Dhinaharan Nagamalai et al. (Eds) : CSE, DBDM, CCNET, AIFL, SCOM, CICS, CSIP - 2014
pp. 137–147, 2014. © CS & IT-CSCP 2014 DOI : 10.5121/csit.2014.4412
IMPROVED NEURAL NETWORK
PREDICTION PERFORMANCES OF
ELECTRICITY DEMAND: MODIFYING
INPUTS THROUGH CLUSTERING
K.A.D. Deshani1
, Liwan Liyanage Hansen2
, M.D.T. Attygalle3
,
A. Karunaratne4
1, 3, 4
Department of Statistics, University of Colombo, Colombo 03, Sri Lanka
2
School of Computing, Engineering and Mathematics, University of Western
Sydney, Australia
1
deshani@stat.cmb.ac.lk, 3
dilhari@stat.cmb.ac.lk, 4
ak@stat.cmb.ac.lk
l.liyanage@uws.edu.au
ABSTRACT
Accurate prediction of electricity demand can bring extensive benefits to any country as the
forecast values help the relevant authorities to take decisions regarding electricity generation,
transmission and distribution much appropriately. The literature reveals that, when compared
to conventional time series techniques, the improved artificial intelligent approaches provide
better prediction accuracies. However, the accuracy of predictions using intelligent approaches
like neural networks are strongly influenced by the correct selection of inputs and the number of
neuro-forecasters used for prediction. This research shows how a cluster analysis performed to
group similar day types, could contribute towards selecting a better set of neuro-forecasters in
neural networks. Daily total electricity demands for five years were considered for the analysis
and each date was assigned to one of the thirteen day-types, in a Sri Lankan context. As a
stochastic trend could be seen over the years, prior to performing the k-means clustering, the
trend was removed by taking the first difference of the series. Three different clusters were
found using Silhouette plots, and thus three neuro-forecasters were used for predictions. This
paper illustrates the proposed modified neural network procedure using electricity demand
data.
KEYWORDS
Clustering, Silhouette plots, Improve performance
1. INTRODUCTION
Predicting the future electricity demand is an essential task for a country, as a huge amount of
money could be saved by utilizing the available electricity generation options. In this scenario,
increasing the accuracy of short-term predictions is very crucial, as decisions regarding the
required load, has to be taken within a short period of time. Literature regarding short-term load
forecasting consists of both conventional time series models and artificial intelligent approaches
from different fields mostly in the field of engineering. To develop a dynamic forecasting system,
intelligent approaches yields better results than usual conventional time series techniques as they
could be adapted to suit novel conditions and handle more complex patterns in data. However, the
138 Computer Science & Information Technology (CS & IT)
accuracy of predictions using intelligent approaches like neural networks are strongly influenced
by the correct selection of inputs and the number of neuro-forecasters used for prediction. This
paper presents a cluster analysis, performed to group similar day types with respect to electricity
demand. Even though many external causes like metrological conditions such as temperature,
rainfall, humidity, wind speed and cloud cover, economic and demographic factors influence the
electricity demand, this paper has considered only a single input which is day type. The main
focus has been given to this input as this paper attempts to illustrate how data mining techniques
can be complimented by statistical techniques to make them more efficient.
A dataset consisting of daily total electricity demands in Sri Lanka was considered for the period
of 01st January 2008 to 31st December 2012. Each day was assigned to one of the predefined
thirteen categories, suitable to Sri Lanka.
2. LITERATURE REVIEW
Literature related to load forecasting reveal that higher prediction accuracies could be obtained
when using intelligent techniques when compared to using conventional statistical techniques
(Farahat & Talaat, 2012; Barzamini, Hajati, Gheisari, & Motamadinejad, 2012; Nagi, Yap, Tiong
& Ahmed, 2008). Many researchers point out the importance of using intelligent techniques in
situations where quick weather changes lead to fail accurate predictions. (Seetha & Saravanan,
2007; Senjyu, Takara, Uezato, & Funabashi, 2002; Barzamini et al., 2012). Some of those popular
intelligent techniques used in the literature are neural networks, fuzzy inference systems, genetic
algorithms and expert systems.
Many researches had used the effect of different day types to enhance the load predictions
considering their own country’s situations. The literature reveals that, Soared and Medeiros
(2008) had incorporated the maximum number of day types to their model, as Sunday - Saturday,
holiday, working day after holiday, working day before holiday, working day between a holiday
and weekend, Saturday after a holiday, working only during the mornings, working only during
the afternoons and Special holidays. Another research considers seven days of the week and bank
holidays as day types, and a principal component analysis had been performed accordingly and a
segmentation scheme based on the first principal direction had been used to cluster similar
months (Cho, Goude, Brossat, & Yao, 2013). Unlike these approaches, (Barzamini et al., 2012)
had divided the weekly days into four categories based on unique load lags and had incorporated
to the model. Considering the above, this research considers thirteen day types, which can be
considered as different in Sri Lankan context.
Even though thirteen day types are considered, including all these day types into the model will
complicate the prediction process. As such, the ‘day type’ will be clustered into similar day types
in order to avoid complexities in the computation operations and to reduce forecasting error when
training the neural networks (Barzamini et al., 2012; Seetha & Saravanan, 2007). They have
discussed how accurate predictions are made when the inputs are wisely chosen to be fed into the
neural network having different neuro-load forecasters to train similar featured loads. Literature
also shows that in some research, similar days had been clustered based on experience of the
experts of electricity supplying companies rather than performing any statistical analysis (Cho et
al., 2013). Moreover, to understand energy consumption patterns in industrial parks, a cascade
application of a Self-Organizing Map and a clustering k-means algorithm had been performed by
Hernandez, Baladron, Aguiar, Carro & Esguevillas (2012). Even though no study has considered
performing a cluster analysis, this study focuses on a statistical analysis based on k-means
clustering to complement the neural network approach.
Computer Science & Information Technology (CS & IT) 139
3. METHODOLOGY
3.1. Unit Root Test
Two common trend removal or de-trending procedures are first differencing and time-trend
regression. First differencing is appropriate for I(1) time series and time-trend regression is
appropriate for trend stationary
I(0) time series. Unit root tests can be used to determine if trending data should be first
differenced or regressed on deterministic functions of time to render the data stationary. In this
paper a stochastic trend could be seen in order to test for it Augmented Dickey Fuller test was
used.
The ADF test tests the null hypothesis that a time series Yt is I(1) against the alternative that it is
I(0), assuming that the dynamics in the data have an ARMA structure. The ADF test is based on
estimating the test regression
∑=
−− +∆++′=
p
j
tjtjttt YYDY
1
1 εψφβ
where Dt is a vector of deterministic terms (constant, trend etc.), p is the lagged difference terms,
∆Yt−j are used to approximate the ARMA structure of the errors, and the value of p is set so that
the error εt is serially uncorrelated.
When the null hypothesis of having a unit root cannot be rejected, the series can be made
stationary by taking the first difference. One should pay special attention not to take the first
difference to make a series trend stationary when there is a deterministic trend as it will introduce
a non-invertible moving average component.
3.2. K-Means clustering
K-means clustering is a partitioning method. It partitions data into k mutually exclusive clusters.
Unlike hierarchical clustering, k-means clustering operates on actual observations (rather than the
larger set of dissimilarity measures), and creates a single level of clusters. The distinctions mean
that k-means clustering is often more suitable than hierarchical clustering for large amounts of
data.
Each cluster in the partition is defined by its member objects and by its centroid, or center. The
centroid for each cluster is the point to which the sum of distances from all objects in that cluster
is minimized. kmeans computes cluster centroids differently for each distance measure, to
minimize the sum with respect to the measure that you specify.
Distance measure: In this paper, ‘kmeans’ function in Matlab software has been used with ‘city
block’ as the distance measure. Even though there are five distance measure options, only ‘city
block’ and 'sqEuclidean' were suited for the data, and the results for both the cases were almost
