2012
Crocodile Gold Corporate Presentation Oct 2012Crocodile Gold Corporate Presentation Oct 2012
Crocodile Gold Corporate Presentation Oct 2012Crocodile Gold
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold
 
Esperanza Resources Corp. Presentation - A Clear Path To Gold
Esperanza Resources Corp. Presentation - A Clear Path To GoldEsperanza Resources Corp. Presentation - A Clear Path To Gold
Esperanza Resources Corp. Presentation - A Clear Path To GoldEsperanzaResources
 
Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012Crocodile Gold
 
Corporate Presentation November 2012
Corporate Presentation November 2012Corporate Presentation November 2012
Corporate Presentation November 2012Crocodile Gold
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate PresentationAvion Gold Corp
 
Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015coppernorthmining
 
Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Gold Corp
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)QMX Gold Corporation
 
Crocodile Gold Annual General Meeting Presentation 2012
Crocodile Gold Annual General Meeting Presentation 2012Crocodile Gold Annual General Meeting Presentation 2012
Crocodile Gold Annual General Meeting Presentation 2012Crocodile Gold
 
Avion Corporate Presentation - August 2010
Avion Corporate Presentation - August 2010Avion Corporate Presentation - August 2010
Avion Corporate Presentation - August 2010Avion Gold Corp
 
Avion Corporate Presentation - Aug 2010
Avion Corporate Presentation - Aug 2010Avion Corporate Presentation - Aug 2010
Avion Corporate Presentation - Aug 2010Avion Gold Corp
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallLake Shore Gold
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance callLake Shore Gold
 
Crk presentation may 30 2011 final v001 k1a3x2
Crk presentation may 30  2011 final v001 k1a3x2Crk presentation may 30  2011 final v001 k1a3x2
Crk presentation may 30 2011 final v001 k1a3x2Crocodile Gold
 
Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012QMX Gold Corporation
 

Similar a An Evolving Australian Gold Producer (20)

Crocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate PresentationCrocodile Gold May 4 Corporate Presentation
Crocodile Gold May 4 Corporate Presentation
 
CRK AGM presentation May 18 2011
CRK AGM presentation May 18  2011CRK AGM presentation May 18  2011
CRK AGM presentation May 18 2011
 
Crocodile Gold Corporate Presentation Oct 2012
Crocodile Gold Corporate Presentation Oct 2012Crocodile Gold Corporate Presentation Oct 2012
Crocodile Gold Corporate Presentation Oct 2012
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate Presentation
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate Presentation
 
Crocodile Gold Corporate Presentation
Crocodile Gold Corporate PresentationCrocodile Gold Corporate Presentation
Crocodile Gold Corporate Presentation
 
Esperanza Resources Corp. Presentation - A Clear Path To Gold
Esperanza Resources Corp. Presentation - A Clear Path To GoldEsperanza Resources Corp. Presentation - A Clear Path To Gold
Esperanza Resources Corp. Presentation - A Clear Path To Gold
 
Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012Crocodile Gold Corporate Presentation December 2012
Crocodile Gold Corporate Presentation December 2012
 
Corporate Presentation November 2012
Corporate Presentation November 2012Corporate Presentation November 2012
Corporate Presentation November 2012
 
Avion Corporate Presentation
Avion Corporate PresentationAvion Corporate Presentation
Avion Corporate Presentation
 
Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015Copper North Mining - Corporate Presentation - October 22, 2015
Copper North Mining - Corporate Presentation - October 22, 2015
 
Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010Avion Corporate Presentation October 2010
Avion Corporate Presentation October 2010
 
Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)Alexis Minerals October 2011 (english)
Alexis Minerals October 2011 (english)
 
Crocodile Gold Annual General Meeting Presentation 2012
Crocodile Gold Annual General Meeting Presentation 2012Crocodile Gold Annual General Meeting Presentation 2012
Crocodile Gold Annual General Meeting Presentation 2012
 
Avion Corporate Presentation - August 2010
Avion Corporate Presentation - August 2010Avion Corporate Presentation - August 2010
Avion Corporate Presentation - August 2010
 
Avion Corporate Presentation - Aug 2010
Avion Corporate Presentation - Aug 2010Avion Corporate Presentation - Aug 2010
Avion Corporate Presentation - Aug 2010
 
Third Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance CallThird Quater 10 November 2011 Conferance Call
Third Quater 10 November 2011 Conferance Call
 
Third quater conferance call
Third quater conferance callThird quater conferance call
Third quater conferance call
 
Crk presentation may 30 2011 final v001 k1a3x2
Crk presentation may 30  2011 final v001 k1a3x2Crk presentation may 30  2011 final v001 k1a3x2
Crk presentation may 30 2011 final v001 k1a3x2
 
Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012Alexis Marketing Presentation April 2012
Alexis Marketing Presentation April 2012
 

Más de Crocodile Gold

Corporate Presentation October 2014 Update
Corporate Presentation October 2014 UpdateCorporate Presentation October 2014 Update
Corporate Presentation October 2014 UpdateCrocodile Gold
 
October 2014 Corporate Presentation
October 2014 Corporate PresentationOctober 2014 Corporate Presentation
October 2014 Corporate PresentationCrocodile Gold
 
Crocodile Gold Corporate Presentation September 2014
Crocodile Gold Corporate Presentation September 2014Crocodile Gold Corporate Presentation September 2014
Crocodile Gold Corporate Presentation September 2014Crocodile Gold
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate PresentationCrocodile Gold
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014Crocodile Gold
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate PresentationCrocodile Gold
 
Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold
 
Corporate Presentation May 2014
Corporate Presentation May 2014Corporate Presentation May 2014
Corporate Presentation May 2014Crocodile Gold
 
Corporate Presentation April 2014
Corporate Presentation April 2014Corporate Presentation April 2014
Corporate Presentation April 2014Crocodile Gold
 
March 2014 Corporate Presentation
March 2014 Corporate PresentationMarch 2014 Corporate Presentation
March 2014 Corporate PresentationCrocodile Gold
 
Crocodile Gold Corporate March 2014
Crocodile Gold Corporate March 2014Crocodile Gold Corporate March 2014
Crocodile Gold Corporate March 2014Crocodile Gold
 
March 2014 Corporate Presentation
March 2014 Corporate PresentationMarch 2014 Corporate Presentation
March 2014 Corporate PresentationCrocodile Gold
 
Corporate Presentation February 2014
Corporate Presentation February 2014Corporate Presentation February 2014
Corporate Presentation February 2014Crocodile Gold
 
January 2014 Crocodile Gold Corporate Presentation
January 2014 Crocodile Gold Corporate PresentationJanuary 2014 Crocodile Gold Corporate Presentation
January 2014 Crocodile Gold Corporate PresentationCrocodile Gold
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013Crocodile Gold
 
Crocodile Gold Corporate Presentation November 2013
Crocodile Gold Corporate Presentation November 2013Crocodile Gold Corporate Presentation November 2013
Crocodile Gold Corporate Presentation November 2013Crocodile Gold
 
Corporate Presentation September 2013
Corporate Presentation September 2013Corporate Presentation September 2013
Corporate Presentation September 2013Crocodile Gold
 
Corporate Presentation August 2013
Corporate Presentation August 2013Corporate Presentation August 2013
Corporate Presentation August 2013Crocodile Gold
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013Crocodile Gold
 

Más de Crocodile Gold (20)

Corporate Presentation October 2014 Update
Corporate Presentation October 2014 UpdateCorporate Presentation October 2014 Update
Corporate Presentation October 2014 Update
 
October 2014 Corporate Presentation
October 2014 Corporate PresentationOctober 2014 Corporate Presentation
October 2014 Corporate Presentation
 
Crocodile Gold Corporate Presentation September 2014
Crocodile Gold Corporate Presentation September 2014Crocodile Gold Corporate Presentation September 2014
Crocodile Gold Corporate Presentation September 2014
 
August 2014 Corporate Presentation
August 2014 Corporate PresentationAugust 2014 Corporate Presentation
August 2014 Corporate Presentation
 
Corporate Presentation July 2014
Corporate Presentation July 2014Corporate Presentation July 2014
Corporate Presentation July 2014
 
July 2014 Corporate Presentation
July 2014 Corporate PresentationJuly 2014 Corporate Presentation
July 2014 Corporate Presentation
 
Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014Crocodile Gold AGM Presentation from June 5, 2014
Crocodile Gold AGM Presentation from June 5, 2014
 
Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014Crocodile Gold Corporate Presentation May 2014
Crocodile Gold Corporate Presentation May 2014
 
Corporate Presentation May 2014
Corporate Presentation May 2014Corporate Presentation May 2014
Corporate Presentation May 2014
 