similar. Therefore, ‘sum of absolute differences’, that is the ‘city block’ distance measure was
considered.
Determining the number of clusters: To get an idea of how well-separated the resulting clusters
are silhouette plot can be used. The silhouette plot displays a measure of how close each point in
one cluster is to points in the neighboring clusters. This measure ranges from +1, indicating points
140 Computer Science & Information Technology (CS & IT)
that are very distant from neighboring clusters, through 0, indicating points that are not distinctly
in one cluster or another, to -1, indicating points that are probably assigned to the wrong cluster.
Avoiding Local Minima: Like many other types of numerical minimizations, the solution that
kmeans reaches often depends on the starting points. It is possible for kmeans to reach a local
minimum, where reassigning any one point to a new cluster would increase the total sum of point-
to-centroid distances, but where a better solution does exist. However using 'replicates' one can
overcome that problem by taking the one with the lowest total sum of distances, over all
replicates as the final answer. (The MathWorks)
4. ANALYSIS AND INTERPRETATION
4.1. Trend Removal Process
Figure 1 displays fluctuations of daily total electricity demand from January 2008 to December
2012. A stochastic trend could be seen over the years.
Figure 1. Daily total electricity demand over the years
Figure 1 shows that the electricity demand gradually rises during this period. This was confirmed
by the Augmented Dickey-Fuller Unit Root test. When the test was performed using the original
series without any additional variables, the null hypothesis of having a unit root was not rejected
suggesting that the original series is not stationary. However, when a trend and an intercept terms
was included into the model, the null hypothesis of having a unit root was strongly rejected and
both the trend and intercept coefficients were significant in the model. When applying the test for
the first difference series, the null hypothesis of having a unit root was rejected even without the
trend and the intercept term. Therefore, it can be concluded that there is a trend in the series and
the trend can be removed using the first difference as a difference stationary process.
Computer Science & Information Technology (CS & IT) 141
4.2. Clustering Similar Day Types
After taking the first difference of the time series, the trend was removed and then the days were
categorized based on the first difference of the daily total electricity demand. The trend has been
removed prior to clustering, as days in the latter years tend to cluster into separate clusters where
the demand is comparatively higher than the former years.
In the dataset, each day had been assigned into one of the thirteen categories; Sunday, Monday,
Tuesday, Wednesday, Thursday, Friday, Saturday, Poyaday, PBM Holiday (Public, Bank,
Mercantile), PB Holiday (Public, Bank), Working day before holiday, Working day after holiday,
Working day between a holiday and a weekend, Saturday after holiday.
In order to select the most appropriate number of clusters, silhouette plots were used based on the
results of the k-means algorithm. Three clusters could be found as the most appropriate number of
clusters, which resulted the maximum average Silhouette Value of 0.709384. (Figure 2). In order
to avoid the iterations to end up at local minimas, each clustering procedure was replicated 5
times and considered the one with the lowest total sum of distances.
Figure 2. Silhouette Plots to determine the correct number of clusters
Based on results of the cluster analysis, the thirteen day types could be categorized into three
clusters (Table 1). Figure 3 displays how the data points are scattered across three layers. A very
high percentage of Tuesdays (97.2%), Wednesdays (95.3%), Thursdays (95.8%), Fridays (96.7%)
and days before holidays (92.1%) were clustered into the first cluster. A 98.2% of the Mondays
were classified into the second cluster. Finally, a high percentage of Saturdays (91.1%), Sundays
(91.4%), Poyadays (88.7%) and PBM holidays (74.4%) were clustered into the third cluster.
However, PB holidays and Saturday after holidays seemed not prominent in any of these three
clusters.
Average Silhouette Value for 4 clusters is 0.574328
Average Silhouette Value for 3 clusters is 0.709384Average Silhouette Value for 2 clusters is 0.548570
Average Silhouette Value for 5 clusters is 0.542845
142 Computer Science & Information Technology (CS & IT)
Table 1. Distribution of day types across the three identified clusters
Clusters based on the first
difference series
1 2 3
Row N % Row N % Row N %
Day Type
Monday 1.8 98.2 0.0
Tuesday 97.2 1.9 0.9
Wednesday 95.3 0.5 4.3
Thursday 95.8 0.5 3.8
Friday 96.7 0.0 3.3
Saturday 8.0 0.9 91.1
Sunday 8.6 0.0 91.4
Poyaday 11.3 0.0 88.7
PBM Holiday 25.6 0.0 74.4
PB Holiday 39.1 17.4 43.5
Working day before a holiday 92.1 1.6 6.3
Working day after a holiday 22.2 77.8 0.0
Working day between a holiday and
weekend
26.9 73.1 0.0
Saturday after holiday 58.8 11.8 29.4
Figure 3. Spreading of different day types across the three clusters
Working day after a holiday ( Cluster 1- 22.2%, Cluster 2 – 77.8%, Cluster 3 – 0.0%)
There were 15 ‘day after holiday’s classified into cluster 1 where normal Tues-Friday was
included. The rest of the days were similar to Mondays contributing 77.8% of the total ‘day after
holidays’ to cluster 2. It was interesting to find out that all these observations clustering into the
Computer Science & Information Technology (CS & IT) 143
first cluster were either ‘a day after a PB Holiday in a weekday’ or ‘a working day after a new
year day’. Therefore, a new category was created as ‘Workingday after a PB holiday in weekday
or ‘a working day after a new year day’.
Table 2. Distribution of ‘working day after a holiday’s after modification
Clusters based on the first
difference series
1 2 3
Row N
%
Row
N %
Row N
%
Day
Type
Working day after a holiday I:
(NOT PB Holidays)
0.0 100.0 0.0
Working day after a holiday II:
(Working day after PB holiday in weekday OR Day
after New Year)
100.0 0.0 0.0
Poya day ( Cluster 1- 11.3%, Cluster 2 – 0.0%, Cluster 3 – 88.7%)
It could be clearly seen that Poya days behaved like Saturdays and Sundays, except the 11.3%
clustered under cluster 1 which behaved as normal working days like Tuesdays, Wenesdays,
Thursdays and Fridays. From a detailed analysis of Poya days, it was found that, if a Poya day is
a Monday there is a tendency to cluster those days into cluster 1. On the other hand, if a poya day
is in May, it is the Wesak festival and if a poya day is in June, it is the Poson festival, which are
exceptional to any other poya day. Therefore, a new category was introduced as ‘Poyaday on
Monday except in May and June’
Table 3. Distribution of poya days after modification
Clusters based on the first difference series
1 2 3
Row N % Row N % Row N %
Day Type
Poyaday I :
Poyadays not in Mondays and
Monday Poyadays in May & June
1.8 0.0 98.2
Poyaday II:
Poya on Monday Except May &
June
100.0 0.0 0.0
PBM Holiday ( Cluster 1- 25.6%, Cluster 2 – 0.0%, Cluster 3 – 74.4%)
When considering PBM holidays, all days following Wesak Full Moon poyadays had been
classified to cluster I behaving differently than other PBM holidays. Therefore a new category
was introduced as ‘Day Following Wesak Full Moon Poyaday’.
144 Computer Science & Information Technology (CS & IT)
Table 4. Distribution of PBM holidays after modification
Clusters based on the first
difference series
1 2 3
Row N % Row N % Row N %
PBM Holiday (Except day following
Wesak)
14.7 0.0 85.3
Day following Wesak 100.0 0.0 0.0
Saturday after Holiday ( Cluster 1- 58.8%, Cluster 2 – 11.8%, Cluster 3 – 29.4%)
This day type did not have prominent clustering percentages like other day types. Main problem
was identified as the small number of data points. However, the percentages could be modified
when the Saturday after holidays were classified into two new categories as ‘Saturday after PB
Holiday’ and ‘Saturday after PB Holiday OR Poyaday’.
Table 5. Distribution of ‘Saturday after holiday’s after modification
Clusters based on the first difference
series
1 2 3
Row N % Row N % Row N %
Saturday after PB holiday 33.3 0.0 66.7
Saturday after PBM holiday OR
Poyaday
66.7 25.0 8.3
PB Holiday ( Cluster 1- 39.1%, Cluster 2 – 17.4%, Cluster 3 – 43.5%)
PB holidays could not be further categorized as there were a small number of observations for the
subcategories.
Newly identified day types and how they are distributed among the three clusters are presented in
Table 6.
5. CONCLUSION
From the K-means clustering algorithm, day types are categorized into three clusters. Therefore
three back propagated neuro-load forecasters are derived and used to train data of the three
clusters to achieve higher performances. When predicting electricity demand values, identifying
the appropriate day type based on table 6 and feeding it into the correct neuro-load forecaster is
shown to yield better results. If the considered time duration could be expanded, results can be
improved and will be more accurate as there will be more observations for the sub categories.
Further, instead of selecting the day type based on the extracted day types, one can automate the
classification of a new data point to one of the three predefined clusters in order to increase the
accuracy.
Computer Science & Information Technology (CS & IT) 145
Table 6. Distribution of new day types across the three identified clusters
Clusters based on the first
difference series
1 2 3
Row N % Row N
%
Row N %
Day
Type
Monday 1.8 98.2 0.0
Tuesday 97.2 1.9 0.9
Wednesday 95.3 0.5 4.3
Thursday 95.8 0.5 3.8
Friday 96.7 0.0 3.3
Saturday 8.0 0.9 91.1
Sunday 8.6 0.0 91.4
Poyaday I 1.8 0.0 98.2
Poyaday II 100.0 0.0 0.0
PBM Holiday (Except day
following Wesak)
14.7 0.0 85.3
PB Holiday 39.1 17.4 43.5
Working day before a holiday 92.1 1.6 6.3
Working day after a holiday I 0.0 100.0 0.0
Working day after a holiday II 100.0 0.0 0.0
Working day between a holiday
and weekend
26.9 73.1 0.0
Saturday after PB holiday 33.3 0.0 66.7
Saturday after PBM holiday OR
Poyaday
66.7 25.0 8.3
Day following Wesak poya day 100.0 0.0 0.0
6. ACKNOWLEDGEMENTS
I would like to thank my supervisors Dr. M.D.T. Attygalle, Dr. Liwan Liyanage Hansen and Ms.
A. Karunaratne for the invaluable guidance, advice and the support given to do my research. Also
I would like to thank the Vice Chancellor of University of Colombo, Dr. W.K. Hirimburegama,
the Dean of the faculty, Prof. K.R.R. Mahanama for allowing me attend this conference. At last
but not least to my loving husband, my little son, my father, my mother and my sister for their
invaluable help and patience during the period I do my research.
REFERENCES
[1] Barzamini, R., Hajati, F., Gheisari, S., & Motamadinejad, M. B. (2012). Short Term Load Forecasting
using Multi-layer Perception and Fuzzy Inference Syatems for Islamic Countries. Journal of Applied
Sciences , pp40-47.
[2] Farahat, M. A., & Talaat, M. (2012). Short-Term Load Forecasting Using Curve Fitting Prediction
Optimized by Genetic Algorithms. International Journal of Energy Engineering , pp23-28.
[3] Hernandez, L., Baladron, C., Aguiar, J. M., Carro, B., & Esguevillas, A. S. (2012). Classification and
Clustering of Electricity Demand Patterns in Industrial Parks. Energies , pp5215-5227.
[4] Nagi, J., Yap, K. S., Tiong, S. K., & Ahmed, S. K. (2008). Electrical Power Load Forecasting using
Hybrid Self-Organizing Maps and Support Vector Machines. International Power Engineering and
Optimization Conference, (pp. 51-56). Selangor.
146 Computer Science & Information Technology (CS & IT)
[5] Seetha, H., & Saravanan, R. (2007). Short Term Electricity Load Prediction Using Fuzzy BP . Journal
of Computing and Information Technology , pp267-282.
[6] Soares, L. J., & Medeiros, M. C. (2008). Modeling and Forecasting short-term electricity load: A
comparison of methods with an application to Brazilian data. International Journal of Forecasting ,
pp630-644.
[7] The MathWorks, I. Statistics Toolbox.
Authors
Ms. K.A.D. Deshani is a Lecturer (Probationary) in the Department of Statistics,
University of Colombo since March 2011. Before she was absorbed to the
permanent cadre, she has been working in the same department as an Assistant
Lecture, obtaining a B.Sc Special Degree in Statistics with Computer Science in
2008. She has a keen interest in developing computer systems to incorporate the
dynamic nature to statistical interpretations. Her research interests are in the areas
of Operational Research and Data Mining. Currently, she is a member of the
research team of the project titled “Developing an Economical Strategy for the
Future Electricity Generation Procedure in Sri Lanka”; which received the
University of Colombo research grants 2011 which is carried out in collaboration
with University of Western Sydney, Australia and Ceylon Electricity Board, Sri Lanka. In June 2012 she
registered for a M.Phil under the said grant. With her interest in research, she was a contributed speaker at
the International Statistics Conference on the publication titled “Analysis of Efficiency of a Multi-Queue
against a Single Queue with Many Servers: A Study on Advertisement Counter Queues at a Leading
Newspaper Company” and was published in the Proceedings of the International Statistics Conference
2011, Colombo Sri Lanka. In 2013 a research paper titled “A Study of the Dynamic Behaviour of Daily
Load Curve for Short Term Predictions” was published in the proceedings of the International Symposium
for Next Generation Infrastructure (ISNGI) Australia.
Dr Liwan Liyanage joined University of Western Sydney in the year 1989 with
university level teaching experience at University of Colombo, University of
Wollongong and King Saud University Riyadh, totalling 12 years. Qualifications:
B. Sc (First Class), Graduate Diploma in Applied Statistics, Masters Degree in
Theoretical Statistics and the Ph. D. in the area of Applied Probability gives her the
breadth of coverage across the statistics disciplines. At UWS she has been
instrumental in developing many degree programs in particular the integrated
degree B. Maths and IT using data mining as the integrating tool. Senior lecturer
(1995) and head of program of B. Maths & IT (1999). Her PhD was in random walk models, diffusion and
related applications namely queuing theory and game theory. Thus her initial research was in applied
probability, namely random walk models with difference equations, the master equation models with partial
differential equations, and queuing models. This leads to differential equations representing diffusion and
double diffusion. Her research, bridge the probabilistic models to the differential equation models of
diffusion. Her passion to integrate disciplines and research methods have led her to the current research
areas which include innovative work in “Operational Statistics” a new area developed in collaboration with
UC Berkeley; Optimisation Techniques and Data Mining. Application areas include bio security, public
health, climate change, electricity production and demand. From her 10 PhD/Masters students 8 had
completed the research successfully. She has established ongoing national and international linkages and
research collaborations and 30+ publications and a book chapter. Her paper on Operational Statistics was
the 2nd most downloaded paper in April 2006 from Science Direct’s TOP 25 articles.
Dr. Attygalle has been Head of the Department of Statistics from 2010 to present.
As a Senior Lecturer attached to the Department of Statistics from 2006 to present,
she has been routinely involved in Teaching, Research and many other
administrative roles such as being the Coordinator of the MSc in Applied Statistics,
BSc Special degree and Joint Special degree programmes conducted by the
Department of Statistics. She holds professional memberships of the Sri Lanka
Association for the Advancement of Science (SLASS) and the Institute of Applied
Statistics -Sri Lanka.
Computer Science & Information Technology (CS & IT) 147
Dr. Attygalle obtained her PhD in Statistics from the Lancaster University, UK, and a MSc in Statistics
from the Warwick University, UK, in 2006 and 1996 respectively. Prior to this she completed a Diploma in
Applied Statistics, from the University of Colombo in 1992. She obtained her first degree majoring in
Statistics, Applied Mathematics and Pure Mathematics also from the University of Colombo, graduating
with a first class in 1987. As professional qualifications she has obtained the Staff and Educational
Development Association (SEDA)-UK accreditation as a teacher in higher education in 2005 and the
Certificate in Teaching in Higher Education (CTHE) by the Staff Development Centre of the University of
Colombo also in 2005. Her key research areas are Statistical Modelling, Model Diagnostics, Data
Visualization and Sports Statistics. As a senior lecturer she has supervised many undergraduate and
postgraduate research projects. Currently she is so-supervising two MPhil/PhD research students. She had
been instrumental in developing industry links with many private and government organisations over the
years and thus has carried out many consultancy projects and other training programs through the
Department of Statistics. She had also won one of the University of Colombo research grants in 2011.
Mrs. A. Karunarathne is a former head of the Department of Statistics, and also had
served as the former head of Department of Statistics and Computer Science. She had
been in the service for more than 40 years and has been the key person to start the
Special Degrees in Statistics and also initiate the Internship program in the
Department. As a senior lecturer she is conducting lectures mainly in the field of
Operational Research and Stochastic Processes.
She obtained a Diploma di. Sp.(Operational Research) from University of Rome and
her first degree was B.Sc.(Mathematics) from the University of Colombo. She has contributed to the
continuous development and transmittance of statistical knowledge through many diverse avenues, a key
example of which is her involvement in the publication of a book on basics of statistics titled “Moolika
Sankayanaya” written for University entrants and A/L Science Students in Sept 1997. As a senior lecturer
she has supervised many undergraduate and postgraduate research projects.. Her key research areas are
Stochastic Processes, Simulation, Queuing Models and Performance Modelling of Communication
Networks.