Corporate Presentation April 2014
Corporate Presentation April 2014Corporate Presentation April 2014
Corporate Presentation April 2014
 
March 2014 Corporate Presentation
March 2014 Corporate PresentationMarch 2014 Corporate Presentation
March 2014 Corporate Presentation
 
Crocodile Gold Corporate March 2014
Crocodile Gold Corporate March 2014Crocodile Gold Corporate March 2014
Crocodile Gold Corporate March 2014
 
March 2014 Corporate Presentation
March 2014 Corporate PresentationMarch 2014 Corporate Presentation
March 2014 Corporate Presentation
 
Corporate Presentation February 2014
Corporate Presentation February 2014Corporate Presentation February 2014
Corporate Presentation February 2014
 
January 2014 Crocodile Gold Corporate Presentation
January 2014 Crocodile Gold Corporate PresentationJanuary 2014 Crocodile Gold Corporate Presentation
January 2014 Crocodile Gold Corporate Presentation
 
Corporate Presentation December 2013
Corporate Presentation December 2013Corporate Presentation December 2013
Corporate Presentation December 2013
 
Crocodile Gold Corporate Presentation November 2013
Crocodile Gold Corporate Presentation November 2013Crocodile Gold Corporate Presentation November 2013
Crocodile Gold Corporate Presentation November 2013
 
Corporate Presentation September 2013
Corporate Presentation September 2013Corporate Presentation September 2013
Corporate Presentation September 2013
 
Corporate Presentation August 2013
Corporate Presentation August 2013Corporate Presentation August 2013
Corporate Presentation August 2013
 
Corporate Presentation July 2013
Corporate Presentation July 2013Corporate Presentation July 2013
Corporate Presentation July 2013
 

Último

Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfPatidar M
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4JOYLYNSAMANIEGO
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Developmentchesterberbo7
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWQuiz Club NITW
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptxmary850239
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvRicaMaeCastro1
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Celine George
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management SystemChristalin Nelson
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...DhatriParmar
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfChristalin Nelson
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxMichelleTuguinay1
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationdeepaannamalai16
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptxDhatriParmar
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesVijayaLaxmi84
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...Nguyen Thanh Tu Collection
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSMae Pangan
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxAneriPatwari
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptxAneriPatwari
 

Último (20)

Active Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdfActive Learning Strategies (in short ALS).pdf
Active Learning Strategies (in short ALS).pdf
 
Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4Daily Lesson Plan in Mathematics Quarter 4
Daily Lesson Plan in Mathematics Quarter 4
 
Using Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea DevelopmentUsing Grammatical Signals Suitable to Patterns of Idea Development
Using Grammatical Signals Suitable to Patterns of Idea Development
 
Mythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITWMythology Quiz-4th April 2024, Quiz Club NITW
Mythology Quiz-4th April 2024, Quiz Club NITW
 
4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx4.16.24 Poverty and Precarity--Desmond.pptx
4.16.24 Poverty and Precarity--Desmond.pptx
 
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnvESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
ESP 4-EDITED.pdfmmcncncncmcmmnmnmncnmncmnnjvnnv
 
Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17Tree View Decoration Attribute in the Odoo 17
Tree View Decoration Attribute in the Odoo 17
 
Transaction Management in Database Management System
Transaction Management in Database Management SystemTransaction Management in Database Management System
Transaction Management in Database Management System
 
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
Blowin' in the Wind of Caste_ Bob Dylan's Song as a Catalyst for Social Justi...
 
Indexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdfIndexing Structures in Database Management system.pdf
Indexing Structures in Database Management system.pdf
 
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptxDIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
DIFFERENT BASKETRY IN THE PHILIPPINES PPT.pptx
 
Congestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentationCongestive Cardiac Failure..presentation
Congestive Cardiac Failure..presentation
 
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
Unraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptxUnraveling Hypertext_ Analyzing  Postmodern Elements in  Literature.pptx
Unraveling Hypertext_ Analyzing Postmodern Elements in Literature.pptx
 
Sulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their usesSulphonamides, mechanisms and their uses
Sulphonamides, mechanisms and their uses
 
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
31 ĐỀ THI THỬ VÀO LỚP 10 - TIẾNG ANH - FORM MỚI 2025 - 40 CÂU HỎI - BÙI VĂN V...
 