Más contenido relacionado

La actualidad más candente

Optimized Parameter of Wavelet Neural Network (WNN) using INGA
Optimized Parameter of Wavelet Neural Network (WNN) using INGAOptimized Parameter of Wavelet Neural Network (WNN) using INGA
Optimized Parameter of Wavelet Neural Network (WNN) using INGArahulmonikasharma
 
Illustration of Medical Image Segmentation based on Clustering Algorithms
Illustration of Medical Image Segmentation based on Clustering AlgorithmsIllustration of Medical Image Segmentation based on Clustering Algorithms
Illustration of Medical Image Segmentation based on Clustering Algorithmsrahulmonikasharma
 
Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...
Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...
Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...IOSRjournaljce
 
Survey of K means Clustering and Hierarchical Clustering for Road Accident An...
Survey of K means Clustering and Hierarchical Clustering for Road Accident An...Survey of K means Clustering and Hierarchical Clustering for Road Accident An...
Survey of K means Clustering and Hierarchical Clustering for Road Accident An...IRJET Journal
 
RELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORY
RELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORYRELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORY
RELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORYpaperpublications3
 
TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...
TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...
TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...IJDKP
 
Analysis of Genetic Algorithm for Effective power Delivery and with Best Upsurge
Analysis of Genetic Algorithm for Effective power Delivery and with Best UpsurgeAnalysis of Genetic Algorithm for Effective power Delivery and with Best Upsurge
Analysis of Genetic Algorithm for Effective power Delivery and with Best Upsurgeijeei-iaes
 
IRJET- Error Reduction in Data Prediction using Least Square Regression Method
IRJET- Error Reduction in Data Prediction using Least Square Regression MethodIRJET- Error Reduction in Data Prediction using Least Square Regression Method
IRJET- Error Reduction in Data Prediction using Least Square Regression MethodIRJET Journal
 
Particle Swarm Optimization based K-Prototype Clustering Algorithm
Particle Swarm Optimization based K-Prototype Clustering Algorithm Particle Swarm Optimization based K-Prototype Clustering Algorithm
Particle Swarm Optimization based K-Prototype Clustering Algorithm iosrjce
 
Data Imputation by Soft Computing
Data Imputation by Soft ComputingData Imputation by Soft Computing
Data Imputation by Soft Computingijtsrd
 
10 9242 it geo-spatial information for managing ambiguity(edit ty)
10 9242 it  geo-spatial information for managing ambiguity(edit ty)10 9242 it  geo-spatial information for managing ambiguity(edit ty)
10 9242 it geo-spatial information for managing ambiguity(edit ty)IAESIJEECS
 
Application of Exponential Gamma Distribution in Modeling Queuing Data
Application of Exponential Gamma Distribution in Modeling Queuing DataApplication of Exponential Gamma Distribution in Modeling Queuing Data
Application of Exponential Gamma Distribution in Modeling Queuing Dataijtsrd
 
Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...
Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...
Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...sushantparte
 
Short-term load forecasting with using multiple linear regression
Short-term load forecasting with using multiple  linear regression Short-term load forecasting with using multiple  linear regression
Short-term load forecasting with using multiple linear regression IJECEIAES
 
Estimating project development effort using clustered regression approach
Estimating project development effort using clustered regression approachEstimating project development effort using clustered regression approach
Estimating project development effort using clustered regression approachcsandit
 
ESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACH
ESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACHESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACH
ESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACHcscpconf
 

La actualidad más candente (17)

Optimized Parameter of Wavelet Neural Network (WNN) using INGA
Optimized Parameter of Wavelet Neural Network (WNN) using INGAOptimized Parameter of Wavelet Neural Network (WNN) using INGA
Optimized Parameter of Wavelet Neural Network (WNN) using INGA
 
Illustration of Medical Image Segmentation based on Clustering Algorithms
Illustration of Medical Image Segmentation based on Clustering AlgorithmsIllustration of Medical Image Segmentation based on Clustering Algorithms
Illustration of Medical Image Segmentation based on Clustering Algorithms
 
Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...
Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...
Application of Hybrid Genetic Algorithm Using Artificial Neural Network in Da...
 
Survey of K means Clustering and Hierarchical Clustering for Road Accident An...
Survey of K means Clustering and Hierarchical Clustering for Road Accident An...Survey of K means Clustering and Hierarchical Clustering for Road Accident An...
Survey of K means Clustering and Hierarchical Clustering for Road Accident An...
 
RELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORY
RELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORYRELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORY
RELIABILITY BASED POWER DISTRIBUTION SYSTEMS PLANNING USING CREDIBILITY THEORY
 
TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...
TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...
TUPLE VALUE BASED MULTIPLICATIVE DATA PERTURBATION APPROACH TO PRESERVE PRIVA...
 
Analysis of Genetic Algorithm for Effective power Delivery and with Best Upsurge
Analysis of Genetic Algorithm for Effective power Delivery and with Best UpsurgeAnalysis of Genetic Algorithm for Effective power Delivery and with Best Upsurge
Analysis of Genetic Algorithm for Effective power Delivery and with Best Upsurge
 
IRJET- Error Reduction in Data Prediction using Least Square Regression Method
IRJET- Error Reduction in Data Prediction using Least Square Regression MethodIRJET- Error Reduction in Data Prediction using Least Square Regression Method
IRJET- Error Reduction in Data Prediction using Least Square Regression Method
 
50120130405009
5012013040500950120130405009
50120130405009
 
Particle Swarm Optimization based K-Prototype Clustering Algorithm
Particle Swarm Optimization based K-Prototype Clustering Algorithm Particle Swarm Optimization based K-Prototype Clustering Algorithm
Particle Swarm Optimization based K-Prototype Clustering Algorithm
 
Data Imputation by Soft Computing
Data Imputation by Soft ComputingData Imputation by Soft Computing
Data Imputation by Soft Computing
 
10 9242 it geo-spatial information for managing ambiguity(edit ty)
10 9242 it  geo-spatial information for managing ambiguity(edit ty)10 9242 it  geo-spatial information for managing ambiguity(edit ty)
10 9242 it geo-spatial information for managing ambiguity(edit ty)
 
Application of Exponential Gamma Distribution in Modeling Queuing Data
Application of Exponential Gamma Distribution in Modeling Queuing DataApplication of Exponential Gamma Distribution in Modeling Queuing Data
Application of Exponential Gamma Distribution in Modeling Queuing Data
 
Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...
Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...
Predicting of Hosting Animal Centre Outcome Based on Supervised Machine Learn...
 
Short-term load forecasting with using multiple linear regression
Short-term load forecasting with using multiple  linear regression Short-term load forecasting with using multiple  linear regression
Short-term load forecasting with using multiple linear regression
 
Estimating project development effort using clustered regression approach
Estimating project development effort using clustered regression approachEstimating project development effort using clustered regression approach
Estimating project development effort using clustered regression approach
 
ESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACH
ESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACHESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACH
ESTIMATING PROJECT DEVELOPMENT EFFORT USING CLUSTERED REGRESSION APPROACH
 

Destacado

ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...
ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...
ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...Augusto Pucci, PhD
 
Rapport projet UniceBot
Rapport projet UniceBotRapport projet UniceBot
Rapport projet UniceBottheoopparadigm
 
rapport de stage.
rapport de stage.rapport de stage.
rapport de stage.wajdi1985
 
Bio - Martin R. Tilson
Bio - Martin R. TilsonBio - Martin R. Tilson
Bio - Martin R. TilsonBakerDonelson
 
Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...
Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...
Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...IJMER
 
20 Ideas for your Website Homepage Content
20 Ideas for your Website Homepage Content20 Ideas for your Website Homepage Content
20 Ideas for your Website Homepage ContentBarry Feldman
 

Destacado (6)

ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...
ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...
ESANN2006 - A Cyclostationary Neural Network model for the prediction of the ...
 
Rapport projet UniceBot
Rapport projet UniceBotRapport projet UniceBot
Rapport projet UniceBot
 
rapport de stage.
rapport de stage.rapport de stage.
rapport de stage.
 
Bio - Martin R. Tilson
Bio - Martin R. TilsonBio - Martin R. Tilson
Bio - Martin R. Tilson
 
Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...
Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...
Anartificial Neural Network for Prediction of Seismic Behavior in RC Building...
 
20 Ideas for your Website Homepage Content
20 Ideas for your Website Homepage Content20 Ideas for your Website Homepage Content
20 Ideas for your Website Homepage Content
 

Similar a IMPROVED NEURAL NETWORK PREDICTION PERFORMANCES OF ELECTRICITY DEMAND: MODIFYING INPUTS THROUGH CLUSTERING

An exploratory analysis on half hourly electricity load patterns leading to h...
An exploratory analysis on half hourly electricity load patterns leading to h...An exploratory analysis on half hourly electricity load patterns leading to h...
An exploratory analysis on half hourly electricity load patterns leading to h...ijaia
 
Intelligent methods in load forecasting
Intelligent methods in load forecastingIntelligent methods in load forecasting
Intelligent methods in load forecastingprj_publication
 
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEYRAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEYcsandit
 
Forecasting of electric consumption in a semiconductor plant using time serie...
Forecasting of electric consumption in a semiconductor plant using time serie...Forecasting of electric consumption in a semiconductor plant using time serie...
Forecasting of electric consumption in a semiconductor plant using time serie...Alexander Decker
 
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEYRAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEYcscpconf
 
Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...
Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...
Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...IDES Editor
 
Survey on classification algorithms for data mining (comparison and evaluation)
Survey on classification algorithms for data mining (comparison and evaluation)Survey on classification algorithms for data mining (comparison and evaluation)
Survey on classification algorithms for data mining (comparison and evaluation)Alexander Decker
 
Data repository for sensor network a data mining approach
Data repository for sensor network  a data mining approachData repository for sensor network  a data mining approach
Data repository for sensor network a data mining approachijdms
 
Drsp dimension reduction for similarity matching and pruning of time series ...
Drsp  dimension reduction for similarity matching and pruning of time series ...Drsp  dimension reduction for similarity matching and pruning of time series ...
Drsp dimension reduction for similarity matching and pruning of time series ...IJDKP
 
IRJET - Intelligent Weather Forecasting using Machine Learning Techniques
IRJET -  	  Intelligent Weather Forecasting using Machine Learning TechniquesIRJET -  	  Intelligent Weather Forecasting using Machine Learning Techniques
IRJET - Intelligent Weather Forecasting using Machine Learning TechniquesIRJET Journal
 
Clustering big spatiotemporal interval data
Clustering big spatiotemporal interval dataClustering big spatiotemporal interval data
Clustering big spatiotemporal interval dataNexgen Technology
 
Mining Frequent Patterns and Associations from the Smart meters using Bayesia...
Mining Frequent Patterns and Associations from the Smart meters using Bayesia...Mining Frequent Patterns and Associations from the Smart meters using Bayesia...
Mining Frequent Patterns and Associations from the Smart meters using Bayesia...Eswar Publications
 
Short term residential load forecasting using long short-term memory recurre...
Short term residential load forecasting using long short-term  memory recurre...Short term residential load forecasting using long short-term  memory recurre...
Short term residential load forecasting using long short-term memory recurre...IJECEIAES
 
Optimal artificial neural network configurations for hourly solar irradiation...
Optimal artificial neural network configurations for hourly solar irradiation...Optimal artificial neural network configurations for hourly solar irradiation...
Optimal artificial neural network configurations for hourly solar irradiation...IJECEIAES
 
Multi-task learning using non-linear autoregressive models and recurrent neur...
Multi-task learning using non-linear autoregressive models and recurrent neur...Multi-task learning using non-linear autoregressive models and recurrent neur...
Multi-task learning using non-linear autoregressive models and recurrent neur...IJECEIAES
 
System for Prediction of Non Stationary Time Series based on the Wavelet Radi...
System for Prediction of Non Stationary Time Series based on the Wavelet Radi...System for Prediction of Non Stationary Time Series based on the Wavelet Radi...
System for Prediction of Non Stationary Time Series based on the Wavelet Radi...IJECEIAES
 
Human Activity Recognition System
Human Activity Recognition SystemHuman Activity Recognition System
Human Activity Recognition SystemIRJET Journal
 
Study Of Data Mining Algorithm For Cloud Computing
Study Of Data Mining Algorithm For Cloud ComputingStudy Of Data Mining Algorithm For Cloud Computing
Study Of Data Mining Algorithm For Cloud ComputingDawn Rodriguez
 
A framework for cloud cover prediction using machine learning with data imput...
A framework for cloud cover prediction using machine learning with data imput...A framework for cloud cover prediction using machine learning with data imput...
A framework for cloud cover prediction using machine learning with data imput...IJECEIAES
 

Similar a IMPROVED NEURAL NETWORK PREDICTION PERFORMANCES OF ELECTRICITY DEMAND: MODIFYING INPUTS THROUGH CLUSTERING (20)

An exploratory analysis on half hourly electricity load patterns leading to h...
An exploratory analysis on half hourly electricity load patterns leading to h...An exploratory analysis on half hourly electricity load patterns leading to h...
An exploratory analysis on half hourly electricity load patterns leading to h...
 
Intelligent methods in load forecasting
Intelligent methods in load forecastingIntelligent methods in load forecasting
Intelligent methods in load forecasting
 
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEYRAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
 
Forecasting of electric consumption in a semiconductor plant using time serie...
Forecasting of electric consumption in a semiconductor plant using time serie...Forecasting of electric consumption in a semiconductor plant using time serie...
Forecasting of electric consumption in a semiconductor plant using time serie...
 
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEYRAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
RAINFALL PREDICTION USING DATA MINING TECHNIQUES - A SURVEY
 
Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...
Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...
Data Accuracy Models under Spatio - Temporal Correlation with Adaptive Strate...
 
Survey on classification algorithms for data mining (comparison and evaluation)
Survey on classification algorithms for data mining (comparison and evaluation)Survey on classification algorithms for data mining (comparison and evaluation)
Survey on classification algorithms for data mining (comparison and evaluation)
 
Data repository for sensor network a data mining approach
Data repository for sensor network  a data mining approachData repository for sensor network  a data mining approach
Data repository for sensor network a data mining approach
 
Drsp dimension reduction for similarity matching and pruning of time series ...
Drsp  dimension reduction for similarity matching and pruning of time series ...Drsp  dimension reduction for similarity matching and pruning of time series ...
Drsp dimension reduction for similarity matching and pruning of time series ...
 
IRJET - Intelligent Weather Forecasting using Machine Learning Techniques
IRJET -  	  Intelligent Weather Forecasting using Machine Learning TechniquesIRJET -  	  Intelligent Weather Forecasting using Machine Learning Techniques
IRJET - Intelligent Weather Forecasting using Machine Learning Techniques
 
Clustering big spatiotemporal interval data
Clustering big spatiotemporal interval dataClustering big spatiotemporal interval data
Clustering big spatiotemporal interval data
 
Mining Frequent Patterns and Associations from the Smart meters using Bayesia...
Mining Frequent Patterns and Associations from the Smart meters using Bayesia...Mining Frequent Patterns and Associations from the Smart meters using Bayesia...
Mining Frequent Patterns and Associations from the Smart meters using Bayesia...
 
Thesis report
Thesis reportThesis report
Thesis report
 
Short term residential load forecasting using long short-term memory recurre...
Short term residential load forecasting using long short-term  memory recurre...Short term residential load forecasting using long short-term  memory recurre...
Short term residential load forecasting using long short-term memory recurre...
 
Optimal artificial neural network configurations for hourly solar irradiation...
Optimal artificial neural network configurations for hourly solar irradiation...Optimal artificial neural network configurations for hourly solar irradiation...
Optimal artificial neural network configurations for hourly solar irradiation...
 
Multi-task learning using non-linear autoregressive models and recurrent neur...
Multi-task learning using non-linear autoregressive models and recurrent neur...Multi-task learning using non-linear autoregressive models and recurrent neur...
Multi-task learning using non-linear autoregressive models and recurrent neur...
 
System for Prediction of Non Stationary Time Series based on the Wavelet Radi...
System for Prediction of Non Stationary Time Series based on the Wavelet Radi...System for Prediction of Non Stationary Time Series based on the Wavelet Radi...
System for Prediction of Non Stationary Time Series based on the Wavelet Radi...
 
Human Activity Recognition System
Human Activity Recognition SystemHuman Activity Recognition System
Human Activity Recognition System
 
Study Of Data Mining Algorithm For Cloud Computing
Study Of Data Mining Algorithm For Cloud ComputingStudy Of Data Mining Algorithm For Cloud Computing
Study Of Data Mining Algorithm For Cloud Computing
 
A framework for cloud cover prediction using machine learning with data imput...
A framework for cloud cover prediction using machine learning with data imput...A framework for cloud cover prediction using machine learning with data imput...
A framework for cloud cover prediction using machine learning with data imput...
 

Último

UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPathCommunity
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAshyamraj55
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Brian Pichman
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...Aggregage
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfDianaGray10
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaborationbruanjhuli
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfinfogdgmi
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IES VE
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxGDSC PJATK
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdfPedro Manuel
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsSeth Reyes
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1DianaGray10
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintMahmoud Rabie
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureEric D. Schabell
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Commit University
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxMatsuo Lab
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostMatt Ray
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfDaniel Santiago Silva Capera
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDELiveplex
 

Último (20)

UiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation DevelopersUiPath Community: AI for UiPath Automation Developers
UiPath Community: AI for UiPath Automation Developers
 
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPAAnypoint Code Builder , Google Pub sub connector and MuleSoft RPA
Anypoint Code Builder , Google Pub sub connector and MuleSoft RPA
 
Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )Building Your Own AI Instance (TBLC AI )
Building Your Own AI Instance (TBLC AI )
 
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
The Data Metaverse: Unpacking the Roles, Use Cases, and Tech Trends in Data a...
 