Textual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHSTextual Evidence in Reading and Writing of SHS
Textual Evidence in Reading and Writing of SHS
 
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of EngineeringFaculty Profile prashantha K EEE dept Sri Sairam college of Engineering
Faculty Profile prashantha K EEE dept Sri Sairam college of Engineering
 
CHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptxCHEST Proprioceptive neuromuscular facilitation.pptx
CHEST Proprioceptive neuromuscular facilitation.pptx
 
Paradigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTAParadigm shift in nursing research by RS MEHTA
Paradigm shift in nursing research by RS MEHTA
 
ARTERIAL BLOOD GAS ANALYSIS........pptx
ARTERIAL BLOOD  GAS ANALYSIS........pptxARTERIAL BLOOD  GAS ANALYSIS........pptx
ARTERIAL BLOOD GAS ANALYSIS........pptx
 

An Evolving Australian Gold Producer

  • 1. An Evolving Australian Gold Producer AUGUST 2011 TSX:CRK OTCQX:CROCF FRANKFURT:XGC
  • 2. Disclaimer Forward Looking Statements TSX:CRK This presentation contains forward-looking statements under Canadian securities legislation. Forward-looking statements include, but are not limited to, statements with respect to the development potential and timetable of the projects; the Company‟s ability to raise additional funds as necessary; the future price of gold; the estimation of mineral resources; conclusions of economic evaluation (including scoping studies); the realization of mineral resource estimates; the timing and amount of estimated future production, development and exploration; costs of future activities; capital and operating expenditures; success of exploration activities; mining or processing issues; currency exchange rates; government regulation of mining operations; and environmental risks. Generally, forward-looking statements can be identified by the use of forward-looking terminology such as “plans”, “expects” or “does not expect”, “is expected”, “budget”, “scheduled”, “estimates”, “forecasts”, “intends”, “anticipates” or “does not anticipate”, or “believes”, or variations of such words and phrases or statements that certain actions, events or results “may”, “could”, “would”, “might” or “will be taken”, “occur” or “be achieved”. Forward-looking statements are based on the opinions and estimates of management as of the date such statements are made. Estimates regarding the anticipated timing, amount and cost of mining at the projects are based on assumptions underlying mineral resource estimates and the realization of such estimates; results of previous mining activities at the projects, and detailed research and analysis completed by independent of the Company; research and estimates regarding the timing of delivery for long-lead items; knowledge regarding the factors consultants and management involved in building a mine and other factors described in the technical reports and Annual Information Form filed under the profile of the Company on SEDAR. Capital and operating cost estimates are based on results of previous mining activities, research of the Company and independent consultants, recent estimates of construction and mining costs and other factors that are set out in the scoping study. Production estimates are based on mine plans and production schedules, which have been developed by the Company‟s personnel and independent consultants. Forward-looking statements are subject to known and unknown risks, uncertainties and other factors that may cause the actual results, level of activity, performance or achievements of the Company to be materially different from those expressed or implied by such forward-looking statements, including but not limited to risks related to: timing and availability of external financing on acceptable terms; unexpected events and delays during construction, expansion and start-up; variations in ore grade and recovery rates; receipt and revocation of government approvals; actual results of exploration and mining activities; changes in project parameters as plans continue to be refined; future prices of gold; failure of plant, equipment or processes to operate as anticipated; accidents, labour disputes and other risks of the mining industry. Although management of the Company has attempted