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdfUiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
UiPath Solutions Management Preview - Northern CA Chapter - March 22.pdf
 
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online CollaborationCOMPUTER 10: Lesson 7 - File Storage and Online Collaboration
COMPUTER 10: Lesson 7 - File Storage and Online Collaboration
 
Videogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdfVideogame localization & technology_ how to enhance the power of translation.pdf
Videogame localization & technology_ how to enhance the power of translation.pdf
 
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
IESVE Software for Florida Code Compliance Using ASHRAE 90.1-2019
 
Cybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptxCybersecurity Workshop #1.pptx
Cybersecurity Workshop #1.pptx
 
Nanopower In Semiconductor Industry.pdf
Nanopower  In Semiconductor Industry.pdfNanopower  In Semiconductor Industry.pdf
Nanopower In Semiconductor Industry.pdf
 
Computer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and HazardsComputer 10: Lesson 10 - Online Crimes and Hazards
Computer 10: Lesson 10 - Online Crimes and Hazards
 
Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1Secure your environment with UiPath and CyberArk technologies - Session 1
Secure your environment with UiPath and CyberArk technologies - Session 1
 
Empowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership BlueprintEmpowering Africa's Next Generation: The AI Leadership Blueprint
Empowering Africa's Next Generation: The AI Leadership Blueprint
 
OpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability AdventureOpenShift Commons Paris - Choose Your Own Observability Adventure
OpenShift Commons Paris - Choose Your Own Observability Adventure
 
Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)Crea il tuo assistente AI con lo Stregatto (open source python framework)
Crea il tuo assistente AI con lo Stregatto (open source python framework)
 
20230104 - machine vision
20230104 - machine vision20230104 - machine vision
20230104 - machine vision
 
Introduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptxIntroduction to Matsuo Laboratory (ENG).pptx
Introduction to Matsuo Laboratory (ENG).pptx
 
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCostKubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
KubeConEU24-Monitoring Kubernetes and Cloud Spend with OpenCost
 
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdfIaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
IaC & GitOps in a Nutshell - a FridayInANuthshell Episode.pdf
 
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDEADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
ADOPTING WEB 3 FOR YOUR BUSINESS: A STEP-BY-STEP GUIDE
 

IMPROVED NEURAL NETWORK PREDICTION PERFORMANCES OF ELECTRICITY DEMAND: MODIFYING INPUTS THROUGH CLUSTERING

  • 1. Dhinaharan Nagamalai et al. (Eds) : CSE, DBDM, CCNET, AIFL, SCOM, CICS, CSIP - 2014 pp. 137–147, 2014. © CS & IT-CSCP 2014 DOI : 10.5121/csit.2014.4412 IMPROVED NEURAL NETWORK PREDICTION PERFORMANCES OF ELECTRICITY DEMAND: MODIFYING INPUTS THROUGH CLUSTERING K.A.D. Deshani1 , Liwan Liyanage Hansen2 , M.D.T. Attygalle3 , A. Karunaratne4 1, 3, 4 Department of Statistics, University of Colombo, Colombo 03, Sri Lanka 2 School of Computing, Engineering and Mathematics, University of Western Sydney, Australia 1 deshani@stat.cmb.ac.lk, 3 dilhari@stat.cmb.ac.lk, 4 ak@stat.cmb.ac.lk l.liyanage@uws.edu.au ABSTRACT Accurate prediction of electricity demand can bring extensive benefits to any country as the forecast values help the relevant authorities to take decisions regarding electricity generation, transmission and distribution much appropriately. The literature reveals that, when compared to conventional time series techniques, the improved artificial intelligent approaches provide better prediction accuracies. However, the accuracy of predictions using intelligent approaches like neural networks are strongly influenced by the correct selection of inputs and the number of neuro-forecasters used for prediction. This research shows how a cluster analysis performed to group similar day types, could contribute towards selecting a better set of neuro-forecasters in neural networks. Daily total electricity demands for five years were considered for the analysis and each date was assigned to one of the thirteen day-types, in a Sri Lankan context. As a stochastic trend could be seen over the years, prior to performing the k-means clustering, the trend was removed by taking the first difference of the series. Three different clusters were found using Silhouette plots, and thus three neuro-forecasters were used for predictions. This paper illustrates the proposed modified neural network procedure using electricity demand data. KEYWORDS Clustering, Silhouette plots, Improve performance 1. INTRODUCTION Predicting the future electricity demand is an essential task for a country, as a huge amount of money could be saved by utilizing the available electricity generation options. In this scenario, increasing the accuracy of short-term predictions is very crucial, as decisions regarding the required load, has to be taken within a short period of time. Literature regarding short-term load forecasting consists of both conventional time series models and artificial intelligent approaches from different fields mostly in the field of engineering. To develop a dynamic forecasting system, intelligent approaches yields better results than usual conventional time series techniques as they could be adapted to suit novel conditions and handle more complex patterns in data. However, the
  • 2. 138 Computer Science & Information Technology (CS & IT) accuracy of predictions using intelligent approaches like neural networks are strongly influenced by the correct selection of inputs and the number of neuro-forecasters used for prediction. This paper presents a cluster analysis, performed to group similar day types with respect to electricity demand. Even though many external causes like metrological conditions such as temperature, rainfall, humidity, wind speed and cloud cover, economic and demographic factors influence the electricity demand, this paper has considered only a single input which is day type. The main focus has been given to this input as this paper attempts to illustrate how data mining techniques can be complimented by statistical techniques to make them more efficient. A dataset consisting of daily total electricity demands in Sri Lanka was considered for the period of 01st January 2008 to 31st December 2012. Each day was assigned to one of the predefined thirteen categories, suitable to Sri Lanka. 2. LITERATURE REVIEW Literature related to load forecasting reveal that higher prediction accuracies could be obtained when using intelligent techniques when compared to using conventional statistical techniques (Farahat & Talaat, 2012; Barzamini, Hajati, Gheisari, & Motamadinejad, 2012; Nagi, Yap, Tiong & Ahmed, 2008). Many researchers point out the importance of using intelligent techniques in situations where quick weather changes lead to fail accurate predictions. (Seetha & Saravanan, 2007; Senjyu, Takara, Uezato, & Funabashi, 2002; Barzamini et al., 2012). Some of those popular intelligent techniques used in the literature are neural networks, fuzzy inference systems, genetic algorithms and expert systems. Many researches had used the effect of different day types to enhance the load predictions considering their own country’s situations. The literature reveals that, Soared and Medeiros (2008) had incorporated the maximum number of day types to their model, as Sunday - Saturday, holiday, working day after holiday, working day before holiday, working day between a holiday and weekend, Saturday after a holiday, working only during the mornings, working only during the afternoons and Special holidays. Another research considers seven days of the week and bank holidays as day types, and a principal component analysis had been performed accordingly and a segmentation scheme based on the first principal direction had been used to cluster similar months (Cho, Goude, Brossat, & Yao, 2013). Unlike these approaches, (Barzamini et al., 2012) had divided the weekly days into four categories based on unique load lags and had incorporated to the model. Considering the above, this research considers thirteen day types, which can be considered as different in Sri Lankan context. Even though thirteen day types are considered, including all these day types into the model will complicate the prediction process. As such, the ‘day type’ will be clustered into similar day types in order to avoid complexities in the computation operations and to reduce forecasting error when training the neural networks (Barzamini et al., 2012; Seetha & Saravanan, 2007). They have discussed how accurate predictions are made when the inputs are wisely chosen to be fed into the neural network having different neuro-load forecasters to train similar featured loads. Literature also shows that in some research, similar days had been clustered based on experience of the experts of electricity supplying companies rather than performing any statistical analysis (Cho et al., 2013). Moreover, to understand energy consumption patterns in industrial parks, a cascade application of a Self-Organizing Map and a clustering k-means algorithm had been performed by Hernandez, Baladron, Aguiar, Carro & Esguevillas (2012). Even though no study has considered performing a cluster analysis, this study focuses on a statistical analysis based on k-means clustering to complement the neural network approach.
  • 3. Computer Science & Information Technology (CS & IT) 139 3. METHODOLOGY 3.1. Unit Root Test Two common trend removal or de-trending procedures are first differencing and time-trend regression. First differencing is appropriate for I(1) time series and time-trend regression is appropriate for trend stationary I(0) time series. Unit root tests can be used to determine if trending data should be first differenced or regressed on deterministic functions of time to render the data stationary. In this paper a stochastic trend could be seen in order to test for it Augmented Dickey Fuller test was used. The ADF test tests the null hypothesis that a time series Yt is I(1) against the alternative that it is I(0), assuming that the dynamics in the data have an ARMA structure. The ADF test is based on estimating the test regression ∑= −− +∆++′= p j tjtjttt YYDY 1 1 εψφβ where Dt is a vector of deterministic terms (constant, trend etc.), p is the lagged difference terms, ∆Yt−j are used to approximate the ARMA structure of the errors, and the value of p is set so that the error εt is serially uncorrelated. When the null hypothesis of having a unit root cannot be rejected, the series can be made stationary by taking the first difference. One should pay special attention not to take the first difference to make a series trend stationary when there is a deterministic trend as it will introduce a non-invertible moving average component. 3.2. K-Means clustering K-means clustering is a partitioning method. It partitions data into k mutually exclusive clusters. Unlike hierarchical clustering, k-means clustering operates on actual observations (rather than the larger set of dissimilarity measures), and creates a single level of clusters. The distinctions mean that k-means clustering is often more suitable than hierarchical clustering for large amounts of data. Each cluster in the partition is defined by its member objects and by its centroid, or center. The centroid for each cluster is the point to which the sum of distances from all objects in that cluster is minimized. kmeans computes cluster centroids differently for each distance measure, to minimize the sum with respect to the measure that you specify. Distance measure: In this paper, ‘kmeans’ function in Matlab software has been used with ‘city block’ as the distance measure. Even though there are five distance measure options, only ‘city block’ and 'sqEuclidean' were suited for the data, and the results for both the cases were almost similar. Therefore, ‘sum of absolute differences’, that is the ‘city block’ distance measure was considered. Determining the number of clusters: To get an idea of how well-separated the resulting clusters are silhouette plot can be used. The silhouette plot displays a measure of how close each point in one cluster is to points in the neighboring clusters. This measure ranges from +1, indicating points
  • 4. 140 Computer Science & Information Technology (CS & IT) that are very distant from neighboring clusters, through 0, indicating points that are not distinctly in one cluster or another, to -1, indicating points that are probably assigned to the wrong cluster. Avoiding Local Minima: Like many other types of numerical minimizations, the solution that kmeans reaches often depends on the starting points. It is possible for kmeans to reach a local minimum, where reassigning any one point to a new cluster would increase the total sum of point- to-centroid distances, but where a better solution does exist. However using 'replicates' one can overcome that problem by taking the one with the lowest total sum of distances, over all replicates as the final answer. (The MathWorks) 4. ANALYSIS AND INTERPRETATION 4.1. Trend Removal Process Figure 1 displays fluctuations of daily total electricity demand from January 2008 to December 2012. A stochastic trend could be seen over the years. Figure 1. Daily total electricity demand over the years Figure 1 shows that the electricity demand gradually rises during this period. This was confirmed by the Augmented Dickey-Fuller Unit Root test. When the test was performed using the original series without any additional variables, the null hypothesis of having a unit root was not rejected suggesting that the original series is not stationary. However, when a trend and an intercept terms was included into the model, the null hypothesis of having a unit root was strongly rejected and both the trend and intercept coefficients were significant in the model. When applying the test for the first difference series, the null hypothesis of having a unit root was rejected even without the trend and the intercept term. Therefore, it can be concluded that there is a trend in the series and the trend can be removed using the first difference as a difference stationary process.
  • 5. Computer Science & Information Technology (CS & IT) 141 4.2. Clustering Similar Day Types After taking the first difference of the time series, the trend was removed and then the days were categorized based on the first difference of the daily total electricity demand. The trend has been removed prior to clustering, as days in the latter years tend to cluster into separate clusters where the demand is comparatively higher than the former years. In the dataset, each day had been assigned into one of the thirteen categories; Sunday, Monday, Tuesday, Wednesday, Thursday, Friday, Saturday, Poyaday, PBM Holiday (Public, Bank, Mercantile), PB Holiday (Public, Bank), Working day before holiday, Working day after holiday, Working day between a holiday and a weekend, Saturday after holiday. In order to select the most appropriate number of clusters, silhouette plots were used based on the results of the k-means algorithm. Three clusters could be found as the most appropriate number of clusters, which resulted the maximum average Silhouette Value of 0.709384. (Figure 2). In order to avoid the iterations to end up at local minimas, each clustering procedure was replicated 5 times and considered the one with the lowest total sum of distances. Figure 2. Silhouette Plots to determine the correct number of clusters Based on results of the cluster analysis, the thirteen day types could be categorized into three clusters (Table 1). Figure 3 displays how the data points are scattered across three layers. A very high percentage of Tuesdays (97.2%), Wednesdays (95.3%), Thursdays (95.8%), Fridays (96.7%) and days before holidays (92.1%) were clustered into the first cluster. A 98.2% of the Mondays were classified into the second cluster. Finally, a high percentage of Saturdays (91.1%), Sundays (91.4%), Poyadays (88.7%) and PBM holidays (74.4%) were clustered into the third cluster. However, PB holidays and Saturday after holidays seemed not prominent in any of these three clusters. Average Silhouette Value for 4 clusters is 0.574328 Average Silhouette Value for 3 clusters is 0.709384Average Silhouette Value for 2 clusters is 0.548570 Average Silhouette Value for 5 clusters is 0.542845