to identify important factors that could cause actual results to differ materially from those contained in forward-looking statements, there may be other factors that cause results not to be as anticipated, estimated or intended. There can be no assurance that such statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in such statements. Accordingly, readers should not place undue reliance on forward-looking statements. The Company does not undertake to update any forward-looking statements except in accordance with applicable securities laws. Investors are advised that National Instrument NI 43-101 of the Canadian Securities Administrators requires that each category of mineral reserves and mineral resources be reported separately. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty of measured, indicated or inferred mineral resources, these mineral resources may never be upgraded to proven and probable mineral reserves. Non-GAAP Measures Crocodile Gold believes that investors use certain indicators to assess gold mining companies. The indicators are intended to provide additional information and should not be considered in isolation or as a substitute for measures of performance in accordance with the International Financial Reporting Standards. “Cash Cost per Ounce” is a non-GAAP performance measure which could provide an indication of the mining and processing efficiency at the operations. It is determined by dividing the operating expenses, excluding stock-based compensation allocated to the operating expense and next of silver revenue, by the number of ounces of gold sold. There are variations in the method of computation of „cash cost per ounce” as determined by the Company compared with other mining companies. Qualified Person David Keough, MAusIMM of Crocodile Gold Australia Operations is a “qualified person” as such term is defined in National Instrument 43-101 and has reviewed and confirmed the technical information and data included in this presentation. Cautionary Note to U.S. Investors Concerning Estimates of Measured, Indicated or Inferred Resources The information presented uses the terms “measured”, “indicated” and “inferred” mineral resources. United States investors are advised that while such terms are recognized and required by Canadian regulations, the United States Securities and Exchange Commission does not recognize these terms. “Inferred mineral resources” have a great amount of uncertainty as to their existence, and as to their economic and legal feasibility. It cannot be assumed that all or any part of an inferred mineral resource will ever be upgraded to a higher category. Under Canadian rules, estimates of inferred mineral resources may not form the basis of feasibility or other economic studies. United States investors are cautioned not to assume that all or any part of measured or indicated mineral resources will ever be converted into mineral reserves. United States investors are also cautioned not to assume that all or any part of an inferred mineral resource exists, or is economically or legally mineable.
  • 3. First World Location & Infrastructure TSX:CRK
  • 4. Our Assets TSX:CRK Production Development Mills Howley Trend Cosmo Union Reefs Mill  open pit mine  underground mine  2.4 mtpy  initial ore mined 3rd  in operation North Point Qtr 2011  open pit mine Tom’s Gully Mill  oxide, low strip ratio Pine Creek-  240,000 tpy  dry season operation International  Care and (May – Nov)  open pit mine maintenance  Production upon Princess Louise receipt of permits  open pit mine  dry season operation (May – Nov) Exploration Potential >2,700 km2 4
  • 5. Investment Advantage TSX:CRK  Expanding production profile, decreasing cash costs  Outstanding potential to discover additional resources  3.175 million ounces M&I and 2.14 million ounces Inf.  Infrastructure replacement value = $200M (Adjacent to major highway and utilities)  2010 production of 82,000 ounces  2011 production guidance: 77,500 – 82,500 ounces 5
  • 6. 2011 – Growing Production Throughout the Year TSX:CRK 2011 Key Catalysts  Production from Cosmo  Initial ore expected 3rd Qtr -2011  Will contribute 50% of ounces at full production (800,000 t.p.a. ore).  Production from Pine Creek- International, upon receipt of permits  Aggressive exploration program (Brownfields and Greenfields)  Increasing % of high grade mill feed throughout the year from Cosmo 2011 Guidance 2011 Production 2011 Major 77,500 -82,500 oz Sources Capital Cash Cost Open Pits: Howley, Investments US$1,150-$1,250/oz Princess Louise, Pine Cosmo underground Creek/Union Reefs area Exploration Underground: Cosmo, Brocks Creek 6
  • 8. Howley Trend Open Pit Mining May 2011 TSX:CRK Mottrams Pit - Looking South Mottrams Pit – Looking West 8 Howley Pit and Ore ROM Pad Mottrams Pit – Looking South
  • 9. Cosmo – East Lode Expansion Potential TSX:CRK 9
  • 10. Cosmo – West Lode Expansion Potential TSX:CRK 10
  • 11. Cosmo Development July 2011 TSX:CRK Eastern Lodes First Ore As Constructed Design Western Lodes Potential extension Of Western Lode 11
  • 12. Cosmo – Dewatering June 2011 TSX:CRK Future Ventilation Raise 12
  • 14. Mining Projects – Cost Comparison TSX:CRK  Cosmo development provides leverage of Open Pit Open Pit Open Pit Open Pit Underground additional high-grade ore Example Example Example Example leading to significantly Burnside Burnside Burnside Pine Creek Cosmo lower cash costs/oz.  Cosmo mining costs are Mining Cost per Tonne $2.50 $2.50 $2.50 $2.50 $44.00 higher than open pits but Strip Ratio 3.0 3.0 6.5 2.5 the ounces per vertical Mining Cost per Tonne meter assist in lower Milled $10.00 $10.00 $18.75 $8.75 $44.00 mining costs for Processing Cost $16.00 $16.00 $16.00 $16.00 $16.00 Ore Haulage $8.25 $8.25 $8.25 $2.50 $8.50 underground. Site General &  Cosmo will eventually Administration $3.50 $3.50 $3.50 $3.50 $3.50 make up 40% of mill feed (50% of ounces) which will Total $/Tonne Milled $37.75 $37.75 $46.50 $30.75 $72.00 help lower overall costs Ore Grade 1.30 1.50 1.50 1.30 4.50 and improve overall Recovery 90.0% 90.0% 93.0% 80.0% 92.0% production. Cost per Ounce $1,003 $870 $1,037 $920 $541  Open Pits provide good margin (US$400) to current gold price. 14
  • 15. Outside Exploration - Cosmo Conductive/Magnetic Targets Associated With the Cosmo Trend TSX:CRK AEM
  • 16. Burnside: Howley Trend 25 Kilometres of Potential TSX:CRK 16
  • 17. Union Reefs/Pine Creek Area TSX:CRK 17
  • 18. Union Reefs & Pine Creek Near Term, Low Cost Production TSX:CRK  New targets adjacent to Union Reefs Mill  Potential for near term, low cost production  Currently prioritizing targets  Potential production mid 2011  Pine Creek Indicated Resources increased from 69,600 oz to 288,600 oz 18
  • 19. Union Reefs TSX:CRK Historical Production/Intercepts: Union Reefs = 800,000 oz Au Pine Creek = 750,000 oz Au Significant potential to increase existing resources Union North: Lady Alice: 3m @ 24.56 g/t Au 5m @ 31.97 g/t Au 3m @ 45.10 g/t Au Prospect Claim: 3m @ 37.50 g/t Au Crosscourse – “Cosmo” scale target: 11m @ 6.60g/t Au 19m @ 10.62 g/t Au 36m @ 4.10 g/t Au 9m @ 24.40 g/t Au 16m @ 6.00 g/t Au 9m @ 4.00 g/t Au 19
  • 20. Union Reef Crosscourse Deposit TSX:CRK 1.5 g/t Au 4 g/t Au over 30 metres Mineralized Quartz Veins Crosscourse Pit Mineralization (Photo taken in base of pit at Crosscourse in 2003 looking north. Mineralization is estimated to be around 30m wide at a grade of 4g/t plunging to the north at around 60o. Red line is showing high grade zone 20 and orange line is lower grade margin (~1.5g/t).)
  • 21. Union Reef Development Conceptual Cost Profile TSX:CRK  Using previous operating data, Conceptual Conceptual Conceptual existing cost regime, and Underground Underground Underground Underground projected grades, deposits show Cosmo Prospect Prospect Crosscourse excellent potential to deliver low Union Reef Union Reef Union Reef cost ounces to the production profile. Mining Cost per Tonne  Number 1 Exploration priority Milled $44.00 $80.00 $80.00 $44.00  High-Grade vein targets Processing Cost $16.00 $16.00 $16.00 $16.00 (Prospect & Lady Alice) Ore Haulage $8.50 $0.00 $0.00 $0.00  Bulk-Ore targets (Crosscourse- “Cosmo Site General & Style”) Administration $3.50 $3.50 $3.50 $3.50  Need to expand resources and complete detailed mining Total $/Tonne Milled $72.00 $99.50 $99.50 $63.50 studies before deposits can be included in any future Ore Grade 4.50 6.00 7.50 4.50 production forecasts. Recovery 92.0% 92.0% 92.0% 92.0%  No guarantee that an economic resource will be discovered to Cost per Ounce $541 $561 $448 $477 justify a production decision. 21