  • 6. 142 Computer Science & Information Technology (CS & IT) Table 1. Distribution of day types across the three identified clusters Clusters based on the first difference series 1 2 3 Row N % Row N % Row N % Day Type Monday 1.8 98.2 0.0 Tuesday 97.2 1.9 0.9 Wednesday 95.3 0.5 4.3 Thursday 95.8 0.5 3.8 Friday 96.7 0.0 3.3 Saturday 8.0 0.9 91.1 Sunday 8.6 0.0 91.4 Poyaday 11.3 0.0 88.7 PBM Holiday 25.6 0.0 74.4 PB Holiday 39.1 17.4 43.5 Working day before a holiday 92.1 1.6 6.3 Working day after a holiday 22.2 77.8 0.0 Working day between a holiday and weekend 26.9 73.1 0.0 Saturday after holiday 58.8 11.8 29.4 Figure 3. Spreading of different day types across the three clusters Working day after a holiday ( Cluster 1- 22.2%, Cluster 2 – 77.8%, Cluster 3 – 0.0%) There were 15 ‘day after holiday’s classified into cluster 1 where normal Tues-Friday was included. The rest of the days were similar to Mondays contributing 77.8% of the total ‘day after holidays’ to cluster 2. It was interesting to find out that all these observations clustering into the
  • 7. Computer Science & Information Technology (CS & IT) 143 first cluster were either ‘a day after a PB Holiday in a weekday’ or ‘a working day after a new year day’. Therefore, a new category was created as ‘Workingday after a PB holiday in weekday or ‘a working day after a new year day’. Table 2. Distribution of ‘working day after a holiday’s after modification Clusters based on the first difference series 1 2 3 Row N % Row N % Row N % Day Type Working day after a holiday I: (NOT PB Holidays) 0.0 100.0 0.0 Working day after a holiday II: (Working day after PB holiday in weekday OR Day after New Year) 100.0 0.0 0.0 Poya day ( Cluster 1- 11.3%, Cluster 2 – 0.0%, Cluster 3 – 88.7%) It could be clearly seen that Poya days behaved like Saturdays and Sundays, except the 11.3% clustered under cluster 1 which behaved as normal working days like Tuesdays, Wenesdays, Thursdays and Fridays. From a detailed analysis of Poya days, it was found that, if a Poya day is a Monday there is a tendency to cluster those days into cluster 1. On the other hand, if a poya day is in May, it is the Wesak festival and if a poya day is in June, it is the Poson festival, which are exceptional to any other poya day. Therefore, a new category was introduced as ‘Poyaday on Monday except in May and June’ Table 3. Distribution of poya days after modification Clusters based on the first difference series 1 2 3 Row N % Row N % Row N % Day Type Poyaday I : Poyadays not in Mondays and Monday Poyadays in May & June 1.8 0.0 98.2 Poyaday II: Poya on Monday Except May & June 100.0 0.0 0.0 PBM Holiday ( Cluster 1- 25.6%, Cluster 2 – 0.0%, Cluster 3 – 74.4%) When considering PBM holidays, all days following Wesak Full Moon poyadays had been classified to cluster I behaving differently than other PBM holidays. Therefore a new category was introduced as ‘Day Following Wesak Full Moon Poyaday’.
  • 8. 144 Computer Science & Information Technology (CS & IT) Table 4. Distribution of PBM holidays after modification Clusters based on the first difference series 1 2 3 Row N % Row N % Row N % PBM Holiday (Except day following Wesak) 14.7 0.0 85.3 Day following Wesak 100.0 0.0 0.0 Saturday after Holiday ( Cluster 1- 58.8%, Cluster 2 – 11.8%, Cluster 3 – 29.4%) This day type did not have prominent clustering percentages like other day types. Main problem was identified as the small number of data points. However, the percentages could be modified when the Saturday after holidays were classified into two new categories as ‘Saturday after PB Holiday’ and ‘Saturday after PB Holiday OR Poyaday’. Table 5. Distribution of ‘Saturday after holiday’s after modification Clusters based on the first difference series 1 2 3 Row N % Row N % Row N % Saturday after PB holiday 33.3 0.0 66.7 Saturday after PBM holiday OR Poyaday 66.7 25.0 8.3 PB Holiday ( Cluster 1- 39.1%, Cluster 2 – 17.4%, Cluster 3 – 43.5%) PB holidays could not be further categorized as there were a small number of observations for the subcategories. Newly identified day types and how they are distributed among the three clusters are presented in Table 6. 5. CONCLUSION From the K-means clustering algorithm, day types are categorized into three clusters. Therefore three back propagated neuro-load forecasters are derived and used to train data of the three clusters to achieve higher performances. When predicting electricity demand values, identifying the appropriate day type based on table 6 and feeding it into the correct neuro-load forecaster is shown to yield better results. If the considered time duration could be expanded, results can be improved and will be more accurate as there will be more observations for the sub categories. Further, instead of selecting the day type based on the extracted day types, one can automate the classification of a new data point to one of the three predefined clusters in order to increase the accuracy.
  • 9. Computer Science & Information Technology (CS & IT) 145 Table 6. Distribution of new day types across the three identified clusters Clusters based on the first difference series 1 2 3 Row N % Row N % Row N % Day Type Monday 1.8 98.2 0.0 Tuesday 97.2 1.9 0.9 Wednesday 95.3 0.5 4.3 Thursday 95.8 0.5 3.8 Friday 96.7 0.0 3.3 Saturday 8.0 0.9 91.1 Sunday 8.6 0.0 91.4 Poyaday I 1.8 0.0 98.2 Poyaday II 100.0 0.0 0.0 PBM Holiday (Except day following Wesak) 14.7 0.0 85.3 PB Holiday 39.1 17.4 43.5 Working day before a holiday 92.1 1.6 6.3 Working day after a holiday I 0.0 100.0 0.0 Working day after a holiday II 100.0 0.0 0.0 Working day between a holiday and weekend 26.9 73.1 0.0 Saturday after PB holiday 33.3 0.0 66.7 Saturday after PBM holiday OR Poyaday 66.7 25.0 8.3 Day following Wesak poya day 100.0 0.0 0.0 6. ACKNOWLEDGEMENTS I would like to thank my supervisors Dr. M.D.T. Attygalle, Dr. Liwan Liyanage Hansen and Ms. A. Karunaratne for the invaluable guidance, advice and the support given to do my research. Also I would like to thank the Vice Chancellor of University of Colombo, Dr. W.K. Hirimburegama, the Dean of the faculty, Prof. K.R.R. Mahanama for allowing me attend this conference. At last but not least to my loving husband, my little son, my father, my mother and my sister for their invaluable help and patience during the period I do my research. REFERENCES [1] Barzamini, R., Hajati, F., Gheisari, S., & Motamadinejad, M. B. (2012). Short Term Load Forecasting using Multi-layer Perception and Fuzzy Inference Syatems for Islamic Countries. Journal of Applied Sciences , pp40-47. [2] Farahat, M. A., & Talaat, M. (2012). Short-Term Load Forecasting Using Curve Fitting Prediction Optimized by Genetic Algorithms. International Journal of Energy Engineering , pp23-28. [3] Hernandez, L., Baladron, C., Aguiar, J. M., Carro, B., & Esguevillas, A. S. (2012). Classification and Clustering of Electricity Demand Patterns in Industrial Parks. Energies , pp5215-5227. [4] Nagi, J., Yap, K. S., Tiong, S. K., & Ahmed, S. K. (2008). Electrical Power Load Forecasting using Hybrid Self-Organizing Maps and Support Vector Machines. International Power Engineering and Optimization Conference, (pp. 51-56). Selangor.
  • 10. 146 Computer Science & Information Technology (CS & IT) [5] Seetha, H., & Saravanan, R. (2007). Short Term Electricity Load Prediction Using Fuzzy BP . Journal of Computing and Information Technology , pp267-282. [6] Soares, L. J., & Medeiros, M. C. (2008). Modeling and Forecasting short-term electricity load: A comparison of methods with an application to Brazilian data. International Journal of Forecasting , pp630-644. [7] The MathWorks, I. Statistics Toolbox. Authors Ms. K.A.D. Deshani is a Lecturer (Probationary) in the Department of Statistics, University of Colombo since March 2011. Before she was absorbed to the permanent cadre, she has been working in the same department as an Assistant Lecture, obtaining a B.Sc Special Degree in Statistics with Computer Science in 2008. She has a keen interest in developing computer systems to incorporate the dynamic nature to statistical interpretations. Her research interests are in the areas of Operational Research and Data Mining. Currently, she is a member of the research team of the project titled “Developing an Economical Strategy for the Future Electricity Generation Procedure in Sri Lanka”; which received the University of Colombo research grants 2011 which is carried out in collaboration with University of Western Sydney, Australia and Ceylon Electricity Board, Sri Lanka. In June 2012 she registered for a M.Phil under the said grant. With her interest in research, she was a contributed speaker at the International Statistics Conference on the publication titled “Analysis of Efficiency of a Multi-Queue against a Single Queue with Many Servers: A Study on Advertisement Counter Queues at a Leading Newspaper Company” and was published in the Proceedings of the International Statistics Conference 2011, Colombo Sri Lanka. In 2013 a research paper titled “A Study of the Dynamic Behaviour of Daily Load Curve for Short Term Predictions” was published in the proceedings of the International Symposium for Next Generation Infrastructure (ISNGI) Australia. Dr Liwan Liyanage joined University of Western Sydney in the year 1989 with university level teaching experience at University of Colombo, University of Wollongong and King Saud University Riyadh, totalling 12 years. Qualifications: B. Sc (First Class), Graduate Diploma in Applied Statistics, Masters Degree in Theoretical Statistics and the Ph. D. in the area of Applied Probability gives her the breadth of coverage across the statistics disciplines. At UWS she has been instrumental in developing many degree programs in particular the integrated degree B. Maths and IT using data mining as the integrating tool. Senior lecturer (1995) and head of program of B. Maths & IT (1999). Her PhD was in random walk models, diffusion and related applications namely queuing theory and game theory. Thus her initial research was in applied probability, namely random walk models with difference equations, the master equation models with partial differential equations, and queuing models. This leads to differential equations representing diffusion and double diffusion. Her research, bridge the probabilistic models to the differential equation models of diffusion. Her passion to integrate disciplines and research methods have led her to the current research areas which include innovative work in “Operational Statistics” a new area developed in collaboration with UC Berkeley; Optimisation Techniques and Data Mining. Application areas include bio security, public health, climate change, electricity production and demand. From her 10 PhD/Masters students 8 had completed the research successfully. She has established ongoing national and international linkages and research collaborations and 30+ publications and a book chapter. Her paper on Operational Statistics was the 2nd most downloaded paper in April 2006 from Science Direct’s TOP 25 articles. Dr. Attygalle has been Head of the Department of Statistics from 2010 to present. As a Senior Lecturer attached to the Department of Statistics from 2006 to present, she has been routinely involved in Teaching, Research and many other administrative roles such as being the Coordinator of the MSc in Applied Statistics, BSc Special degree and Joint Special degree programmes conducted by the Department of Statistics. She holds professional memberships of the Sri Lanka Association for the Advancement of Science (SLASS) and the Institute of Applied Statistics -Sri Lanka.
  • 11. Computer Science & Information Technology (CS & IT) 147 Dr. Attygalle obtained her PhD in Statistics from the Lancaster University, UK, and a MSc in Statistics from the Warwick University, UK, in 2006 and 1996 respectively. Prior to this she completed a Diploma in Applied Statistics, from the University of Colombo in 1992. She obtained her first degree majoring in Statistics, Applied Mathematics and Pure Mathematics also from the University of Colombo, graduating with a first class in 1987. As professional qualifications she has obtained the Staff and Educational Development Association (SEDA)-UK accreditation as a teacher in higher education in 2005 and the Certificate in Teaching in Higher Education (CTHE) by the Staff Development Centre of the University of Colombo also in 2005. Her key research areas are Statistical Modelling, Model Diagnostics, Data Visualization and Sports Statistics. As a senior lecturer she has supervised many undergraduate and postgraduate research projects. Currently she is so-supervising two MPhil/PhD research students. She had been instrumental in developing industry links with many private and government organisations over the years and thus has carried out many consultancy projects and other training programs through the Department of Statistics. She had also won one of the University of Colombo research grants in 2011. Mrs. A. Karunarathne is a former head of the Department of Statistics, and also had served as the former head of Department of Statistics and Computer Science. She had been in the service for more than 40 years and has been the key person to start the Special Degrees in Statistics and also initiate the Internship program in the Department. As a senior lecturer she is conducting lectures mainly in the field of Operational Research and Stochastic Processes. She obtained a Diploma di. Sp.(Operational Research) from University of Rome and her first degree was B.Sc.(Mathematics) from the University of Colombo. She has contributed to the continuous development and transmittance of statistical knowledge through many diverse avenues, a key example of which is her involvement in the publication of a book on basics of statistics titled “Moolika Sankayanaya” written for University entrants and A/L Science Students in Sept 1997. As a senior lecturer she has supervised many undergraduate and postgraduate research projects.. Her key research areas are Stochastic Processes, Simulation, Queuing Models and Performance Modelling of Communication Networks.