  • 22. Exploration TSX:CRK 22
  • 23. Massive Sulfide Deposits TSX:CRK MOUNT BONNIE IRON BLOW Historic Resource* Historic Production  650,000t - 1.7g/t Au, 279g/t Ag = Au eq 9.3g/t or  10,000t oxide @ 9g/t Au and 250g/t Ag = Au eq 194,000oz 15.8g  plus 9% Zn, 2% Pb, 0.5% Cu  25,000t sulphide (supergene) @ 7g/t Au and 360g/t Ag = Au eq 17g Oxide Cap previously mined  Total production Au eq = 18,747oz  110,000t @ 7g/t Au and 230g/t Ag Current Inferred Resources  Au eq = 13.3g/t Au or 47,000oz Au  3,175,000t @ 2.1g/t Au, 101g/t Ag, 3.3% Zn, 0.76% Pb, 0.19% Cu Aeromagnetics- tilt derivative  Au eq = 4.85g or 495,000oz (only Au and Ag considered) * “Gold Deposits of the Northern Territory” by Ahmad, Wygralak and Ferenczi, 2009. A qualified person has not done sufficient work to classify this historical estimate as current mineral resources or mineral reserves. Crocodile Gold is not treating the historical estimate as current mineral resources or mineral reserves and the historical estimate should not be relied upon. Crocodile Gold believes with minimal confirmatory drilling this historic resource information could be included in the Mineral Resource inventory.
  • 24. Maud Creek Deposit TSX:CRK Resources* Mined 173,600t @3.32g/t Au – 18,500oz Indicated - 9,288,000t @3.1g/t Au for 935,000oz Inferred - 1,072,000t @2.4g/t Au for 82,000oz using a 1.0g/t Au cut-off  Indicated Resource -Greater than 4.5g/t Au – 3.1 Mt @ 6.3 g/t for 628,000oz  Partially refractory – metallurgical testing indicates 90-95% recovery by flotation with concentrates grading 6 opt.  Near the town of Katherine – 8km haul road to paved highway  Significant asset to Crocodile Gold  North south trending, good widths, excellent configuration for underground mining *Mineral Reserves are included in Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Depleted for mining as at December 31, 2010 and does not include any depletion for mining since such date. The Mineral Reserve estimate was reviewed and optimized by Mark Edwards who is a “qualified person” as such term is defined in National Instrument 43-101 and has supervised the preparation of the technical information in this presentation. The mineral resource estimate was Cross section generated using the following parameters: •Models used have been reviewed and optimized by Mark Edwards and Fleur Muller •Model technique is Ordinary Kriging, Multiple Indicator Kriging or Inverse Distance (review NI43-101 for more details) •Mineralization wireframes conducted on 0.4-2g/t material with a minimum width of 1-2m depending on deposit and mineralization styles •High grade top cut used of 2-40g/t depending on statistical review of sample results •1m metre samples with core half core or split RC samples used in models •Samples were generally submitted to NAL and analyzed using 50g fire assay with AAS finish, some samples were submitted to umpire laboratory for QAQC purposes
  • 25. Regional Exploration Program (Airborne Geophysics Survey Areas) TSX:CRK Bons Rush Mt. Ellison Woolwonga Brocks Creek  3,700 line Km’s Scheduled for Mid June Cosmo Mine Mt. Bonnie  Combined AEM and magnetometer survey  Geotech VTEM system- state of the art  Includes Moline and Maud Creek tenements 25
  • 26. Undervalued on Equivalent/oz Au Comparison TSX:CRK $400 MFL EV/oz Au Producer Average $350 = $US 145/oz $300 KCN Crocodile Gold EV/oz Au (US$/oz) GAM $250 HRG = $US 45/oz TGZ AGI $200 SMF NGD P $150 Average ORA EDV $100 AVMAUQ JAG ARZ OGCGSC RSG CLF $50 NGX CRK RML $0 0 5,000 10,000 15,000 20,000 Source: NBF Total Resources (Koz Au) Updated on June 15, 2011 26
  • 27. Undervalued on Price to Net Asset Value Comparison TSX:CRK 2 1.5 1 0.5x 0.5 0 ORA CRK AGI GSC LSG YRI ANO ELD AEM Source: Raymond James Gold Producers 27 Updated as of June 14, 2011
  • 28. Management & Board TSX:CRK Management Board of Directors Chantal Lavoie, P.Eng. Stan Bharti, P.Eng. President and Chief Executive Officer Chairman Chantal Lavoie, P.Eng David Keough Chief Operating Officer George Faught, CA Steve Woodhead Mike Hoffman, P.Eng. Chief Financial Officer Bruce Humphrey, P.Eng. Bill Nielsen, P. Geo Vice President Exploration Peter Tagliamonte, P.Eng. Colinda Parent Vice President Business Development Brianna Davies Corporate Secretary 28
  • 29. Capital Structure TSX:CRK Share Structure (at July 31, 2011) Analyst Coverage Cormark Securities TSX:CRK Fraser Mackenzie Shares Issued & 309,851,311 Raymond James Outstanding Union Securities Warrants 69,499,116 CRK Share Price Options 19,441,204 $1.80 $1.60 Fully Diluted 409,291,631* $1.40 $1.20 Market $217 Million $1.00 Capitalization $0.80 $0.60 (approximately, as of July 31, 2011) $0.40 *Including 2.5 million shares to be issued under the Company Share Compensation Plan $0.20 $0.00 29
  • 30. Reserve Summary December 31, 2010 TSX:CRK PROBABLE MINERAL RESERVE Gold Grade Ounces Project Deposit Cut-off (g/t) Tonnes (g/t) Gold Burnside Brocks Creek 7.1 34,000 8.6 9,300 Cosmo Deeps 3.1 3,100,000 4.2 420,000 Howley 1.0 340,000 1.6 18,000 North Point 1.0 55,000 2.3 4,000 Princess Louise 1.0 200,000 1.5 9,700 Mottrams 1.0 980,000 1.2 39,000 Pine Creek Kohinoor 1.0 290,000 1.9 18,000 Cox 1.0 500,000 1.6 26,000 International 1.0 1,300,000 1.5 65,000 Gandys 1.0 480,000 1.7 26,000 South Enterprise 1.0 420,000 2.0 27,000 TOTAL 7,699,000 2.7 662,000 Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability Gold Price: $US1000/oz $A:$US 0.91 Note: Mineral Reserves are included in Mineral Resources. Mineral Resources that are not Mineral Reserves do not have demonstrated economic viability. Depleted for mining as at December 31, 2010 and does not include any depletion for mining since such date. The Mineral Reserve estimate was reviewed and optimized by Mark Edwards who is a “qualified person” as such term is defined in National Instrument 43-101 and has supervised the preparation of the technical information and data included in this news release. The mineral resource estimate was generated using the following parameters: • Models used have been reviewed and optimized by Mark Edwards and Fleur Muller • Model technique is Ordinary Kriging, Multiple Indicator Kriging or Inverse Distance (review NI43-101 for more details) • Mineralization wireframes conducted on 0.4-2g/t material with a minimum width of 1-2m depending on deposit and mineralization styles • High grade top cut used of 2-40g/t depending on statistical review of sample results • 1m metre samples with core half core or split RC samples used in models • Samples were generally submitted to NAL and analyzed using 50g fire assay with AAS finish, some samples were submitted to umpire laboratory for QAQC purposes 30
  • 31. Resource Summary December 31, 2010 TSX:CRK M+I MINERAL RESOURCE INFERRED MINERAL RESOURCE Gold Grade Gold Grade Project Tonnes Ounces Gold (g/t) Tonnes (g/t) Ounces Gold Mt Bundy*A 20,241,000 1.0 664,800 10,513,000 1.0 350,800 Burnside* 16,553,330 2.4 1,268,500 18,679,800 2.2 1,323,200 Union Reefs 239,000 2.4 18,200 3,740,000 1.7 204,200 Pine Creek 5,528,000 1.6 288,600 2,347,000 2.4 183,200 Maud Creek* 9,288,000 3.1 935,000 1,072,000 2.4 82,000 Total 51,849,330 1.9 3,175,100 36,351,800 1.8 2,143,400 *Includes Underground Resources A Crocodile Gold holes 80% interest in the Rustlers Roost deposit which is included in this Project Please Note: Mineral Resources include Mineral Reserves. Mineral resources that are not mineral reserves do not have demonstrated economic viability. Due to the uncertainty of measured, indicated or inferred mineral resources, these mineral resources may never be upgraded to proven and probable mineral reserves. Calculated at a gold price of US$1,000>/oz and exchange rate of $A0.91:US$1.00 ) and contained within optimizing pit shells using current operating costs MINERAL RESOURCE STATEMENT (Other Commodities) INFERRED MINERAL RESOURCE Project Deposit Commodity Cut-off Tonnes Grade (ppm) Contained metal Lead 1.0g/t Au 3,175,000 7,595 53,163,000 pounds Iron Blow Zinc 1.0g/t Au 3,175,000 32,823 229,750,000 pounds Burnside Silver 1.0g/t Au 3,175,000 101 10,200,000 ounces C Thunderball Uranium 200ppm 316,800 796 556,000 pounds C Crocodile Gold has a 30% free carried interest in this deposit 31
  • 32. Investor Contact Info TSX:CRK Chantal Lavoie www.crocgold.com President and CEO Find us on 416-861-2964 clavoie@crocgold.com Investor Relations Rob Hopkins 416-861-5899 info@crocgold.com Union Reefs Mill A Member of the Forbes & Manhattan Group of Companies 32